CN106285019B - 一种局限空间下的天车安装方法 - Google Patents
一种局限空间下的天车安装方法 Download PDFInfo
- Publication number
- CN106285019B CN106285019B CN201610779447.2A CN201610779447A CN106285019B CN 106285019 B CN106285019 B CN 106285019B CN 201610779447 A CN201610779447 A CN 201610779447A CN 106285019 B CN106285019 B CN 106285019B
- Authority
- CN
- China
- Prior art keywords
- overhead traveling
- traveling crane
- crane
- jack
- jacks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
一种局限空间下的天车安装方法,属于局限区域空间内天车安装技术领域。在局限空间下通过吊车与倒链、倒链与倒链的衔接配合,使天车顺利安装就位。包括四步:二台小型吊车;二台倒链衔接,吊车回钩;二台倒链提升天车到最大高度;对称增加二台倒链,变成四台倒链配合提升,天车顺利就位。优点在于:通过吊车与倒链的配合及倒链与倒链的配合,避免了拆除屋面及大型吊车的安装,在施工安全、工期、质量上得到充足保障,而且大大降低了安装成本,为公司取得了良好的经济效益。
Description
技术领域
本发明属于局限区域空间内天车安装技术领域,特别是提供了一种局限空间下的天车安装方法。
背景技术
工业厂房天车安装一般情况下都是在厂房封闭前进行,但是有些特殊及意外情况使得天车不能满足厂房封闭前安装,我单位所施工的通钢棒材主厂房由于要满足设备安装,在天车到厂以前进行了封闭(防止雨淋进水),天车到厂后,按照常规施工经验,由于天车安装位置距离屋面很近,需要拆除局部彩板,然后再利用大型吊车进行吊装就位,此传统安装方式不但时间较长(拆除恢复彩板),而且成本较大(拆除的彩板不能再利用,需使用新的彩板,且大型吊车费用较高),我单位经过多年施工经验积累,以保证安全、缩短工期、降低成本为宗旨,探索总结出了一套新的局限空间下天车安装工艺,并在通钢棒材天车的安装中成功加以应用。
发明内容
本发明的目的在于提供一种局限空间下天车的安装方法,通过对天车安装区域空间综合考虑,采用小型吊车起吊及倒链配合的方式,避免了拆除屋面板及大型吊车的使用,降低了施工工期,节约了施工成本。
工业厂房天车安装一般情况下都是在厂房封闭前进行,但是有些特殊及意外情况使得天车不能满足厂房封闭前安装,我单位所施工的通钢棒材主厂房由于要满足设备安装,在天车到厂以前进行了封闭(防止雨淋进水),天车到厂后,按照常规施工经验,由于天车安装位置距离屋面很近,需要拆除局部彩板,然后再利用大型吊车进行吊装就位,此传统安装方式不但时间较长(拆除恢复彩板),而且成本较大(拆除的彩板不能再利用,需使用新的彩板,且大型吊车费用较高),我单位经过多年施工经验积累,以保证安全、缩短工期、降低成本为宗旨,探索总结出了一套新的局限空间下天车安装工艺,并在通钢棒材天车的安装中成功加以应用。在局限空间下通过吊车与倒链、倒链与倒链的衔接配合,使天车顺利安装就位。
本发明的天车安装流程:双机抬吊→二台倒链衔接→二台倒链提升→增设二台倒链→四台倒链提升天车→天车就位。具体步骤如下:
待安装天车运输至主厂房安装位置的正下方,使用两台20t汽车吊(核算满足要求),站位于天车两侧,两吊车吊点分别选在距离天车3米位置,具体吊装分四步进行:
第一步,两吊车同时起钩,并两端系牵引绳,以维系平衡,每台吊车同时起吊,当天车起升到天车梁位置下方时,两吊车同时转杆,以避开天车梁,之后继续起钩,受屋顶高度影响,吊车起杆受限,天车停止提升,此时的天车还未达到安装标高;(图1)
第二步,在天车两端部正上方的框架梁上各固定一5t倒链(两倒链固定梁水平间距3米),固定好后吊车回钩收车,之后两倒链同时提升天车,当天车超过安装标高位置时,倒链停止提升(图2);
第三步,在两倒链上的固定屋架梁上再对称固定两5t倒链,并与天车两端同一位置点进行固定,这时新增平行两倒链与天车斜向固定绷直,达到吃力程度(图3);
第四步,对与天车斜拉的两台倒链进行提升,同时同步回落另两台倒链,使天车慢慢转向,直至天车梁轨道正上方,此时四台倒链均与天车形成斜角,当天车轮正对天车梁轨道时,再将4台倒链同时缓慢回落,天车完全就位(图4)。
本发明的优点在于:通过吊车与倒链的配合及倒链与倒链的配合,避免了拆除屋面及大型吊车的安装,在施工安全、工期、质量上得到充足保障,而且大大降低了安装成本,为公司取得了良好的经济效益。
附图说明
图1为小型吊车抬吊天车提升图。
图2为两台倒链衔接提升天车图。
图3为四台倒链配合天车回落图。
图4为天车吊装就位图。
具体实施方式
图1-图4为本发明的一种具体实施方式。具体步骤如下:
待安装天车运输至主厂房安装位置的正下方,使用两台20t汽车吊(核算满足要求),站位于天车两侧,两吊车吊点分别选在距离天车3米位置,具体吊装分四步进行:
第一步,两吊车同时起钩,并两端系牵引绳,以维系平衡,每台吊车同时起吊,当天车起升到天车梁位置下方时,两吊车同时转杆,以避开天车梁,之后继续起钩,受屋顶高度影响,吊车起杆受限,天车停止提升,此时的天车还未达到安装标高;(图1)
第二步,在天车两端部正上方的框架梁上各固定一5t倒链(两倒链固定梁水平间距3米),固定好后吊车回钩收车,之后两倒链同时提升天车,当天车超过安装标高位置时,倒链停止提升(图2);
第三步,在两倒链上的固定屋架梁上再对称固定两5t倒链,并与天车两端同一位置点进行固定,这时新增平行两倒链与天车斜向固定绷直,达到吃力程度(图3);
第四步,对与天车斜拉的两台倒链进行提升,同时同步回落另两台倒链,使天车慢慢转向,直至天车梁轨道正上方,此时四台倒链均与天车形成斜角,当天车轮正对天车梁轨道时,再将4台倒链同时缓慢回落,天车完全就位(图4)。
Claims (1)
1.一种局限空间下的天车安装方法,其特征在于,在局限空间下通过吊车与倒链、倒链与倒链的衔接配合,使天车顺利安装就位:使用两台20t汽车吊,站位于天车两侧,两吊车吊点分别选在距离天车3米位置,具体吊装分四步进行:
第一步,两吊车同时起钩,并在天车两端系牵引绳,以维系平衡,每台吊车同时起吊,当天车起升到天车梁位置下方时,两吊车同时转杆,以避开天车梁,之后继续起钩,受屋顶高度影响,吊车起杆受限,天车停止提升,此时的天车还未达到安装标高;
第二步,在天车两端部正上方的框架梁上各固定一5t倒链,两倒链固定梁水平间距3米,固定好后吊车回钩收车,之后两倒链同时提升天车,当天车超过安装标高位置时,倒链停止提升;
第三步,在两倒链固定梁上再对称固定两5t倒链,并与天车两端同一位置点进行固定,这时新增平行两倒链与天车斜向固定绷直,达到吃力程度;
第四步,对与天车斜拉的两台倒链进行提升,同时同步回落另两台倒链,使天车转向,直至天车梁轨道正上方,此时四台倒链均与天车形成斜角,当天车轮正对天车梁轨道时,再将4台倒链同时回落,天车完全就位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610779447.2A CN106285019B (zh) | 2016-08-30 | 2016-08-30 | 一种局限空间下的天车安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610779447.2A CN106285019B (zh) | 2016-08-30 | 2016-08-30 | 一种局限空间下的天车安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106285019A CN106285019A (zh) | 2017-01-04 |
CN106285019B true CN106285019B (zh) | 2018-06-08 |
Family
ID=57672393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610779447.2A Active CN106285019B (zh) | 2016-08-30 | 2016-08-30 | 一种局限空间下的天车安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106285019B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110550558A (zh) * | 2018-05-31 | 2019-12-10 | 中国二十冶集团有限公司 | 用于屋面封闭时桥式起重机的装卸方法 |
CN110159057B (zh) * | 2019-05-24 | 2021-01-22 | 中国二十二冶集团有限公司 | 技改厂房烟筒安装施工方法 |
CN110700614A (zh) * | 2019-10-18 | 2020-01-17 | 上海通用建筑工程有限公司 | 一种狭窄条件下屋面支架梁的加装方法 |
CN114439254A (zh) * | 2021-12-30 | 2022-05-06 | 北京首钢建设集团有限公司 | 一种局限空间检修钢梁的安装方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1045373A (ja) * | 1996-08-02 | 1998-02-17 | Fujita Corp | 長尺資材の搬送方法とそれに使用する落下防止籠 |
JP2002302382A (ja) * | 2001-04-04 | 2002-10-18 | Kidoh Construction Co Ltd | 長尺物の鉛直吊り方法 |
CN102080451A (zh) * | 2009-11-27 | 2011-06-01 | 中冶天工建设有限公司 | 工业厂房网架的施工方法 |
CN103255917A (zh) * | 2013-05-23 | 2013-08-21 | 广州建筑股份有限公司 | 一种越过竖向障碍物的平面异位整体提升施工设备及其方法 |
CN204199721U (zh) * | 2014-09-17 | 2015-03-11 | 天津二十冶建设有限公司 | 一种用于厂房建筑施工中高空结构体的安装装置 |
-
2016
- 2016-08-30 CN CN201610779447.2A patent/CN106285019B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1045373A (ja) * | 1996-08-02 | 1998-02-17 | Fujita Corp | 長尺資材の搬送方法とそれに使用する落下防止籠 |
JP2002302382A (ja) * | 2001-04-04 | 2002-10-18 | Kidoh Construction Co Ltd | 長尺物の鉛直吊り方法 |
CN102080451A (zh) * | 2009-11-27 | 2011-06-01 | 中冶天工建设有限公司 | 工业厂房网架的施工方法 |
CN103255917A (zh) * | 2013-05-23 | 2013-08-21 | 广州建筑股份有限公司 | 一种越过竖向障碍物的平面异位整体提升施工设备及其方法 |
CN204199721U (zh) * | 2014-09-17 | 2015-03-11 | 天津二十冶建设有限公司 | 一种用于厂房建筑施工中高空结构体的安装装置 |
Also Published As
Publication number | Publication date |
---|---|
CN106285019A (zh) | 2017-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106285019B (zh) | 一种局限空间下的天车安装方法 | |
CN101514586B (zh) | 吊轨式电动吊船及其施工方法 | |
CN104060540B (zh) | 一种空间缆索悬索桥临时横撑及其吊装施工方法 | |
CN103911956B (zh) | 一种大跨度斜拉桥钢桁梁安装方法 | |
CN103882812B (zh) | 斜拉索桥中跨主梁的施工方法 | |
CN102251483B (zh) | 自提升附着式吊机吊装钢管混凝土格构桥墩的施工方法 | |
CN204185120U (zh) | 移动式设备就位小车 | |
CN105484502A (zh) | 一种工业厂房钢结构屋面檩条与支撑杆组合安装方法 | |
CN103899093A (zh) | 巨型框架钢桁架梁分步吊装施工工法 | |
CN103288002B (zh) | 简易组合门架高空重物吊装装置 | |
CN105019664A (zh) | 箱房式电气室的高空滑移安装法 | |
CN104153586B (zh) | 一种用悬索吊来安装檩条的施工方法 | |
CN109653484A (zh) | 一种屋面超高临空幕墙工程外挂吊篮安装结构 | |
CN103912128A (zh) | 高空连体钢桁架的施工方法 | |
CN107190990A (zh) | 一种局限空间下厂房钢柱安装方法 | |
CN103669882A (zh) | 工业厂房内利用钢丝绳做轨道进行构件安装的方法 | |
CN103147406A (zh) | 一种小曲线穿越山岭隧道箱梁运架一体机及其首末孔箱梁架设方法 | |
CN205637622U (zh) | 垂直单元式玻璃幕墙吊装系统 | |
CN104989111A (zh) | 钢结构高层吊装施工方法 | |
CN101264845A (zh) | 天车高空整体悬吊换位施工方法 | |
CN204982628U (zh) | 一种平拉索桥 | |
CN104032966A (zh) | 弧形双层网架分块吊装高空合拢安装方法 | |
CN105155427B (zh) | 悬索桥猫道铺设的施工方法 | |
CN105625732B (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
CN112942847A (zh) | 一种跨越底层障碍物在旧有幕墙外加装装饰板的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |