CN105677978A - 一种水平多管道支架及其基于bim的预制施工方法 - Google Patents

一种水平多管道支架及其基于bim的预制施工方法 Download PDF

Info

Publication number
CN105677978A
CN105677978A CN201610009913.9A CN201610009913A CN105677978A CN 105677978 A CN105677978 A CN 105677978A CN 201610009913 A CN201610009913 A CN 201610009913A CN 105677978 A CN105677978 A CN 105677978A
Authority
CN
China
Prior art keywords
component
support
dimensional model
described support
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610009913.9A
Other languages
English (en)
Other versions
CN105677978B (zh
Inventor
王兴坡
尹奎
毛颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Sichuan Co ltd Of China Construction Third Engineering Bureau
First Construction Co Ltd of China Construction Third Engineering Division
China Construction Third Bureau Green Industry Investment Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201610009913.9A priority Critical patent/CN105677978B/zh
Publication of CN105677978A publication Critical patent/CN105677978A/zh
Application granted granted Critical
Publication of CN105677978B publication Critical patent/CN105677978B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/221Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals having brackets connected together by means of a common support
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Mechanical Engineering (AREA)
  • Pipeline Systems (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

本发明公开了一种水平多管道支架,包括横担,横担上依次设置有若干管道抱箍;横担的两端分别通过连接件固定在两根立柱的下端,立柱的上端安设有楼板固定座,楼板固定座与楼板连接;支架还包括吊杆,吊杆的底部与横担连接,吊杆的顶部安设有楼板连接座;楼板连接座通过膨胀螺栓与楼板固定;管道抱箍均匀间隔安装在横担上。本发明还采用了一种如上所述支架基于BIM的预制施工方法。本发明构造简单实用,管道排列紧凑、美观,不破坏墙体及楼板的表面,也不需土建专业的二次修补;采用BIM技术建立三维模型,并基于该三维模型实现管道支架的模块化和标准化预制施工,优化了管道支架的结构,提高了施工效率,降低了工程造价。

Description

一种水平多管道支架及其基于BIM的预制施工方法
技术领域
本发明涉及建筑施工领域,具体涉及一种水平多管道支架及其基于BIM的预制施工方法。
背景技术
目前,在室内建筑的给排水系统、暖通水系统、消防系统施工中,涉及到的管道非常多。当整个系统中的管道均水平,且流向相同、路由相同,相邻管道间的间距较小时,如何设计一个合理的吊装支架并进行预制施工成为管道施工的难点。同时,随着建筑行业的发展,利用BIM技术进行工厂化生产、模块化的预制和安装能够保证生产的连续性,生产部件的标准化,使机电安装向高效、节能、环保、平行设计、平行施工的产业化模式转变。
发明内容
本发明所采用的技术问题是,针对现有技术的不足,提供一种稳定、简单、施工效率高的水平多管道支架及其基于BIM的预制施工方法。
本发明采用的技术方案是:一种水平多管道支架,包括横担,横担上依次设置有若干管道抱箍;横担的两端分别通过连接件固定在两根立柱的下端,立柱的上端安设有楼板固定座,楼板固定座与楼板连接。
按上述方案,所述支架还包括吊杆,吊杆的底部与横担连接,吊杆的顶部安设有楼板连接座;楼板连接座通过膨胀螺栓与楼板固定。
按上述方案,所述管道抱箍均匀间隔安装在横担上。
按上述方案,所述连接件呈L形,连接件的两端分别通过螺栓与横担和立柱连接。
按上述方案,所述横担、立柱均由C型钢制成;所述吊杆由圆钢制成。
本发明还采用了一种如上所述支架基于BIM的预制施工方法,包括以下步骤:
步骤一、将用于制造所述支架各构件的材料其相关参数输入BIM,构建数据库;
步骤二、根据建筑物的排水系统、通风系统等管系中的水平多管道建立所述支架的三维模型;
步骤三、合理布置管线中各管道的位置,对三维模型进行优化处理;
步骤四、根据管线中各管道的位置生成所述支架的剖面图,分析所述支架各构件剖面的受力情况;
步骤五、调取数据库,根据受力情况对各构件进行选型、设计;
步骤六、自动输出预制加工料表及所述支架各构件的多角度三维视图,并在车间内对各构件进行预制加工;
步骤七、依据三维模型中的设计参数对所述支架各构件检查核实、预拼装,运至施工现场;
步骤八、在施工现场根据三维模型放线定位,复核所述支架的结构及各构件的尺寸;
步骤九、基于三维模型图纸对所述支架定位吊装。
按上述方案,在步骤六中,所述支架各构件的多角度三维视图与预制加工料表通过三维模型一体输出。
按上述方案,在步骤六中,所述支架各构件实体加工完成后,根据三维模型进行编码。
按上述方案,在步骤六中,所述支架各构件的加工均为模块化加工,各构件可相互连接固定。
按上述方案,在步骤五中,三维模型中所述支架各构件的几何参数可调。
本发明的有益效果是:1)本支架构造简单实用,管道排列紧凑、美观,不破坏墙体及楼板的表面,也不需土建专业的二次修补;2)采用BIM技术建立三维模型,三维模型内信息自动集成和提取,实现管道支架的模块化和标准化预制施工,优化了管道支架的结构,降低了施工难度,提高了施工效率,降低了工程造价。
附图说明
图1为本发明一个具体实施例的结构示意图。。
图2为本实施例中图1的俯视图。
图3为本实施例中立柱与楼板固定座的BIM模型输出图。
图4为本实施例中吊杆与楼板固定底座的BIM模型输出图。
图5为本实施例中立柱与横担连接的固定件BIM模型输出图。
图6为本实施例中C型钢的结构示意图。
其中:1、螺栓孔;2、楼板固定座;3、立柱;4、管道抱箍;5、楼板连接座;6、吊杆;7、管道;8、横担;9、连接件。
具体实施方式
为了更好地理解本发明,下面结合附图和具体实施例对本发明作进一步地描述。
如图1所示的一种水平多管道支架,包括横担8,横担8上依次均匀间隔设置有若干用于箍紧管道7的管道抱箍4(根据管道7设计管道抱箍4);横担8的两端分别通过连接件9固定在两根立柱3的下端,连接件9为L形,连接件9的两端分别通过螺栓与横担8和立柱9连接;立柱3的上端安设有楼板固定座2,楼板固定座2上开设有螺栓孔,楼板固定座2通过螺栓与楼板连接固定。
本实施例中,为了提高所述支架的强度,还安设有吊杆6,吊杆6的底部与横担8连接,吊杆6的顶部安设有楼板连接座5,楼板连接座5为带固定翼折弯的U形钢板制成;楼板连接座5通过膨胀螺栓与楼板固定。
本实施例中,横担8、立柱3均由C型钢制成,横担8和立柱3上均开设有用于连接的螺栓孔;吊杆6由圆钢制成,吊杆6上也开设有用于连接的螺栓孔。
本发明还提供了一种上述支架基于BIM的预制施工方法,包括以下步骤:
步骤一、将用于制造各构件的材料其型号规格、物理特性等参数输入BIM,形成参数化的数据库。
步骤二、根据建筑物的排水系统、通风系统等管系中的水平多管道建立所述支架的三维模型。
步骤三、合理布置管线中各管道的空间位置,根据各管道的位置对三维模型进行优化处理。
步骤四、根据各管道的布置位置快速生成所述支架的剖面图,并综合现场施工条件分析所述支架各构件剖面的受力情况。
步骤五、调取数据库,根据受力情况对所述支架各构件进行选型、设计;在三维模型中,所述支架各构件的几何参数(长度、宽度及高度)是可调的。
步骤六、通过三维模型自动整体输出预制加工料表及所述支架各构件的多角度三维视图,并在车间内对所述支架各构件进行预制加工;各构件的加工均为模块化加工,各构件可相互连接固定;加工完成后根据三维模型对所述支架各构件编码。
步骤七、依据三维模型中的设计参数对所述支架各构件检查核实、预拼装,并运至施工现场。
步骤八、在施工现场根据三维模型放线定位,复核所述支架的结构及各构件的尺寸。
步骤九、基于三维模型图纸对所述支架定位吊装。
以上仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (10)

1.一种水平多管道支架,其特征在于,包括横担,横担上依次设置有若干管道抱箍;横担的两端分别通过连接件固定在两根立柱的下端,立柱的上端安设有楼板固定座,楼板固定座与楼板连接。
2.如权利要求1所述的一种水平多管道支架,其特征在于,还包括吊杆,吊杆的底部与横担连接,吊杆的顶部安设有楼板连接座;楼板连接座通过膨胀螺栓与楼板固定。
3.如权利要求1所述的一种水平多管道支架,其特征在于,所述管道抱箍均匀间隔安装在横担上。
4.如权利要求1所述的一种水平多管道支架,其特征在于,所述连接件呈L形,连接件的两端分别通过螺栓与横担和立柱连接。
5.如权利要求1所述的一种水平多管道支架,其特征在于,所述横担、立柱均由C型钢制成;所述吊杆由圆钢制成。
6.权利要求1~5中任一权利要求所述支架基于BIM的预制施工方法,其特征在于,包括以下步骤:
步骤一、将用于制造所述支架各构件的材料其相关参数输入BIM,构建数据库;
步骤二、根据建筑物的排水系统、通风系统等管系中的水平多管道建立所述支架的三维模型;
步骤三、合理布置管线中各管道的位置,对三维模型进行优化处理;
步骤四、根据管线中各管道的位置生成所述支架的剖面图,分析所述支架各构件剖面的受力情况;
步骤五、调取数据库,根据受力情况对各构件进行选型、设计;
步骤六、自动输出预制加工料表及所述支架各构件的多角度三维视图,并在车间内对各构件进行预制加工;
步骤七、依据三维模型中的设计参数对所述支架各构件检查核实、预拼装,运至施工现场;
步骤八、在施工现场根据三维模型放线定位,复核所述支架的结构及各构件的尺寸;
步骤九、基于三维模型图纸对所述支架定位吊装。
7.如权利要求6所述的预制施工方法,其特征在于,在步骤六中,所述支架各构件的多角度三维视图与预制加工料表通过三维模型一体输出。
8.如权利要求6所述的预制施工方法,其特征在于,在步骤六中,所述支架各构件实体加工完成后,根据三维模型进行编码。
9.如权利要求6所述的预制施工方法,其特征在于,在步骤六中,所述支架各构件的加工均为模块化加工,各构件可相互连接固定。
10.如权利要求6所述的预制施工方法,其特征在于,在步骤五中,三维模型中所述支架各构件的几何参数可调。
CN201610009913.9A 2016-01-08 2016-01-08 一种水平多管道支架及其基于bim的预制施工方法 Active CN105677978B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610009913.9A CN105677978B (zh) 2016-01-08 2016-01-08 一种水平多管道支架及其基于bim的预制施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610009913.9A CN105677978B (zh) 2016-01-08 2016-01-08 一种水平多管道支架及其基于bim的预制施工方法

Publications (2)

Publication Number Publication Date
CN105677978A true CN105677978A (zh) 2016-06-15
CN105677978B CN105677978B (zh) 2018-09-11

Family

ID=56299440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610009913.9A Active CN105677978B (zh) 2016-01-08 2016-01-08 一种水平多管道支架及其基于bim的预制施工方法

Country Status (1)

Country Link
CN (1) CN105677978B (zh)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106504127A (zh) * 2016-11-11 2017-03-15 上海市机械施工集团有限公司 无纸化的建筑施工方法
CN106522550A (zh) * 2016-10-20 2017-03-22 中建三局集团有限公司 超大型地下制冷机房整体式钢结构平台管道支架设置方法
CN106677534A (zh) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 建筑机电工程装配式整体安装系统及方法
CN106786267A (zh) * 2016-12-14 2017-05-31 上海建工建集团有限公司 一种超厚混凝土成排异形束流管的固定装置及安装方法
CN106989211A (zh) * 2017-04-20 2017-07-28 中亿丰建设集团股份有限公司 基于bim的装配式建筑管线支吊架系统安装方法
CN107103170A (zh) * 2017-06-30 2017-08-29 东风设计研究院有限公司 基于bim技术的管道支架设计方法
CN107767295A (zh) * 2016-08-16 2018-03-06 赫克斯冈技术中心 施工管理系统
CN107842667A (zh) * 2017-09-30 2018-03-27 中国化学工程第六建设有限公司 一种钢衬里管道的一次配管成型方法
CN107990052A (zh) * 2017-10-31 2018-05-04 重庆建工第二建设有限公司 一种管线装配式吊架安装方法
CN108711773A (zh) * 2018-06-07 2018-10-26 武汉鑫科信科技有限公司 一种建筑物综合布线设备间的设计方法
CN109099210A (zh) * 2017-06-21 2018-12-28 镇江军友电气设备有限公司 一种模块化综合管线支架
CN109141307A (zh) * 2018-09-10 2019-01-04 上海宝冶建筑工程有限公司 一种管道支架加工精度检测方法
CN109191568A (zh) * 2018-09-28 2019-01-11 上海嘉实(集团)有限公司 一种三维绘图中安装支架自动生成的方法
CN110287591A (zh) * 2019-06-24 2019-09-27 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的模块化方法
CN110348077A (zh) * 2019-06-24 2019-10-18 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的3c模块化方法
CN110375113A (zh) * 2019-07-31 2019-10-25 北京毕亦可机电设计咨询有限公司 基于bim的标准模数化机电管道装配方法
CN110565903A (zh) * 2019-09-12 2019-12-13 中建八局第二建设有限公司 一种钢结构网架内大型风管施工方法
CN110620348A (zh) * 2019-08-30 2019-12-27 北京首钢建设集团有限公司 一种利用室内装配式临电吊杆的临电架设施工方法
CN111079262A (zh) * 2019-11-22 2020-04-28 久瓴(上海)智能科技有限公司 管路吊装结构的生成方法、装置、计算机设备和存储介质
CN111336321A (zh) * 2020-03-31 2020-06-26 中铁建工集团有限公司 一种可快速装配成组管道的固定支吊架
CN111853347A (zh) * 2020-07-10 2020-10-30 青岛新华友建工集团股份有限公司 一种基于bim的超前定位直埋锚栓预制管线支架施工工艺
CN111981200A (zh) * 2020-08-24 2020-11-24 中建八局第二建设有限公司 复杂管道综合支撑体系设计施工一体化施工方法
CN112632660A (zh) * 2020-12-08 2021-04-09 中国电建集团河北省电力勘测设计研究院有限公司 一种bim设计链接的电缆桥架支吊架的智能布置方法
CN113516442A (zh) * 2020-04-10 2021-10-19 深圳市市政设计研究院有限公司 一种基于bim+cam技术的型材制造系统及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003208451A (ja) * 2002-01-11 2003-07-25 Okawa Kozo Sekkei:Kk 3次元cadによる土木構造物の数量算出方法及び照査方法
JP2004295168A (ja) * 2003-03-25 2004-10-21 Okawa Kozo Sekkei:Kk 3次元cadによる構造物の設計図並びに数量計算書の作成及び照査方法
CN103218492A (zh) * 2013-04-16 2013-07-24 上海上安机电设计事务所有限公司 一种基于bim的管道预制方法
CN204284661U (zh) * 2014-12-12 2015-04-22 中铁建大桥工程局集团第五工程有限公司 一种用于管线分类合理排布的综合支吊架
CN204785046U (zh) * 2015-06-08 2015-11-18 中建安装工程有限公司 一种集成模块管廊系统
CN204901084U (zh) * 2015-08-31 2015-12-23 科宇智能环境技术服务有限公司 一种基于bim的预制一体化装配式组合支架

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003208451A (ja) * 2002-01-11 2003-07-25 Okawa Kozo Sekkei:Kk 3次元cadによる土木構造物の数量算出方法及び照査方法
JP2004295168A (ja) * 2003-03-25 2004-10-21 Okawa Kozo Sekkei:Kk 3次元cadによる構造物の設計図並びに数量計算書の作成及び照査方法
CN103218492A (zh) * 2013-04-16 2013-07-24 上海上安机电设计事务所有限公司 一种基于bim的管道预制方法
CN204284661U (zh) * 2014-12-12 2015-04-22 中铁建大桥工程局集团第五工程有限公司 一种用于管线分类合理排布的综合支吊架
CN204785046U (zh) * 2015-06-08 2015-11-18 中建安装工程有限公司 一种集成模块管廊系统
CN204901084U (zh) * 2015-08-31 2015-12-23 科宇智能环境技术服务有限公司 一种基于bim的预制一体化装配式组合支架

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107767295A (zh) * 2016-08-16 2018-03-06 赫克斯冈技术中心 施工管理系统
US11379626B2 (en) 2016-08-16 2022-07-05 Hexagon Technology Center Gmbh Construction management system
CN106522550A (zh) * 2016-10-20 2017-03-22 中建三局集团有限公司 超大型地下制冷机房整体式钢结构平台管道支架设置方法
CN106522550B (zh) * 2016-10-20 2019-06-14 中建三局集团有限公司 一种超大型地下制冷机房整体式钢结构平台管道支架设置方法
CN106504127A (zh) * 2016-11-11 2017-03-15 上海市机械施工集团有限公司 无纸化的建筑施工方法
CN106677534A (zh) * 2016-11-16 2017-05-17 上海建工集团股份有限公司 建筑机电工程装配式整体安装系统及方法
CN106786267A (zh) * 2016-12-14 2017-05-31 上海建工建集团有限公司 一种超厚混凝土成排异形束流管的固定装置及安装方法
CN106786267B (zh) * 2016-12-14 2019-06-25 上海建工一建集团有限公司 一种超厚混凝土成排异形束流管的固定装置及安装方法
CN106989211A (zh) * 2017-04-20 2017-07-28 中亿丰建设集团股份有限公司 基于bim的装配式建筑管线支吊架系统安装方法
CN109099210A (zh) * 2017-06-21 2018-12-28 镇江军友电气设备有限公司 一种模块化综合管线支架
CN107103170A (zh) * 2017-06-30 2017-08-29 东风设计研究院有限公司 基于bim技术的管道支架设计方法
CN107103170B (zh) * 2017-06-30 2020-11-03 东风设计研究院有限公司 基于bim技术的管道支架设计方法
CN107842667A (zh) * 2017-09-30 2018-03-27 中国化学工程第六建设有限公司 一种钢衬里管道的一次配管成型方法
CN107990052A (zh) * 2017-10-31 2018-05-04 重庆建工第二建设有限公司 一种管线装配式吊架安装方法
CN108711773A (zh) * 2018-06-07 2018-10-26 武汉鑫科信科技有限公司 一种建筑物综合布线设备间的设计方法
CN109141307A (zh) * 2018-09-10 2019-01-04 上海宝冶建筑工程有限公司 一种管道支架加工精度检测方法
CN109191568A (zh) * 2018-09-28 2019-01-11 上海嘉实(集团)有限公司 一种三维绘图中安装支架自动生成的方法
CN110348077A (zh) * 2019-06-24 2019-10-18 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的3c模块化方法
CN110287591A (zh) * 2019-06-24 2019-09-27 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的模块化方法
WO2020258122A1 (zh) * 2019-06-24 2020-12-30 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的3c模块化方法
WO2020258123A1 (zh) * 2019-06-24 2020-12-30 长沙远大住宅工业集团股份有限公司 建筑设计、制造、施工的模块化方法
CN110375113A (zh) * 2019-07-31 2019-10-25 北京毕亦可机电设计咨询有限公司 基于bim的标准模数化机电管道装配方法
CN110620348A (zh) * 2019-08-30 2019-12-27 北京首钢建设集团有限公司 一种利用室内装配式临电吊杆的临电架设施工方法
CN110565903A (zh) * 2019-09-12 2019-12-13 中建八局第二建设有限公司 一种钢结构网架内大型风管施工方法
CN111079262A (zh) * 2019-11-22 2020-04-28 久瓴(上海)智能科技有限公司 管路吊装结构的生成方法、装置、计算机设备和存储介质
CN111079262B (zh) * 2019-11-22 2023-10-20 久瓴(江苏)数字智能科技有限公司 管路吊装结构的生成方法、装置、计算机设备和存储介质
CN111336321A (zh) * 2020-03-31 2020-06-26 中铁建工集团有限公司 一种可快速装配成组管道的固定支吊架
CN113516442A (zh) * 2020-04-10 2021-10-19 深圳市市政设计研究院有限公司 一种基于bim+cam技术的型材制造系统及方法
CN111853347A (zh) * 2020-07-10 2020-10-30 青岛新华友建工集团股份有限公司 一种基于bim的超前定位直埋锚栓预制管线支架施工工艺
CN111981200A (zh) * 2020-08-24 2020-11-24 中建八局第二建设有限公司 复杂管道综合支撑体系设计施工一体化施工方法
CN112632660B (zh) * 2020-12-08 2022-10-21 中国电建集团河北省电力勘测设计研究院有限公司 一种bim设计链接的电缆桥架支吊架的智能布置方法
CN112632660A (zh) * 2020-12-08 2021-04-09 中国电建集团河北省电力勘测设计研究院有限公司 一种bim设计链接的电缆桥架支吊架的智能布置方法

Also Published As

Publication number Publication date
CN105677978B (zh) 2018-09-11

Similar Documents

Publication Publication Date Title
CN105677978A (zh) 一种水平多管道支架及其基于bim的预制施工方法
CN106989211B (zh) 基于bim的装配式建筑管线支吊架系统安装方法
CN105701282A (zh) 一种多管组安装框架及其基于bim的预制施工方法
CN204478334U (zh) 模块式集成冷冻站
CN204901084U (zh) 一种基于bim的预制一体化装配式组合支架
CN107990052A (zh) 一种管线装配式吊架安装方法
CN115758553B (zh) 一种基于bim技术的模块化装配式机房实施方法
CN117010065A (zh) 一种基于bim技术的医院狭窄走廊机电管线施工方法
CN100570757C (zh) 用于核电站核岛的模块化建造方法
CN101752017B (zh) 用于核电站核岛的模块化建造方法
CN101736925B (zh) 用于核电站核岛的模块化建造方法
CN204127487U (zh) 管线工业化安装支架结构
CN101748915B (zh) 用于核电站核岛的模块化建造方法
CN206770801U (zh) 一种基于综合管廊排布的多功能支吊架
CN203656365U (zh) 基于电缆下桥引缆的组合式过渡引缆笼
CN115618455A (zh) 一种多泵组机组模块化及装配化数字建造方法
CN203111475U (zh) 钻井船锚台整体制作工艺制作的锚台结构
CN206052777U (zh) 叠合装配式地下管廊墙板定位装置
CN205224388U (zh) 一种集成装配式外墙板
CN102383496A (zh) 钢筋混凝土梁柱节点预制钢箍筒及施工工法
CN207159938U (zh) 一种制作大型钢圆筒的临时支撑胎架
CN203905531U (zh) 农村装配式钢结构住宅体系
CN204385909U (zh) 一种具有自复位功能的装配式混凝土框架组合节点
CN102777703A (zh) 组装式轻型管道吊架
CN106764075A (zh) 用于机电综合管线安装的型钢双拼联合支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221018

Address after: 430040, No. 1, Soochow Road, Dongxihu District, Hubei, Wuhan

Patentee after: CHINA CONSTRUCTION THIRD BUREAU FIRST ENGINEERING Co.,Ltd.

Patentee after: The First Construction (Sichuan) Co.,Ltd. of China Construction Third Engineering Bureau

Patentee after: CHINA CONSTRUCTION THIRD ENGINEERING BUREAU GREEN INDUSTRY INVESTMENT Co.,Ltd.