CN105926929A - Straight wall concrete pouring construction method - Google Patents

Straight wall concrete pouring construction method Download PDF

Info

Publication number
CN105926929A
CN105926929A CN201610241206.2A CN201610241206A CN105926929A CN 105926929 A CN105926929 A CN 105926929A CN 201610241206 A CN201610241206 A CN 201610241206A CN 105926929 A CN105926929 A CN 105926929A
Authority
CN
China
Prior art keywords
template
back cord
stalk
mould bases
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610241206.2A
Other languages
Chinese (zh)
Other versions
CN105926929B (en
Inventor
隗志远
舒辞
胡顺鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201610241206.2A priority Critical patent/CN105926929B/en
Publication of CN105926929A publication Critical patent/CN105926929A/en
Application granted granted Critical
Publication of CN105926929B publication Critical patent/CN105926929B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/34Horizontally-travelling moulds for making walls blockwise or section-wise
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/14Bracing or strutting arrangements for formwalls; Devices for aligning forms

Abstract

The invention discloses a straight wall concrete pouring construction method. An integrated moveable framework used for construction is formed by a pair of unilateral integrated moveable frameworks, symmetrically arranged on two sides of a to-be-poured straight wall concrete wall. The method is characterized by providing the integrated moveable framework including a running system, a supporting adjusting system, and a template system. The unilateral integrated moveable framework uses the supporting adjusting system to integrally stand mould, and integrally moves by the running system. The integrated moveable framework is used for pouring straight wall concrete. The method can realize rapid mould standing, and greatly shortens construction time, reduces labor intensity of workers, eliminates potential safety hazard, and improves working efficiency.

Description

A kind of pouring construction method of stalk concrete
The application is Application No. 2014105456538, filing date on October 15th, 2014, and invention entitled stalk mixes Solidifying soil pours and moves integrally mould bases and application thereof, applies for the divisional application of artificial China Railway No.4 Bureau Group Co., Ltd.
Technical field
The present invention relates to the pouring construction method of stalk concrete in a kind of engineering construction.
Background technology
In prior art, the template pouring use of aimed wall concrete, generally use the little template assembly of sizing or bulk Template assembly, by reinforcing pull bar, needs erection construction scaffold simultaneously.One section concrete has poured, and tears template, scaffold open Carry out assembly after removing again and pour next section of stalk concrete, sometimes, use a large scale investment, increase concrete stalk segmentation The length poured.Template assembly and construction scaffolding erection construction cycle length, labor strength is big, potential safety hazard is many.
Summary of the invention
The present invention is for avoiding the weak point existing for above-mentioned prior art, it is provided that a kind of pouring of stalk concrete is executed Work method, it is achieved quickly aimed wall concreting formwork erection, shortens the engineering time, reduces labor strength, eliminate safety hidden Suffer from, improve work efficiency.
The present invention solves technical problem and adopts the following technical scheme that
Stalk concreting of the present invention moves integrally mould bases, is to be moved integrally mould bases at stalk to be poured by a pair one side The lateral symmetry of concrete wall is arranged, and is connected by pull bar is fixing, and it is structurally characterized in that described one side moves integrally mould bases Have:
Running gear, is with longitudinal traveling steel rail of pair of parallel setting as bottom support, at described longitudinal traveling steel rail On be equipped with road wheel, described road wheel can vertically move on longitudinal traveling steel rail, and lower support member is by described row Travelling wheel supports, and utilizes road wheel to vertically move on longitudinal traveling steel rail;
Support regulation system, be in described lower support member, to be fixedly installed support platform, in described support platform Side is in uprightly arranging outer back cord;The bottom of described outer back cord is set to movable pulley, and the support platform of correspondence position is provided with horizontal stroke To horizontal race, described movable pulley is equipped with in described transverse horizontal race, and can move in transverse horizontal race;? Described transverse horizontal race be provided above laterally adjustable screw mandrel, one end of described laterally adjustable screw mandrel is hinged on the described outer back of the body Stupefied bottom, the other end is arranged in support platform by support;Adjustable inclined supporting leg, institute are set in the outside of described support platform State the top of the top braces back cord outside of adjustable inclined supporting leg, prop up with the triangle of the paired described outer back cord of described adjustable inclined leg-shaped Support;It is connected with vertical even channel-section steel between back cord outside each road of longitudinally spaced setting;
Template system, is connected as integral mold plate by back cord in each road of longitudinally spaced setting by each piece of template, described To be connected in longitudinal two-way channel-section steel between interior back cord with outer back cord.
The construction features that stalk concreting of the present invention moves integrally mould bases lies also in: independent of described integral mold plate list Solely arranging bottom template, described bottom template refers to the height template less than the height of described movable pulley;And independent of described Interior back cord is separately provided back cord in bottom, and in described bottom, back cord is the interior back of the body for pull bar is fixed bottom template by bottom Stupefied, in described bottom, back cord can be affiliated in described support platform by the reinforcing bar peg being arranged on support platform inner side end Medial end.
The construction features that stalk concreting of the present invention moves integrally mould bases lies also in: independent of described integral mold plate list Solely arranging apical grafting template, described apical grafting template means above the template of described interior back cord height.
The construction features that stalk concreting of the present invention moves integrally mould bases lies also in: solid in the outside of described outer back cord Operating platform is set surely.
The feature utilizing stalk concreting of the present invention to move integrally the method that mould bases carries out stalk concrete construction is Construction as follows:
Step 1: first pour at stalk concrete wall position to be poured base course wall as guide wall, in institute State and guide the both sides of wall and be respectively provided with the lumps of wood as chock, arrange at the external side parallel of described chock described in move integrally in mould bases A pair longitudinal traveling steel rail, and move integrally described in making mould bases be in described in first the pouring of stalk concrete wall to be poured At fragment position;
Step 2: drawing high adjustable inclined supporting leg and make template in uprightly, regulation laterally adjusts screw mandrel and makes template in place, in symmetry Arrange moves integrally for a pair between mould bases, makes two side templates utilize by vertical even channel-section steel and is fixedly installed pull bar, completes formwork erection And carry out the pouring of stalk concrete wall of first section of pouring;
Step 3: when the stalk concrete wall of described first section of pouring completes initial set, removal is to pull bar, and regulation is laterally Adjust screw mandrel so that template retreats and leaves the stalk concrete wall poured;Shrink adjustable inclined supporting leg, drive template system Rotating around movable pulley, it is outward-dipping further away from pouring the concrete wall of molding for making template, moves integrally mould bases i.e. In removable state;
Step 4: the described mould bases that moves integrally is moved to next of stalk concrete wall along described longitudinal traveling steel rail Pour at fragment position;
Step 5: repetition step 2 is to step 4, until completing pouring of stalk concrete wall.
Compared with the prior art, the present invention has the beneficial effect that:
1, the present invention uses and moves integrally mould bases, and when carrying out stalk concreting, formwork erection speed is fast, shortens construction week Phase.
2, the present invention moves integrally mould bases and is moved along traveling rail by road wheel, mobile convenient, action required personnel are few.
3, this can realize form removal when form removal by the laterally adjustable screw mandrel of regulation and adjustable inclined supporting leg, simple to operate, behaviour Make that personnel are few, safe operation process is reliable.
4, operating platform of the present invention is directly attached on outer back cord, can greatly facilitate formwork reinforcement, concreting etc. to make Industry process.
Accompanying drawing explanation
Fig. 1 is that the present invention moves integrally mould bases formwork erection view;
Fig. 1 a and Fig. 1 b is the close-up schematic view on Fig. 1 diverse location;
Fig. 2 is that the present invention moves integrally mould bases mobile status schematic diagram;
Label in figure: 1 longitudinal traveling steel rail, 2 road wheels, 3 lower support member, 4 support platforms, 5 outer back cords, 6 movable pulleys, 7 transverse horizontal races, 8 laterally adjustable screw mandrels, 9 adjustable inclined supporting legs, 10 vertical even channel-section steels, back cord in 11, back cord in 11a bottom, 12 Template, 12a bottom template, 12b apical grafting template, 13 two-way channel-section steels, 14 operating platforms, 15 guiding walls, 16 chocks, 17 pairs of pull bars, 18 stalk concrete walls, 19 balancing weights, 20 reinforcing bar pegs.
Detailed description of the invention
Seeing Fig. 1, Fig. 1 a, Fig. 1 b and Fig. 2, in the present embodiment, it is by a pair that stalk concreting moves integrally mould bases One side moves integrally mould bases and arranges in the lateral symmetry of stalk concrete wall to be poured, and is connected by pull bar is fixing.
In the present embodiment, one side moves integrally mould bases and is set to:
Running gear is set, is with longitudinal traveling steel rail 1 of pair of parallel setting as bottom support, in described longitudinally walking Being equipped with road wheel 2 on rail 1, described road wheel 2 can vertically move on longitudinal traveling steel rail 1, and lower support member 3 is Supported by described road wheel 2, and utilize road wheel 2 to vertically move on longitudinal traveling steel rail 1;
Support regulation system is set, is to be fixedly installed support platform 4 in described lower support member 3, put down in described support The inner side of platform 4 is in uprightly arranging outer back cord 5;The bottom of described outer back cord 5 is set to movable pulley 6, the support platform 4 of correspondence position On be provided with transverse horizontal race 7, described movable pulley 6 is equipped with in described transverse horizontal race 7, and can be in transverse horizontal Race 7 moves;In the laterally adjustable screw mandrel 8 that is provided above of transverse horizontal race 7, one end of described laterally adjustable screw mandrel 8 Being hinged on the bottom of described outer back cord 5, the other end is arranged in support platform 4 by support;Outside in described support platform 4 Arranging adjustable inclined supporting leg 9, the top of the top braces of described adjustable inclined supporting leg 9 back cord 5 outside, with described adjustable inclined supporting leg 9 shape The gusseted of paired described outer back cord 5;It is connected with vertical even channel-section steel 10 between back cord 5 outside each road of longitudinally spaced setting Connect;
Template system is set, back cord 11 in each road of longitudinally spaced setting each piece of template 12 is connected as non-detachable mold Plate, to be connected in longitudinal two-way channel-section steel 13 between described interior back cord 11 and outer back cord 5.
In being embodied as, owing to support platform 4 has certain height, therefore can be independent independent of described integral mold plate Arranging bottom template 12a, described bottom template 12a refers to the height template less than the height of described movable pulley 6;And independent of Described interior back cord 11 is separately provided back cord 11a in bottom, and in described bottom, back cord 11a is for pull bar being fixed the end by bottom The interior back cord of layer template 12a, in described bottom, back cord 11a can be hung by the reinforcing bar being arranged on support platform 4 inner side end The medial end in described support platform 4 is affiliated to by bar 20, and together moves with support platform 4.
Construct for the ease of top, apical grafting template 12b, described apical grafting template can be separately provided independent of integral mold plate 12b means above the template of described interior back cord 11 height.
For the ease of construction, it is fixedly installed operating platform 14 in the outside of described outer back cord 5, flat in support shown in Fig. 1 Place balancing weight 19 on platform 4 and can ensure that the steadiness moving integrally mould bases.
Utilizing stalk concreting move integrally mould bases to carry out stalk concrete construction in the present embodiment is by following step Suddenly carry out:
Step 1: first pour at stalk concrete wall position to be poured base course wall as guide wall 15, The both sides of described guiding wall 15 are respectively provided with the lumps of wood as chock 16, and the external side parallel at described chock 16 arranges described overall move In dynamic model frame a pair longitudinal traveling steel rail, and move integrally described in making mould bases be in described in stalk concrete wall to be poured First pours at fragment position;
Step 2: drawing high adjustable inclined supporting leg 9 and make template 12 in uprightly, regulation laterally adjusts screw mandrel and makes template 12 in place, Move integrally between mould bases symmetrically arranged a pair, make two side templates 12 utilize by vertical even channel-section steel 10 and set pull bar 17 is fixing Put, complete formwork erection and carry out the pouring, as shown in Figure 1 of stalk concrete wall of first section of pouring;
Step 3: the stalk concrete wall in described first section of pouring completes initial set when reaching some strength, and removal is to drawing Bar 17, regulation laterally adjusts screw mandrel so that template 12 retreats and leaves the stalk concrete wall poured;Contraction adjustable inclined props up Lower limb 9, drives template system to rotate around movable pulley 6, makes template 12 in outward-dipping further away from the concrete pouring molding Body of wall, moves integrally mould bases i.e. in removable state;
Step 4: the described mould bases that moves integrally is moved to next of stalk concrete wall along described longitudinal traveling steel rail Pour at fragment position;
Step 5: repetition step 2 is to step 4, until completing pouring of stalk concrete wall 18.
For being separately provided back cord 11a in bottom template 12a and bottom, and it is separately provided the situation of apical grafting template 12b, During formwork erection, the template 12 overall by first propping up vertical bottom template 12a, then Zhi Licheng, finally prop up vertical apical grafting template 12b Order is constructed;During mould unloading first removal apical grafting template 12b, then return in overall template 12, at the bottom of last removal Layer template 12a, wherein apical grafting template 12b is placed separately, and bottom template 12a is affiliated in support platform 4 by reinforcing bar peg 20 Medial end, and together move with support platform 4, as shown in Figure 2.

Claims (4)

1. a pouring construction method for stalk concrete, is characterized in that:
Stalk concreting is set and moves integrally mould bases, be to be moved integrally mould bases at stalk concrete to be poured by a pair one side The lateral symmetry of body of wall is arranged, and is connected by pull bar is fixing, and described one side moves integrally mould bases to be had:
Running gear, be the longitudinal traveling steel rail (1) with pair of parallel setting as bottom support, at described longitudinal traveling steel rail (1) being equipped with road wheel (2) on, described road wheel (2) can vertically move on longitudinal traveling steel rail (1), lower support structure Part (3) is to be supported by described road wheel (2), and utilizes road wheel (2) to vertically move on longitudinal traveling steel rail (1);
Support regulation system, be in described lower support member (3), to be fixedly installed support platform (4), in described support platform (4) Inner side in uprightly arranging outer back cord (5);The bottom of described outer back cord (5) is set to movable pulley (6), and the support of correspondence position is put down Being provided with transverse horizontal race (7) on platform (4), described movable pulley (6) is equipped with in described transverse horizontal race (7), and Can move in transverse horizontal race (7);It is provided above laterally adjustable screw mandrel (8), institute described transverse horizontal race (7) The one end stating laterally adjustable screw mandrel (8) is hinged on the bottom of described outer back cord (5), and the other end is arranged on support platform by support (4) on;Arrange adjustable inclined supporting leg (9) in the outside of described support platform (4), the top braces of described adjustable inclined supporting leg (9) exists The top of outer back cord (5), forms the gusseted to described outer back cord (5) with described adjustable inclined supporting leg (9);Longitudinally spaced It is connected with vertical even channel-section steel (10) between back cord (5) outside each road arranged;
Template system, is connected as integral mold plate by back cord (11) in each road of longitudinally spaced setting by each piece of template (12), To be connected in longitudinal two-way channel-section steel (13) between described interior back cord (11) and outer back cord (5).
The pouring construction method of described stalk concrete is to carry out as follows:
Step 1: first pour at stalk concrete wall position to be poured base course wall as guide wall (15), in institute State and guide the both sides of wall (15) and be respectively provided with the lumps of wood and arrange described whole as chock (16), the external side parallel at described chock (16) In body mobile formwork a pair longitudinal traveling steel rail (1), and move integrally described in making mould bases be in described in stalk coagulation to be poured The first of cob wall body pours at fragment position;
Step 2: draw high adjustable inclined supporting leg (9) and make template (12) in uprightly, regulate laterally adjustable screw mandrel (8) and just make template (12) Position, moves integrally between mould bases at symmetrically arranged a pair, makes two side templates (12) utilize pull bar by vertical even channel-section steel (10) (17) it is fixedly installed, completes formwork erection and carry out the pouring of stalk concrete wall of first section of pouring;
Step 3: when the stalk concrete wall of described first section of pouring completes initial set, removal is to pull bar (17), and regulation is laterally Adjust screw mandrel so that template (12) retreats and leaves the stalk concrete wall poured;Shrink adjustable inclined supporting leg (9), drive Template (12) system rotates around movable pulley (6), makes template (12) in outward-dipping further away from the concrete pouring molding Body of wall, moves integrally mould bases i.e. in removable state;
Step 4: the described mould bases that moves integrally is moved to next of stalk concrete wall and pours along described longitudinal traveling steel rail At fragment position;
Step 5: repetition step 2 is to step 4, until completing pouring of stalk concrete wall (18).
The pouring construction method of stalk concrete the most according to claim 1, is characterized in that: water at described stalk concrete Building and move integrally in mould bases, be separately provided bottom template (12a) independent of described integral mold plate, described bottom template (12a) is Refer to the height template less than the height of described movable pulley (6);And carry on the back in being separately provided bottom independent of described interior back cord (11) Stupefied (11a), in described bottom, back cord (11a) is the interior back cord for pull bar is fixed bottom template by bottom, described bottom Interior back cord (11a) can be affiliated in described support platform (4) by the reinforcing bar peg being arranged on support platform (4) inner side end Medial end.
The pouring construction method of stalk concrete the most according to claim 1, is characterized in that: water at described stalk concrete Building and move integrally in mould bases, be separately provided apical grafting template (12b) independent of described integral mold plate, described apical grafting template (12b) is Refer to the template higher than described interior back cord (11) height.
The pouring construction method of stalk concrete the most according to claim 1, is characterized in that: water at described stalk concrete Build and move integrally in mould bases, be fixedly installed operating platform (14) in the outside of described outer back cord (5).
CN201610241206.2A 2014-10-15 2014-10-15 A kind of pouring construction method of stalk concrete Active CN105926929B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610241206.2A CN105926929B (en) 2014-10-15 2014-10-15 A kind of pouring construction method of stalk concrete

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410545653.8A CN104314305B (en) 2014-10-15 2014-10-15 Stalk concreting moves integrally mould bases and application thereof
CN201610241206.2A CN105926929B (en) 2014-10-15 2014-10-15 A kind of pouring construction method of stalk concrete

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410545653.8A Division CN104314305B (en) 2014-10-15 2014-10-15 Stalk concreting moves integrally mould bases and application thereof

Publications (2)

Publication Number Publication Date
CN105926929A true CN105926929A (en) 2016-09-07
CN105926929B CN105926929B (en) 2018-01-30

Family

ID=52369605

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610241206.2A Active CN105926929B (en) 2014-10-15 2014-10-15 A kind of pouring construction method of stalk concrete
CN201410545653.8A Active CN104314305B (en) 2014-10-15 2014-10-15 Stalk concreting moves integrally mould bases and application thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201410545653.8A Active CN104314305B (en) 2014-10-15 2014-10-15 Stalk concreting moves integrally mould bases and application thereof

Country Status (1)

Country Link
CN (2) CN105926929B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589767A (en) * 2018-07-05 2018-09-28 上海市机械施工集团有限公司 A kind of turnbuckle single side formwork erection tiltedly throws support arrangement and its construction method
CN108908663A (en) * 2018-07-26 2018-11-30 北京市燕通建筑构件有限公司 A kind of Novel interior wall plate formwork erection and its application method
CN111364516A (en) * 2020-04-17 2020-07-03 中国建筑土木建设有限公司 Supporting and dismantling walking system for pipeline gallery wallboard running water construction and construction method thereof

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895108B (en) * 2015-05-28 2017-03-08 杭州江润科技有限公司 Beret truss assembled movable type truss single side formwork system construction method
CN105113783B (en) * 2015-08-07 2018-09-11 武汉理工大学 A kind of construction formwork and its construction method of gypsum cast-in-situ wall
CN105799054A (en) * 2016-04-25 2016-07-27 中铁隧道集团二处有限公司 Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork
CN107142961B (en) * 2017-05-23 2023-01-03 中建五局土木工程有限公司 Concrete pouring integral movable formwork
CN107313589A (en) * 2017-08-04 2017-11-03 上海建工五建集团有限公司 Outer wall of basement one side steel form support system and its construction method
CN107575023A (en) * 2017-10-25 2018-01-12 中铁科建有限公司 A kind of sliding formwork component and apply its caisson cutting edge layer slding form operation method
CN111911198A (en) * 2020-08-14 2020-11-10 中交路桥建设有限公司 Rapid supporting structure for tunnel guide wall template and construction method
CA3139717A1 (en) * 2020-11-23 2022-05-23 Plumwall Bracing Systems Inc. Alignment device for concrete forms
CN112609964A (en) * 2020-12-17 2021-04-06 中国核工业第五建设有限公司 Movable formwork assembly and construction method of building formwork

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1070712A (en) * 1991-08-13 1993-04-07 安东尼奥·约翰·拉扎罗托 The building of annular walls
CN2654768Y (en) * 2003-11-14 2004-11-10 北京建工集团有限责任公司 Large mould plate demould movable support device
KR100643528B1 (en) * 2006-08-10 2006-11-10 (주)삼주엔지니어링 건축사사무소 Installation structure of temporary wall in assembly type for building
CN201228440Y (en) * 2008-07-07 2009-04-29 通州建总集团有限公司 Horizontal mobile device for big steel form plate system
CN201297030Y (en) * 2008-11-24 2009-08-26 中铁十六局集团有限公司 Movable template
CN202299399U (en) * 2011-10-20 2012-07-04 刘发清 Building template for pouring indoor wall
CN103397658A (en) * 2013-08-13 2013-11-20 宁波建工股份有限公司 Single-side support-formwork system backing on brick mixing retaining wall and construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2797508Y (en) * 2005-05-10 2006-07-19 魏炜 Guiding rolling sliding form
KR100537025B1 (en) * 2005-08-12 2005-12-16 (주)천일기술단 Movable cast can be used curve part of breast
CN2869202Y (en) * 2006-01-04 2007-02-14 中国建筑第八工程局第二建筑公司 External-hooping internal-arching sliding form device
CN202430992U (en) * 2012-01-20 2012-09-12 李法爱 Vertical cast-in-situ wallboard machine
CN204126257U (en) * 2014-10-15 2015-01-28 中铁四局集团有限公司 Stalk concreting moves integrally mould bases

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1070712A (en) * 1991-08-13 1993-04-07 安东尼奥·约翰·拉扎罗托 The building of annular walls
CN2654768Y (en) * 2003-11-14 2004-11-10 北京建工集团有限责任公司 Large mould plate demould movable support device
KR100643528B1 (en) * 2006-08-10 2006-11-10 (주)삼주엔지니어링 건축사사무소 Installation structure of temporary wall in assembly type for building
CN201228440Y (en) * 2008-07-07 2009-04-29 通州建总集团有限公司 Horizontal mobile device for big steel form plate system
CN201297030Y (en) * 2008-11-24 2009-08-26 中铁十六局集团有限公司 Movable template
CN202299399U (en) * 2011-10-20 2012-07-04 刘发清 Building template for pouring indoor wall
CN103397658A (en) * 2013-08-13 2013-11-20 宁波建工股份有限公司 Single-side support-formwork system backing on brick mixing retaining wall and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589767A (en) * 2018-07-05 2018-09-28 上海市机械施工集团有限公司 A kind of turnbuckle single side formwork erection tiltedly throws support arrangement and its construction method
CN108908663A (en) * 2018-07-26 2018-11-30 北京市燕通建筑构件有限公司 A kind of Novel interior wall plate formwork erection and its application method
CN111364516A (en) * 2020-04-17 2020-07-03 中国建筑土木建设有限公司 Supporting and dismantling walking system for pipeline gallery wallboard running water construction and construction method thereof

Also Published As

Publication number Publication date
CN104314305A (en) 2015-01-28
CN105926929B (en) 2018-01-30
CN104314305B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN105926929B (en) A kind of pouring construction method of stalk concrete
CN206538790U (en) Interior mould trolley is used in a kind of cast-in-place pipe gallery construction
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN103556578B (en) Straight-line section and side span closure section casting mold system for continuous beam and erection method for casting mold system
CN105155423A (en) Upward moving type movable formwork for continuous box girder construction
CN106089253A (en) A kind of all-hydraulic template system poured for culvert
CN113235472A (en) Concrete placement platform truck is contained to apron
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN202544854U (en) Lining trolley for subway station
CN205778918U (en) Loess tunnel excavation and just formwork build concrete construction combined type chassis
CN205100119U (en) Steel form device in self -propelled
CN102605720B (en) Integrated construction equipment for binding and lifting continuous beam steel reinforcement framework and construction method
CN204126257U (en) Stalk concreting moves integrally mould bases
CN104929660B (en) Formation and construction set for continuous open-cut tunnel
CN106150525A (en) A kind of rock anchorage beam construction trolley and construction method thereof
CN107013030A (en) Lift-on/lift-off type elevator hoistway construction platform device and the construction of lift well method
CN111042835A (en) Tunnel cable trench and ditch construction trolley and construction method thereof
CN214993219U (en) Concrete placement platform truck is contained to apron
CN214530530U (en) Gate chamber corridor removes strutting arrangement
CN201400997Y (en) Step alternate support platform device
CN202108241U (en) Movable hanging frame for assembling spherical storage tank
CN206111212U (en) Rock -anchored beam construction trolley car
CN211597706U (en) Single side wall formwork device
CN210948709U (en) Single side wall formwork trolley
CN212128879U (en) Movable formwork for bridge construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant