CN106012830A - 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法 - Google Patents

一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法 Download PDF

Info

Publication number
CN106012830A
CN106012830A CN201610452455.6A CN201610452455A CN106012830A CN 106012830 A CN106012830 A CN 106012830A CN 201610452455 A CN201610452455 A CN 201610452455A CN 106012830 A CN106012830 A CN 106012830A
Authority
CN
China
Prior art keywords
pull rod
reinforcing pull
tunnel
rod assembly
tie rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610452455.6A
Other languages
English (en)
Other versions
CN106012830B (zh
Inventor
唐中波
徐国挺
伏冠西
张艳丽
李清培
田雪梅
黎飞
胡盼
张磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Original Assignee
SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN LUQIAO HUADONG BUILDING CO Ltd filed Critical SICHUAN LUQIAO HUADONG BUILDING CO Ltd
Priority to CN201610452455.6A priority Critical patent/CN106012830B/zh
Publication of CN106012830A publication Critical patent/CN106012830A/zh
Application granted granted Critical
Publication of CN106012830B publication Critical patent/CN106012830B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

本发明公开了一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法;其特征在于:包括以下步骤:(1)运输存放;(2)组装;(3)转运起吊;(4)转动;(5)平移下放;(6)转运;(7)再次旋转;(8)转换吊点。钢拉杆自身长度较长,通常在转运过程中比较难控制。尤其是在空间比较狭隘的隧道锚里,它的起吊和转动很难操作,且花费的人工和时间较长,对工期影响较大。通过本发明能有效快速的使钢拉杆运输至安装区域,在这过程中它的各环节施工效率得到了很大的提升,且利用隧道横洞缩短了运输至安装底部的距离,可增加其转运效率,节约成本。

Description

一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法
技术领域
本发明涉及土木工程领域,具体涉及一种实现在超长、大倾角隧道锚中利用隧道横洞横向快速转运钢拉杆的施工方法。
背景技术
目前,较多的悬索桥锚碇系统设计成隧道式锚碇,这种形式的锚碇其特点为空间狭长且具有一定的倾角。在隧道锚中实现材料的转运是相当麻烦的,而且功效较低,特别是对于像钢拉杆这种较长刚性材质。若从洞口处进行转运其过程是需要较多工序转换才能实施,费时且不安全。此发明主要针对钢拉杆及其他刚性材质的转运进行研究,并充分利用隧道横洞,具有效率高、安全性好等优点,大大节约了施工成本。
发明内容
本发明的目的在于在此提供一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法,采用电动葫芦及平车系统并利用隧道横洞转运钢拉杆;使钢拉杆转运过程中能有效且安全的实施,从而保证施工安全、提高功效、节约成本。
本发明是这样实现的,一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法,利用简易方便的装置实现较为复杂的转运,其特征在于:包括以下步骤:
步骤一:运输存放:平板车将钢拉杆运入隧道,通过电动葫芦提升运输系统将钢拉杆吊装存放于隧道指定位置。存放区设置条形基础防潮,以及木条隔层梁;
步骤二:组装:通过电动葫芦将钢拉杆自存放点移至钢拉杆穿管系统,组装钢拉杆及其附件;
步骤三:转运起吊:组装完成后再次利用电动葫芦提升运输系统将钢拉杆组件自穿管处,缓缓向横洞移动,同时转动钢拉杆组件让其能顺利进入横洞;
步骤四:转动:转动钢拉杆组件时,使其一端进入横洞,直至钢拉杆组件与横洞轴线一致后停止转动;
步骤五:平移下放:匀速移动电动葫芦,使钢拉杆组件完全进入横洞,然后将钢拉杆组件置于平板小车之上;
步骤六:转运:待钢拉杆组件在平车上放置平稳后,拉动平板车,缓缓移向隧道锚施工平台;
步骤七:再次旋转:在施工平台上将钢拉杆组件整体起吊至一定高度,然后旋转至与隧道锚洞同轴;
步骤八:转换吊点:将钢拉杆组件吊点转换到洞顶承重钢丝绳的小车上,随后即可进行钢拉杆组件的吊装运输。
本发明具有如下优点:
1、只需要两次转动就能让钢拉杆就位。
2、转运系统结构形式不复杂,易于安装和操作。
3、效率高,省时省工,且安全。
4、充分利用隧道横洞缩短了运输至安装底部的距离,可增加其转运效率,节约成本。
附图说明
图1是钢拉杆运输存放立面图
图2为钢拉杆起吊装置就位示意图
图3为钢拉杆起吊示意图
图4为钢拉杆转动及转运示意图
图5为钢拉杆转运至隧道锚示意图
图6为钢拉杆隧道锚起吊示意图
图7为钢拉杆隧道锚转动示意图。
具体实施方式
下面将结合附图1-7对本发明进行详细说明,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明提供一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法,使钢拉杆有效且安全的转运至指定位置,从而保证施工安全并节约成本。
下面结合附图进一步阐述本发明具体实施方式:
一种快速转运钢拉杆的方法,使钢拉杆有效且安全的转运至指定位置,从而保证施工安全并节约成本。
步骤一:运输存放:平板车将钢拉杆运入隧道,通过电动葫芦提升运输系统将钢拉杆吊装存放于隧道指定位置。存放区设置条形基础防潮,以及木条隔层梁,如图2所示;
步骤二:组装:通过电动葫芦将钢拉杆自存放点移至钢拉杆穿管系统,组装钢拉杆及其附件;
步骤三:转运起吊:组装完成后再次利用电动葫芦提升运输系统将钢拉杆组件自穿管处,缓缓向横洞移动,同时转动钢拉杆组件让其能顺利进入横洞,如图3所示;
步骤四:转动:转动钢拉杆组件时,使其一端进入横洞,直至钢拉杆组件与横洞轴线一致后停止转动,如图3所示;
步骤五:平移下放:匀速移动电动葫芦,使钢拉杆组件完全进入横洞,然后将钢拉杆组件置于平板小车之上,如图4所示;
步骤六:转运:待钢拉杆组件在平车上放置平稳后,拉动平板车,缓缓移向隧道锚施工平台,如图5所示;
步骤七:再次旋转:在施工平台上将钢拉杆组件整体起吊至一定高度,然后旋转至与隧道锚洞同轴,如图6和图7所示;
步骤八:转换吊点:将钢拉杆组件吊点转换到洞顶承重钢丝绳的小车上,随后即可进行钢拉杆组件的吊装运输。
本发明具有如下优点:
1、只需要两次转动就能让钢拉杆就位。
2、转运系统结构形式不复杂,易于安装和操作。
3、效率高,省时省工,且安全。
4、充分利用隧道横洞缩短了运输至安装底部的距离,可增加其转运效率,节约成本。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。

Claims (1)

1. 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法,其特征在于:包括以下步骤:
步骤一:运输存放:平板车将钢拉杆运入隧道,通过电动葫芦提升运输系统将钢拉杆吊装存放于隧道指定位置;
存放区设置条形基础防潮,以及木条隔层梁;
步骤二:组装:通过电动葫芦将钢拉杆自存放点移至钢拉杆穿管系统,组装钢拉杆及其附件;
步骤三:转运起吊:组装完成后再次利用电动葫芦提升运输系统将钢拉杆组件自穿管处,缓缓向横洞移动,同时转动钢拉杆组件让其能顺利进入横洞;
步骤四:转动:转动钢拉杆组件时,使其一端进入横洞,直至钢拉杆组件与横洞轴线一致后停止转动;
步骤五:平移下放:匀速移动电动葫芦,使钢拉杆组件完全进入横洞,然后将钢拉杆组件置于平板小车之上;
步骤六:转运:待钢拉杆组件在平车上放置平稳后,拉动平板车,缓缓移向隧道锚施工平台;
步骤七:再次旋转:在施工平台上将钢拉杆组件整体起吊至一定高度,然后旋转至与隧道锚洞同轴;
步骤八:转换吊点:将钢拉杆组件吊点转换到洞顶承重钢丝绳的小车上,随后即可进行钢拉杆组件的吊装运输。
CN201610452455.6A 2016-06-22 2016-06-22 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法 Active CN106012830B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610452455.6A CN106012830B (zh) 2016-06-22 2016-06-22 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610452455.6A CN106012830B (zh) 2016-06-22 2016-06-22 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法

Publications (2)

Publication Number Publication Date
CN106012830A true CN106012830A (zh) 2016-10-12
CN106012830B CN106012830B (zh) 2017-11-07

Family

ID=57087035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610452455.6A Active CN106012830B (zh) 2016-06-22 2016-06-22 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法

Country Status (1)

