CN105090613A - Hoisting method of gas pipeline in external wall of super high-rise building - Google Patents

Hoisting method of gas pipeline in external wall of super high-rise building Download PDF

Info

Publication number
CN105090613A
CN105090613A CN201510469187.4A CN201510469187A CN105090613A CN 105090613 A CN105090613 A CN 105090613A CN 201510469187 A CN201510469187 A CN 201510469187A CN 105090613 A CN105090613 A CN 105090613A
Authority
CN
China
Prior art keywords
gas pipeline
mast
wire rope
lifting
bipod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510469187.4A
Other languages
Chinese (zh)
Other versions
CN105090613B (en
Inventor
高雄伟
童一鸣
何哲彬
成立人
王雯艳
王敏敏
王元康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHENERGY ENERGY SERVICE Co Ltd
Original Assignee
SHANGHAI SHENERGY ENERGY SERVICE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHENERGY ENERGY SERVICE Co Ltd filed Critical SHANGHAI SHENERGY ENERGY SERVICE Co Ltd
Priority to CN201510469187.4A priority Critical patent/CN105090613B/en
Publication of CN105090613A publication Critical patent/CN105090613A/en
Application granted granted Critical
Publication of CN105090613B publication Critical patent/CN105090613B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground
    • F16L1/0246Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/60Derricks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Abstract

The invention discloses a hoisting method of a gas pipeline in an external wall of a super high-rise building. The hoisting method comprises the following steps: manufacturing and mounting a temporary construction platform at the bottom of a hoisting region; manufacturing and mounting zig-zag mast hoisting equipment through a roof platform of the building; mounting a fixed bracket for lifting a hoisting basket through the roof platform of the building; mounting the gas pipeline and a gas pipeline bracket from bottom to top; hoisting constructors to a corresponding position at which the gas pipeline bracket needs to be mounted of the external wall through the hoisting basket, and mounting the gas pipeline bracket by the constructors; hoisting the gas pipeline to be mounted to a corresponding mounting position of the external wall of the building through the zig-zag mast hoisting equipment, and embedding the gas pipeline to be mounted into the mounted gas pipeline bracket; and welding the gas pipeline and the lower mounted gas pipeline by the constructors. According to the hoisting method disclosed by the invention, the gas pipeline can be efficiently hoisted on the external wall of the super high-rise building and can be efficiently mounted in the external wall of the super high-rise building.

Description

A kind of lifting method of skyscraper exterior wall gas pipeline
Technical field
The present invention relates to the lifting method of pipeline, particularly relate to a kind of lifting method exceeding external wall of high-rise building gas pipeline.
Background technique
Rock gas is a kind of high-grade energy close to environmental protection, sulfur-bearing, dust and other harmful matter hardly, the carbon dioxide produced during burning is less than other fossil fuel, thus can fundamentally environmental protect quality, and combustion gas also has economical and practical, safe and reliable advantage in addition.
Rock gas generally all adopts the method supply of Cemented filling.Skyscraper top layer natural gas supply, natural gas line lays in pipe special well usually in building.But when not having space enforcement for building interior, laying natural gas line at skyscraper exterior wall is a kind of effective approach.But implement Pipe installing at skyscraper space outerpace, difficulty is large, performance difficulty.
Summary of the invention
Because the above-mentioned defect of prior art, technical problem to be solved by this invention is to provide a kind of lifting method for gas pipeline, can realize gas pipeline and complete handling and welded and installed at skyscraper exterior wall, and efficiently.
For achieving the above object, the invention provides a kind of lifting method of skyscraper exterior wall gas pipeline, comprise the following steps:
Step one, at the bottom fabrication and installation temporary construction platform in lifting region, described temporary construction platform, for stacking gas pipeline to be installed, simultaneously for placing hanging basket, and plays the effect of the lower zone protecting described temporary construction platform;
Step 2, at the roof platform fabrication and installation bipod mast hanging device of building, described bipod mast hanging device is for lifting by crane described gas pipeline;
Step 3, install the fixed support of Lifting basket at the roof platform of described building, hanging basket is fixed by fixed support, and can move in external wall oscilaltion;
Step 4, installs gas pipeline support; Utilizing described hanging basket workmen to be winched to needs to install the external wall relevant position of gas pipeline support, and workmen, to wall body hole, buries chemical bolt underground in hole, then utilizes described chemical bolt to install described gas pipeline support; Described gas pipeline support is used for the exterior wall described gas pipeline being fixed on described building;
Step 5, utilize described bipod mast hanging device that gas pipeline to be installed is winched to the corresponding mounting point of external wall, described gas pipeline to be installed embeds in mounted described gas pipeline support by the workmen in described hanging basket;
Described bipod mast hanging device lifts by the workmen in step 6, described hanging basket and the mounted gas pipeline of gas pipeline and below embedded in described gas pipeline support welds together;
Step 7, repeat step 5 and step 6, described gas pipeline is installed by root from lower to upper, until the whole installation of described gas pipeline to be installed being welded to each other together.
Further, described interim operation protection platform adopts steel structural form, and lays Checkered Steel Plate on steel structure.
Further, described bipod mast hanging device comprises bipod mast, winch, sheave block and wire rope; Described wire rope comprises the first wire rope and the second wire rope; Described bipod mast is fixed on above the top layer platform of described building, and with described first wire rope as cable wind rope, stable to guarantee that described bipod mast is installed; Described second wire rope is the wire rope of lifting, and described second wire rope is connected with described winch by described sheave block, and the pulling force provided by described winch lifts by crane described gas pipeline.
Further, described bipod mast comprises the first mast, the second mast and the 3rd mast, described first mast is positioned at the top of described bipod mast and parallel with floor ground, one end of described second mast is all fixedly connected with described first mast with one end of described 3rd mast, and the other end of described second mast and the other end of described 3rd mast are all fixedly connected with building roof platform; The two ends of described first mast are fixedly connected with construction wall respectively by described first wire rope with middle part; Described second mast and described 3rd mast form man type.
Further, be connected with sheave block between described second mast and described 3rd mast, described sheave block be provided with described second wire rope, one end of described second wire rope is connected with described winch, and the other end is connected with described gas pipeline.
Further, one end of described gas pipeline is departed from weld bond place and is welded with two pieces for the shackle plate hanging wire rope during lifting, and described shackle plate adopts angle steel to make, and has lifted rear described shackle plate and has been cut off.
Lifting method for gas pipeline of the present invention, can realize gas pipeline in the handling of skyscraper building exterior wall and installation, and efficiently.
Be described further below with reference to the technique effect of accompanying drawing to design of the present invention, concrete structure and generation, to understand object of the present invention, characteristic sum effect fully.
Accompanying drawing explanation
Fig. 1 is the elevation of the lifting pipeline of a preferred embodiment of the present invention;
Fig. 2 is the plan view of the interim operation protection platform of a preferred embodiment of the present invention;
Fig. 3 is the side view of Fig. 2
Fig. 4 is the side view of the bipod mast in Fig. 1;
Fig. 5 is Fig. 4 plan view.
Embodiment
A preferred embodiment of the present invention provides a kind of lifting method of gas pipeline, and mainly for increasing along body of wall in the periphery with 45 floor height buildings, a road gas pipeline proposes the method.The present embodiment is applicable to the lifting of skyscraper exterior wall gas pipeline.
As shown in Figure 1, the lifting method of the gas pipeline of the present embodiment comprises the following steps:
Step one, at the bottom fabrication and installation temporary construction platform 100 in lifting region, described temporary construction platform 100, for stacking gas pipeline 405 to be installed, simultaneously for placing hanging basket 500, and plays the effect of the lower zone protecting described temporary construction platform 100;
Step 2, at the roof platform fabrication and installation bipod mast hanging device of building 200, described bipod mast hanging device is for lifting by crane described gas pipeline;
Step 3, install the fixed support of Lifting basket at the roof platform of described building 200, hanging basket 500 is fixed by fixed support, and can move along external wall 201 oscilaltion;
Step 4, installs gas pipeline support; Utilizing described hanging basket 500 workmen to be winched to needs to install external wall 201 relevant position of gas pipeline support, and workmen, to wall body hole, buries chemical bolt underground in hole, then utilizes described chemical bolt to install described gas pipeline support; Described gas pipeline support is used for the exterior wall 201 described gas pipeline 405 being fixed on described building;
Step 5, utilize described bipod mast hanging device gas pipeline 405 to be installed to be winched to the corresponding mounting point of exterior wall 201 of building, described gas pipeline to be installed embeds in mounted described gas pipeline support by the workmen in described hanging basket;
Described bipod mast hanging device lifts by the workmen in step 6, described the hanging basket 500 and mounted gas pipeline of gas pipeline and below embedded in described gas pipeline support welds together;
Step 7, repeat step 5 and step 6, described gas pipeline is installed by root from lower to upper, until the whole installation of described gas pipeline to be installed being welded to each other together.
As shown in Figures 2 and 3, the interim operation protection platform 100 of the present embodiment is built along the exterior wall 101 of lifting sections bottom and column 102, adopts steel structural form, and on steel structure, lays the Checkered Steel Plate of 3mm.
As shown in Figure 4 and Figure 5, the bipod mast hanging device of the present embodiment comprises bipod mast 1, winch 2, sheave block 3 and wire rope; Wire rope comprises the first wire rope 4 and the second wire rope 5; Bipod mast 1 is fixed on above the platform of building roof, and with the first wire rope 4 as cable wind rope, stable to guarantee that bipod mast 1 is installed; Second wire rope 5 is the wire rope of lifting, and the second wire rope 5 is connected with winch 2 by sheave block 3, the pulling force lifting gas pipeline 405 provided by winch 2.
Particularly, bipod mast 1 comprises the first mast 11, second mast 12 and the 3rd mast 13, first mast 11 is positioned at the top of bipod mast 1 and parallel with floor ground, one end of second mast 12 is all fixedly connected with the first mast 11 with one end of the 3rd mast 13, and the other end of the second mast 12 is all fixedly connected with roof platform with the other end of the 3rd mast 13; The two ends of the first mast 11 are fixedly connected with construction wall respectively by the first wire rope 4 with middle part; Second mast 12 and the 3rd mast 13 form man type.Be connected with sheave block 3 between second mast 12 and the 3rd mast 13, one end that sheave block 3 is provided with the second wire rope 5, second wire rope 5 is connected with winch 2, and the other end is connected with gas pipeline 405.The bottom of mast 1 is also fixed by the parapet 7 of rope 6 with floor, and mast 1 is 55 ° with the angle of horizontal plane.
More than describe preferred embodiment of the present invention in detail.Should be appreciated that those of ordinary skill in the art just design according to the present invention can make many modifications and variations without the need to creative work.Therefore, all technician in the art, all should by the determined protection domain of claims under this invention's idea on the basis of existing technology by the available technological scheme of logical analysis, reasoning, or a limited experiment.

Claims (6)

1. a lifting method for skyscraper exterior wall gas pipeline, is characterized in that, comprises the following steps:
Step one, at the bottom fabrication and installation temporary construction platform in lifting region, described temporary construction platform, for stacking gas pipeline to be installed, simultaneously for placing hanging basket, and plays the effect of the lower zone protecting described temporary construction platform;
Step 2, at the roof platform fabrication and installation bipod mast hanging device of building, described bipod mast hanging device is for lifting by crane described gas pipeline;
Step 3, install the fixed support of Lifting basket at the roof platform of described building, hanging basket is fixed by described fixed support, and can move in external wall oscilaltion;
Step 4, gas pipeline support is installed: utilizing described hanging basket workmen to be winched to needs to install the external wall relevant position of gas pipeline support, workmen, to wall body hole, buries chemical bolt underground in hole, then utilizes described chemical bolt to install described gas pipeline support; Described gas pipeline support is used for the exterior wall described gas pipeline being fixed on described building;
Step 5, utilize described bipod mast hanging device that gas pipeline to be installed is winched to the corresponding mounting point of external wall, described gas pipeline to be installed embeds in mounted described gas pipeline support by the workmen in described hanging basket;
Described bipod mast hanging device lifts by the workmen in step 6, described hanging basket and the mounted gas pipeline of gas pipeline and below embedded in described gas pipeline support welds together;
Step 7, repeat step 5 and step 6, described gas pipeline is installed by root from lower to upper, until the whole installation of described gas pipeline to be installed being welded to each other together.
2. the lifting method of skyscraper exterior wall gas pipeline as claimed in claim 1, is characterized in that, described interim operation protection platform adopts steel structural form, and lays Checkered Steel Plate on steel structure.
3. the lifting method of skyscraper exterior wall gas pipeline as claimed in claim 1, it is characterized in that, described bipod mast hanging device comprises bipod mast, winch, sheave block and wire rope; Described wire rope comprises the first wire rope and the second wire rope; Described bipod mast is fixed on above the roof platform of described building, and with described first wire rope as cable wind rope, stable to guarantee that described bipod mast is installed; Described second wire rope is the wire rope of lifting, and described second wire rope is connected with described winch by described sheave block, and the pulling force provided by described winch lifts by crane described gas pipeline.
4. the lifting method of skyscraper exterior wall gas pipeline as claimed in claim 3, it is characterized in that, described bipod mast comprises the first mast, the second mast and the 3rd mast, described first mast is positioned at the top of described bipod mast and parallel with floor ground, one end of described second mast is all fixedly connected with described first mast with one end of described 3rd mast, and the other end of described second mast is all fixedly connected with architectural top platform with the other end of described 3rd mast; The two ends of described first mast are fixedly connected with construction wall respectively by described first wire rope with middle part; Described second mast and described 3rd mast form man type.
5. the lifting method of skyscraper exterior wall gas pipeline as claimed in claim 4, it is characterized in that, sheave block is connected with between described second mast and described 3rd mast, described sheave block is provided with described second wire rope, one end of described second wire rope is connected with described winch, and the other end is connected with described gas pipeline.
6. the lifting method of skyscraper exterior wall gas pipeline as claimed in claim 1, it is characterized in that, one end of described gas pipeline is departed from weld bond place and is welded with two pieces for the shackle plate hanging wire rope during lifting, and described shackle plate adopts angle steel to make, and has lifted rear described shackle plate and has been cut off.
CN201510469187.4A 2015-08-03 2015-08-03 A kind of hanging method of high-rise building exterior wall gas pipeline Active CN105090613B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510469187.4A CN105090613B (en) 2015-08-03 2015-08-03 A kind of hanging method of high-rise building exterior wall gas pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510469187.4A CN105090613B (en) 2015-08-03 2015-08-03 A kind of hanging method of high-rise building exterior wall gas pipeline

Publications (2)

Publication Number Publication Date
CN105090613A true CN105090613A (en) 2015-11-25
CN105090613B CN105090613B (en) 2017-10-03

Family

ID=54571649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510469187.4A Active CN105090613B (en) 2015-08-03 2015-08-03 A kind of hanging method of high-rise building exterior wall gas pipeline

Country Status (1)

Country Link
CN (1) CN105090613B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416685A (en) * 2017-08-29 2017-12-01 株洲新奥燃气有限公司 Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN108626482A (en) * 2018-04-23 2018-10-09 西山煤电建筑工程集团有限公司矿建第分公司 The construction method of vertical gas pipe is installed using anti-well drilling machine
CN113333981A (en) * 2021-06-03 2021-09-03 中国电建集团四川工程有限公司 Large-size pi-shaped pipeline installation method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110616909B (en) * 2019-09-28 2021-07-09 中建三局集团有限公司 Construction method of suspension track system at bottom of connecting bridge of super high-rise building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
詹淑民: "高层建筑室外立管安装施工方法", 《城市煤气》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107416685A (en) * 2017-08-29 2017-12-01 株洲新奥燃气有限公司 Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN107416685B (en) * 2017-08-29 2019-11-05 株洲新奥燃气有限公司 Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN108626482A (en) * 2018-04-23 2018-10-09 西山煤电建筑工程集团有限公司矿建第分公司 The construction method of vertical gas pipe is installed using anti-well drilling machine
CN113333981A (en) * 2021-06-03 2021-09-03 中国电建集团四川工程有限公司 Large-size pi-shaped pipeline installation method

Also Published As

Publication number Publication date
CN105090613B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
JP4701047B2 (en) Wind power tower construction method
CN103243926B (en) Construction method for hoisting engineering tube well stand pipe of high-rise building
CN105090613A (en) Hoisting method of gas pipeline in external wall of super high-rise building
CN103669900B (en) Integral reinforcement construction method for outer barrel wall of chimney
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN204000830U (en) Merogenesis take-over type sand drain machine
CN110159057B (en) Mounting and construction method for smoke pipe of technically improved factory building
CN104016260B (en) Little lattice funnel slide installation method and slippage installing mechanism
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN105274976B (en) Steel platform prefabricated construction method in water
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN102061810B (en) Construction method of safe flat net positioned on periphery of building
CN104627849B (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN105155427B (en) The construction method that suspension bridge cat road is laid
CN203794505U (en) Internal climbing steel beam conveying device of internal climbing movable arm tower crane
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN102425115A (en) Control method for actively overcoming dead weight and line shape of vice cable saddle buttress concrete
CN105040592A (en) Flat suspension bridge and erecting method thereof
CN108951430A (en) A kind of road and bridge in-site installation structure, method and loop wheel machine
JP2016079761A (en) Installation method and removal method for connection-type pole structure
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
CN211597658U (en) Movable overhanging scaffold

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant