CN105442735A - 一种长钢筋凳现浇楼板的施工方法 - Google Patents
一种长钢筋凳现浇楼板的施工方法 Download PDFInfo
- Publication number
- CN105442735A CN105442735A CN201510749482.5A CN201510749482A CN105442735A CN 105442735 A CN105442735 A CN 105442735A CN 201510749482 A CN201510749482 A CN 201510749482A CN 105442735 A CN105442735 A CN 105442735A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- stool
- floor
- bar stool
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
Abstract
本发明提供了一种长钢筋凳现浇楼板的施工方法,属于建筑施工技术领域。该方法包括:挑选钢筋;加工制作长钢筋凳;安装模板、梁板钢筋;安装钢筋凳;绑扎负筋;浇筑楼板砼;楼板砼过面找平;剪断钢丝取出钢筋凳;修补砼面;清理钢筋凳等步骤。本发明利用钢筋凳自身强度和刚度控制因施工外力造成负筋变形下沉,从而控制楼板负筋保护层厚度偏差。同时利用钢筋凳高度控制楼板厚度和砼楼板面平整度;钢筋凳可重复利用,施工更为简便。
Description
技术领域
本发明涉及建筑施工技术领域,具体是一种长钢筋凳现浇楼板的施工方法。
背景技术
目前住宅建筑领域,尤其是高层建筑,均采用楼板的施工均采用混凝土现浇技术,其中保证负筋不下沉,控制楼板负筋保护层厚度是难点问题。近年来,现浇混凝土楼板中推广使用的“钢管方通凳悬挂法”能有效控制砼楼板厚度和负筋保护层厚度,但其投入成本较高,且方通凳数量多,存放、保管、运输都比较困难。因此,需要提供一种成本低廉、施工结构更为简单的现浇楼板的施工方法。
发明内容
本发明要解决的技术问题是提供一种耗材少、成本低廉,施工结构更为简单的现浇楼板的施工方法。
为解决上述技术问题,本发明采取如下技术方案:
一种长钢筋凳现浇楼板的施工方法,包括如下步骤:加工制作长钢筋凳;安装模板、梁板钢筋;安装钢筋凳;绑扎负筋;浇筑楼板砼;楼板砼过面找平;剪断铁丝取出钢筋凳;修补砼面;清理钢筋凳。
进一步,所述施工方法具体步骤如下:
(1)加工制作长钢筋凳:选用长1-1.5m、直径14mm的螺纹钢筋作为长钢筋;然后用2根直径10mm的短钢筋与长钢筋焊接成带八字形脚、且相邻两组脚间距不大于600mm的钢筋凳,凳子高度与楼板设计厚度相同;
(2)按设计要求安装模板、梁板钢筋,并检查加固;
(3)安装钢筋凳:钢筋凳成排布置,每排凳子间距约1m,在楼板转角处钢筋凳与墙面呈45度放置;要求钢筋凳放置平稳。
(4)绑扎负筋:将楼板负筋用铁丝绑在长钢筋下面,要求绑扎牢固,以控制负筋变形;钢筋凳与负筋垂直布置;
(5)浇筑楼板砼;
(6)楼板砼过面找平:混凝土找平时以平钢筋凳面为准;
(7)剪断铁丝取出钢筋凳;
(8)修补砼面;
(9)清理钢筋凳以便重复利用。
进一步,所述长、短钢筋均来自现场钢筋加工场余料。
进一步,所述钢筋凳高度与楼板厚度的高度误差≤±3mm。
本发明通过钢筋凳将负筋绑扎在钢筋凳面筋下面,利用钢筋凳自身强度和刚度控制因施工外力造成负筋变形下沉,从而控制楼板负筋保护层厚度偏差。同时利用钢筋凳高度控制楼板厚度和砼楼板面平整度。钢筋凳原料来源于加工余料,且钢筋凳可重复利用,施工更为简便。
附图说明
图1为钢筋凳结构示意图
图2为钢筋凳绑扎负筋示意图
图中:1长钢筋;2短钢筋;3负筋
具体实施方式
如图1、图2所示,一种长钢筋凳现浇楼板的施工方法,步骤如下:
(1)加工制作长钢筋凳:从钢筋加工场余料中选出长1-1.5m、直径14mm的螺纹钢筋作为长钢筋1;然后用2根直径10mm的短钢筋2与长钢筋焊接成带八字形脚、且相邻两组脚间距不大于600mm的钢筋凳;一般每根钢筋凳上焊接2-3对脚;短钢筋2长度根据楼板的设计厚度切割,焊接好的钢筋凳高度与楼板设计厚度相同;
(2)按设计要求安装模板、梁板钢筋,并检查加固;
(3)安装钢筋凳:钢筋凳成排布置,每排凳子间距约1m,在楼板转角处钢筋凳与墙面呈45度放置;要求钢筋凳放置平稳,钢筋凳的凳面与楼板设计面高度误差≤±3mm。
(4)绑扎负筋:将楼板负筋用铁丝绑在长钢筋1下面,要求绑扎牢固,以控制负筋变形;钢筋凳与负筋垂直布置;
(5)浇筑楼板砼;
(6)楼板砼过面找平:混凝土找平时以平钢筋凳面为准;
(7)剪断铁丝取出钢筋凳;
(8)修补砼面;
(9)清理钢筋凳以便重复利用。
长钢筋凳现浇楼板的施工方法已经在多个工程中应用过,均取得较好效果,具体工程实例见下表。
其中,以施工中烟住宅楼工程为例,新方法最终开支:钢筋15400元,人工费4100元,共计19500元。比“钢管方通悬挂法“的预算97140元节省了:97140-19500=77640元。
Claims (4)
1.一种长钢筋凳现浇楼板的施工方法,其特征在于,包括如下步骤:加工制作长钢筋凳;安装模板、梁板钢筋;安装钢筋凳;绑扎负筋;浇筑楼板砼;楼板砼过面找平;剪断铁丝取出钢筋凳;修补砼面;清理钢筋凳。
2.根据权利要求1所述的长钢筋凳现浇楼板的施工方法,其特征在于,具体施工步骤如下:
(1)加工制作长钢筋凳:选用长1-1.5m、直径14mm的螺纹钢筋作为长钢筋;然后用2根直径10mm的短钢筋与长钢筋焊接成带八字形脚、且相邻两组脚间距不大于600mm的钢筋凳,凳子高度与楼板设计厚度相同;
(2)按设计要求安装模板、梁板钢筋,并检查加固;
(3)安装钢筋凳:钢筋凳成排布置,每排凳子间距约1m,在楼板转角处钢筋凳与墙面呈45度放置;要求钢筋凳放置平稳;
(4)绑扎负筋:将楼板负筋用铁丝绑在长钢筋下面,要求绑扎牢固,以控制负筋变形;钢筋凳与负筋垂直布置;
(5)浇筑楼板砼;
(6)楼板砼过面找平:混凝土找平时以平钢筋凳面为准;
(7)剪断铁丝取出钢筋凳;
(8)修补砼面;
(9)清理钢筋凳以便重复利用。
3.根据权利要求2所述的长钢筋凳现浇楼板的施工方法,其特征在于:所述长、短钢筋均来自现场钢筋加工场余料。
4.根据权利要求2所述的长钢筋凳现浇楼板的施工方法,其特征在于:所述钢筋凳与楼板厚度的高度误差≤+3mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510749482.5A CN105442735A (zh) | 2015-11-06 | 2015-11-06 | 一种长钢筋凳现浇楼板的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510749482.5A CN105442735A (zh) | 2015-11-06 | 2015-11-06 | 一种长钢筋凳现浇楼板的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105442735A true CN105442735A (zh) | 2016-03-30 |
Family
ID=55553328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510749482.5A Pending CN105442735A (zh) | 2015-11-06 | 2015-11-06 | 一种长钢筋凳现浇楼板的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105442735A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185268A (zh) * | 2019-05-24 | 2019-08-30 | 五冶集团上海有限公司 | 一种混凝土楼板浇筑厚度及平整度的控制方法 |
CN110439288A (zh) * | 2019-08-30 | 2019-11-12 | 中冶建工集团有限公司 | 一种现浇混凝土楼板厚标高控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100894808B1 (ko) * | 2008-12-05 | 2009-04-24 | 동아에스텍 주식회사 | 트러스거더 연결구 |
JP2011026820A (ja) * | 2009-07-24 | 2011-02-10 | Fujisho Giken:Kk | 床構造材および鉄筋架設具 |
CN202658805U (zh) * | 2012-06-01 | 2013-01-09 | 中国三冶集团有限公司第二建筑工程公司 | 一种楼板负弯矩筋保护层厚度控制装置 |
CN203034692U (zh) * | 2012-12-27 | 2013-07-03 | 福建工程学院 | 现浇钢筋混凝土楼板负筋支架 |
CN103291000A (zh) * | 2013-05-24 | 2013-09-11 | 中国华冶科工集团有限公司 | 工具式钢筋支架及其悬挂楼板负弯矩钢筋的施工方法 |
-
2015
- 2015-11-06 CN CN201510749482.5A patent/CN105442735A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100894808B1 (ko) * | 2008-12-05 | 2009-04-24 | 동아에스텍 주식회사 | 트러스거더 연결구 |
JP2011026820A (ja) * | 2009-07-24 | 2011-02-10 | Fujisho Giken:Kk | 床構造材および鉄筋架設具 |
CN202658805U (zh) * | 2012-06-01 | 2013-01-09 | 中国三冶集团有限公司第二建筑工程公司 | 一种楼板负弯矩筋保护层厚度控制装置 |
CN203034692U (zh) * | 2012-12-27 | 2013-07-03 | 福建工程学院 | 现浇钢筋混凝土楼板负筋支架 |
CN103291000A (zh) * | 2013-05-24 | 2013-09-11 | 中国华冶科工集团有限公司 | 工具式钢筋支架及其悬挂楼板负弯矩钢筋的施工方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110185268A (zh) * | 2019-05-24 | 2019-08-30 | 五冶集团上海有限公司 | 一种混凝土楼板浇筑厚度及平整度的控制方法 |
CN110439288A (zh) * | 2019-08-30 | 2019-11-12 | 中冶建工集团有限公司 | 一种现浇混凝土楼板厚标高控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105888108B (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN107975160B (zh) | 带侧向连接键槽的剪力墙结构、制作及装配方法 | |
CN102505866A (zh) | 一种柱身缺陷混凝土的置换方法 | |
CN204435638U (zh) | 一种空心叠合楼板 | |
CN205875473U (zh) | 内置定位预制件钢筋混凝土剪力墙 | |
CN102359279A (zh) | 钢筋混凝土框架结构梁柱节点区钢筋骨架安装改进方法 | |
CN206091003U (zh) | 一种sc构件预制钢结构混凝土叠合楼板 | |
CN105332510A (zh) | 一种复杂梁柱节点核心区施工方法 | |
CN104612300A (zh) | 一种空心叠合楼板及其施工方法 | |
CN204060020U (zh) | 一种钢筋混凝土柱加固结构 | |
CN107355008B (zh) | 一种新增钢管混凝土柱与既有结构的预制连接结构及方法 | |
CN111691582A (zh) | 一种叠合剪力墙密拼竖向接缝构造及施工方法 | |
CN104631674A (zh) | 一种叠合楼板及其施工方法 | |
CN105089177A (zh) | 预制型钢桁架混凝土剪力墙及制造方法 | |
CN105442735A (zh) | 一种长钢筋凳现浇楼板的施工方法 | |
CN113898102A (zh) | 一种带肋混凝土叠合板 | |
CN110130534A (zh) | 一种新型耗能预制剪力墙及其加工安装方法 | |
CN103194982B (zh) | 桥梁边跨现浇段短悬臂支架施工方法 | |
CN103758347B (zh) | 大跨度钢筋混凝土梁板结构后浇带支撑托换施工方法 | |
CN203808249U (zh) | 一种梁柱节点核心区柱箍筋笼组件 | |
CN204001424U (zh) | 超大管径组拼式树杈柱 | |
CN106368445B (zh) | 既有建筑加固自承重保温一体化系统及施工方法 | |
CN204825945U (zh) | 一种用于固定预埋螺栓的卡具 | |
CN112976297A (zh) | 一种t梁预制台座的改制方法 | |
CN109653770B (zh) | 一种利用原有临时支撑进行的中板施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160330 |