CN202108241U - Movable hanging frame for assembling spherical storage tank - Google Patents

Movable hanging frame for assembling spherical storage tank Download PDF

Info

Publication number
CN202108241U
CN202108241U CN2011201896776U CN201120189677U CN202108241U CN 202108241 U CN202108241 U CN 202108241U CN 2011201896776 U CN2011201896776 U CN 2011201896776U CN 201120189677 U CN201120189677 U CN 201120189677U CN 202108241 U CN202108241 U CN 202108241U
Authority
CN
China
Prior art keywords
hanger
support body
crossbeam
storage tank
marking time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201896776U
Other languages
Chinese (zh)
Inventor
夏吉龙
汪钢
宋焕波
贾春洪
金洪岩
陈凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Seventh Construction Corp
Original Assignee
No7 Building Corp Chinese Petroleum Gas
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Corp Chinese Petroleum Gas filed Critical No7 Building Corp Chinese Petroleum Gas
Priority to CN2011201896776U priority Critical patent/CN202108241U/en
Application granted granted Critical
Publication of CN202108241U publication Critical patent/CN202108241U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model relates to installation auxiliary equipment, in particular to a movable hanging frame for assembling a spherical storage tank, which comprises a movable hanging frame body. The movable hanging frame further comprises a safe landing channel, the movable hanging frame body comprises operating platforms which are arranged at interval from top to bottom, a labor protection body is respectively arranged on the operating platforms on each layer, each labor protection body comprises a protection beam and a protection vertical column, and the protection beams are arranged along the edges of the operating platforms and fixed on the operating platforms through the protection vertical columns. The operating platforms on each layer are fixedly connected through steel channel beams, two continuous steel channel beams are arranged on the movable hanging frame body from top to bottom and arranged symmetrically, bending hangers are respectively arranged at the top and the bottom of the two steel channel beams, two top hangers are connected through a top beam, and the bottom hangers are connected through reinforcement beams. The safe landing channel is arranged between the operating platforms from the top to the bottom, and the safe landing channel is connected with the movable hanging frame.

Description

The spherical storage tank assembling is with moving hanger
Technical field
The utility model relates to a kind of installation auxiliary equipment, and especially a kind of spherical storage tank assembling is with moving hanger.
Background technology
At present, the following three kinds of methods of the main employing of the assembling of spherical storage tank construction: burst assembling method, the large stretch of assembling method of branch and endless belt assembling method.Wherein, The burst assembling method has a variety of; Using at present is central post platform method comparatively widely; This method is set up central post and multilayer operating platform before the spherical storage tank assembling, the purpose of setting up central post is for fixing equator zone plate and upper temperature zone plate to be installed, and the multilayer platform is used for the operating personnel and lands construction operation on it.The shortcoming of this kind assemble method is, making mold needs the long period, and needs to remove, and operation is loaded down with trivial details, and the required relatively duration is longer.
Dividing large stretch of assembling method is that adjacent two or three Spherical Tank Shell Plates are organized becoming a spherical coverboard of sheet on the ground, then through lifting with each large stretch of spherical coverboard group to forming an integral spherical storage tank.This kind assemble method is had relatively high expectations to installation accuracy, and requires more large-scale hanging device.
In the endless belt assembling method, at first before assembling, lay the various molds that are consistent with the assembling band that needs assembling, each assembling band is assembled into the lifting of whole back.Because the complex procedures of this method, hanging device is had relatively high expectations, and combination parameter is complicated between endless belt, and the integral construction difficulty is bigger, so the present less use of this kind method.
The utility model content
The purpose of the utility model is to have proposed a kind of spherical storage tank assembling with moving hanger, and it makes simple, and materials used is few; Utilize in the time of should moving hanger assembling spherical storage tank, low to the hanging device requirement, can satisfy the safe construction requirement of spherical storage tank; Easy to use, group is high to efficient, has reduced the assembling difficulty of spherical storage tank; Practice thrift construction cost, shorten the construction period.
The utility model is that the technical scheme below adopting realizes: a kind of spherical storage tank assembling comprises and moves the hanger support body, wherein with moving hanger; Should move hanger and also comprise and land safely passage, described mobile hanger support body comprises operating platform, and operating platform from top to bottom is provided with at interval; Be equipped with the labour protection body on every layer operation platform, the labour protection body comprises protection beam and protection column, and the protection beam is along the edge setting of operating platform; The protection beam is fixed on the operating platform through the protection column, is fixedly connected through steel channel beam between each layer operation platform, from top to the bottom of moving the hanger support body two continuous steel channel beams is set; Two steel channel beams are and are symmetrical set; The top of two steel channel beams and bottom are respectively equipped with the hook of bending, connect through top cross beam between two top hooks, interconnect through reinforcement between the hook of two bottoms; Be provided with between the operating platform by top to bottom and land safely passage, land safely passage and be connected with mobile hanger support body.
In the utility model; The said passage that lands safely comprises the side bar that vertically is provided with that lays respectively at both sides; Be connected with the crossbeam of marking time of along continuous straight runs setting between two side bars, the crossbeam of marking time vertically is provided with at interval, also is connected with guardrail between two side bars; Described guardrail is surrounded on the outside of the crossbeam of marking time; Guardrail is formed the passage that seals with the crossbeam of marking time, side bar, and the top of two side bars and bottom are equipped with the hook of bending, will land safely passage through hook and hang on the mobile hanger support body.
Between the bottom of said mobile hanger support body and the ground vertical ladder can be set.Described vertical ladder comprises the side bar that vertically is provided with that lays respectively at both sides; Be connected with the crossbeam of marking time of along continuous straight runs setting between two side bars, the crossbeam of marking time vertically is provided with at interval, also is connected with guardrail between two side bars; Guardrail is surrounded on the outside of the crossbeam of marking time; Guardrail is formed the passage that seals with the crossbeam of marking time, side bar, and the top of two side bars is provided with the hook of bending, through hook vertical ladder is hung over and moves on the hanger support body.
The shape of said mobile hanger support body can for trapezoidal, fall trapezoidal or rectangle.In the practice of construction process, the hanger shape that is adopted will be confirmed according to the concrete specification of spherical storage tank.
The beneficial effect of the utility model is: at first, it is simple that this moves hanging rack structure, easy to make, and materials used is few; The second, utilize in the time of should moving hanger assembling spherical storage tank, only need select hanging device for use according to the weight of the spherical coverboard of monolithic, therefore hanging device is required lowly, use general hanging device to construct; The 3rd, it is easy to use that this moves spherical hanger, and group is high to efficient, reduced the assembling difficulty of spherical storage tank, and can satisfy the safe construction requirement of spherical storage tank fully, practices thrift construction cost, shortens the construction period.
Description of drawings
Fig. 1 is the structural representation of four-tape spherical storage tank among the embodiment 1;
Fig. 2 is the front view that upper temperature zone moves hanger among the embodiment 1;
Fig. 3 is the front view that hanger is moved in the equatorial zone among the embodiment 1;
Fig. 4 is the front view that upper temperature zone moves the hanger support body among the embodiment 1;
Fig. 5 is the left view that upper temperature zone moves the hanger support body among the embodiment 1;
Fig. 6 is the front view that the hanger support body is moved in the equatorial zone among the embodiment 1;
Fig. 7 is the left view that the hanger support body is moved in the equatorial zone among the embodiment 1;
Fig. 8 is the front view that lands safely passage among the embodiment 1;
Fig. 9 is the left view that lands safely passage among the embodiment 1;
Figure 10 is the front view that the hanger support body is moved in the equatorial zone among the embodiment 2;
Figure 11 is the left view that the hanger support body is moved in the equatorial zone among the embodiment 2.
Among the figure: utmost point band on 1; 2 upper temperature zones; 3 equatorial zones; 4 times utmost point bands; 5 hooks; 6 labour protection bodies; 7 operating platforms; 8 steel channel beams; 9 reinforcements; 10 spherical coverboards; 11 top cross beam; 12 side bars; 13 steps; 14 crossbeams of marking time; 15 move the hanger support body; 16 land safely passage; 17 vertical ladders.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is further specified.
Embodiment 1
Fig. 1 to Fig. 9 is that the described spherical storage tank assembling of the utility model is with moving hanger.Spherical storage tank in the present embodiment is a four-tape spherical storage tank, and this spherical storage tank from top to bottom is made up of the four-tape, is respectively to go up utmost point band 1, upper temperature zone 2, equatorial zone 3 and following utmost point band 4.During this spherical storage tank assembling, carry out the assembling of equatorial zone 3 earlier, upper and lower mouthful with equatorial zone 3 is the basis then, successively to descending utmost point band 4, upper temperature zone 2, last utmost point band 1 to assemble respectively.When equatorial zone 3 and upper temperature zone 2 are assembled, utilize mobile hanger to assemble.
Mobile hanger comprises mobile hanger support body 15, lands safely passage 16 and vertical ladder 17.Described mobile hanger support body 15 comprises operating platform 7, and operating platform 7 is provided with multilayer from top to bottom at interval, and every layer operation platform 7 is formed by fixedly connecting by at least three springboards arranged side by side.Be equipped with labour protection body 6 on every layer operation platform 7, labour protection body 6 comprises protection beam and protection column, and the protection beam is along the edge setting of operating platform 7, and the protection beam is fixed on the operating platform 7 through the protection column.In the work progress, 6 couples of constructors of labour protection body have played the effect of safeguard protection.Be fixedly connected through steel channel beam 8 between each layer operation platform 7.Two continuous steel channel beams, 8, two steel channel beams 8 are set from top to the bottom of moving the hanger support body to be and to be symmetrical set.The top of two steel channel beams 8 and bottom are respectively equipped with between 5, two tops of hook hook 5 of bending and connect through top cross beam 11, connect through reinforcement 9 between two bottom hooks 5.To move hanger through top hook 5 and hang on the spherical coverboard 10, bottom hook 5 then can play fixing effect of moving hanger.
Be provided with between the operating platform 7 by top to bottom and land safely passage 16; Land safely passage 16 and comprise the side bar 12 that vertically is provided with that lays respectively at both sides; Be connected with the crossbeam 13 of marking time of a plurality of along continuous straight runs settings between two side bars 12, the crossbeam 13 of marking time vertically is provided with at interval.Also be connected with guardrail 14 between two side bars 12 simultaneously; Described guardrail 14 is surrounded on the outside of the crossbeam 13 of marking time; The guardrail 14 and the crossbeam 13 of marking time, side bar 12 are formed the passage of a relative closure, and the constructor can land safely each layer operation platform through the crossbeam 13 of marking time from this passage.The top of two side bars 12 and bottom are equipped with the hook 5 of bending, will land safely passage 16 and hang over and move on the hanger support body 15 through linking up with 5, have realized landing safely being connected of passage 16 and mobile hanger support body 15.Land safely passage 16 through this, the constructor can land safely to each operating platform 7.
Simultaneously; When the assembling equatorial zone, can successfully land to operating platform safely for the ease of the constructor from ground, between bottom of moving the hanger support body and ground, vertical ladder 17 is set; The structure of vertical ladder 17 is identical with the structure that lands safely passage 16; Be that vertical ladder 17 comprises the side bar that vertically is provided with that lays respectively at both sides, be connected with the crossbeam of marking time of a plurality of along continuous straight runs settings between two side bars, the crossbeam of marking time vertically is provided with at interval.Also be connected with guardrail between two side bars simultaneously, guardrail is surrounded on the outside of the crossbeam of marking time, and the guardrail and the crossbeam of marking time, side bar are formed the passage of a relative closure, and the constructor can land to mobile hanger support body from ground through the crossbeam of marking time in this passage.The top of two side bars is provided with the hook of bending, through hook vertical ladder is hung over and moves on the hanger support body.
In the present embodiment, be used for mobile hanger and mobile hanger support body such as Fig. 2, Fig. 4 and shown in Figure 5 of upper temperature zone, this moves in the hanger support body, will move the external surface that hanger hangs over the spherical coverboard of upper temperature zone through the top hook.The mobile hanger and the mobile hanger support body that are used for the equatorial zone are respectively like Fig. 3, Fig. 6 and shown in Figure 7, and this moves hanger hangs over the spherical coverboard in equatorial zone through the hook at its top inner surface.In addition, because equatorial zone assembling is assembled upper temperature zone after finishing again, so upper temperature zone moves hanger and do not comprise vertical ladder, and promptly the upper temperature zone bottom of moving the hanger support body need not to be provided with vertical ladder.
In the utility model and since in the upper temperature zone each spherical coverboard be shaped as up-small and down-big, therefore be used for the shape of mobile hanger support body of upper temperature zone corresponding for trapezoidal.And in the equatorial zone each spherical coverboard be shaped as up big and down small, therefore be used for the shape of mobile hanger support body of equatorial zone corresponding for trapezoidal.
Utilize above-mentioned mobile hanger to realize that the process of spherical tank body assembling is described below: at first; The upper supporting column and the lower supporting rod assembly welding that will have the spherical coverboard in equatorial zone on ground are integral; Then the spherical coverboard in the equatorial zone of adjacent two band pillars is stood in basic going up and the adjustment verticality, temporary fixed with wire rope and stone bolt; Second step; Two mobile hangers are lifted respectively on the spherical coverboard in the equatorial zone that is suspended to two mounted band pillars; The top-hung that moves hanger is hooked on the spherical coverboard; Bottom hook connects jack and wire rope, the bottom of moving hanger is fixed, the constructor through vertical ladder with land safely passage and log on respectively on each layer operation platform; The 3rd step; Lift not in place with the spherical coverboard in the equatorial zone of pillar in the middle of the spherical coverboards in two equatorial zones, the constructor who moves this moment on the hanger operating platform fixes the spherical coverboard in this sheet equatorial zone and the equatorial zone sphere coverboard of mounted two band pillars with jig; The 4th step; The spherical coverboard in equatorial zone that lifts a slice band pillar again is in place and fixing; Constructor on the spherical coverboard hanger in first equatorial zone this moment is through landing safely passage and vertical ladder returns ground; And the hanger on should the sphere coverboard moves on the spherical coverboard in equatorial zone of band pillar of the 3rd hoisted in position, repeats above-mentioned installation steps.Through repeating above-mentioned installation steps, with the equatorial zone assembled.In the assembling process, utilize frock clamp that longitudinal joint gap, equatorial zone, unfitness of butt joint, angularity, upper and lower opening levelness etc. are adjusted in the allowable variation scope.
After 3 assembled of equatorial zone, mouthful be basis, assemble successively according to the order of utmost point band, upper temperature zone, last utmost point band down with the upper and lower of equatorial zone 3.Wherein, the assemble method of upper temperature zone is identical with the assemble method of equatorial zone.The assemble method of last utmost point band and following utmost point band is to weld angle steel and on angle steel, set up springboard with inboard in the outside of spherical coverboard, and personnel log on and carry out assembling operation on the springboard.
Embodiment 2
Figure 10 and Figure 11 are that embodiment 2 described spherical storage tank assemblings are with moving hanger.Different with embodiment 1 is: when spherical storage tank is three dribbling shape storage tanks or five dribbling shape storage tanks, the mobile hanger support body that uses during its assembling be shaped as rectangle.Therefore moving the shape of hanger support body mainly confirms according to the specification and the size of spherical storage tank.
Other is with embodiment 1.

Claims (5)

1. spherical storage tank assembling comprises and moves hanger support body (15) with moving hanger, it is characterized in that: this moves hanger and also comprises and land safely passage (16); Described mobile hanger support body (15) comprises operating platform (7); Operating platform (7) from top to bottom is provided with at interval, is equipped with labour protection body (6) on every layer operation platform (7), and labour protection body (6) comprises protection beam and protection column; The protection beam is along the edge setting of operating platform (7); The protection beam is fixed on the operating platform (7) through the protection column, is fixedly connected through steel channel beam (8) between each layer operation platform (7), from top to the bottom of moving the hanger support body two continuous steel channel beams (8) is set; Two steel channel beams (8) are and are symmetrical set; The hook (5) that the top of two steel channel beams (8) and bottom are respectively equipped with bending connects through top cross beam (11) between two top hooks (5), interconnects through reinforcement (9) between the two bottoms hooks (5); Be provided with between the operating platform (7) by top to bottom and land safely passage (16), land safely passage (16) and be connected with mobile hanger support body (15).
2. spherical storage tank assembling according to claim 1 is with moving hanger; It is characterized in that: the described passage (16) that lands safely comprises the side bar (12) that vertically is provided with that lays respectively at both sides; Be connected with the crossbeam of marking time (13) of along continuous straight runs setting between two side bars (12); The crossbeam (13) of marking time vertically is provided with at interval; Also be connected with guardrail (14) between two side bars (12), described guardrail (14) is surrounded on the outside of the crossbeam of marking time (13), and guardrail (14) is formed the passage that seals with the crossbeam (13) of marking time, side bar (12); The hook (5) that the top of two side bars (12) and bottom are equipped with bending will land safely passage (16) through hook (5) and hang on the mobile hanger support body (15).
3. spherical storage tank assembling according to claim 1 is characterized in that: be provided with vertical ladder (17) between the bottom of said mobile hanger support body (15) and the ground with moving hanger.
4. spherical storage tank assembling according to claim 4 is with moving hanger; It is characterized in that: vertical ladder (17) comprises the side bar that vertically is provided with that lays respectively at both sides; Be connected with the crossbeam of marking time of along continuous straight runs setting between two side bars, the crossbeam of marking time vertically is provided with at interval, also is connected with guardrail between two side bars; Guardrail is surrounded on the outside of the crossbeam of marking time; Guardrail is formed the passage that seals with the crossbeam of marking time, side bar, and the top of two side bars is provided with the hook of bending, through hook vertical ladder (17) is hung over and moves on the hanger support body (15).
5. spherical storage tank according to claim 1 assembling is characterized in that with moving hanger: being shaped as of said mobile hanger support body (15) be trapezoidal, fall trapezoidal or rectangle.
CN2011201896776U 2011-06-07 2011-06-07 Movable hanging frame for assembling spherical storage tank Expired - Fee Related CN202108241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201896776U CN202108241U (en) 2011-06-07 2011-06-07 Movable hanging frame for assembling spherical storage tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201896776U CN202108241U (en) 2011-06-07 2011-06-07 Movable hanging frame for assembling spherical storage tank

Publications (1)

Publication Number Publication Date
CN202108241U true CN202108241U (en) 2012-01-11

Family

ID=45433678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201896776U Expired - Fee Related CN202108241U (en) 2011-06-07 2011-06-07 Movable hanging frame for assembling spherical storage tank

Country Status (1)

Country Link
CN (1) CN202108241U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106287216A (en) * 2015-06-11 2017-01-04 张家港中集圣达因低温装备有限公司 Pressure vessel
CN109098425A (en) * 2018-09-21 2018-12-28 中国五冶集团有限公司 A kind of girder steel station connection structure
CN112918637A (en) * 2021-03-12 2021-06-08 上海外高桥造船有限公司 Marine hawse pipe construction platform

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106287216A (en) * 2015-06-11 2017-01-04 张家港中集圣达因低温装备有限公司 Pressure vessel
CN109098425A (en) * 2018-09-21 2018-12-28 中国五冶集团有限公司 A kind of girder steel station connection structure
CN109098425B (en) * 2018-09-21 2023-10-13 中国五冶集团有限公司 Steel beam operation table connection structure
CN112918637A (en) * 2021-03-12 2021-06-08 上海外高桥造船有限公司 Marine hawse pipe construction platform

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN104120877B (en) A kind of hydraulic climbing die block system and climbing form method
CN105839543B (en) Bridge High-pier rises outrigger over-form construction technique certainly
CN106592826A (en) Construction method for cylindrical frame supporting type hydraulic-climbing integral steel platform formwork shear steel plate layer
CN105839542B (en) Bridge High-pier rises outrigger turning-over certainly
CN202108241U (en) Movable hanging frame for assembling spherical storage tank
CN206233600U (en) Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar
CN109469083B (en) Foundation beam reinforcement cage assembling system and construction method thereof
CN106869479A (en) Bailey bracket sliding formwork system construction method
CN202064281U (en) Slip form frame
CN106150525A (en) A kind of rock anchorage beam construction trolley and construction method thereof
CN106522541B (en) A kind of template suspension centre spandrel girder of steel platform and the hanging method of template system
CN106639328A (en) Concrete beam steel reinforcement framework construction device and method
CN209413291U (en) A kind of liquid press to turn over molds that climbs certainly
CN111648313A (en) Bailey beam dismantling and transporting device and construction method applying same
CN116838083A (en) Integral climbing steel platform formwork and climbing method thereof
CN206646795U (en) Housing construction is greatly across double-deck moving operation car device
CN110847031A (en) Movable hanging basket for bridge construction
CN207727440U (en) Whole self-crawling type integrated platform for bridge tower construction
CN206111212U (en) Rock -anchored beam construction trolley car
CN109853928A (en) Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing
CN109944164A (en) Jack up hollow thin-walled high pier roller die system and its construction method
CN110424749B (en) Rail type overhead connection device for pier body reinforcement height connection construction and height connection method thereof
CN109537445A (en) Mobile overhanging lifting platform for crash barrier template construction
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Miao road Laoshan District 266000 Shandong city of Qingdao province No. 36 in building A

Patentee after: China Petroleum & natural gas seventh Construction Co., Ltd.

Address before: Miao road Laoshan District 266000 Shandong city of Qingdao province No. 36 in building A

Patentee before: No.7 Building Corp., Chinese Petroleum Gas

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120111

Termination date: 20190607