- Publication number
- CN105947910B CN105947910B CN201610371395.5A CN201610371395A CN105947910B CN 105947910 B CN105947910 B CN 105947910B CN 201610371395 A CN201610371395 A CN 201610371395A CN 105947910 B CN105947910 B CN 105947910B
- Authority
- CN
- China
- Prior art keywords
- lifting rope
- superstructure
- lifting
- rope
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002965 rope Substances 0.000 claims abstract description 153
- 230000005484 gravity Effects 0.000 claims abstract description 11
- 230000015572 biosynthetic process Effects 0.000 claims description 5
- 238000005755 formation reaction Methods 0.000 claims description 5
- 230000001154 acute Effects 0.000 claims description 4
- 230000000630 rising Effects 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000003032 molecular docking Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/64—Jibs
- B66C23/68—Jibs foldable or otherwise adjustable in configuration
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/03—Cranes with arms or jibs; Multiple cranes
- B66C2700/0392—Movement of the crane arm; Coupling of the crane arm with the counterweights; Safety devices for the movement of the arm
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610371395.5A CN105947910B (zh) | 2016-05-27 | 2016-05-27 | Fpso克令吊上部结构的吊装工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610371395.5A CN105947910B (zh) | 2016-05-27 | 2016-05-27 | Fpso克令吊上部结构的吊装工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105947910A CN105947910A (zh) | 2016-09-21 |
CN105947910B true CN105947910B (zh) | 2017-10-10 |
Family
ID=56910925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610371395.5A Active CN105947910B (zh) | 2016-05-27 | 2016-05-27 | Fpso克令吊上部结构的吊装工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105947910B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107352450B (zh) * | 2017-08-17 | 2018-10-16 | 广州中船文冲船坞有限公司 | Fpso克令吊筒身及其建造安装方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105060093A (zh) * | 2015-07-03 | 2015-11-18 | 上海振华重工(集团)股份有限公司 | 岸边集装箱起重机前后大梁组件整体吊装方法 |
CN105108708A (zh) * | 2015-09-21 | 2015-12-02 | 上海振华重工集团(南通)有限公司 | 一种克令吊拆卸工艺 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2681066B2 (ja) * | 1987-08-04 | 1997-11-19 | 株式会社 加藤製作所 | クレーンにおける吊荷の振れ止め方法及び装置 |
-
2016
- 2016-05-27 CN CN201610371395.5A patent/CN105947910B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105060093A (zh) * | 2015-07-03 | 2015-11-18 | 上海振华重工(集团)股份有限公司 | 岸边集装箱起重机前后大梁组件整体吊装方法 |
CN105108708A (zh) * | 2015-09-21 | 2015-12-02 | 上海振华重工集团(南通)有限公司 | 一种克令吊拆卸工艺 |
Non-Patent Citations (1)
Title |
---|
大型克令吊关键制造及安装技术;王小彬等;《城市建设理论研究》;国资委商业网点建设中心;20141130;第4卷(第33期);文章第1-2页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105947910A (zh) | 2016-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109775565B (zh) | 一种大直径单桩单钩水下翻桩方法 | |
US20150217838A1 (en) | Method for lowering and hoisting of a load to or from an ocean floor | |
CN108163694A (zh) | 一种带舱口围的船体分段吊装方法 | |
CN107685835A (zh) | 一种风电钢管桩吊装运输工艺 | |
CN105947910B (zh) | Fpso克令吊上部结构的吊装工艺 | |
CN206088728U (zh) | 一种新型大型试车吊架 | |
CN103072899A (zh) | 超大型筒体分段吊装工艺 | |
CN101787687B (zh) | 一种海洋石油钻井平台橇块及其吊装工艺 | |
CN102530782A (zh) | 超大型构件液压同步提升吊装技术及设备 | |
CN206266077U (zh) | 吊具系统 | |
CN105398944B (zh) | 钢构构件三点式起吊安装装置 | |
CN205187698U (zh) | 一种卸船机吊运装置 | |
CN201686393U (zh) | 扒杆吊装工装 | |
CN105129622A (zh) | 一种分段吊装工艺方法 | |
CN105060093A (zh) | 岸边集装箱起重机前后大梁组件整体吊装方法 | |
CN206705563U (zh) | 一种新型桩式起重机 | |
CN204251194U (zh) | 一种新型吊装工具 | |
CN203532624U (zh) | 一种应用于垂直升降系统的配重平衡系统以及集装箱起重机、散货起重机 | |
CN103193152B (zh) | 链斗式卸船机的吊装装置及方法 | |
CN206580444U (zh) | 一种城建建筑预制构件吊装装置 | |
CN110329908A (zh) | 一种重吊船主吊联吊试验方法 | |
CN112777484A (zh) | 一种货架的吊装方法 | |
CN105752816B (zh) | 一种可提高大型龙门吊起升高度的增高吊梁及大型龙门吊 | |
CN201914830U (zh) | 塔吊分绳器 | |
CN205365984U (zh) | 一种船用多功能平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 511462 Nansha District, Guangzhou, No. sailing Road, No. 10, self made by the author of the 4 (office building), No. 1 Applicant after: The boat in Guangzhou Wenchong Dock Company Limited Address before: 511462 Nansha District, Guangzhou, No. sailing Road, No. 10, self made by the author of the 4 (office building), No. 1 Applicant before: The ship dengxi shipyard (Guangzhou) Co. Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191219 Address after: 511462 building 6, No. 2, No. 10, QIHANG Road, Nansha District, Guangzhou City, Guangdong Province (production management building and auxiliary building of electromechanical comprehensive workshop) (office only) Patentee after: Guangzhou Wenchong Shipbuilding Co., Ltd Address before: 511462 No. 10, sailing Road, Nansha District, Guangdong, China, No. 1, 4 (office building), written by myself, Guangzhou Patentee before: The boat in Guangzhou Wenchong Dock Company Limited |