CN109853928A - Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing - Google Patents

Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing Download PDF

Info

Publication number
CN109853928A
CN109853928A CN201910088835.XA CN201910088835A CN109853928A CN 109853928 A CN109853928 A CN 109853928A CN 201910088835 A CN201910088835 A CN 201910088835A CN 109853928 A CN109853928 A CN 109853928A
Authority
CN
China
Prior art keywords
elevator
stretcher
shear wall
stringer
workbench
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910088835.XA
Other languages
Chinese (zh)
Inventor
侯伶聪
张建青
侯秀云
王军平
张玉刚
刘翔
张懿
郝宁宁
张旭东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi Sanjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Sanjian Group Co Ltd filed Critical Shanxi Sanjian Group Co Ltd
Priority to CN201910088835.XA priority Critical patent/CN109853928A/en
Publication of CN109853928A publication Critical patent/CN109853928A/en
Pending legal-status Critical Current

Links

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

The invention discloses a kind of interior posture workbench and its erection method for setting up elevator shear wall formwork for placing, solve the problems, such as that setting up for existing elevator shear wall formwork for placing is at high cost poor with safety existing for platform.The stretcher (5) for having I-steel along 45 degree of upward direction inclined shores is completed between shear wall (4) in this floor laminate (3) at elevator and elevator, steel pipe combination hub (6) have been routed in the stretcher (5) of I-steel, angle between steel pipe combination hub (6) and the stringer of stretcher (5) is 45 degree, it is plugged with vertical pillars (7) in steel pipe combination hub (6), the top of vertical pillars (7) is provided with workbench plate (8).The present invention greatly reduces the construction cost of frame body material, and speed of application is fast;It is simple to have the characteristics that conveniently moving and production reinforce process.

Description

Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing
Technical field
Workbench is set up the present invention relates to a kind of shear wall formwork for placing in high-rise building elevator shaft, especially The interior posture for being related to a kind of shear wall formwork for placing of high-rise building elevator shaft sets up workbench and the erection method of the platform.
Background technique
In skyscraper pouring construction, elevator shear wall is pouring with the floor internal shear force wall in every floor, It successively connects upwards and pours to complete, in traditional construction, full hall scaffold is set up since the bottom in elevator, Carry out precoating on the tip platform of full hall scaffold the setting up of the shear wall formwork for building the elevator of floor, when the whole of this layer After the completion of shear wall pours, increase set up full hall scaffold upwards, the top of the full hall scaffold after increasing constructs flat again Platform carries out setting up for one layer of elevator shear wall formwork for placing on the platform, and so circulation is until roof;This construction Mode is at high cost there are full hall scaffold material utilization amount is more, sets up time long defect.In recent years, also have through suspension scaffold generation Platform is installed as elevator shear wall formwork for full hall scaffold, suspension scaffold frame is that the floor electricity for having poured completion is arranged in In shear wall reserving hole in stair shaft, with increasing for floor, next row suspension scaffold can be stayed on the shear wall in elevator Fixation holes, these holes need it is subsequent is blocked, meanwhile, overhanging body panel there is also safety difference and in elevator It is taken in the confined space and tears difficult problem open.
Summary of the invention
The present invention provides a kind of interior posture workbench and its erection method for setting up elevator shear wall formwork for placing, solutions Determined existing elevator shear wall formwork for placing set up existing for platform it is at high cost, set up that the time is long and the skill of safety difference Art problem.
The present invention is to solve the above technical problem by the following technical programs:
The present general inventive concept is: this layer of elevator of floor and completed door opening opposite at the door opening of this layer of elevator Shear wall between, activity set up 45 degree inclined I-steel end wall brackets, in two oblique cross beams of end wall bracket welding stand Bar grafting steel-tube seat, the grafting vertical pillars in upright bar grafting steel-tube seat set up level table on the top of vertical pillars, as Set up the workbench of one layer of elevator shear wall formwork for placing.
A kind of interior posture workbench for setting up elevator shear wall formwork for placing, including elevator, this floor laminate, this layer Elevator door opening is provided in the elevator of this layer of elevator door opening face and has poured the elevator of completion shearing is completed Wall, this floor laminate and elevator at elevator, which are completed between shear wall, has I-shaped along 45 degree of upward direction inclined shores Steel pipe combination hub has been routed in the stretcher of I-steel, the angle between steel pipe combination hub and the stringer of stretcher in the stretcher of steel It is 45 degree, is plugged with vertical pillars in steel pipe combination hub, the top of vertical pillars is provided with workbench plate.
It is welded with L shape branch mouth in two stringer bottom ends of stretcher, which can also directly add in the bottom end of two I-shaped steel longitudinal beams Work goes out, and is welded with support plate on two stringer tops of stretcher, the top of two I-shaped steel longitudinal beams is first processed to 45 degree of inclined-plane, so Quadrate support plate is welded on the inclined-plane again afterwards, stretcher is overlapped on this floor laminate at elevator by L shape branch mouth activity On, stretcher abuts against elevator by support plate and is completed on shear wall, and crossbeam is provided in the middle part of vertical pillars;In stretcher Safety guard net is provided in the elevator of lower section.
A kind of erection method of interior posture workbench that setting up elevator shear wall formwork for placing, it is characterised in that following step It is rapid:
The first step makes stretcher, the welded still pipe combination hub on the stretcher of I-steel of I-shaped steel, and welded still pipe combination hub is weldering It connects on two stringers of stretcher, and lays it at equal intervals, the angle between steel pipe combination hub and the stringer of stretcher is 45 degree;? L shape branch mouth is welded in two stringer bottom ends of stretcher, welds one piece of support plate on two stringer tops of stretcher;
This floor laminate and elevator that the stretcher made is erected at elevator are completed between shear wall second step, The L shape branch mouth branch for welding two stringer bottom ends of stretcher is located on this floor laminate, the support of the two stringer tops welding of stretcher Plate acts against elevator and is completed on the metope of shear wall;
Vertical pillars are plugged into steel pipe combination hub, and make the top of each vertical pillars in same level by third step;
4th step sets up workbench plate on the top of each vertical pillars, forms upper layer elevator shear wall formwork for placing Set up platform;Safety guard net is provided in the elevator below stretcher.
The present invention greatly reduces the construction cost of frame body material, and speed of application is fast;It is reinforced with conveniently moving and production The simple feature of process;Frame body can increase with floor and overall increase to upper layer, the construction especially suitable for high rise elevator well.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the present invention in side-looking direction;
Fig. 2 is structural schematic diagram of the present invention in main view direction.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
A kind of interior posture workbench for setting up elevator shear wall formwork for placing, including elevator 1, this floor laminate 3, this layer of electricity Stair shaft door opening 2 is provided in the elevator of this layer of 2 face of elevator door opening and has poured the elevator of completion shear wall is completed 4, this floor laminate 3 at elevator and elevator, which are completed between shear wall 4, has work along 45 degree of upward direction inclined shores Steel pipe combination hub 6 has been routed in the stretcher 5 of I-steel, between steel pipe combination hub 6 and the stringer of stretcher 5 in the stretcher 5 of word steel Angle be 45 degree, vertical pillars 7 are plugged in steel pipe combination hub 6, the top of vertical pillars 7 is provided with workbench plate 8。
It is welded with L shape branch mouth 9 in two stringer bottom ends of stretcher 5, is welded with support plate 10 on two stringer tops of stretcher 5, On this floor laminate 3 that stretcher 5 is overlapped at elevator by 9 activity of L shape branch mouth, stretcher 5 abuts against electricity by support plate 10 Stair shaft is completed on shear wall 4, and the middle part of vertical pillars 7 is provided with crossbeam 11;It is provided in the elevator below stretcher 5 Safety guard net 12.
A kind of erection method of interior posture workbench that setting up elevator shear wall formwork for placing, it is characterised in that following step It is rapid:
The first step makes stretcher 5, the welded still pipe combination hub 6 on the stretcher 5 of I-steel, welded still pipe combination hub 6 with I-shaped steel It is welded on two stringers of stretcher 5, and lays it at equal intervals, the angle between steel pipe combination hub 6 and the stringer of stretcher 5 is 45 degree;L shape branch mouth 9 is welded in two stringer bottom ends of stretcher 5, welds one piece of support plate 10 on two stringer tops of stretcher 5;
Second step, the stretcher 5 made is erected to this floor laminate 3 at elevator and elevator be completed shear wall 4 it Between, make L shape branch 9, mouth that two stringer bottom ends of stretcher 5 are welded to be located on this floor laminate 3, the two stringer tops welding of stretcher 5 Support plate 10 act against elevator and be completed on the metope of shear wall 4;
Vertical pillars 7 are plugged into steel pipe combination hub 6 by third step, and make the top of each vertical pillars 7 in same level On;
4th step sets up workbench plate 8 on the top of each vertical pillars 7, forms upper layer elevator shear wall formwork for placing Set up platform;Safety guard net 12 is provided in the elevator below stretcher 5;When upper layer, elevator shear wall formwork is taken If simultaneously after the completion of concreting, to construct upper layer shear wall when, can by way of slinging by stretcher 5 and its thereon hang down Right cylinder and platform are sling together, are shifted up to upper layer and are hugged and carry out setting up fixation at plate, are realized a tower and are set, the mesh of reuse Ground.

Claims (3)

1. a kind of interior posture workbench for setting up elevator shear wall formwork for placing, including elevator (1), this floor laminate (3), This layer of elevator door opening (2) is provided in the elevator of this layer of elevator door opening (2) face and has poured the elevator of completion It completes shear wall (4), which is characterized in that this floor laminate (3) at elevator and elevator are completed between shear wall (4) There is the stretcher (5) of I-steel along 45 degree of upward direction inclined shores, steel pipe combination hub has been routed in the stretcher (5) of I-steel (6), the angle between steel pipe combination hub (6) and the stringer of stretcher (5) is 45 degree, is plugged in steel pipe combination hub (6) vertical Column (7) is provided with workbench plate (8) on the top of vertical pillars (7).
2. a kind of interior posture workbench for setting up elevator shear wall formwork for placing according to claim 1, feature exist In being welded with L shape branch mouth (9) in two stringer bottom ends of stretcher (5), be welded with support plate on two stringer tops of stretcher (5) (10), stretcher (5) is overlapped on this floor laminate (3) at elevator by L shape branch mouth (9) activity, and stretcher (5) passes through support Plate (10) abuts against elevator and is completed on shear wall (4), and crossbeam (11) are provided in the middle part of vertical pillars (7);In stretcher (5) safety guard net (12) are provided in the elevator below.
3. a kind of erection method for the interior posture workbench for setting up elevator shear wall formwork for placing, it is characterised in that following step It is rapid:
The first step makes stretcher (5) with I-shaped steel, the welded still pipe combination hub (6) on the stretcher (5) of I-steel, welded still pipe Combination hub (6) is welded on two stringers of stretcher (5), and lays it at equal intervals, steel pipe combination hub (6) and stretcher (5) Angle between stringer is 45 degree;L shape branch mouth (9) are welded in two stringer bottom ends of stretcher (5), on two stringer tops of stretcher (5) Weld one piece of support plate (10) in end;
The stretcher made (5) is erected at this floor laminate (3) at elevator and shear wall is completed in elevator by second step (4) between, L shape branch mouth (9) branch for welding two stringer bottom ends of stretcher (5) is located on this floor laminate (3), stretcher (5) The support plate (10) of two stringer tops welding acts against elevator and is completed on the metope of shear wall (4);
Vertical pillars (7) are plugged into steel pipe combination hub (6), and make the top of each vertical pillars (7) in same water by third step In plane;
4th step is set up workbench plate (8) on the top of each vertical pillars (7), is formed upper layer elevator shear wall and is poured Template sets up platform;Safety guard net (12) are provided in the elevator below stretcher (5).
CN201910088835.XA 2019-01-30 2019-01-30 Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing Pending CN109853928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910088835.XA CN109853928A (en) 2019-01-30 2019-01-30 Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910088835.XA CN109853928A (en) 2019-01-30 2019-01-30 Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing

Publications (1)

Publication Number Publication Date
CN109853928A true CN109853928A (en) 2019-06-07

Family

ID=66896843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910088835.XA Pending CN109853928A (en) 2019-01-30 2019-01-30 Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing

Country Status (1)

Country Link
CN (1) CN109853928A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343064A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Construction method for dismantling large-section annular concrete support beam of deep foundation pit
CN114703987A (en) * 2022-04-02 2022-07-05 东莞职业技术学院 High-rise shear wall pouring method and high-rise staircase pouring method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN102312562A (en) * 2011-06-30 2012-01-11 中国新兴保信建设总公司 Construction supporting platform of elevator well and construction method thereof
CN103498551A (en) * 2013-09-26 2014-01-08 重庆市南岸区建设工程施工安全监督站 Lift shaft section steel construction operating platform
CN203559574U (en) * 2013-11-26 2014-04-23 新疆泽昌投资(集团)有限公司 Elevator shaft formwork supporting movable support
CN204435921U (en) * 2015-02-10 2015-07-01 中冶建工集团有限公司 Movable supporting post in a kind of elevator shaft
CN204728675U (en) * 2015-06-19 2015-10-28 青岛海川建设集团有限公司 A kind of high rise elevator well is with layer activity operations frame
CN205025074U (en) * 2015-08-12 2016-02-10 上海绿地建设(集团)有限公司 Elevator well steel bracing promotes double -deck scaffold operation platform of formula
CN206844621U (en) * 2017-06-26 2018-01-05 中国核工业第二二建设有限公司 It is elevated from steady support job platform in a kind of elevator hoistways of shear wall structure
CN209907898U (en) * 2019-01-30 2020-01-07 山西三建集团有限公司 Internal frame type workbench for erecting elevator shaft shear wall pouring template

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101824910A (en) * 2009-11-17 2010-09-08 新疆建工(集团)有限责任公司 Quick template supporting construction method of elevator shaft
CN102312562A (en) * 2011-06-30 2012-01-11 中国新兴保信建设总公司 Construction supporting platform of elevator well and construction method thereof
CN103498551A (en) * 2013-09-26 2014-01-08 重庆市南岸区建设工程施工安全监督站 Lift shaft section steel construction operating platform
CN203559574U (en) * 2013-11-26 2014-04-23 新疆泽昌投资(集团)有限公司 Elevator shaft formwork supporting movable support
CN204435921U (en) * 2015-02-10 2015-07-01 中冶建工集团有限公司 Movable supporting post in a kind of elevator shaft
CN204728675U (en) * 2015-06-19 2015-10-28 青岛海川建设集团有限公司 A kind of high rise elevator well is with layer activity operations frame
CN205025074U (en) * 2015-08-12 2016-02-10 上海绿地建设(集团)有限公司 Elevator well steel bracing promotes double -deck scaffold operation platform of formula
CN206844621U (en) * 2017-06-26 2018-01-05 中国核工业第二二建设有限公司 It is elevated from steady support job platform in a kind of elevator hoistways of shear wall structure
CN209907898U (en) * 2019-01-30 2020-01-07 山西三建集团有限公司 Internal frame type workbench for erecting elevator shaft shear wall pouring template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343064A (en) * 2020-11-27 2021-02-09 中铁七局集团第五工程有限公司 Construction method for dismantling large-section annular concrete support beam of deep foundation pit
CN114703987A (en) * 2022-04-02 2022-07-05 东莞职业技术学院 High-rise shear wall pouring method and high-rise staircase pouring method

Similar Documents

Publication Publication Date Title
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN105863253B (en) Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN103669224A (en) Method and steel pipe support for construction of arch tower of inclined arch tower double-cable-plane prestressed concrete cable-stayed bridge
CN105863046A (en) Prefabricated assembly type beam column joint connecting process
CN105714684A (en) Prestressed concrete variable cross-section fish-bellied type continuous box girder construction method
CN104631822A (en) Construction Method of High-rise Reinforced Concrete Elevator Shaft
CN105908902A (en) Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages
CN107989447A (en) A kind of large-scale earthing concrete tank dome steel support structure and installation method
CN114770706B (en) Light T-beam prefabrication equipment and prefabrication installation construction method
CN106988485A (en) The construction method of structural transition layer Shaped Steel concrete beam
CN206352391U (en) Socket joint type key slot type Quick Release support system
CN103981897A (en) Waterproof construction method of basement exterior wall stiffness pillar
CN106284840A (en) A kind of second pouring steel reinforced concrete frame beam and construction method thereof
CN109853928A (en) Set up the interior posture workbench and its erection method of elevator shear wall formwork for placing
CN203613467U (en) Steel pipe bracket for construction of arch tower in oblique arch tower double-cable plane pre-stressed concrete cable-stayed bridge
CN102767282A (en) Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN107882328A (en) The construction method of large span steel truss overhung construction
CN106320183A (en) Assembly type bent cap formwork system
CN202090578U (en) Shaped elevator shaft construction operating platform device
CN112160247A (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN107130521A (en) Method for constructing large-section beam bailey bracket hoisting mold of pit cliff wall section
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN205617664U (en) Prefabricated pier stud locating rack for steel reinforcement cage
CN102383376B (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190607

WD01 Invention patent application deemed withdrawn after publication