CN105257298B - 步进式顶管机主顶进装置 - Google Patents
步进式顶管机主顶进装置 Download PDFInfo
- Publication number
- CN105257298B CN105257298B CN201510750519.6A CN201510750519A CN105257298B CN 105257298 B CN105257298 B CN 105257298B CN 201510750519 A CN201510750519 A CN 201510750519A CN 105257298 B CN105257298 B CN 105257298B
- Authority
- CN
- China
- Prior art keywords
- oil cylinder
- jacking
- track
- push pipe
- footstock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510750519.6A CN105257298B (zh) | 2015-11-06 | 2015-11-06 | 步进式顶管机主顶进装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510750519.6A CN105257298B (zh) | 2015-11-06 | 2015-11-06 | 步进式顶管机主顶进装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105257298A CN105257298A (zh) | 2016-01-20 |
CN105257298B true CN105257298B (zh) | 2017-09-22 |
Family
ID=55097188
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510750519.6A Active CN105257298B (zh) | 2015-11-06 | 2015-11-06 | 步进式顶管机主顶进装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105257298B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105458343B (zh) * | 2016-02-06 | 2018-04-10 | 宁波慧作机电有限公司 | 一种自动钻孔机 |
CN107816355B (zh) * | 2017-09-28 | 2019-08-09 | 中国十七冶集团有限公司 | 一种多顶管定位顶进装置 |
CN107975374B (zh) * | 2017-11-24 | 2019-05-10 | 上海隧道工程有限公司 | 管幕暗挖法顶管施工的主顶进装置 |
CN110440052B (zh) * | 2019-08-09 | 2021-02-09 | 上海矩顶工程科技有限公司 | 一种用于顶管施工的移动式平滑顶升机构 |
CN111044273A (zh) * | 2019-11-22 | 2020-04-21 | 芜湖新兴铸管有限责任公司 | 顶管模拟顶推型式试验方法 |
CN111472789B (zh) * | 2020-04-29 | 2021-05-28 | 安徽开源路桥有限责任公司 | 顶管施工工艺 |
CN112627835B (zh) * | 2021-01-15 | 2022-09-06 | 刁志刚 | 一种穿心式连续顶进装置及盾构始发方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1202365C (zh) * | 2003-03-06 | 2005-05-18 | 上海隧道工程股份有限公司 | 中心螺旋式土压平衡微型顶管机 |
CN100343650C (zh) * | 2004-12-09 | 2007-10-17 | 上海隧道工程股份有限公司 | 大型盾构掘进模拟试验平台 |
CN202209175U (zh) * | 2011-08-29 | 2012-05-02 | 上海市机械施工有限公司 | 可调式土石分离步进异型掘进机 |
CN103787195A (zh) * | 2014-02-14 | 2014-05-14 | 山东兖煤黑豹矿业装备有限公司 | 煤矿单轨吊短距整体推进轨道 |
CN104196539A (zh) * | 2014-08-27 | 2014-12-10 | 石家庄铁道大学 | 开敞式tbm平面滑行步进装置及步进方法 |
-
2015
- 2015-11-06 CN CN201510750519.6A patent/CN105257298B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105257298A (zh) | 2016-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105257298B (zh) | 步进式顶管机主顶进装置 | |
CN206538790U (zh) | 一种现浇综合管廊施工用内模台车 | |
CN108867647B (zh) | 一种桩柱一体化施工用多功能钢管柱调垂机 | |
CN105155423A (zh) | 用于连续箱梁施工的上行式移动模架 | |
CN204457802U (zh) | 一体浇筑式模板台车 | |
CN105804762B (zh) | 一种盾构机过站、掉头装置的使用方法 | |
CN107974944A (zh) | 一种y型公铁两用桥梁桥面板吊装装置及吊装方法 | |
CN111663430B (zh) | 一种角度可调且横向可调的移动栈桥 | |
CN106968687B (zh) | 急倾斜煤层回采巷道封闭式圆环让压支护装置及支护方法 | |
CN106593469A (zh) | 一种用于仰拱施工的台车 | |
CN104329096A (zh) | 一种盾构过站始发平移施工工艺 | |
CN205576749U (zh) | 桥体梁架提升及调位装置 | |
CN203271588U (zh) | 轮式车载钻机 | |
CN203603928U (zh) | 一种轮胎式走行全液压衬砌台车 | |
CN206816263U (zh) | 用于半封闭式车站盾构机平移升降装置 | |
CN104018869B (zh) | 超前支架支护装置 | |
CN210194392U (zh) | 一种市政工程施工用道路整平装置 | |
CN204492846U (zh) | 带仰拱衬砌设备的移动式过车栈桥 | |
CN101979771A (zh) | 塔楼整体移动举升装置 | |
CN104018868A (zh) | 门式整体超前支架 | |
CN115749896A (zh) | 一种巷道掘进中围岩顶部临时支护设备及其使用方法 | |
CN203515607U (zh) | 隧道加宽断可调式钢模台车 | |
CN109281697A (zh) | 一种掘进支护设备 | |
CN108385452A (zh) | 一种治理路基沉降的起升调整机构、系统及方法 | |
CN105841986B (zh) | 用于室内盾构模型试验始发反力传递装置及其使用方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Xu Xiaolei Inventor after: Wang Qiuping Inventor after: Yuan Xianghua Inventor after: Wu Wenfei Inventor after: Li Hao Inventor after: Chen Liufeng Inventor after: Zhang Yalan Inventor before: Xu Xiaolei Inventor before: Wang Qiuping Inventor before: Yuan Xianghua Inventor before: Wu Wenfei Inventor before: Li Hao Inventor before: Zhang Yalan |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211105 Address after: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee after: Shanghai Waigaoqiao tunnel machinery Co.,Ltd. Address before: 200232 floor 5, No. 1099, Wanping South Road, Xuhui District, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee after: Shanghai urban construction tunnel equipment Co., Ltd Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee before: Shanghai Waigaoqiao tunnel machinery Co., Ltd |