Country Link
CN (1) CN106012830B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886242A (zh) * 2019-12-31 2020-03-17 中铁大桥局集团有限公司 山区悬索桥隧道锚洞内复合索鞍安装方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1784667A1 (de) * 1967-09-22 1971-08-19 United States Steel Corp Verfahren und Vorrichtung zum Verankern von Haengebrueckenhauptseilen u.dgl.
DE3343352C1 (de) * 1983-11-30 1985-06-05 Max 8228 Freilassing Aicher Verbundkabel für Spannbetonbauwerke, vorzugsweise für Schrägkabelbrücken
CN102352601A (zh) * 2011-08-15 2012-02-15 四川省交通运输厅公路规划勘察设计研究院 隧道式复合锚碇
CN203603060U (zh) * 2013-11-25 2014-05-21 中铁第四勘察设计院集团有限公司 一种适用于软岩地区的隧道式锚碇
CN104328744A (zh) * 2014-11-27 2015-02-04 中铁四局集团有限公司 一种地锚式悬索桥锚碇钢拉杆锚固系统施工方法
CN104631320A (zh) * 2014-12-29 2015-05-20 大连理工大学 单洞双锚系统的隧道锚
CN105155413A (zh) * 2015-08-14 2015-12-16 山东大学 一种部分无粘结隧道式复合锚碇系统及方法
CN105648921A (zh) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 悬索桥岩体与钢筋混凝土板复合式锚碇及其施工方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1784667A1 (de) * 1967-09-22 1971-08-19 United States Steel Corp Verfahren und Vorrichtung zum Verankern von Haengebrueckenhauptseilen u.dgl.
DE3343352C1 (de) * 1983-11-30 1985-06-05 Max 8228 Freilassing Aicher Verbundkabel für Spannbetonbauwerke, vorzugsweise für Schrägkabelbrücken
CN102352601A (zh) * 2011-08-15 2012-02-15 四川省交通运输厅公路规划勘察设计研究院 隧道式复合锚碇
CN203603060U (zh) * 2013-11-25 2014-05-21 中铁第四勘察设计院集团有限公司 一种适用于软岩地区的隧道式锚碇
CN104328744A (zh) * 2014-11-27 2015-02-04 中铁四局集团有限公司 一种地锚式悬索桥锚碇钢拉杆锚固系统施工方法
CN104631320A (zh) * 2014-12-29 2015-05-20 大连理工大学 单洞双锚系统的隧道锚
CN105155413A (zh) * 2015-08-14 2015-12-16 山东大学 一种部分无粘结隧道式复合锚碇系统及方法
CN105648921A (zh) * 2016-02-18 2016-06-08 长江水利委员会长江科学院 悬索桥岩体与钢筋混凝土板复合式锚碇及其施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周舟: "矮寨特大悬索桥隧道锚碇体总体施工技术", 《现代商贸工业》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110886242A (zh) * 2019-12-31 2020-03-17 中铁大桥局集团有限公司 山区悬索桥隧道锚洞内复合索鞍安装方法
CN110886242B (zh) * 2019-12-31 2021-05-14 中铁大桥局集团有限公司 山区悬索桥隧道锚洞内复合索鞍安装方法

Also Published As

Publication number Publication date
CN106012830B (zh) 2017-11-07

Similar Documents

Publication Publication Date Title
CN203383148U (zh) 一种预制小箱梁跨内起梁装置
CN103572699A (zh) 一种新型公路架桥机
CN104060830A (zh) 一种地下核电站大件吊装运输方法
CN112342928A (zh) 一种山区超高主塔斜拉桥安装方法
CN203284084U (zh) 洞室顶部悬吊式运输装置
CN104016260B (zh) 小格漏斗滑移安装方法及滑移安装机构
CN208932821U (zh) 一种架梁施工用高低腿龙门吊
CN105421239B (zh) 大跨度公铁两用钢桁梁桥桥面板吊装方法
CN106012830A (zh) 一种超长隧道锚利用隧道横洞横向转运钢拉杆施工的方法
CN104047229A (zh) 一种在梁上预制t梁的方法
CN103964300B (zh) 顶升式加高设备
CN105448366A (zh) 一种核电站凝汽器的安装方法
CN102776840B (zh) 用于弯曲桥梁的桁架梁异位拼装就位方法
CN204999517U (zh) 电厂烟囱中输煤栈桥钢桁架吊装装置
CN104963521A (zh) 一种用于钢塔整体吊装旋转的系统及施工方法
CN205527496U (zh) 一种门型移动式装卸吊装装置
CN106192762A (zh) 钢箱梁施工栈桥运梁、梁体平面转体、悬臂拼装施工方法
CN107720652B (zh) 一种框架结构大型设备的吊装施工方法
CN100366832C (zh) 钢煤斗吊装就位的施工工艺
CN105540433A (zh) 一种倾斜安装位置超重设备吊装方法
JP2007321399A (ja) 線路上空構造物の構築方法及びその装置
CN204873680U (zh) 一种便携移动式建筑起吊机装置
CN210530883U (zh) 用于圆形带钢内衬隧道卧拼竖转结合的施工系统
CN104891371A (zh) 一种便携移动式建筑起吊机装置
CN104328920B (zh) 建筑材料输送方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant