CN105090613B - A kind of hanging method of high-rise building exterior wall gas pipeline - Google Patents
A kind of hanging method of high-rise building exterior wall gas pipeline Download PDFInfo
- Publication number
- CN105090613B CN105090613B CN201510469187.4A CN201510469187A CN105090613B CN 105090613 B CN105090613 B CN 105090613B CN 201510469187 A CN201510469187 A CN 201510469187A CN 105090613 B CN105090613 B CN 105090613B
- Authority
- CN
- China
- Prior art keywords
- gas pipeline
- mast
- wire rope
- steel wire
- hanging
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/0243—Laying or reclaiming pipes on land, e.g. above the ground above ground
- F16L1/0246—Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/60—Derricks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/06—Accessories therefor, e.g. anchors
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of hanging method of high-rise building exterior wall gas pipeline, including:Bottom fabrication and installation temporary construction platform in lifting region;Using building roof platform fabrication and installation bipod mast hanging device;Utilize the fixed support for building roof platform installation Lifting basket;Gas pipeline and gas pipeline support are installed from bottom to top;Workmen is hung to the corresponding outer wall displacement for needing to install gas pipeline support using hanging basket, workmen installs gas pipeline support;Gas pipeline to be installed is hung in the corresponding installation site of external wall and embedded mounted gas pipeline support using bipod mast hanging device;The mounted gas pipeline in gas pipeline and lower section is implemented to be welded to connect by workmen.The hanging method of the present invention can realize handling and installation of the gas pipeline in high-rise building exterior wall, and efficiently.
Description
Technical field
The present invention relates to the hanging method of pipeline, more particularly to a kind of lifting side more than external wall of high-rise building gas pipeline
Method.
Background technology
Natural gas is a kind of high-grade energy close to environmental protection, hardly sulfur-bearing, dust and other harmful substances matter, is produced during burning
Raw carbon dioxide is less than other fossil fuels, thus can fundamentally improve environmental quality, and combustion gas in addition also has economical real
Favour, safe and reliable advantage.
Natural gas is typically all supplied using the method for pipeline.High-rise building top layer natural gas supply, natural gas tube
Road is generally laid in building in pipe special well.But in the case of not having space implementation for building interior, built in Super High
It is a kind of effective approach to build exterior wall and lay natural gas line.But implement Pipe installing, difficulty in high-rise building exterior space
Greatly, performance difficulty.
The content of the invention
In view of the drawbacks described above of prior art, the technical problems to be solved by the invention are to provide a kind of for Gas Pipe
The hanging method in road, can realize that gas pipeline completes handling and welded and installed in high-rise building exterior wall, and efficiently.
To achieve the above object, the invention provides a kind of hanging method of high-rise building exterior wall gas pipeline, including
Following steps:
Step one, in the bottom fabrication and installation temporary construction platform of lifting region, the temporary construction platform is used to stack
Gas pipeline to be installed, while for placing hanging basket, and play a part of protecting the lower zone of the temporary construction platform;
Step 2, in the roof platform fabrication and installation bipod mast hanging device of building, the bipod mast hanging device
For lifting by crane the gas pipeline;
Step 3, the fixed support of Lifting basket is installed in the roof platform of the building, and hanging basket is solid by fixed support
It is fixed, and can be moved in external wall oscilaltion;
Step 4, installs gas pipeline support;Being hung to workmen using the hanging basket needs to install gas pipeline branch
The external wall relevant position of frame, workmen buries chemical bolt in hole, then utilizes the chemical spiral shell to wall body hole
Bolt installs the gas pipeline support;The gas pipeline support is used to the gas pipeline being fixed on the outer of the building
Wall;
Accordingly installed Step 5: gas pipeline to be installed is hung into external wall using the bipod mast hanging device
The gas pipeline to be installed is embedded in the mounted gas pipeline support by the workmen in position, the hanging basket
It is interior;
Step 6: the combustion gas that the workmen in the hanging basket lifts the bipod mast hanging device and embedded
Gas pipeline in support of pipelines welds together with the mounted gas pipeline in lower section;
Step 7: repeat step five and step 6, the gas pipeline are installed by root from lower to upper, until institute to be installed
State the whole installations of gas pipeline and be welded to each other together.
Further, the interim operation protection platform uses steel structural form, and lays on steel construction checkered steel plate.
Further, the bipod mast hanging device includes bipod mast, hoist engine, assembly pulley and steel wire rope;It is described
Steel wire rope includes the first steel wire rope and the second steel wire rope;The bipod mast is fixed on above the top layer platform of the building, and
With first steel wire rope as cable wind rope, to ensure the stabilization of the bipod mast installation;Second steel wire rope is lifting
Steel wire rope, second steel wire rope is connected by the assembly pulley with the hoist engine, is provided by the hoist engine
Pulling force lifts by crane the gas pipeline.
Further, the bipod mast includes the first mast, the second mast and the 3rd mast, and first mast is located at
The top of the bipod mast is simultaneously parallel with floor ground, one end of one end of second mast and the 3rd mast with
First mast is fixedly connected, and the other end of the other end of second mast and the 3rd mast is put down with building roof
Platform is fixedly connected;The two ends and middle part of first mast are fixedly connected by first steel wire rope with construction wall respectively;
Second mast and the 3rd mast formation herringbone.
Further, it is connected with assembly pulley, the assembly pulley and sets between second mast and the 3rd mast
There is second steel wire rope, one end of second steel wire rope is connected with the hoist engine, the other end and the gas pipeline phase
Even.
Further, one end of the gas pipeline is deviateed hangs hanging for steel wire rope when two pieces are welded with weld bond for lifting
Otic placode, the shackle plate is made using angle steel, and the shackle plate is cut off after the completion of lifting.
The hanging method for gas pipeline of the present invention, can realize gas pipeline hanging in high-rise building building exterior wall
Fortune and installation, and efficiently.
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to accompanying drawing, with
It is fully understood from the purpose of the present invention, feature and effect.
Brief description of the drawings
Fig. 1 is the elevation of the lifting pipeline of the preferred embodiment of the present invention;
Fig. 2 is the top view of the interim operation protection platform of the preferred embodiment of the present invention;
Fig. 3 is Fig. 2 side view
Fig. 4 is the side view of the bipod mast in Fig. 1;
Fig. 5 is Fig. 4 top views.
Embodiment
The present invention a preferred embodiment provide a kind of hanging method of gas pipeline, this method primarily directed to
With 45 floor height buildings periphery along wall increase all the way gas pipeline propose.The present embodiment is applied to high-rise building exterior wall
The lifting of gas pipeline.
As shown in figure 1, the hanging method of the gas pipeline of the present embodiment comprises the following steps:
Step one, in the bottom fabrication and installation temporary construction platform 100 of lifting region, the temporary construction platform 100 is used
In stacking gas pipeline 405 to be installed, while protecting the temporary construction platform 100 for placing hanging basket 500, and playing
The effect of lower zone;
Step 2, in the roof platform fabrication and installation bipod mast hanging device of building 200, the bipod mast lifting is set
It is ready for use on the lifting gas pipeline;
Step 3, the fixed support of Lifting basket is installed in the roof platform of the building 200, and hanging basket 500 passes through fixation
Support is fixed, and can be moved along the oscilaltion of external wall 201;
Step 4, installs gas pipeline support;Being hung to workmen using the hanging basket 500 needs to install gas pipeline
The relevant position of external wall 201 of support, workmen buries chemical bolt, then using described to wall body hole in hole
Chemical bolt installs the gas pipeline support;The gas pipeline support is described for the gas pipeline 405 to be fixed on
The exterior wall 201 of building;
Step 5: gas pipeline 405 to be installed to be hung to the exterior wall 201 of building using the bipod mast hanging device
The gas pipeline to be installed is embedded in the mounted Gas Pipe by the workmen in corresponding installation site, the hanging basket
In road support;
Step 6: that the workmen in the hanging basket 500 lifts the bipod mast hanging device and embedded described
Gas pipeline in gas pipeline support welds together with the mounted gas pipeline in lower section;
Step 7: repeat step five and step 6, the gas pipeline are installed by root from lower to upper, until institute to be installed
State the whole installations of gas pipeline and be welded to each other together.
As shown in Figures 2 and 3, exterior wall 101 of the interim operation protection platform 100 of the present embodiment along lifting region bottom
Built with column 102, using steel structural form, and lay on steel construction 3mm checkered steel plate.
