CN101264845A - 天车高空整体悬吊换位施工方法 - Google Patents
天车高空整体悬吊换位施工方法 Download PDFInfo
- Publication number
- CN101264845A CN101264845A CNA2008101059399A CN200810105939A CN101264845A CN 101264845 A CN101264845 A CN 101264845A CN A2008101059399 A CNA2008101059399 A CN A2008101059399A CN 200810105939 A CN200810105939 A CN 200810105939A CN 101264845 A CN101264845 A CN 101264845A
- Authority
- CN
- China
- Prior art keywords
- crane
- crown block
- transposition
- suspended
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 12
- 230000017105 transposition Effects 0.000 title claims abstract description 12
- 239000000725 suspension Substances 0.000 title claims abstract description 8
- 238000000034 method Methods 0.000 abstract description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Landscapes
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
本发明涉及一种天车高空整体悬吊换位施工方法,它是在厂房内利用厂房空间结构,将安装到天车轨道上的天车进行换位。采用以下步骤:①利用线层面上电葫芦(1)吊装悬吊天车(7)主梁一端,在屋架单轨梁(5)的另一端设置滑轮组(2)吊装悬吊天车(7)另一端,将悬吊天车(7)吊到两屋架间的空间;②将运行天车(11)从悬吊天车(7)下方通过,运行至设计位置;③电葫芦(1)和滑轮组(2)缓缓回落悬吊天车(7)到轨面上,完成吊车换位。这种施工方法改变了以往的先拆屋面,后用大吊车进行吊装的方法,达到省力省时省钱的目的。
Description
技术领域
本发明涉及一种天车安装方法,尤其适用于封闭厂房内新增加天车的天车高空整体悬吊换位施工方法。
背景技术
目前,对于封闭厂房内已经投入生产的天车之间新天车的安装,一般采用的是先拆除屋面,然后利用大型吊车将天车各部件逐个吊装就位后组装的施工方法。该方法影响原有天车运行、厂房拆除工作量大、利用大型吊车吊装费用高。
发明内容
为了解决在已封闭的厂房内新增天车时,由于厂房内空间限制,无法在厂房内用吊车直接安装天车和为了避免天车的安装对现有的生产造成影响的问题。本发明提供一种天车高空整体悬吊换位施工方法,不仅解决在不影响生产的前提下进行新增天车的安装的技术问题,而且避免了常规方法的繁琐工序和对生产造成影响,并节省了大型吊车的高额台班费。
本发明所采用的技术方案是,施工采用以下步骤:①利用线层面上电葫芦吊装悬吊天车主梁一端,在屋架单轨梁的另一端设置滑轮组吊装悬吊天车另一端,将悬吊天车吊到两屋架间的空间;②将运行天车从悬吊天车下方通过,运行至设计位置;③电葫芦和滑轮组缓缓回落悬吊天车到轨面上,完成吊车换位。
本发明的有益效果是:天车整体悬吊换位避免了繁琐的解体和组装过程,简化了施工工序,提高了工作效率;高空悬吊换位施工时间短,不影响一期天车的正常生产;避免使用大型吊车进行吊装,节省机械费用效益可观。
附图说明:
下面结合附图对本发明的具体实施方式作进一步说明。
图1为本发明具体实施方式的结构示意图。
图中1、电葫芦,2、滑轮组,3、垫木护铁,4、滑轮,5、单轨梁,6、屋架下弦,7、悬吊天车,8、司机室,9、托栏架,10、小车,11、运行天车,12、卷扬机。
具体实施方式
下面结合具体实施例来说明吊车换位的施工方法,施工方法采用以下步骤,如图1所示:
①利用线层面上电葫芦1吊装悬吊天车7主梁一端,在屋架单轨梁5的另一端设置滑轮组2吊装悬吊天车7另一端,将悬吊天车7吊到两屋架间的空间;
②将运行天车11从悬吊天车7下方通过,运行至设计位置;
③电葫芦1和滑轮组2缓缓回落悬吊天车7到轨面上。
④恢复已回落天车滑轮,查核天车工况,无异常可投入使用,至此吊车换位工作完毕达到设计布置要求。
虽然结合附图描述了本发明的实施方式,但是本领域的普通技术人员可以在所述权利要求的范围内作出各种变形或修改。
Claims (1)
1、一种天车高空整体悬吊换位施工方法,其特征在于,采用以下步骤:
①利用线层面上电葫芦(1)吊装悬吊天车(7)主梁一端,在屋架单轨梁(5)的另一端设置滑轮组(2)吊装悬吊天车(7)另一端,将悬吊天车(7)吊到两屋架间的空间;
②将运行天车(11)从悬吊天车(7)下方通过,运行至设计位置;
③电葫芦(1)和滑轮组(2)缓缓回落悬吊天车(7)到轨面上,完成吊车换位。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101059399A CN101264845A (zh) | 2008-05-06 | 2008-05-06 | 天车高空整体悬吊换位施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2008101059399A CN101264845A (zh) | 2008-05-06 | 2008-05-06 | 天车高空整体悬吊换位施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101264845A true CN101264845A (zh) | 2008-09-17 |
Family
ID=39987576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2008101059399A Pending CN101264845A (zh) | 2008-05-06 | 2008-05-06 | 天车高空整体悬吊换位施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101264845A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102556853A (zh) * | 2011-12-31 | 2012-07-11 | 攀钢集团工程技术有限公司 | 冶金吊车拆除方法 |
CN103121625A (zh) * | 2011-11-21 | 2013-05-29 | 攀钢集团攀枝花钢钒有限公司 | 一种高空拆卸大型部件的方法 |
CN103486330A (zh) * | 2013-10-02 | 2014-01-01 | 中国二十二冶集团有限公司 | 车间内部高空管道安装施工方法 |
CN106015729A (zh) * | 2016-06-08 | 2016-10-12 | 中国十七冶集团有限公司 | 一种厂房封闭下汽化烟道逆向就位的方法 |
CN106144929A (zh) * | 2016-06-28 | 2016-11-23 | 中国建筑第二工程局有限公司 | 一种群吊葫芦装置及施工方法 |
CN111704039A (zh) * | 2020-07-17 | 2020-09-25 | 江西速升智能装备有限公司 | 一种用于大型零部件在一层与二层厂房之间转换的洞口 |
-
2008
- 2008-05-06 CN CNA2008101059399A patent/CN101264845A/zh active Pending
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103121625A (zh) * | 2011-11-21 | 2013-05-29 | 攀钢集团攀枝花钢钒有限公司 | 一种高空拆卸大型部件的方法 |
CN103121625B (zh) * | 2011-11-21 | 2015-02-04 | 攀钢集团攀枝花钢钒有限公司 | 一种高空拆卸大型部件的方法 |
CN102556853A (zh) * | 2011-12-31 | 2012-07-11 | 攀钢集团工程技术有限公司 | 冶金吊车拆除方法 |
CN102556853B (zh) * | 2011-12-31 | 2014-03-19 | 攀钢集团工程技术有限公司 | 冶金吊车拆除方法 |
CN103486330A (zh) * | 2013-10-02 | 2014-01-01 | 中国二十二冶集团有限公司 | 车间内部高空管道安装施工方法 |
CN103486330B (zh) * | 2013-10-02 | 2015-11-11 | 中国二十二冶集团有限公司 | 车间内部高空管道安装施工方法 |
CN106015729A (zh) * | 2016-06-08 | 2016-10-12 | 中国十七冶集团有限公司 | 一种厂房封闭下汽化烟道逆向就位的方法 |
CN106015729B (zh) * | 2016-06-08 | 2018-03-06 | 中国十七冶集团有限公司 | 一种厂房封闭下汽化烟道逆向就位的方法 |
CN106144929A (zh) * | 2016-06-28 | 2016-11-23 | 中国建筑第二工程局有限公司 | 一种群吊葫芦装置及施工方法 |
CN111704039A (zh) * | 2020-07-17 | 2020-09-25 | 江西速升智能装备有限公司 | 一种用于大型零部件在一层与二层厂房之间转换的洞口 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100519396C (zh) | 扒杆综合拆卸塔式起重机方法 | |
CN101264845A (zh) | 天车高空整体悬吊换位施工方法 | |
CN104032967B (zh) | 预制装配式框架结构构件吊装施工方法 | |
CN110258352A (zh) | 两跨连做的钢混组合桥梁施工方法 | |
CN102877638A (zh) | 用于悬挂钢结构体系施工的操作平台及其操作方法 | |
CN102049335A (zh) | 大型球磨机安装施工方法 | |
CN110159057A (zh) | 技改厂房烟筒安装施工方法 | |
CN201317627Y (zh) | 双导梁架桥机 | |
CN101723252B (zh) | 400吨桥式起重机更换设备高空移动安装方法 | |
CN203393619U (zh) | 一种用于双幅桥梁间横系梁现浇施工的多功能施工平台 | |
CN103266572B (zh) | 一种用于双幅桥梁间横系梁现浇施工的多功能施工平台 | |
CN202465100U (zh) | 一种带双v型支腿的单梁龙门起重机 | |
CN106968371B (zh) | 一种幕墙结构高空飘翼分节结构的施工方法 | |
CN202465115U (zh) | 一种双主梁龙门起重机 | |
CN208517821U (zh) | 一种拆除箱梁贝雷片的简易起重装置 | |
CN202755321U (zh) | 一种斜拉桥砼箱梁加固用步履式梁底工作平台 | |
CN202265781U (zh) | 三角形桁架桥用折角吊篮 | |
CN202465098U (zh) | 一种带v型支腿的单梁龙门起重机 | |
CN202465106U (zh) | 一种大型造船门机 | |
CN205634685U (zh) | 缆索吊起重机 | |
CN107857193A (zh) | 一种插板式混凝土声屏障吸声板吊具装置 | |
CN204662932U (zh) | 高塔液压爬架用液压系统 | |
CN109694004A (zh) | 一种井塔桥起重机安装天轮平台及起重机安装方法 | |
CN202945004U (zh) | 用于安装大型设备的龙门起重机 | |
CN205500606U (zh) | 电磁挂梁起重机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20080917 |