CN110287591A - 建筑设计、制造、施工的模块化方法 - Google Patents
建筑设计、制造、施工的模块化方法 Download PDFInfo
- Publication number
- CN110287591A CN110287591A CN201910552849.2A CN201910552849A CN110287591A CN 110287591 A CN110287591 A CN 110287591A CN 201910552849 A CN201910552849 A CN 201910552849A CN 110287591 A CN110287591 A CN 110287591A
- Authority
- CN
- China
- Prior art keywords
- standard module
- construction
- manufacture
- module
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/02—CAD in a network environment, e.g. collaborative CAD or distributed simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2119/00—Details relating to the type or aim of the analysis or the optimisation
- G06F2119/18—Manufacturability analysis or optimisation for manufacturability
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Hardware Design (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Architecture (AREA)
- Mathematical Analysis (AREA)
- Structural Engineering (AREA)
- Pure & Applied Mathematics (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
一种建筑设计、制造、施工的模块化方法,包括:(1)将建筑划分成不同的标准模块;(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;(3)利用大数据平台组建标准化全行业共享的模块库;(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;(5)建筑设计人员通过搜索引擎从大数据平台的模块库中信用符合自身建筑方案所需的标准模块,进行匹配;(6)建筑的制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。本发明减少设计、制造、施工环节的冗余工作量,降低综合成本,提高效率,保护环境,提升质量,实现模块化、标准化、通用化和信息化。
Description
技术领域:
本发明涉及建筑工程技术领域,具体涉及一种建筑设计、制造、施工的模块化方法。
背景技术:
现有的建筑设计、制造、施工都是根据每一幢建筑的不同而分别定制化进行的,其设计、制造、施工的每一个环节都是从原材料级开始,逐级进行,工作量大,周期长,成本高,效率低,交付慢。例如建筑设计,设计人员需要建立结构计算模型,对每一个建筑构件的混凝土强度、钢筋、尺寸进行核算;预制构件制造时,需要绘制构件生产图纸,制作专用模具,编制制造工艺;施工时都是将原材料运到现场进行加工制作。因此,整个建筑行业的设计、制造、施工仍处于分散的、独立的、重复的、低效高成本的原始落后状态,缺乏模块化、标准化、通用化和信息化。
发明内容:
本发明所要解决的技术问题是:解决上述现有技术存在的问题,而提供一种建筑设计、制造、施工的模块化方法,减少设计、制造、施工环节的冗余工作量,降低综合成本,提高效率,保护环境,提升质量,实现模块化、标准化、通用化和信息化。
本发明采用的技术方案是:一种建筑设计、制造、施工的模块化方法,包括:
(1)将建筑划分成不同的标准模块;
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
上述技术方案中,所述方法(1)的标准模块包括预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块。
上述技术方案中,所述方法(2)标准模块的图形、清单、性能参数、制造工艺、施工工艺包括建筑构件的布置与计算,以及建筑构件使用的材料、形状、大小及内部钢筋构造。
一种建筑设计、制造、施工的模块化方法,包括:
(1)将建筑划分成不同的标准模块;
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
(7)根据建筑方案,设计、施工、建造建筑受力架构;
(8)将上述方法(1)-(6)制造的标准模块建筑构件装配在上述(7)建筑受力架构上。
上述技术方案中,所述方法(8)的标准模块建筑构件与建筑受力架构通过螺栓或铆接或焊接连接安装,标准模块建筑构件与标准模块建筑构件之间通过螺栓或铆接或焊接连接安装。
上述技术方案中,所述方法(7)的建筑受力架构包括框架、框剪和/或框筒。
上述技术方案中,所述建筑受力架构采用混凝土结构或钢结构。
上述技术方案中,所述的方法(1)的标准模块包括预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块。
本发明突出的实质性特点和显著效果:
现有技术根据每幢建筑的不同,分别进行定制生产,其设计、制造、施工的每个环节都是分别从原材料级开始,首先设计人员需要建立结构计算模型,然后对每一个构件的混凝土、钢筋、尺寸进行核算;制造时另需要绘制建筑构件生产图纸,制作专用模具,编制制造工艺;施工时都是将原材料运到现场加工制作。这样,从设计、制造到施工,每一幢建筑都要进行分散的、独立的、重复性的大量工作,所以成本高、效率低、交付慢,缺乏标准化和通用性。
本发明将这些表面看起来不一样的建筑找出其中很多共性的部分,设计制造成标准模块,供行业共享,这样就避免了分散、独立、重复的设计、制造与施工,大大减少了冗余工作量,提高了效率,降低了综合成本,保护了环境,提升了建筑质量。
本发明首先将建筑划分成不同的标准模块,通过对比不同建筑的模块,建立一个全行业共享的模块库,模块库中的标准模块包含了图形、性能参数、清单、制造工艺、施工工艺等信息。设计人员可以通过搜索,查找到符合自身建筑方案所需的标准模块,进行匹配,从而避免再做复杂的重复设计工作,只需对一些无法匹配的部分进行设计;制造与施工时,也无需再与模块库匹配,可以直接从模块库中调用相关的数据进行制造与施工。这样就实现了建筑行业的模块化、标准化、通用化和信息化。将建筑行业落后的分散、独立、重复、低效设计、制造与施工提升到产品的个性化、模块的标准化、工艺的通用化和工艺的简洁化新高度。
附图说明:
图1为本发明原理框图。
具体实施方式:
实施例1,本发明的一种建筑设计、制造、施工的模块化方法,包括:
(1)将建筑划分成不同的标准模块;如:预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块;
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
上述(1)的标准模块包括所述方法(2)标准模块的图形、清单、性能参数、制造工艺、施工工艺包括建筑构件的布置与计算,以及建筑构件使用的材料、形状、大小及内部钢筋构造。
实施例2,本发明的另一种建筑设计、制造、施工的模块化方法,包括:
(1)将建筑划分成不同的标准模块;如预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块。
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
(7)根据建筑方案,设计、施工、建造建筑受力架构;
(8)将上述方法(1)-(6)制造的标准模块建筑构件装配在上述(7)建筑受力架构上。
所述方法(8)的标准模块建筑构件与建筑受力架构通过螺栓或铆接或焊接连接安装,标准模块建筑构件与标准模块建筑构件之间通过螺栓或铆接或焊接连接安装。
所述方法(7)的建筑受力架构包括框架、框剪和/或框筒。
所述建筑受力架构采用混凝土结构或钢结构。
Claims (8)
1.一种建筑设计、制造、施工的模块化方法,其特征在于,包括:
(1)将建筑划分成不同的标准模块;
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
2.根据权利要求1所述的建筑设计、制造、施工的模块化方法,其特征在于,包括:所述方法(1)的标准模块包括预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块。
3.根据权利要求1所述的建筑设计、制造、施工的模块化方法,其特征在于,所述方法(2)标准模块的图形、清单、性能参数、制造工艺、施工工艺包括建筑构件的布置与计算,以及建筑构件使用的材料、形状、大小及内部钢筋构造。
4.一种建筑设计、制造、施工的模块化方法,其特征在于,包括:
(1)将建筑划分成不同的标准模块;
(2)对应每一个标准模块由设计人员建模、计算、出图,使每一个标准模块包含有完整的图形、清单、性能参数、制造工艺、施工工艺等所有信息;
(3)利用大数据平台组建标准化全行业共享的模块库;
(4)将上述(1)、(2)的标准模块信息导入(3)的模块库中;
(5)建筑设计人员通过搜索引擎从大数据平台的模块库中选用符合自身建筑方案所需的标准模块,进行匹配;
(6)建筑制造与施工人员直接从选用的标准模块中调用制造和施工的相关数据,进行制造和施工。
(7)根据建筑方案,设计、施工、建造建筑受力架构;
(8)将上述方法(1)-(6)制造的标准模块建筑构件装配在上述(7)建筑受力架构上。
5.根据权利要求4所述的建筑设计、制造、施工的模块化方法,其特征在于,所述方法(8)制造的标准模块建筑构件与建筑受力架构通过螺栓连接安装,标准模块建筑构件与标准模块建筑构件之间通过螺栓连接安装。
6.根据权利要求4所述的建筑设计、制造、施工的模块化方法,其特征在于,所述方法(7)的建筑受力架构包括框架、框剪和/或框筒。
7.根据权利要求4所述的建筑设计、制造、施工的模块化方法,其特征在于,所述建筑受力架构采用混凝土结构或钢结构。
8.根据权利要求4所述的建筑设计、制造、施工的模块化方法,其特征在于,包括:所述方法(1)的标准模块包括预制外墙标准模块、内剪力墙标准模块、隔墙标准模块、梁标准模块、楼板标准模块、楼梯标准模块、空调板标准模块、楼梯休息平台板标准模块和柱标准模块。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910552849.2A CN110287591A (zh) | 2019-06-24 | 2019-06-24 | 建筑设计、制造、施工的模块化方法 |
PCT/CN2019/093169 WO2020258123A1 (zh) | 2019-06-24 | 2019-06-27 | 建筑设计、制造、施工的模块化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910552849.2A CN110287591A (zh) | 2019-06-24 | 2019-06-24 | 建筑设计、制造、施工的模块化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110287591A true CN110287591A (zh) | 2019-09-27 |
Family
ID=68005476
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910552849.2A Pending CN110287591A (zh) | 2019-06-24 | 2019-06-24 | 建筑设计、制造、施工的模块化方法 |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN110287591A (zh) |
WO (1) | WO2020258123A1 (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111177828A (zh) * | 2019-12-18 | 2020-05-19 | 深圳市华阳国际工程设计股份有限公司 | 应用于标准楼层模型的联动方法、装置及计算机存储介质 |
CN111395524A (zh) * | 2020-03-27 | 2020-07-10 | 毅德建筑咨询(上海)有限公司 | 一种冷弯薄壁轻钢结构模块化的建筑设计方法 |
CN111753364A (zh) * | 2020-07-06 | 2020-10-09 | 许广明 | 一种采用预制方法进行节能建筑建造的施工方法 |
CN111877257A (zh) * | 2020-06-19 | 2020-11-03 | 日昌(福建)集团有限公司 | 一种基于大数据处理的水坝建造方法 |
WO2023072304A1 (zh) * | 2021-10-28 | 2023-05-04 | 中建科技武汉有限公司 | 一种用于装配式混凝土建筑的设计方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105677978A (zh) * | 2016-01-08 | 2016-06-15 | 中建三局第一建设工程有限责任公司 | 一种水平多管道支架及其基于bim的预制施工方法 |
CN105701282A (zh) * | 2016-01-08 | 2016-06-22 | 中建三局第建设工程有限责任公司 | 一种多管组安装框架及其基于bim的预制施工方法 |
CN106907025A (zh) * | 2017-03-27 | 2017-06-30 | 上海市地下空间设计研究总院有限公司 | 基于标准化预制构件的装配式住宅房型设计方法 |
CN107526882A (zh) * | 2017-08-11 | 2017-12-29 | 中国化学工程第六建设有限公司 | 基于bim技术的化工工艺建筑施工方法 |
US20190172161A1 (en) * | 2017-12-02 | 2019-06-06 | M-Fire Suppression, Inc. | Method of and system for delivering, certifying and inspecting fire protection provided to wood-framed and mass-timber building construction sites, and prefabricated wood-framed and mass timber buildings and components within a factory |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN207032468U (zh) * | 2017-06-07 | 2018-02-23 | 吴青桦 | 装配式建筑 |
CN109898839A (zh) * | 2019-02-24 | 2019-06-18 | 王琪 | 一种建筑模板的标准部件与非标件及bim化装配方法 |
-
2019
- 2019-06-24 CN CN201910552849.2A patent/CN110287591A/zh active Pending
- 2019-06-27 WO PCT/CN2019/093169 patent/WO2020258123A1/zh active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105677978A (zh) * | 2016-01-08 | 2016-06-15 | 中建三局第一建设工程有限责任公司 | 一种水平多管道支架及其基于bim的预制施工方法 |
CN105701282A (zh) * | 2016-01-08 | 2016-06-22 | 中建三局第建设工程有限责任公司 | 一种多管组安装框架及其基于bim的预制施工方法 |
CN106907025A (zh) * | 2017-03-27 | 2017-06-30 | 上海市地下空间设计研究总院有限公司 | 基于标准化预制构件的装配式住宅房型设计方法 |
CN107526882A (zh) * | 2017-08-11 | 2017-12-29 | 中国化学工程第六建设有限公司 | 基于bim技术的化工工艺建筑施工方法 |
US20190172161A1 (en) * | 2017-12-02 | 2019-06-06 | M-Fire Suppression, Inc. | Method of and system for delivering, certifying and inspecting fire protection provided to wood-framed and mass-timber building construction sites, and prefabricated wood-framed and mass timber buildings and components within a factory |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111177828A (zh) * | 2019-12-18 | 2020-05-19 | 深圳市华阳国际工程设计股份有限公司 | 应用于标准楼层模型的联动方法、装置及计算机存储介质 |
CN111395524A (zh) * | 2020-03-27 | 2020-07-10 | 毅德建筑咨询(上海)有限公司 | 一种冷弯薄壁轻钢结构模块化的建筑设计方法 |
CN111877257A (zh) * | 2020-06-19 | 2020-11-03 | 日昌(福建)集团有限公司 | 一种基于大数据处理的水坝建造方法 |
CN111753364A (zh) * | 2020-07-06 | 2020-10-09 | 许广明 | 一种采用预制方法进行节能建筑建造的施工方法 |
CN111753364B (zh) * | 2020-07-06 | 2023-09-05 | 广东骏德建设发展有限公司 | 一种采用预制方法进行节能建筑建造的施工方法 |
WO2023072304A1 (zh) * | 2021-10-28 | 2023-05-04 | 中建科技武汉有限公司 | 一种用于装配式混凝土建筑的设计方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2020258123A1 (zh) | 2020-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110287591A (zh) | 建筑设计、制造、施工的模块化方法 | |
CN110348077A (zh) | 建筑设计、制造、施工的3c模块化方法 | |
KR101396795B1 (ko) | Bim 시스템 및 모델링 방법 | |
CN111400812A (zh) | 一种基于bim的装配式结构剪力墙加工图设计方法 | |
Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
CN109146118B (zh) | 一种基于优化算法的预制构件堆场优化系统及其优化方法 | |
CN110119516A (zh) | 一种基于bim技术的钢筋翻样方法 | |
CN112560134A (zh) | 一种基于cad与bim的装配式结构叠合板批量深化设计方法 | |
CN102888957A (zh) | 一种预制轻型板式楼梯 | |
CN104766177A (zh) | 一种基于工业化建设项目的预制构件信息库构建方法 | |
CN115587784A (zh) | 一种应用于钢结构数字化加工制造的bim方法 | |
CN209227776U (zh) | 一种三维建筑模块 | |
Liu et al. | Comparative analysis of off-site precast concrete and cast-in-place concrete in low-carbon built environment | |
CN108897978A (zh) | 基于bim的钢筋下料及断料的优化方法 | |
Abdul Kadir et al. | Construction performance comparison between conventional and industrialised building systems in Malaysia | |
CN103993659A (zh) | 一种楼面结构模块及其拼装方法 | |
Richard | Industrialized building system categorization | |
CN110909409A (zh) | 基于bim装配式建筑钢筋数据生成方法、装置、设备及介质 | |
Placzek et al. | Concrete Additive Manufacturing in Construction: Integration Based on Component-Related Fabrication Strategies | |
CN200982051Y (zh) | 一种预铸组合式轻质墙板 | |
CN115146369A (zh) | 一种3d打印预制叠合楼板建造方法及系统 | |
CN110042958A (zh) | 一种钢筋模板一体化t形墙构件及生产方法 | |
CN210032084U (zh) | 一种模块化钢结构节点 | |
CN206053132U (zh) | 预制钢筋笼构件、剪力墙和地下连续墙 | |
CN210562835U (zh) | 一种钢筋模板一体化l形墙构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190927 |