CN105507580B - 一种电梯井整体提升模板装置 - Google Patents
一种电梯井整体提升模板装置 Download PDFInfo
- Publication number
- CN105507580B CN105507580B CN201610054268.2A CN201610054268A CN105507580B CN 105507580 B CN105507580 B CN 105507580B CN 201610054268 A CN201610054268 A CN 201610054268A CN 105507580 B CN105507580 B CN 105507580B
- Authority
- CN
- China
- Prior art keywords
- side plate
- column
- base
- template
- elevator hoistway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Elevator Door Apparatuses (AREA)
Abstract
本发明涉及建筑领域,提供一种电梯井整体提升模板装置,包括长方体结构的核心筒,核心筒的4个侧面均设置带有穿墙丝孔的侧板,相邻侧面的连接处设有截面为三角形的立柱,立柱的侧边与侧板的面相齐平,内部设有若干使侧板沿内边向移动的收缩装置,立柱的下方与核心筒的底座可移动连接,底座的下方设有若干与墙体内部预设的闩锁盒配合连接的爪座,爪座在水平状态下支撑底座并与底座向下可转动连接。本发明可在一定范围内任意调节梁的长度,调节方便,而且可以重复使用,用于搭建模板平台,使模板平台大小可调,适应不同截面尺寸筒子型现浇剪力墙模板施工;同时在施工完之后,向上吊起直接进行下一层的电梯井建造,提升了设备的技术性能,极大提高建筑施工效率,并可重复使用。
Description
技术领域
本发明涉及建筑领域,具体涉及一种电梯井整体提升模板装置。
背景技术
在建筑施工中,经常遇到各种形状和不同截面尺寸的筒子型现浇剪力墙,如电梯井类筒子型现浇剪力墙,安装模板时需要在筒子内部搭接模板平台,较常见的方法是采用钢管、扣件、木板等进行搭接,这种传统的搭接方法,耗材多,费工费时,而且不同形状和截面尺寸的现浇剪力墙需要不同规格和数量的搭接零部件,不仅成本高,工作量大,并搭建的简易平台存在很大的安全隐患。
发明内容
本发明为了解决传统安装方式费工费力,安全隐患大的问题,提供一种一次性整体安装,井内吊装,同时方便固定浇注的电梯井整体提升模板装置。
本发明采用以下技术方案实现,一种电梯井整体提升模板装置,包括长方体结构的核心筒,核心筒的4个侧面均设置带有穿墙丝孔的侧板,相邻侧面的连接处设有截面为三角形的立柱,立柱的侧边与侧板的面相齐平,内部设有若干使侧板沿内边向移动的收缩装置,立柱的下方与核心筒的底座可移动连接,底座的下方设有若干与墙体内部预设的闩锁盒配合连接的爪座,爪座在水平状态下支撑底座并与底座向下可转动连接。
为便于拉动侧板所述收缩装置包括位于立柱中部的丝杆,丝杆上的螺母与相邻的侧板20之间分别设有可转动的拉板,形成丝杆转动带动螺母上下移动转换成侧板向内移动的结构。
优选的,所述螺母和拉板为2组,2个螺母的螺纹旋向相反,分别带动两侧的拉板上下运动。
为提高可靠性,位于同一侧板上的拉板与侧板之间通过压板转动连接。
为平稳的滑动,所述侧板分别与立柱的内边之间设有滑槽和滑块组成的滑动装置。
优选的,所述立柱沿纵向设有若干组收缩装置与滑动装置。
为便于固定,所述闩锁盒的上部设有便于爪座滑入滑出的倾斜的连接部。
为便于调整水平度,所述底座与爪座之间分别设有调节底座高低的调节装置。
本发明的有益之处在于,结构简单,制作成本低,可在一定范围内任意调节梁的长度,调节方便,而且可以重复使用,用于搭建模板平台,使模板平台大小可调,适应不同截面尺寸筒子型现浇剪力墙模板施工,操作容易,大大节约了人力物力;同时在施工完之后,向上吊起直接进行下一层的电梯井建造,提升了设备的技术性能,极大提高建筑施工效率,并可重复使用,安全可靠。
附图说明
图1 本发明的整体结构示意图;
图2 本发明起吊时结构示意图;
图3 本发明立柱的结构示意图;
图4 本发明立柱的俯视结构示意图;
图5 本发明收缩装置的结构示意图;
图6 本发明顶部立体结构示意图。
图中1.核心筒,11.丝杆,12.滑槽,13.丝杠座,14.滑块,15.右丝母,16.拉板,17.压板,18.转轴,19.左丝母,20.侧板,2.底座,21.连接套,22.立柱,3.爪座,4.闩锁盒,5.调整装置,6.墙体。
具体实施方式
下面结合附图对本发明作进一步说明。
本发明提供一种电梯井整体提升模板装置,包括长方体结构的核心筒1,核心筒1的4个侧面均为表面平整的侧板20,4个侧板20相邻侧面的连接处设有横截面为直角三角形的立柱22,与侧板20组成截面正方形的长方体结构。相邻的2个侧板20的外侧面分别与立柱22的2个侧面相齐平,立柱22的内部沿纵向设有若干使侧板20沿立柱22的内边移动的收缩装置,立柱22下方与核心筒1的底座2活动连接,底座2的下方设有若干与墙体6内部预设的闩锁盒4配合连接的爪座3,爪座3在水平状态下支撑底座2并与底座向下可转动连接。
收缩装置包括位于立柱22中部的丝杆11,丝杆11上的螺母与相邻的侧板20之间分别转动连接地设有拉板16,这样就形成丝杆11转动带动螺母上下移动拉动拉板16移动,并转换成侧板20向内移动的结构。为了提高移动平稳性和可靠性,螺母和拉板16为2组,2个螺母的螺纹旋向相反,左丝母19和右丝母15分别带动两侧的拉杆16上下运动。位于同一侧侧板20上的拉板16与侧板20之间通过压板17转动连接。
侧板20分别与立柱22的内边设有滑槽12和滑块14组成的滑动装置,侧板20沿着滑槽12方向内外滑动。
为了进一步提高稳定性,立柱22沿纵向设有若干组收缩装置与滑动装置。
闩锁盒4位于墙体6的侧壁内部,沿着纵向以一定的间隔设置,数量与爪座相对应,上部设有便于爪座3滑入滑出的倾斜的连接部,底座2与爪座3之间分别设有调节底座高低的调节装置5,便于底座2水平调整。
本发明实施时,将核心筒放入预制基座的内部,并预先建造最下方的闩锁盒调整侧板之间的距离达到设计要求,外部设置外模板,侧板作为内模板进行墙体的浇注,建造第一层电梯井。浇注建造时,在本层电梯井的上部预置闩锁盒,最下方的一层电梯井完成并达到预定强度后,将核心筒吊起,操作丝杆将侧板进行收缩,向上吊起之,向上移动至上方的闩锁盒附近,爪座进入闩锁盒进行固定,通过调整装置调整水平,重新操作丝杆将侧板扩张成设计尺寸,进行下一层的建造。
本发明提供的电梯井筑造设备能够简单快速,无需多次拆装即可实现多层电梯井的建造,节约成本和建造时间,且可以重复使用。
Claims (5)
1.一种电梯井整体提升模板装置,包括长方体结构的核心筒(1),其特征在于,所述核心筒(1)的4个侧面均设置带有穿墙丝孔的侧板(20),相邻侧面的连接处设有截面为三角形的立柱(22),立柱(22)的侧边与侧板(20)的面相齐平,内部设有若干使侧板(20)沿内边向移动的收缩装置,立柱(22)的下方与核心筒(1)的底座(2)可移动连接,底座(2)的下方设有若干与墙体(6)内部预设的闩锁盒(4)配合连接的爪座(3),爪座(3)在水平状态下支撑底座(2)并与底座(2)向下可转动连接,底座(2)与爪座(3)之间分别设有调节底座(2)高低的调节装置(5)。
2.根据权利要求1所述的电梯井整体提升模板装置,其特征在于,所述收缩装置包括位于立柱(22)中部的丝杆(11),丝杆(11)上的螺母与相邻的侧板(20)之间分别设有可转动的拉板(16),形成丝杆(11)转动带动螺母上下移动转换成侧板(20)向内移动的结构;所述螺母和拉板(16)为2组,2个螺母的螺纹旋向相反,分别带动两侧的拉板(16)上下运动;位于同一侧板(20)上的拉板(16)与侧板(20)之间通过压板(17)转动连接。
3.根据权利要求2所述的电梯井整体提升模板装置,其特征在于,所述侧板(20)分别与立柱(22)的内边之间设有滑槽(12)和滑块(14)组成的滑动装置。
4.根据权利要求3所述的电梯井整体提升模板装置,其特征在于,所述立柱(22)沿纵向设有若干组收缩装置与滑动装置。
5.根据权利要求1所述的电梯井整体提升模板装置,其特征在于,所述闩锁盒的上部设有便于爪座(3)滑入滑出的倾斜的连接部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610054268.2A CN105507580B (zh) | 2016-01-27 | 2016-01-27 | 一种电梯井整体提升模板装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610054268.2A CN105507580B (zh) | 2016-01-27 | 2016-01-27 | 一种电梯井整体提升模板装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105507580A CN105507580A (zh) | 2016-04-20 |
CN105507580B true CN105507580B (zh) | 2017-08-25 |
Family
ID=55715852
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610054268.2A Active CN105507580B (zh) | 2016-01-27 | 2016-01-27 | 一种电梯井整体提升模板装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105507580B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108385967A (zh) * | 2017-08-25 | 2018-08-10 | 中建二局第建筑工程有限公司 | 电梯井道整体模板系统及电梯井道的施工方法 |
CN107975233B (zh) * | 2018-01-11 | 2023-07-14 | 山东方正建筑新型材料有限公司 | 一种电梯井内模板收支系统 |
CN114809578B (zh) * | 2022-05-06 | 2023-08-08 | 山东方正建筑新型材料有限公司 | 井道用爪臂式可调节施工平台 |
CN115095139A (zh) * | 2022-06-30 | 2022-09-23 | 山东众泰建筑科技股份有限公司 | 一种电梯井整体提升模板装置 |
CN115162713A (zh) * | 2022-08-16 | 2022-10-11 | 中国化学工程第六建设有限公司 | 自爬升式井道模板体系施工方法 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100239913B1 (ko) * | 1997-09-24 | 2000-01-15 | 유성용 | 거푸집 자동 상승장치 |
CN201071595Y (zh) * | 2007-07-24 | 2008-06-11 | 青岛市胶州建设集团有限公司 | 筒模板 |
KR100945426B1 (ko) * | 2008-02-29 | 2010-03-05 | (주)영웅엔지니어링 | 건축용 폼 상승 시스템 및 이를 이용한 건축물의 복수 벽면동시 시공방법 |
CN201195940Y (zh) * | 2008-05-13 | 2009-02-18 | 正太集团有限公司 | 电梯井整体提升模板 |
CN201665996U (zh) * | 2009-09-15 | 2010-12-08 | 马永乐 | 电梯井筒模及跟进平台联合装置 |
CN203531384U (zh) * | 2013-09-24 | 2014-04-09 | 昆明钢铁集团有限责任公司 | 一种可自由调节升降高度的建筑模板梁支撑固定装置 |
CN103643794A (zh) * | 2013-11-19 | 2014-03-19 | 江苏沪武建设工程有限公司 | 工具式电梯井内模板支设与提升系统 |
CN204983636U (zh) * | 2015-09-01 | 2016-01-20 | 中民筑友有限公司 | 收支模机构、内筒模以及电梯井模板装置 |
CN205330157U (zh) * | 2016-01-27 | 2016-06-22 | 山东方圆建筑材料有限公司 | 一种电梯井整体提升模板装置 |
-
2016
- 2016-01-27 CN CN201610054268.2A patent/CN105507580B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105507580A (zh) | 2016-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105507580B (zh) | 一种电梯井整体提升模板装置 | |
US11021887B2 (en) | Method of constructing a tower | |
CN110241692B (zh) | 一种公路施工混凝土浇筑装置及操作方法 | |
CN109469296A (zh) | 一种用于贴地砖的自动贴砖机 | |
CN110039641A (zh) | 预制楼梯成型模及使用方法 | |
CN104264984B (zh) | 混凝土构筑物浇注用模板以及浇注施工方法 | |
CN102953546A (zh) | 双墙处变形缝模板安装施工方法 | |
CN103967273A (zh) | 楼板浇筑用混凝土模板支撑装置 | |
CN109555027B (zh) | 一种节段梁混凝土浇筑系统及其施工方法 | |
CN104372947A (zh) | 一种电梯井整体模板进退模施工方法 | |
CN108265859A (zh) | 一种装配式建筑墙体 | |
CN205330157U (zh) | 一种电梯井整体提升模板装置 | |
CN113047612B (zh) | 一种装配式建筑构造柱及其施工方法 | |
CN104149177A (zh) | 新型组装式钢筋混凝土电缆沟槽生产模具 | |
CN203905488U (zh) | 楼板浇筑用混凝土模板支撑装置 | |
CN106639305B (zh) | 可滑移提升式构造柱钢模板及其施工方法 | |
CN211524076U (zh) | 一种横梁木板的夹持装置 | |
CN104164974B (zh) | 建筑物浇筑方法及其使用的浇筑模具系统 | |
CN208122040U (zh) | 一种装配式建筑墙体 | |
CN202139830U (zh) | 一种振动挤压式抹灰机 | |
CN203640266U (zh) | 建筑模板系统 | |
CN104453217A (zh) | 一种电梯井整体模板升模施工方法 | |
CN206568315U (zh) | 预制件脱模机构 | |
CN207290432U (zh) | 一种简便可拆卸楔形混凝土预制块模具装置 | |
CN219175848U (zh) | 矩形柱模板的安装加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200826 Address after: 276000 Intelligent Manufacturing Industrial Park, economic development zone, Linyi City, Shandong Province Patentee after: Shandong Fangzheng construction new materials Co., Ltd Address before: 276000 Linxi Linyi twelve Road steel market, Shandong Patentee before: SHANDONG FANGYUAN BUILDING MATERIALS Co.,Ltd. |
|
TR01 | Transfer of patent right |