As shown in Figure 4 and Figure 5, the bipod mast hanging device of the present embodiment includes bipod mast 1, hoist engine 2, assembly pulley
3 and steel wire rope;Steel wire rope includes the first steel wire rope 4 and the second steel wire rope 5;Bipod mast 1 is fixed on the platform of building roof
Side, and with the first steel wire rope 4 as cable wind rope, to ensure the stabilization of the installation of bipod mast 1;Second steel wire rope 5 is lifting
Steel wire rope, the second steel wire rope 5 is connected by assembly pulley 3 with hoist engine 2, and the pulling force provided by hoist engine 2 lifts by crane gas pipeline
405。
Specifically, bipod mast 1 includes the first mast 11, the second mast 12 and the 3rd mast 13, and the first mast 11 is located at
The top of bipod mast 1 is simultaneously parallel with floor ground, one end of the second mast 12 and one end of the 3rd mast 13 with the first mast
Bar 11 is fixedly connected, and the other end of the second mast 12 and the other end of the 3rd mast 13 are fixedly connected with roof platform;First
The two ends and middle part of mast 11 are fixedly connected by the first steel wire rope 4 with construction wall respectively;Second mast 12 and the 3rd mast
13 form herringbone.Assembly pulley 3 is connected between second mast 12 and the 3rd mast 13, assembly pulley 3 is provided with the second steel wire rope
5, one end of the second steel wire rope 5 is connected with hoist engine 2, and the other end is connected with gas pipeline 405.The bottom of mast 1 also passes through rope
The parapet 7 of rope 6 and floor is fixed, and the angle of mast 1 and horizontal plane is 55 °.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without
Need creative work just can make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art
Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea
Technical scheme, all should be in the protection domain being defined in the patent claims.
Claims (5)
1. a kind of hanging method of high-rise building exterior wall gas pipeline, it is characterised in that the Super High is 45 floor height buildings, institute
Hanging method is stated to comprise the following steps:
Step one, in the bottom fabrication and installation temporary construction platform of lifting region, the temporary construction platform is used to stack to wait to pacify
The gas pipeline of dress, while for placing hanging basket, and play a part of protecting the lower zone of the temporary construction platform;
Step 2, in the roof platform fabrication and installation bipod mast hanging device of building, the bipod mast hanging device is used for
Lift by crane the gas pipeline;The bipod mast hanging device includes bipod mast, hoist engine, assembly pulley and steel wire rope;It is described
Steel wire rope includes the first steel wire rope and the second steel wire rope;The bipod mast is fixed on above the roof platform of the building, and
With first steel wire rope as cable wind rope, to ensure the stabilization of the bipod mast installation;Second steel wire rope is lifting
Steel wire rope, second steel wire rope is connected by the assembly pulley with the hoist engine, is provided by the hoist engine
Pulling force lifts by crane the gas pipeline;
Step 3, the fixed support of Lifting basket is installed in the roof platform of the building, and hanging basket is solid by the fixed support
It is fixed, and can be moved in external wall oscilaltion;
Step 4, installs gas pipeline support:Being hung to workmen using the hanging basket needs to install gas pipeline support
External wall relevant position, workmen buries chemical bolt to wall body hole in hole, is then pacified using the chemical bolt
Fill the gas pipeline support;The gas pipeline support is used for the exterior wall that the gas pipeline is fixed on to the building;
Step 5: gas pipeline to be installed is hung into the corresponding installation position of external wall using the bipod mast hanging device
Put, the gas pipeline to be installed is embedded in the mounted gas pipeline support by the workmen in the hanging basket;
Step 6: the gas pipeline that the workmen in the hanging basket lifts the bipod mast hanging device and embedded
Gas pipeline in support welds together with the mounted gas pipeline in lower section;
Step 7: repeat step five and step 6, the gas pipeline are installed by root from lower to upper, until the combustion to be installed
Feed channel whole installation is simultaneously welded to each other together.
2. the hanging method of high-rise building exterior wall gas pipeline as claimed in claim 1, it is characterised in that described to apply temporarily
Work platform uses steel structural form, and lays on steel construction checkered steel plate.
3. the hanging method of high-rise building exterior wall gas pipeline as claimed in claim 1, it is characterised in that the bipod mast
Bar includes the first mast, the second mast and the 3rd mast, and first mast is located at the top of the bipod mast and and floor
Ground is parallel, and one end of one end of second mast and the 3rd mast is fixedly connected with first mast, described
The other end of the other end of second mast and the 3rd mast is fixedly connected with architectural top platform;First mast
Two ends and middle part are fixedly connected by first steel wire rope with construction wall respectively;Second mast and the 3rd mast
Form herringbone.
4. the hanging method of high-rise building exterior wall gas pipeline as claimed in claim 3, it is characterised in that second mast
It is connected between bar and the 3rd mast on assembly pulley, the assembly pulley and is provided with second steel wire rope, second steel
One end of cord is connected with the hoist engine, and the other end is connected with the gas pipeline.
5. the hanging method of high-rise building exterior wall gas pipeline as claimed in claim 1, it is characterised in that the Gas Pipe
The shackle plate that steel wire rope is hung when two pieces are welded with weld bond for lifting is deviateed in the one end in road, and the shackle plate uses angle steel system
Make, the shackle plate is cut off after the completion of lifting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510469187.4A CN105090613B (en) | 2015-08-03 | 2015-08-03 | A kind of hanging method of high-rise building exterior wall gas pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510469187.4A CN105090613B (en) | 2015-08-03 | 2015-08-03 | A kind of hanging method of high-rise building exterior wall gas pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105090613A CN105090613A (en) | 2015-11-25 |
CN105090613B true CN105090613B (en) | 2017-10-03 |
Family
ID=54571649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510469187.4A Active CN105090613B (en) | 2015-08-03 | 2015-08-03 | A kind of hanging method of high-rise building exterior wall gas pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105090613B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616909A (en) * | 2019-09-28 | 2019-12-27 | 中建三局集团有限公司 | Construction method of suspension track system at bottom of connecting bridge of super high-rise building |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107416685B (en) * | 2017-08-29 | 2019-11-05 | 株洲新奥燃气有限公司 | Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge |
CN108626482B (en) * | 2018-04-23 | 2019-10-08 | 西山煤电建筑工程集团有限公司矿建第一分公司 | Utilize the construction method of anti-well drilling machine installation vertical gas pipe |
CN113333981A (en) * | 2021-06-03 | 2021-09-03 | 中国电建集团四川工程有限公司 | Large-size pi-shaped pipeline installation method |
-
2015
- 2015-08-03 CN CN201510469187.4A patent/CN105090613B/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616909A (en) * | 2019-09-28 | 2019-12-27 | 中建三局集团有限公司 | Construction method of suspension track system at bottom of connecting bridge of super high-rise building |
Also Published As
Publication number | Publication date |
---|---|
CN105090613A (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105090613B (en) | A kind of hanging method of high-rise building exterior wall gas pipeline | |
CN103669900B (en) | Integral reinforcement construction method for outer barrel wall of chimney | |
CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
CN204000830U (en) | Merogenesis take-over type sand drain machine | |
CN202530769U (en) | Large span steel structure high-altitude subsection hoisting support system | |
CN203729560U (en) | Construction platform device for large chimneys | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN204434116U (en) | A kind of hanging device for interior courtyard lifting pipeline | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN204982628U (en) | Horizontal pull rope bridge | |
CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
CN204626930U (en) | Integrated lifting frame operating platform | |
CN106049843A (en) | Hanging type anti-shaking construction platform and mounting method thereof | |
CN107842246A (en) | A kind of chimney steel beam hydraulic lifting high-altitude integral slipping hanging apparatus and method | |
CN104631897A (en) | Chimney glass fiber reinforced plastic inner tube fast installation method | |
CN205444867U (en) | Novel elevator shaft is from turning over formula handling frame | |
CN104627849B (en) | Hoisting equipment and hoisting method for hoisting inner courtyard pipeline | |
CN203794505U (en) | Internal climbing steel beam conveying device of internal climbing movable arm tower crane | |
CN107010551B (en) | A kind of restricted clearance construction method for hanging | |
CN211712490U (en) | Pipeline well pipeline hoisting device | |
CN106081830A (en) | Bridging type safety door construction elevator | |
CN206051244U (en) | Bridging type safety door construction elevator | |
CN106703418A (en) | Mobile safety set hanging method for large-span net shell structure roof installation | |
CN202913705U (en) | Large curtain wall unit plate track lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |