CN105799054A - Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork - Google Patents
Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork Download PDFInfo
- Publication number
- CN105799054A CN105799054A CN201610256070.2A CN201610256070A CN105799054A CN 105799054 A CN105799054 A CN 105799054A CN 201610256070 A CN201610256070 A CN 201610256070A CN 105799054 A CN105799054 A CN 105799054A
- Authority
- CN
- China
- Prior art keywords
- overall external
- external mold
- self
- mold
- propelled hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/76—Moulds
- B28B21/82—Moulds built-up from several parts; Multiple moulds; Moulds with adjustable parts
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/56—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
- B28B21/60—Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B21/00—Methods or machines specially adapted for the production of tubular articles
- B28B21/86—Cores
- B28B21/88—Cores adjustable, collapsible or expansible
Abstract
The invention provides a self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork. The self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork is characterized in that a main traveling trolley is installed at the lower end of an integral outer formwork body, the main traveling trolley makes contact with a longitudinal rail through longitudinal traveling wheels, and a transverse rail is arranged on the main traveling trolley; a traverse traveling trolley makes contact with the transverse rail through transverse traveling wheels, and the traverse traveling trolley is connected with the integral outer formwork body through a lifting oil cylinder; a stand column of the integral outer formwork body is connected with the longitudinal rail in a fastened mode through fastening bolts; the top of the left side of the integral outer formwork body and the top of the right side of the integral outer formwork body are fixedly connected through a truss, and sinking pipe section steel bars formed through binding are located between the integral outer formwork body and an inner formwork body. When the self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork is in use, repeated disassembly and assembly of steel molds are not needed, so that the efficiency is improved, mutual influences between crossed procedures are reduced, and potential safety hazards are reduced; and integral transferring is conducted after demolding, so that large investment of labor is reduced, time is saved, the construction period is shortened, and accordingly the engineering quality is effectively guaranteed.
Description
Technical field
The present invention relates to tunnel immersed tube tube coupling and manufacture field, demoulding tunnel, especially a kind of self-propelled hydraulic location immersed tube tube coupling prefab-form.
Background technology
At present, in immersed tube tunnel is constructed, immersed tube tube coupling length is longer, and each tube coupling needs the trifle segmentation being divided into fixed dimension to carry out concrete pouring construction, and in tube coupling concrete pouring construction, once-pouring of concrete side's amount is bigger.Commonly used combined steel block-by-block is assembled into entirety one by one and carries out tube coupling concrete pouring construction more traditionally; this kind of method is relatively ripe; apply comparatively general; but application the method is many for immersed tube tube coupling quantity; the project that construction period is tight, then usually can because of combined steel construct its mounting or dismounting inconvenience, effect is low, personnel have high input, affect the duration, the carrying out smoothly of high etc. the engineering constraint of indirect cost.Existing combined steel construction method be applied to immersed tube tube coupling prefabricated in, because of template in construction process dismounting, the handling of reinforcing bar, colligation installation and concreting homogeneous mutual restriction on space and operation, generally all cause construction time and effort consuming, inefficiency, especially multiple tube couplings are simultaneously prefabricated, when cross-operation face is many, also easily there is security incident.In a word, existing immersed tube tube coupling prefabricated construction difficulty is big, and efficiency is low and there is bigger safety problem,.
Summary of the invention
It is an object of the invention to provide a kind of easy construction, work efficiency is high, use the self-propelled hydraulic of safety to position demoulding tunnel immersed tube tube coupling prefab-form.
Demoulding tunnel, the self-propelled hydraulic location immersed tube tube coupling prefab-form of the present invention, including overall external mold, internal mold, truss, internal mold is located between the overall external mold of the left and right sides, it is characterized in that, main walking dolly is installed in the lower end of overall external mold, main walking dolly is contacted with long rails by lengthwise rows travelling wheel, lengthwise rows travelling wheel is driven by drive motor and change speed gear box, main walking dolly is provided with cross track, horizontal walking dolly is contacted with cross track by horizontal road wheel, horizontal road wheel is by horizontal hydraulic oil cylinder driving, horizontal walking dolly is connected with overall external mold by hoist cylinder, hoist cylinder controls the above-below direction motion of overall external mold, horizontal road wheel controls the transverse movement of overall external mold, lengthwise rows travelling wheel controls the lengthwise movement of overall external mold;Having connecting hole on long rails, the column of overall external mold is fastenedly connected with long rails by fastening bolt through connecting hole;The overall outer mold top of the left and right sides connects by truss is fixing, internal mold is reinforced by ground anchor bolt location, internally installed to support strut, the immersed tube tube coupling reinforcing bar of colligation molding is between overall external mold and internal mold, and the immersed tube tube coupling reinforcing bar both sides of colligation molding adopt wooden model closure.
The using method of demoulding tunnel, the self-propelled hydraulic location immersed tube tube coupling prefab-form of the present invention:
1, on pre-aligned good base plate, first carry out the colligation molding of immersed tube tube coupling reinforcing bar;
2, in advance assembled good overall external mold is in place along the immersed tube tube coupling reinforcing bar limit marching to colligation molding on the good long rails of pre-plugged, internal mold is in place by gantry crane lifting;
3, overall external mold and internal mold first carrying out the location of upper and lower absolute altitude, then carries out horizontal boundary alignment, check, by measuring instrument, the position that overall external mold is relative with immersed tube tube coupling reinforcing bar, location completes;
4, behind integral mold plate location, fastening bolt is used to tighten fixing by the sole of overall external mold column and long rails, the overall outer mold top of the left and right sides connects by truss is fixing, internal mold is reinforced by ground anchor bolt location, internally installed to support strut reinforcing, reinforcing completes, and the both sides of immersed tube tube coupling reinforcing bar adopt wooden model closure;
5, immersed tube tube coupling is layered from bottom to top by base plate to abutment wall and carries out casting concrete, adopts pump truck machinery to enter mould, mechanical packing;
6, concreting is complete, according to concrete strength requirement, determine the demoulding time, after rebound test reaches normal intensity, first the truss at top is removed, start hydraulic power unit, control overall external mold transverse direction oil cylinder and carry out the demoulding, remove the connection fastening bolt between overall external mold column and long rails again, control the hoist cylinder of overall external mold, after making overall external mold depart from long rails certain altitude, start drive motor and change speed gear box, longitudinal main walking dolly of traction drive steadily moves to next group tube coupling along immersed tube tube coupling axial direction with overall external mold longitudinally track, internal mold is carried out lifting by straddle truck and removes to next group tube coupling;
The immersed tube tube coupling built is carried out water seasoning after removing by interior external mold, and curing concrete more than 14 days, subsequently into subsequent cycle.
When demoulding tunnel, the self-propelled hydraulic location immersed tube tube coupling prefab-form of the present invention uses, concrete pouring construction, without frequently dismounting punching block, improves effect, reduces influencing each other between intersection operation, reduce potential safety hazard, overall transhipment after the demoulding, decreases artificial a large amount of inputs, has saved time and construction period, concreting process adopt pump truck machinery enter mould, mechanical packing, whole work progress safety is fast, and makes construction quality obtain effective guarantee.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A direction view of Fig. 1;
Fig. 3 is B partial enlarged drawing in Fig. 1;
Fig. 4 be in Fig. 2 C to cut-away view;
1, overall external mold, 2, internal mold, 3, to support strut, 4, girder, 5, tube coupling reinforcing bar, 6, main walking dolly, 7, long rails, 8, fastening bolt, 9, lengthwise rows travelling wheel, 10, drive motor and change speed gear box, 11, horizontal oil cylinder, 12, hoist cylinder, 13, horizontal road wheel, 14, horizontal walking dolly.
Detailed description of the invention
nullDemoulding tunnel, a kind of self-propelled hydraulic location immersed tube tube coupling prefab-form,Including overall external mold 1、Internal mold 2、Truss 4,Internal mold 2 is located between the overall external mold 1 of the left and right sides,It is characterized in that,Main walking dolly 6 is installed in the lower end of overall external mold 1,Main walking dolly 6 is contacted with long rails 7 by lengthwise rows travelling wheel 9,Lengthwise rows travelling wheel 9 is driven by drive motor and change speed gear box 10,Main walking dolly 6 is provided with cross track,Horizontal walking dolly 14 is contacted with cross track by horizontal road wheel 13,Horizontal road wheel 13 is driven by horizontal oil cylinder 11,Horizontal walking dolly 14 is connected with overall external mold 1 by hoist cylinder 12,Hoist cylinder 12 controls the above-below direction motion of overall external mold 1,Horizontal road wheel 13 controls the transverse movement of overall external mold 1,Lengthwise rows travelling wheel 9 controls the lengthwise movement of overall external mold 1;Having connecting hole on long rails 7, the column of overall external mold 1 is fastenedly connected with long rails 7 by fastening bolt 8 through connecting hole;Overall external mold 1 top of the left and right sides connects by truss 4 is fixing, internal mold 2 is reinforced by ground anchor bolt location, internally installed to support strut 3, the immersed tube tube coupling reinforcing bar 5 of colligation molding is between overall external mold 1 and internal mold 2, and immersed tube tube coupling reinforcing bar 5 both sides of colligation molding adopt wooden model closure.
Claims (3)
- null1. demoulding tunnel, self-propelled hydraulic location immersed tube tube coupling prefab-form,Including overall external mold (1)、Internal mold (2)、Truss (4),Internal mold (2) is located between the overall external mold (1) of the left and right sides,,It is characterized in that: main walking dolly (6) is installed in the lower end of overall external mold (1),Main walking dolly (6) is contacted with long rails (7) by lengthwise rows travelling wheel (9),Lengthwise rows travelling wheel (9) is driven by drive motor and change speed gear box (10),Main walking dolly (6) is provided with cross track,Horizontal walking dolly (14) is contacted with cross track by horizontal road wheel (13),Horizontal road wheel (13) is driven by horizontal oil cylinder (11),Horizontal walking dolly (14) is connected with overall external mold (1) by hoist cylinder (12),Hoist cylinder (12) controls the above-below direction motion of overall external mold (1),Horizontal road wheel (13) controls the transverse movement of overall external mold (1),Lengthwise rows travelling wheel (9) controls the lengthwise movement of overall external mold (1);Overall external mold (1) top of the left and right sides connects by truss (4) is fixing, internal mold (2) is reinforced by ground anchor bolt location, immersed tube tube coupling reinforcing bar (5) of colligation molding is positioned between overall external mold (1) and internal mold (2), and immersed tube tube coupling reinforcing bar (5) both sides of colligation molding adopt wooden model closure.
- 2. demoulding tunnel, self-propelled hydraulic according to claim 1 location immersed tube tube coupling prefab-form, it is characterized in that: have connecting hole on long rails (7), the column of overall external mold (1) is fastenedly connected with long rails (7) by fastening bolt (8) through connecting hole.
- 3. demoulding tunnel, self-propelled hydraulic according to claim 1 location immersed tube tube coupling prefab-form, it is characterised in that: internal mold (2) is internally installed to support strut (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610256070.2A CN105799054A (en) | 2016-04-25 | 2016-04-25 | Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610256070.2A CN105799054A (en) | 2016-04-25 | 2016-04-25 | Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105799054A true CN105799054A (en) | 2016-07-27 |
Family
ID=56457436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610256070.2A Pending CN105799054A (en) | 2016-04-25 | 2016-04-25 | Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105799054A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108162161A (en) * | 2018-02-09 | 2018-06-15 | 北京交通大学 | A kind of high-precision two-orbit beam makes template system |
CN110524691A (en) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | Immersed tube tunnel outboard template system and construction method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103557011A (en) * | 2013-11-14 | 2014-02-05 | 广州鑫桥建筑劳务有限公司 | Side wall trolley |
CN103726511A (en) * | 2013-11-29 | 2014-04-16 | 中交第四航务工程局有限公司 | Template system used for overall pouring of large-area tunnel immersed tube |
CN104314305A (en) * | 2014-10-15 | 2015-01-28 | 中铁四局集团有限公司 | Integral moving formwork for stalk concrete pouring and application thereof |
CN104647583A (en) * | 2015-02-16 | 2015-05-27 | 中交第二航务工程局有限公司 | Immersed-tube prefabricated outer wall support |
CN204552761U (en) * | 2015-01-11 | 2015-08-12 | 中交一公局第三工程有限公司 | Wall all-hydraulic self-walking formwork jumbo in combined type song |
CN104895584A (en) * | 2015-04-28 | 2015-09-09 | 金中天集团港航有限公司 | Modularization steel die trolley and construction process thereof |
JP5862358B2 (en) * | 2011-04-21 | 2016-02-16 | 株式会社大林組 | Concrete compaction method |
CN205704660U (en) * | 2016-04-25 | 2016-11-23 | 中铁隧道集团二处有限公司 | Demoulding tunnel, self-propelled hydraulic location immersed tube tube coupling prefab-form |
-
2016
- 2016-04-25 CN CN201610256070.2A patent/CN105799054A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5862358B2 (en) * | 2011-04-21 | 2016-02-16 | 株式会社大林組 | Concrete compaction method |
CN103557011A (en) * | 2013-11-14 | 2014-02-05 | 广州鑫桥建筑劳务有限公司 | Side wall trolley |
CN103726511A (en) * | 2013-11-29 | 2014-04-16 | 中交第四航务工程局有限公司 | Template system used for overall pouring of large-area tunnel immersed tube |
CN104314305A (en) * | 2014-10-15 | 2015-01-28 | 中铁四局集团有限公司 | Integral moving formwork for stalk concrete pouring and application thereof |
CN204552761U (en) * | 2015-01-11 | 2015-08-12 | 中交一公局第三工程有限公司 | Wall all-hydraulic self-walking formwork jumbo in combined type song |
CN104647583A (en) * | 2015-02-16 | 2015-05-27 | 中交第二航务工程局有限公司 | Immersed-tube prefabricated outer wall support |
CN104895584A (en) * | 2015-04-28 | 2015-09-09 | 金中天集团港航有限公司 | Modularization steel die trolley and construction process thereof |
CN205704660U (en) * | 2016-04-25 | 2016-11-23 | 中铁隧道集团二处有限公司 | Demoulding tunnel, self-propelled hydraulic location immersed tube tube coupling prefab-form |
Non-Patent Citations (1)
Title |
---|
王秋林等: "南昌红谷沉管隧道预制关键设备选型及配套技术", 《隧道建设》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108162161A (en) * | 2018-02-09 | 2018-06-15 | 北京交通大学 | A kind of high-precision two-orbit beam makes template system |
CN110524691A (en) * | 2019-08-13 | 2019-12-03 | 中交第四航务工程局有限公司 | Immersed tube tunnel outboard template system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109681238B (en) | Two linings of tunnel side wall are pour and prefabricated section of jurisdiction of vault is forwardded and is used template platform truck | |
CN106089253B (en) | A kind of all-hydraulic template system poured for culvert | |
CN102704949A (en) | No-pull rod side wall construction method for underground tunnel and formwork trolley for construction | |
CN101302739B (en) | Prestress concrete box girder hydraulic internal mold vehicle as well as hydraulic internal mold system | |
CN107882064A (en) | A kind of formwork jumbo and slding form operation method for pipe gallery cast-in-place concrete slding form operation | |
CN105298111B (en) | Open cut tunnel lining construction template and its constructing device, method | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN108442405A (en) | A kind of piping lane support construction based on Urban Underground pipe gallery | |
CN101182773A (en) | Railway large-bore tunnel oval-shaped table-board cap brim bias-cutting type hole-door construction method | |
CN105114103A (en) | Rail-traveling type hydraulic ditch cable trench trolley formwork system | |
CN104695335B (en) | Upstroke movable framework steel bar overall binding lifting construction engineering method and constructing device | |
CN204662952U (en) | A kind of self-propelled tool single side formwork formwork system | |
CN106120584B (en) | A kind of box culvert slip form construction device and method | |
CN207567810U (en) | A kind of formwork jumbo for pipe gallery cast-in-place concrete slding form operation | |
CN205704660U (en) | Demoulding tunnel, self-propelled hydraulic location immersed tube tube coupling prefab-form | |
CN204982681U (en) | Steel bow member integral translation device | |
CN201244857Y (en) | Prestress concrete box girder hydraulic internal mold vehicle and hydraulic internal mold system | |
CN204402504U (en) | A kind of tunnel steel form lining trolley | |
CN111809660A (en) | Comprehensive pipe gallery rectangular trolley and construction method | |
CN105799054A (en) | Self-propelled hydraulic positioning and demolding type tunnel sinking pipe section prefabricating formwork | |
CN211762304U (en) | Self-propelled hydraulic integral T-beam template device | |
CN211547804U (en) | Cantilever type retaining wall rapid construction device | |
CN102225580B (en) | Method for longitudinally moving box girder internal mold | |
CN206205905U (en) | A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting | |
CN107042575A (en) | A kind of umbrella skeleton support assembled core and prefabricated component manufacture method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160727 |
|
WD01 | Invention patent application deemed withdrawn after publication |