CN2869202Y - External-hooping internal-arching sliding form device - Google Patents

External-hooping internal-arching sliding form device Download PDF

Info

Publication number
CN2869202Y
CN2869202Y CN 200620079802 CN200620079802U CN2869202Y CN 2869202 Y CN2869202 Y CN 2869202Y CN 200620079802 CN200620079802 CN 200620079802 CN 200620079802 U CN200620079802 U CN 200620079802U CN 2869202 Y CN2869202 Y CN 2869202Y
Authority
CN
China
Prior art keywords
outer hoop
inner arch
arch
jack
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620079802
Other languages
Chinese (zh)
Inventor
高波
韦永斌
崔维军
戴耀军
刘雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN 200620079802 priority Critical patent/CN2869202Y/en
Application granted granted Critical
Publication of CN2869202Y publication Critical patent/CN2869202Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an outer hoop and inner arch slipform device, belonging to the slipform device for concrete building construction. The slipform body that is the whole passes through the inner part together with the inner arch truss structure and the outer hoop truss structure forms a stable template supporting system in a whole; the inner and outer templates are respectively connected with the inner arch and outer hoop on which an operating platform is arranged. The interior and exterior hung scaffolds are respectively arranged under the inner arch and outer hoop that are connected on the lifting scaffold that is connected with the jack and the jack is sheathed on the supporting bar. The utility model has the advantages of rational design, low cost, large loading weight and excellent stability. As the utility model applies the structure of inner arch and outer hoop to fasten the template and the inner arch has the outward tension and the outer hoop has the inward pressure, a stable template supporting system is formed under the joint action of the two forces. The intensity of the inner arch is improved by localizer. In addition, the utility model can utilize the hung scaffold to conduct post-treatment toward the molded concrete cylinder body when constructing the slipform.

Description

外箍内拱滑模装置Outer hoop inner arch sliding form device

技术领域technical field

本实用新型涉及一种建筑物施工用滑模装置,具体地说是一种外箍内拱滑模装置。The utility model relates to a sliding form device for building construction, in particular to an outer hoop and inner arch sliding form device.

背景技术Background technique

在圆筒形混凝土建筑物的施工中需要用到滑模装置,即在混凝土筒壁中设置一根支撑杆,支撑杆上套有千斤顶,千斤顶下方通过提升架连有模板,施工过程中向模板中间浇注混凝土,待混凝土达到所需强度后,千斤顶在支撑杆上向上滑动,带动模板向上滑动,然后再浇注混凝土,如此不断向上施工。但是目前的滑模装置普遍采用型钢制作,其自身质量大,载重量小,不稳定,它一般只能进行滑模施工用,功能单一,并且由于大直径圆形建筑在施工时模板容易产生变形,很难保证施工出来的混凝土筒体的圆度。In the construction of cylindrical concrete buildings, a sliding form device is required, that is, a support rod is set in the concrete wall, a jack is set on the support rod, and a formwork is connected to the formwork under the jack through a lifting frame. Concrete is poured in the middle. After the concrete reaches the required strength, the jack slides upwards on the support rod, driving the formwork to slide upwards, and then pours concrete, so that the construction continues upwards. However, the current sliding form device is generally made of section steel, which has a large mass, small load capacity, and instability. It can only be used for sliding form construction in general, and has a single function, and the formwork is prone to deformation during construction of large-diameter circular buildings. , it is difficult to ensure the roundness of the constructed concrete cylinder.

发明内容Contents of the invention

本实用新型要的解决的技术问题是提供一种质量小、载重量大、稳定性好,施工效果好,同时可以起吊钢梁的外箍内拱滑模装置。The technical problem to be solved by the utility model is to provide an outer hoop inner arch sliding form device with small mass, large load capacity, good stability, good construction effect and the ability to lift steel beams at the same time.

本实用新型解决其技术问题所采用的技术方案是:它由支承杆、千斤项、提升架、模板、内拱、内拱定位器、外箍、操作平台及吊脚手架构成,滑模体系整体通过内部的拱形桁架结构和外箍桁架结构,形成稳定的模板支撑体系;内外模板分别与内拱外箍联结,操作平台在内拱、外箍上,内外吊脚手架分别设置在内拱、外箍下,内拱外箍联接在提升架上,提升架联结千斤顶上,千斤顶套在支撑杆上。模板的侧压力传给内拱、外箍,内拱上连接有定位器,模板的重量及滑升阻力、操作平台及吊脚手架的荷载分别传给内拱、外箍,内拱、外箍的力传给提升架,提升架通过千斤顶爬升。The technical scheme adopted by the utility model to solve its technical problems is: it is composed of a support rod, a jack item, a lifting frame, a formwork, an inner arch, an inner arch positioner, an outer hoop, an operating platform and a hanging scaffold, and the sliding form system as a whole passes through The internal arched truss structure and outer hoop truss structure form a stable formwork support system; the inner and outer formworks are respectively connected with the inner arch and outer hoop, the operating platform is on the inner arch and outer hoop, and the inner and outer hanging scaffolds are respectively installed on the inner arch and outer hoop Next, the inner arch and the outer hoop are connected to the lifting frame, the lifting frame is connected to the jack, and the jack is sleeved on the support rod. The side pressure of the formwork is transmitted to the inner arch and outer hoop, and the inner arch is connected with a locator. The weight of the formwork and the sliding resistance, the load of the operating platform and the hanging scaffold are respectively transmitted to the inner arch, outer hoop, and the inner arch and outer hoop. The force is transmitted to the lifting frame, which climbs through the jack.

内拱桁架和外箍桁架分别由钢管相互搭接而成。The inner arch truss and the outer hoop truss are respectively formed by overlapping steel pipes.

本实用新型的外箍内拱滑模装置和现有技术相比,具有设计合理、成本低、载重量大、稳定性好等特点,它采用了内拱和外箍的结构来固定模板,由于内拱有向外的张力,而外箍有向内的压力,在两个力的共同作用下形成稳定的模板支撑体系,从而保证所施工出来的混凝土筒体达到很高的标准。内拱通过定位器提高强度。另外,它在滑模施工的同时可以利用吊脚手架对已经浇注好的混凝土筒体进行后期处理。Compared with the prior art, the outer hoop and inner arch sliding form device of the utility model has the characteristics of reasonable design, low cost, large load capacity and good stability. It adopts the structure of inner arch and outer hoop to fix the formwork, because The inner arch has outward tension, while the outer hoop has inward pressure. Under the joint action of the two forces, a stable formwork support system is formed, thereby ensuring that the constructed concrete cylinder reaches a high standard. Inner arches increase strength with locators. In addition, it can use the hanging scaffold to carry out post-processing on the poured concrete cylinder while the slip form is being constructed.

附图说明Description of drawings

下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.

附图1为本实用新型的外箍内拱滑模装置的俯视图;Accompanying drawing 1 is the top view of the outer hoop inner arch sliding form device of the present utility model;

附图2为附图1中A-A剖视图的放大图。Accompanying drawing 2 is the enlarged view of A-A sectional view in accompanying drawing 1.

图中:1.支撑杆,2.操作平台,3.提升架,4.千斤顶,5.模板,6.横梁,7.定位杆,8.护栏,9.安全网,10.外箍,11.混凝土筒体,12.内拱,13.吊脚手架,14.定位器。In the figure: 1. Support rod, 2. Operating platform, 3. Lifting frame, 4. Jack, 5. Template, 6. Beam, 7. Positioning rod, 8. Guardrail, 9. Safety net, 10. Outer hoop, 11 . Concrete cylinder, 12. Inner arch, 13. Hanging scaffold, 14. Locator.

具体实施方式Detailed ways

参照说明书附图对本实用新型的外箍内拱滑模装置作以下详细地说明。Referring to the accompanying drawings of the description, the outer hoop inner arch sliding form device of the present utility model will be described in detail below.

如附图所示,内拱12、外箍10设在混凝土筒体11的两侧,内拱12和外箍10分别由有多根钢管搭接而成,其上连接有模板5,内拱12、外箍10的上方分别设置有内、外操作平台2,下方分别设置有内、外吊脚手架13,内拱12、外箍10分别连接到提升架3上,提升架3通过横梁6连接到千斤顶4上,千斤顶4套在支撑杆1上。在内拱12的中心位置设有定位器14,定位器通过定位杆7与内拱12连接在一起,定位杆同时将相邻的两圈内拱连接在一起。操作平台悬空的一侧还设有护栏8和安全网9。由此,滑模体系整体通过内部的拱形桁架结构和外箍桁架结构,形成稳定的模板支撑体系。As shown in the drawings, the inner arch 12 and the outer hoop 10 are arranged on both sides of the concrete cylinder 11. The inner arch 12 and the outer hoop 10 are respectively formed by overlapping steel pipes, and a formwork 5 is connected to it. 12. The upper part of the outer hoop 10 is respectively provided with the inner and outer operating platforms 2, and the lower part is respectively provided with the inner and outer hanging scaffolds 13. The inner arch 12 and the outer hoop 10 are respectively connected to the lifting frame 3, and the lifting frame 3 is connected by the beam 6 On the jack 4, the jack 4 is sleeved on the support rod 1. A locator 14 is provided at the center of the inner arch 12, and the locator is connected with the inner arch 12 through a positioning rod 7, and the positioning rod simultaneously connects two adjacent inner arches together. A guardrail 8 and a safety net 9 are also provided on the suspended side of the operating platform. Thus, the sliding formwork system as a whole forms a stable formwork support system through the internal arched truss structure and the outer hoop truss structure.

使用时,向内、外模板5间浇注混凝土,待混凝土达到所需要的强度后,启动千斤顶4,千斤顶4在支撑杆1上向上滑动,横梁6带动提升架3向上运动,同时操作平台2、吊脚手架13、模板5也向上运动,当运动一定距离后停止,进行下个施工段。这时施工人员可站在吊脚手架13上进行检查混凝土出模强度、处理滑升过程中的质量缺陷、滑模后仓壁修整、清理出预留和预埋件、外壁原浆抹光等操作,大大提高了施工效率,缩短了工期。When in use, concrete is poured between the inner and outer templates 5. After the concrete reaches the required strength, the jack 4 is started, and the jack 4 slides upward on the support rod 1. The crossbeam 6 drives the lifting frame 3 to move upward. At the same time, the platform 2, Hanging scaffolding 13, formwork 5 also moves upwards, stops after moving certain distance, carries out next construction section. At this time, the construction personnel can stand on the hanging scaffold 13 to check the strength of the concrete mold release, deal with the quality defects during the sliding process, repair the warehouse wall after the sliding form, clean out the reserved and embedded parts, and wipe the original slurry on the outer wall, etc. , greatly improving the construction efficiency and shortening the construction period.

Claims (2)

1、外箍内拱滑模装置,包括支承杆、千斤顶、提升架、模板、内拱、内拱定位器、外箍、操作平台及吊脚手架,其特征是:滑模体系整体通过内部的拱形桁架结构和外箍桁架结构,形成稳定的模板支撑体系;内外模板分别与内拱外箍联结,操作平台在内拱、外箍上,内外吊脚手架分别设置在内拱、外箍下,内拱外箍联接在提升架上,提升架联结千斤顶上,千斤顶套在支撑杆上。模板的侧压力传给内拱、外箍,内拱上连接有定位器,模板的重量及滑升阻力、操作平台及吊脚手架的荷载分别传给内拱、外箍,内拱、外箍的力传给提升架,提升架通过千斤顶爬升。1. Outer hoop and inner arch sliding form device, including support rod, jack, lifting frame, formwork, inner arch, inner arch positioner, outer hoop, operating platform and hanging scaffold, characterized in that the sliding form system as a whole passes through the inner arch Shaped truss structure and outer hoop truss structure form a stable formwork support system; the inner and outer formworks are respectively connected with the inner arch and outer hoop, the operating platform is on the inner arch and outer hoop, and the inner and outer hanging scaffolds are respectively installed under the inner arch and outer hoop. The arch outer hoop is connected on the lifting frame, the lifting frame is connected on the jack, and the jack is sleeved on the support rod. The side pressure of the formwork is transmitted to the inner arch and outer hoop, and the inner arch is connected with a locator. The weight of the formwork and the sliding resistance, the load of the operating platform and the hanging scaffold are respectively transmitted to the inner arch, outer hoop, and the inner arch and outer hoop. The force is transmitted to the lifting frame, which climbs through the jack. 2、根据权利要求1所述的外箍内拱滑模装置,其特征在于所述的内拱桁架和外箍桁架分别由钢管相互搭接而成。2. The outer hoop inner arch sliding form device according to claim 1, characterized in that the inner arch truss and the outer hoop truss are respectively formed by overlapping steel pipes.
CN 200620079802 2006-01-04 2006-01-04 External-hooping internal-arching sliding form device Expired - Fee Related CN2869202Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620079802 CN2869202Y (en) 2006-01-04 2006-01-04 External-hooping internal-arching sliding form device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620079802 CN2869202Y (en) 2006-01-04 2006-01-04 External-hooping internal-arching sliding form device

Publications (1)

Publication Number Publication Date
CN2869202Y true CN2869202Y (en) 2007-02-14

Family

ID=37724136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620079802 Expired - Fee Related CN2869202Y (en) 2006-01-04 2006-01-04 External-hooping internal-arching sliding form device

Country Status (1)

Country Link
CN (1) CN2869202Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011483A (en) * 2010-11-19 2011-04-13 东北电业管理局烟塔工程公司 Cooling tower ring beam attached type support truss and construction method thereof
CN102561694A (en) * 2011-12-29 2012-07-11 山西四建集团有限公司 Construction method for support mould with large-curvature spherical concrete structure
CN104314305A (en) * 2014-10-15 2015-01-28 中铁四局集团有限公司 Integral mobile formwork for straight wall concrete pouring and its application
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN109914655A (en) * 2019-03-29 2019-06-21 卢龙腾 A kind of the floor wall construction method and wall molding die of building
CN113309291A (en) * 2021-06-07 2021-08-27 浙江高盛钢结构有限公司 Steel structure support column filled with concrete

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102011483A (en) * 2010-11-19 2011-04-13 东北电业管理局烟塔工程公司 Cooling tower ring beam attached type support truss and construction method thereof
CN102011483B (en) * 2010-11-19 2012-06-27 东北电业管理局烟塔工程公司 Cooling tower ring beam attached type support truss and construction method thereof
CN102561694A (en) * 2011-12-29 2012-07-11 山西四建集团有限公司 Construction method for support mould with large-curvature spherical concrete structure
CN102561694B (en) * 2011-12-29 2014-01-15 山西四建集团有限公司 Formwork Supporting Construction Method for Spherical Concrete Structure with Large Curvature
CN104314305A (en) * 2014-10-15 2015-01-28 中铁四局集团有限公司 Integral mobile formwork for straight wall concrete pouring and its application
CN108560992A (en) * 2018-03-14 2018-09-21 扬州中创模板有限公司 The construction equipment and concrete placings construction method of towering structure
CN108560992B (en) * 2018-03-14 2023-10-31 扬州市中润模板有限公司 Construction equipment for high-rise structure and concrete pouring construction method
CN109914655A (en) * 2019-03-29 2019-06-21 卢龙腾 A kind of the floor wall construction method and wall molding die of building
CN113309291A (en) * 2021-06-07 2021-08-27 浙江高盛钢结构有限公司 Steel structure support column filled with concrete
CN113309291B (en) * 2021-06-07 2022-03-29 浙江高盛钢结构有限公司 Steel structure support column filled with concrete

Similar Documents

Publication Publication Date Title
CN202023360U (en) Hydraulic climbing die plate for building construction
CN105201195B (en) One kind can lift supporting leg type elevator hoistway construction platform and construction method
CN105926929B (en) A kind of pouring construction method of straight wall concrete
CN2929056Y (en) Hydraulic driving automatic climbing formwork
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN206737388U (en) Lift-on/lift-off type elevator hoistway construction platform device
CN102900022A (en) Hydraulic climbing formwork construction method for leaning tower of cable-stayed bridge
CN205476401U (en) Elevator well type steel protection construction platform
CN209323962U (en) A dual power system steel platform formwork climbing system
CN103806654A (en) Hydraulic support system for elevator shaft mold and operating method thereof
CN111809528B (en) A pier column vertical cage platform channel construction method and cage platform channel device
CN108118620A (en) For the whole self-crawling type integrated platform and its construction method of bridge tower construction
CN102296808A (en) Template hoisting system for building
CN202850498U (en) Hydraulic support system used for elevator shaft mold
CN100365237C (en) A self-elevating deformable and detachable overall lifting steel platform system and construction method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN202064281U (en) Slip form frame
CN207727438U (en) A kind of big segment double-template system of self-crawling type for bridge tower construction
CN206784884U (en) Curved-surface building climbing device
CN112723094B (en) An integrated wall-attached device based on synchronous climbing of a light steel platform
CN204983692U (en) Concrete panel's hoist device
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN204386135U (en) Portable Hanging Basket
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN116145540B (en) A precast reinforced concrete cover slab and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA CONSTRUCTION SECOND BUILDING CO., LTD.

Free format text: FORMER NAME OR ADDRESS: NO.2 BUILDING CO., LTD., CHINA NO.8 BUILDING ENGINEERING BUREAU

CP03 Change of name, title or address

Address after: Ji'nan City, Shandong Province, Jiwei Road No. 91, zip code: 250022

Patentee after: The Second Construction Co., Ltd. of China Construction Eighth Engineering Divis

Address before: The central city of Ji'nan province Shandong City Jiwei Road No. 91, zip code: 250022

Patentee before: No.2 Construction Company of China Construction Eighth Engineering Division

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070214

Termination date: 20100204