CN105568867A - 一种钢箱梁低位滑移快速施工方法 - Google Patents

一种钢箱梁低位滑移快速施工方法 Download PDF

Info

Publication number
CN105568867A
CN105568867A CN201610032597.7A CN201610032597A CN105568867A CN 105568867 A CN105568867 A CN 105568867A CN 201610032597 A CN201610032597 A CN 201610032597A CN 105568867 A CN105568867 A CN 105568867A
Authority
CN
China
Prior art keywords
steel box
girder
slippage
box girder
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610032597.7A
Other languages
English (en)
Other versions
CN105568867B (zh
Inventor
宋伟俊
邢如祥
陈宁贤
朱林达
岳超杰
蔡文焘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Jingjiang Heavy Industry Co ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201610032597.7A priority Critical patent/CN105568867B/zh
Publication of CN105568867A publication Critical patent/CN105568867A/zh
Application granted granted Critical
Publication of CN105568867B publication Critical patent/CN105568867B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供了一种钢箱梁低位滑移快速施工方法,包括以下步骤:1).主塔下横梁施工;2).在主塔边跨范围内安装滑移支架,所述滑移支架沿主桥中心线设置,通过该滑移支架将边跨钢箱梁段和中跨钢箱梁段进行存放;3).施工主塔中横梁;4).在主塔中横梁上安装中横梁托架,吊运至少两个钢箱梁节段至该中横梁托架上,并调整钢箱梁节段的位置及线性后进行拼接形成支撑体。本发明所述的一种钢箱梁低位滑移快速施工方法,在桥跨边跨侧搭设低位滑移平台,与主塔同步施工,支架高度较低,支架工程量仅需1300t钢材。该施工方法对于跨越江河湖海的大跨度自锚式悬索桥的钢箱梁施工有重要意义,施工安全系数高,具有良好的社会效益和经济效益。

Description

一种钢箱梁低位滑移快速施工方法
技术领域
本发明专利涉及大桥施工设备,尤其是涉及一种钢箱梁低位滑移快速施工方法。
背景技术
钢材的大量运用,使得钢箱梁被广泛应用于各类桥梁中。无论是城市桥梁,或者是铁路桥梁,都有很多桥梁采用了钢箱梁为主梁梁体。这既是钢箱梁成熟运用的表现,同时也为钢箱梁的多样化施工带来了可能。本发明即将要提到的大跨度自锚式悬索桥,一般修建于深水之上,主梁段也经常使用钢箱梁截面,不过由于受水文地质条件的限制,施工也会有相应的局限性。大跨度自锚式钢箱梁悬索桥主梁的安装方案通常是采用支架法+顶推或者滑移施工:在桥跨一端或两端搭设顶推或者滑移平台,在桥跨中间搭设若干个支架作为钢箱梁主梁的支承结构,通过顶推或者滑移方式将钢箱梁主梁从一端向另一端顶推或者滑移、或从两端向中间顶推或者滑移,从而完成钢箱梁的安装。
发明内容
本发明专利的目的是提供一种钢箱梁低位滑移快速施工方法,该方法能够解决安装大跨度自锚式悬索桥钢箱梁主梁的问题,而且施工速度快,结构简单、受力明确。
为达到上述目的,本发明的技术方案是这样实现的:
一种钢箱梁低位滑移快速施工方法,包括以下步骤:
1).主塔下横梁施工;
2).在主塔边跨范围内安装滑移支架,所述滑移支架沿主桥中心线设置,通过该滑移支架将边跨钢箱梁段和中跨钢箱梁段进行存放;
3).施工主塔中横梁;
4).在主塔中横梁上安装中横梁托架,吊运至少两个钢箱梁节段至该中横梁托架上,并调整钢箱梁节段的位置及线性后进行拼接形成支撑体;
5).在由钢箱梁节段拼接形成的支撑体上拼装吊机;
6).利用吊机将船运至墩附近的边跨钢箱梁段和中跨钢箱梁段起吊,安放至滑移支架适当位置;
7).主塔施工完成后,且临时钢塔安装完成,挂设第一对斜拉索9,通过吊机对滑移支架的边跨钢箱梁段和中跨钢箱梁段依次对称起吊并依次拼接,直到所有梁段完成吊装。
进一步的,在步骤1)和步骤2)间设有步骤1.1):锚固桩的施工,该锚固桩位于主桥中心线上,且锚固桩和主塔间留有滑移支架施工空间,在所述锚固桩顶部安装穿心千斤顶,所述穿心千斤顶和滑移支架相对应设置。
进一步的,所述滑移支架包括主塔两侧分别设置的多个临时支墩,所述多个临时支墩的顶部设有滑道梁,所述滑道梁上设有滑块,所述边跨钢箱梁段和中跨钢箱梁段通过滑块运输至滑道梁的不同位置。
进一步的,所述吊机为履带式吊机。
相对于现有技术,本发明所述的一种钢箱梁低位滑移快速施工方法具有以下优势:
本发明所述的一种钢箱梁低位滑移快速施工方法,在钢箱梁来源受限的情况下,在桥跨边跨侧搭设低位滑移平台,与主塔同步施工,支架高度较低,支架工程量仅需1300t钢材。该施工方法对于跨越江河湖海的大跨度自锚式悬索桥的钢箱梁施工有重要意义,施工安全系数高,具有良好的社会效益和经济效益。
附图说明
构成本发明的一部分的附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:
图1为本发明实施例所述的一种钢箱梁低位滑移快速施工方法施工示意图;
图2为本发明实施例所述的一种钢箱梁低位滑移快速施工方法图1左视图;
图3为本发明实施例所述的一种钢箱梁低位滑移快速施工方法中步骤4)施工示意图;
图4为本发明实施例所述的一种钢箱梁低位滑移快速施工方法中步骤6)施工示意图;
图5为本发明实施例所述的一种钢箱梁低位滑移快速施工方法中步骤7)施工示意图;
附图标记说明:
1-锚固桩;2-穿心千斤顶;3-滑道梁;4-临时支墩;5-主塔;6-钢箱梁节段;7-中横梁托架;8-吊机;9-斜拉索;10-滑块。
具体实施方式
需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。
在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明中的具体含义。
下面将参考附图并结合实施例来详细说明本发明。
如图1-图5所示,一种钢箱梁低位滑移快速施工方法,包括以下步骤:
1).主塔下横梁施工;
2).在主塔5边跨范围内安装滑移支架,所述滑移支架沿主桥中心线设置,通过该滑移支架将边跨钢箱梁段和中跨钢箱梁段进行存放;
3).施工主塔中横梁;
4).在主塔中横梁上安装中横梁托架7,吊运至少两个钢箱梁节段6至该中横梁托架7上,并调整钢箱梁节段6的位置及线性后进行拼接形成支撑体;
5).在由钢箱梁节段6拼接形成的支撑体上拼装吊机8;
6).利用吊机8将船运至墩附近的边跨钢箱梁段和中跨钢箱梁段起吊,安放至滑移支架适当位置;
7).主塔5施工完成后,且临时钢塔安装完成,挂设第一对斜拉索9,通过吊机8对滑移支架的边跨钢箱梁段和中跨钢箱梁段依次对称起吊并依次拼接,直到所有梁段完成吊装。
在步骤1)和步骤2)间设有步骤1.1):锚固桩1的施工,该锚固桩1位于主桥中心线上,且锚固桩1和主塔5间留有滑移支架施工空间,在所述锚固桩1顶部安装穿心千斤顶2,所述穿心千斤顶2和滑移支架相对应设置。
所述滑移支架包括主塔5两侧分别设置的多个临时支墩4,所述多个临时支墩4的顶部设有滑道梁3,所述滑道梁3上设有滑块10,所述边跨钢箱梁段和中跨钢箱梁段通过滑块10运输至滑道梁3的不同位置。
所述吊机8为履带式吊机。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (4)

1.一种钢箱梁低位滑移快速施工方法,其特征在于:包括以下步骤:
1).主塔下横梁施工;
2).在主塔(5)边跨范围内安装滑移支架,所述滑移支架沿主桥中心线设置,通过该滑移支架将边跨钢箱梁段和中跨钢箱梁段进行存放;
3).施工主塔中横梁;
4).在主塔中横梁上安装中横梁托架(7),吊运至少两个钢箱梁节段(6)至该中横梁托架(7)上,并调整钢箱梁节段(6)的位置及线性后进行拼接形成支撑体;
5).在由钢箱梁节段(6)拼接形成的支撑体上拼装吊机(8);
6).利用吊机(8)将船运至墩附近的边跨钢箱梁段和中跨钢箱梁段起吊,安放至滑移支架适当位置;
7).主塔(5)施工完成后,且临时钢塔安装完成,挂设第一对斜拉索(9),通过吊机(8)对滑移支架的边跨钢箱梁段和中跨钢箱梁段依次对称起吊并依次拼接,直到所有梁段完成吊装。
2.根据权利要求1所述的一种钢箱梁低位滑移快速施工方法,其特征在于:在步骤1)和步骤2)间设有步骤1.1):锚固桩(1)的施工,该锚固桩(1)位于主桥中心线上,且锚固桩(1)和主塔(5)间留有滑移支架施工空间,在所述锚固桩(1)顶部安装穿心千斤顶(2),所述穿心千斤顶(2)和滑移支架相对应设置。
3.根据权利要求1或2所述的一种钢箱梁低位滑移快速施工方法,其特征在于:所述滑移支架包括主塔(5)两侧分别设置的多个临时支墩(4),所述多个临时支墩(4)的顶部设有滑道梁(3),所述滑道梁(3)上设有滑块(10),所述边跨钢箱梁段和中跨钢箱梁段通过滑块(10)运输至滑道梁(3)的不同位置。
4.根据权利要求1所述的一种钢箱梁低位滑移快速施工方法,其特征在于:所述吊机(8)为履带式吊机。
CN201610032597.7A 2016-01-18 2016-01-18 一种钢箱梁低位滑移快速施工方法 Active CN105568867B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610032597.7A CN105568867B (zh) 2016-01-18 2016-01-18 一种钢箱梁低位滑移快速施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610032597.7A CN105568867B (zh) 2016-01-18 2016-01-18 一种钢箱梁低位滑移快速施工方法

Publications (2)

Publication Number Publication Date
CN105568867A true CN105568867A (zh) 2016-05-11
CN105568867B CN105568867B (zh) 2017-08-11

Family

ID=55879457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610032597.7A Active CN105568867B (zh) 2016-01-18 2016-01-18 一种钢箱梁低位滑移快速施工方法

Country Status (1)

Country Link
CN (1) CN105568867B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437030A (zh) * 2016-09-14 2017-02-22 中冶天工集团有限公司 一种高层建筑劲性钢柱的安装方法
CN107117522A (zh) * 2017-06-20 2017-09-01 中国五冶集团有限公司 钢箱梁吊装系统及吊装方法
CN111705681A (zh) * 2020-05-25 2020-09-25 中铁十七局集团第三工程有限公司 一种箱梁低位纵移方法
CN112695649A (zh) * 2020-12-18 2021-04-23 中铁大桥局集团有限公司 一种滩地大跨度斜拉桥钢桁梁整节段对称双悬臂架设方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203768818U (zh) * 2014-04-10 2014-08-13 山东恒堃机械有限公司 新型移动模架推进小车
JP2014145231A (ja) * 2013-01-30 2014-08-14 Kajima Corp 桁吊り下げ構造
CN104005341A (zh) * 2014-06-13 2014-08-27 中铁重工有限公司 一种液压换装架的平衡显示装置及平衡显示方法
CN104631334A (zh) * 2014-12-23 2015-05-20 郑州新大方重工科技有限公司 新型大吨位架桥机的中部支撑装置
JP2015117468A (ja) * 2013-12-16 2015-06-25 株式会社Ihiインフラシステム 重量物案内装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014145231A (ja) * 2013-01-30 2014-08-14 Kajima Corp 桁吊り下げ構造
JP2015117468A (ja) * 2013-12-16 2015-06-25 株式会社Ihiインフラシステム 重量物案内装置
CN203768818U (zh) * 2014-04-10 2014-08-13 山东恒堃机械有限公司 新型移动模架推进小车
CN104005341A (zh) * 2014-06-13 2014-08-27 中铁重工有限公司 一种液压换装架的平衡显示装置及平衡显示方法
CN104631334A (zh) * 2014-12-23 2015-05-20 郑州新大方重工科技有限公司 新型大吨位架桥机的中部支撑装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437030A (zh) * 2016-09-14 2017-02-22 中冶天工集团有限公司 一种高层建筑劲性钢柱的安装方法
CN107117522A (zh) * 2017-06-20 2017-09-01 中国五冶集团有限公司 钢箱梁吊装系统及吊装方法
CN111705681A (zh) * 2020-05-25 2020-09-25 中铁十七局集团第三工程有限公司 一种箱梁低位纵移方法
CN112695649A (zh) * 2020-12-18 2021-04-23 中铁大桥局集团有限公司 一种滩地大跨度斜拉桥钢桁梁整节段对称双悬臂架设方法

Also Published As

Publication number Publication date
CN105568867B (zh) 2017-08-11

Similar Documents

Publication Publication Date Title
CN102192368B (zh) 大跨度架空管道滑移安装方法
CN102797226B (zh) 60米钢箱梁整体架设施工方法
CN104746437A (zh) 一种自锚式悬索桥安装方法
CN105568867A (zh) 一种钢箱梁低位滑移快速施工方法
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN201943007U (zh) 活动支架不变幅架梁吊机
CN101392501A (zh) 一种大跨度钢箱桥梁的架设方法
JP4771549B2 (ja) 橋梁架設装置を用いて橋梁を架設する方法
CN105484162A (zh) 悬索桥施工岸上加劲梁二次荡移装置及方法
CN104947604A (zh) 一种高速铁路900t混凝土箱梁的快速换架施工方法
CN104314009A (zh) 大节段提升机构及使用方法
CN108625289B (zh) 一种适用于悬索桥加劲梁的架设装置及架设方法
CN110629681A (zh) 一种多跨钢箱梁施工工艺
CN202658590U (zh) 整体装配式钻孔平台
CN108505441A (zh) 一种桥梁检测用维修平台
CN206052522U (zh) 一种钢架路平台
CN210619625U (zh) 一种大型可调试顶升滑移装置
CN110593111B (zh) 索塔区梁段安装方法
CN204715362U (zh) 一种深基坑埋入式柱脚支撑架
CN210216415U (zh) 一种在深水急流区域桥梁桩基础钢护筒的定位装置
CN209703323U (zh) 一种墩顶龙门吊装置
CN112982183A (zh) 主梁的配重式安装系统
CN105544402A (zh) 一种用于高墩盖梁的悬空组合模板支撑架及施工方法
CN102561261B (zh) 采用简易门式起重机吊运预制面板建造码头的方法
JP4884082B2 (ja) 橋梁の架け替え工法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Song Weijun

Inventor after: Xing Ruxiang

Inventor after: Yue Chaojie

Inventor after: Tang Heda

Inventor after: Pei Ye

Inventor after: Wang Sen

Inventor after: Chen Ningxian

Inventor after: Gong Guofeng

Inventor after: Qu Jiangfeng

Inventor after: Liu Changhai

Inventor after: Gao Xuewen

Inventor after: Liu Zhi

Inventor after: Chang Jie

Inventor after: Zhang Yaolin

Inventor before: Song Weijun

Inventor before: Xing Ruxiang

Inventor before: Chen Ningxian

Inventor before: Zhu Linda

Inventor before: Yue Chaojie

Inventor before: Cai Wendao

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221107

Address after: 214513 No. 88, Cargo Station Road, Xingang District, Xingang City, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: China Railway Construction Bridge Engineering Bureau Group Jingjiang Bridge Technology Industrial Park Co.,Ltd.

Address before: 300300 No. 32 Central West Road, Airport Economic Zone, Binhai New Area, Tianjin

Patentee before: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 214513 No. 88, Cargo Station Road, Xingang District, Xingang City, Jingjiang City, Taizhou City, Jiangsu Province

Patentee after: China Railway Construction Bridge Engineering Bureau Group Jingjiang Heavy Industry Co.,Ltd.

Address before: 214513 No. 88, Cargo Station Road, Xingang District, Xingang City, Jingjiang City, Taizhou City, Jiangsu Province

Patentee before: China Railway Construction Bridge Engineering Bureau Group Jingjiang Bridge Technology Industrial Park Co.,Ltd.

CP01 Change in the name or title of a patent holder