CN104016260B - Little lattice funnel slide installation method and slippage installing mechanism - Google Patents
Little lattice funnel slide installation method and slippage installing mechanism Download PDFInfo
- Publication number
- CN104016260B CN104016260B CN201410288131.4A CN201410288131A CN104016260B CN 104016260 B CN104016260 B CN 104016260B CN 201410288131 A CN201410288131 A CN 201410288131A CN 104016260 B CN104016260 B CN 104016260B
- Authority
- CN
- China
- Prior art keywords
- funnel
- pulley
- little lattice
- platform
- small grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种小格漏斗滑移安装方法,包括小格漏斗起吊及转运步骤,小格漏斗吊运步骤,小格漏斗安装步骤,该小格漏斗滑移安装方法采用轨道平台承担大量的构件转运工作,减少了吊车的移动,节约劳动力,从而节省了大量的机械费用和人工费用,且避免了手拉葫芦挪动带来的歪拉斜吊,极大的保证施工安全性,减少吊车移动的同时也提高了工作效率,缩短了工期。本发明还公开了一种滑移安装机构,该滑移安装机构为实施小格漏斗滑移安装方法所采用的装置,能够有效保证安全、稳固的实现对小格漏斗实施吊运、转运、安装等步骤过程,避免了以往安装方法中大量的人工拖拉步骤,结构简单稳固,实施方便。
The invention discloses a sliding installation method of a small grid funnel, which comprises the steps of hoisting and transferring the small grid funnel, the lifting step of the small grid funnel, and the installation step of the small grid funnel. The sliding installation method of the small grid funnel adopts a track platform to bear a large amount of Component transfer work reduces the movement of the crane and saves labor, thereby saving a lot of mechanical costs and labor costs, and avoids the crooked and inclined lifting caused by the movement of the chain hoist, which greatly ensures the construction safety and reduces the movement of the crane. At the same time, it also improves work efficiency and shortens the construction period. The invention also discloses a sliding installation mechanism. The sliding installation mechanism is a device used in implementing the sliding installation method of the small grid funnel, which can effectively ensure safe and stable implementation of hoisting, transfer, and installation of the small grid funnel. The process of waiting steps avoids a large number of manual dragging steps in the previous installation method, the structure is simple and stable, and the implementation is convenient.
Description
技术领域 technical field
发明属于构件转运及吊装的施工领域,具体应用于室内吊装、面积较大、转运工作繁琐的场合,具体涉及一种小格漏斗滑移安装方法及滑移安装机构。 The invention belongs to the construction field of component transfer and hoisting, and is specifically applied to occasions where indoor hoisting, large area, and cumbersome transfer work are involved, and specifically relates to a small grid funnel sliding installation method and a sliding installation mechanism.
背景技术 Background technique
此前在安装小格漏斗时,通常采用在每个轴线处将构件进行吊装,然后在室内利用多个手拉葫芦进行就位再吊装。此方法不仅机械费成本过高,需要不停的转移吊车,一个位置只能吊装2个构件;并且在将构件吊至烧结楼二楼后,需用多个手拉葫芦慢慢挪动就位,不可避免的存在歪拉斜吊,具有极大的安全隐患。同时需要大量的施工人员操作葫芦,工作效率很低,工期偏长。 Previously, when installing small grid funnels, the components were usually hoisted at each axis, and then multiple hand chain hoists were used indoors for in-situ hoisting. This method not only requires high mechanical costs, but also requires continuous transfer of cranes, and only two components can be hoisted at one position; and after the components are hoisted to the second floor of the sintering building, multiple chain hoists are required to slowly move them into place. Unavoidable existence of crooked pull oblique hanging, has great potential safety hazard. At the same time, a large number of construction workers are required to operate the hoist, so the work efficiency is very low and the construction period is long.
发明内容 Contents of the invention
本发明公开了一种小格漏斗滑移安装方法,该小格漏斗滑移安装方法采用轨道平台承担大量的构件转运工作,减少了吊车的移动,节约劳动力,从而节省了大量的机械费用和人工费用,且避免了手拉葫芦挪动带来的歪拉斜吊,极大的保证施工安全性,减少吊车移动的同时也提高了工作效率,缩短了工期。 The invention discloses a sliding installation method of a small grid funnel. The sliding installation method of a small grid funnel adopts a rail platform to undertake a large number of component transfer work, reduces the movement of a crane, saves labor, and thus saves a lot of mechanical costs and labor. cost, and avoid the crooked and inclined hanging caused by the movement of the chain hoist, which greatly ensures the safety of construction, reduces the movement of the crane, improves work efficiency and shortens the construction period.
本发明还公开了一种滑移安装机构,该滑移安装机构为实施小格漏斗滑移安装方法所采用的装置,能够有效保证安全、稳固的实现对小格漏斗实施吊运、转运、安装等步骤过程,避免了以往安装方法中大量的人工拖拉步骤,结构简单稳固,实施方便。 The invention also discloses a sliding installation mechanism. The sliding installation mechanism is a device used in implementing the sliding installation method of the small grid funnel, which can effectively ensure safe and stable implementation of hoisting, transfer, and installation of the small grid funnel. The process of waiting steps avoids a large number of manual dragging steps in the previous installation method, the structure is simple and stable, and the implementation is convenient.
本发明公开的一种小格漏斗滑移安装方法,其实现如下: A sliding installation method for a small grid funnel disclosed by the present invention is realized as follows:
包括以下步骤,小格漏斗起吊及转运步骤,用起吊装置将待安装的小格漏斗吊至吊装孔挑台处的横向转运小车上,由横向转运小车转运至横向转运轨道与纵向转运轨道的转运处;使用卷扬机及钢丝绳配合第一滑轮与第二滑轮吊运小格漏斗,将小格漏斗从横向转运小车上转运至纵向转运小车上;由纵向转运小车将小格漏斗运送至指定的漏斗安装位置; Including the following steps, the lifting and transfer steps of the small grid funnel, use the lifting device to lift the small grid funnel to be installed to the horizontal transfer trolley at the lifting platform of the hoisting hole, and transfer it from the horizontal transfer trolley to the transshipment between the horizontal transfer track and the vertical transfer track use the hoist and wire rope to cooperate with the first pulley and the second pulley to lift the small grid funnel, and transfer the small grid funnel from the horizontal transfer trolley to the vertical transfer trolley; the vertical transfer trolley transports the small grid funnel to the designated funnel for installation Location;
小格漏斗吊运步骤,在漏斗安装位置的中心上方设置滑轮挂点安装第三滑轮,再使用卷扬机及钢丝绳配合第三滑轮将小格漏斗从纵向转运小车吊运至漏斗安装位置下方的中部平台上, Steps for hoisting the small grid funnel: Set the pulley hanging point above the center of the funnel installation position to install the third pulley, and then use the hoist and wire rope to cooperate with the third pulley to lift the small grid funnel from the longitudinal transfer trolley to the middle platform below the funnel installation position superior,
小格漏斗安装步骤,用卷扬机吊挂小格漏斗内部,同时在小格漏斗两侧分别挂上一个电动葫芦后起升,将小格漏斗吊起至卷扬机钢丝绳上限高度时停止起升,这时用小格漏斗两侧所挂的电动葫芦起升小格漏斗并调整小格漏斗水平,在达到设定的标高标记后,将小格漏斗边沿与设定的标高高度上的预留孔洞预埋钢板用固定筋板焊接固定。 The installation steps of the small grid funnel are to hang the inside of the small grid funnel with a hoist, and at the same time hang an electric hoist on both sides of the small grid funnel and then lift it up. Lift the small grid funnel to the upper limit height of the hoist wire rope and stop lifting. At this time Use the electric hoist hanging on both sides of the small grid funnel to lift the small grid funnel and adjust the level of the small grid funnel. After reaching the set elevation mark, pre-bury the edge of the small grid funnel and the reserved hole on the set elevation height The steel plates are welded and fixed with fixed ribs.
小格漏斗的安装是将小格漏斗吊运至规定高度的高台,再在指定位置处吊至高台的顶壁进行焊接固定,通常固定于已经固定好的筋板上,通常一次工程需要再一个高台上固定多个小格漏斗,此前安装烧结机小格漏斗的方法为,采用的在每个待安装处的轴线位置将小格进行吊装,这样需要在多个位置将小格漏斗分别用起吊装置吊至高台,再在高台之上的室内使用多个手拉葫芦或者电动葫芦对吊至高台之上的小格漏斗进行位置调整再起吊,因此需要移动多次移动起吊装置,由于配合小格漏斗的起吊装置都为大型起吊装置,因此工程量大,费时,费力,耗时十分之长。由于处于高台的室内限制了起吊装置的移动以及起吊装置本身并不能十分精确的调整放置位置方向,以至于处于高台上的小格漏斗存在歪拉斜吊以及放置位置还不能直接起吊的情况,需要使用多个手拉葫芦对小格漏斗的位置角度进行调整才能进行二次吊运及固定,由于小格漏斗本身重量很大,调整的过程同样十分费时费力。 The installation of the small grid funnel is to lift the small grid funnel to the high platform of the specified height, and then lift it to the top wall of the high platform at the designated position for welding and fixing, usually fixed on the fixed rib plate, usually one project needs another Multiple small grid funnels are fixed on the high platform. The previous method of installing the small grid funnels of the sintering machine is to hoist the small grids at the axis position of each place to be installed. In this way, the small grid funnels need to be hoisted in multiple positions. The device is hoisted to the high platform, and then multiple hand chain hoists or electric hoists are used in the room above the high platform to adjust the position of the small grid funnel hoisted to the high platform before lifting. Therefore, it is necessary to move the lifting device many times. The hoisting devices of the funnel are all large-scale hoisting devices, so the amount of work is large, time-consuming, laborious, and time-consuming. Because the room on the high platform restricts the movement of the lifting device and the lifting device itself cannot adjust the direction of the placement position very accurately, so that the small grid funnel on the high platform is tilted and tilted, and the placement position cannot be directly lifted. Use multiple hand chain hoists to adjust the position and angle of the small grid funnel to perform secondary lifting and fixing. Since the small grid funnel itself is very heavy, the adjustment process is also very time-consuming and laborious.
上述技术方案的有益效果包括: The beneficial effects of the above-mentioned technical solution include:
1、上述技术方案中的整个步骤中中仅需在小格漏斗起吊及转运步骤中所有的小格漏斗都在同一位置使用同一起吊装置进行起吊,减少了起吊装置的移动,由于所需起吊装置的通常为大型起吊装置,节约劳动力,从而节省了大量的机械费用和人工费用; 1. In the whole steps of the above technical scheme, it is only necessary to lift all the small hoppers at the same position and use the same lifting device in the steps of lifting and transferring the small hoppers, which reduces the movement of the lifting device. Due to the required lifting device It is usually a large lifting device, which saves labor, thus saving a lot of machinery costs and labor costs;
2、采用高台横纵转运轨道的设置使得仅需要一次转运即可将小格漏斗运至指定的安装地点,而且转运步骤可以标准化操作,将小格漏斗转运于中间平台上便于进行包括位置和角度调整在内起吊准备,之后仅需在指定位置按照安装步骤中所述方法用电动葫芦起吊即可标准安装,从而避免以往安装方法中大量的人工拖拉步骤,而且可以通过调整轨道位置来保证二次吊运前精确对准高台顶壁的固定筋板; 2. The setting of the horizontal and vertical transfer tracks on the high platform makes it possible to transport the small grid funnel to the designated installation site with only one transfer, and the transfer steps can be standardized. It is convenient to transfer the small grid funnel to the middle platform, including the position and angle. Adjust the internal lifting preparation, and then only need to use the electric hoist to lift at the designated position according to the method described in the installation steps to standard installation, thereby avoiding a large number of manual dragging steps in the previous installation method, and can ensure the second time by adjusting the track position Accurately align the fixed ribs on the top wall of the high platform before hoisting;
3、结构简单稳固,实施方便,相较于之前实际工程中的小格漏斗等安装工作,其中转运就位仅仅用了4天时间,该时间节点应数全国之最,整体工期由两个半月缩短至一个半月。对于建筑区域狭小、路况复杂的烧结机系统施工现场,缩短转运安装时间对于整个系统工程进度都起到极大的促进作用。 3. The structure is simple and stable, and the implementation is convenient. Compared with the installation work of the small grid funnel in the previous actual project, it only took 4 days for the transfer to be in place. This time node should be the most in the country, and the overall construction period is two and a half months. shortened to one and a half months. For the construction site of the sintering machine system with narrow construction area and complex road conditions, shortening the transfer installation time will greatly promote the progress of the entire system project.
进一步的,所述起吊装置为吊车,其承重量为25t。25t承重吊车为优选的适应小格漏斗的起吊装置。起吊时也可以用平板车、塔吊进行配合安装。 Further, the lifting device is a crane with a bearing capacity of 25t. The 25t load-bearing crane is the preferred hoisting device adapted to the small grid funnel. When lifting, it can also be installed with a flatbed truck or a tower crane.
进一步的,所述吊车的吊装半径在8-10米之间,吊装角度在59-61度之间,主臂长度在17-20米之间。吊装半径、吊装角度、主臂长度的设置为优选的设置,有利于吊车稳固的起吊小格漏斗。 Further, the hoisting radius of the crane is between 8-10 meters, the hoisting angle is between 59-61 degrees, and the length of the main arm is between 17-20 meters. The hoisting radius, hoisting angle, and main arm length are the optimal settings, which are conducive to the stable lifting of the small funnel by the crane.
进一步的,所述卷扬机为3t的卷扬机,所述第一滑轮为5t的双门滑轮,所述第二滑轮为5t的滑轮,所述第三滑轮为5t滑轮,所述电动葫芦为5t的电动葫芦,配合卷扬机、各滑轮及电动葫芦使用的钢丝绳的直径均为18mm。卷扬机、双门滑轮及滑轮、电动葫芦的型号选择为标准型号,在保证留有余量的稳固运输基础上取用方便。 Further, the hoist is a 3t hoist, the first pulley is a 5t double door pulley, the second pulley is a 5t pulley, the third pulley is a 5t pulley, and the electric hoist is a 5t electric The hoist, the diameter of the wire rope used with the winch, each pulley and the electric hoist is 18mm. The hoist, double-door pulley and pulley, and electric hoist are selected as standard models, which are easy to use on the basis of ensuring a stable transportation with a margin.
进一步的,将小格漏斗从横向转运小车上转运至纵向转运小车上时,设置手拉葫芦挂在横向转运小车背离纵向转运方向的一侧与第二立柱之间,将小格漏斗从纵向转运小车吊运至中部平台时,在纵向转运小车背离纵向转运方向的一侧上挂设手拉葫芦。设置手拉葫芦的目的为转运时存在一定的斜度,因此在横向小车上与立柱之间挂接手拉葫芦进行配合,以保证安全。 Further, when the small grid funnel is transferred from the horizontal transfer trolley to the vertical transfer trolley, a chain hoist is set to hang between the side of the horizontal transfer trolley that deviates from the vertical transfer direction and the second column, and the small grid funnel is transferred from the vertical When the trolley is hoisted to the middle platform, a chain hoist is hung on the side of the longitudinal transfer trolley that deviates from the longitudinal transfer direction. The purpose of setting up the chain block is that there is a certain slope during the transfer, so the chain block is mounted between the horizontal trolley and the column for cooperation to ensure safety.
本发明公开的滑移安装机构,其技术方案实现如下: The sliding installation mechanism disclosed in the present invention has a technical solution as follows:
包括第一平台、第二平台,所述第一平台上设置有横向转运轨道、纵向转运轨道,所述横向转运轨道与纵向转运轨道的相交处为转运点,所述横向转运轨道通向起吊方向,所述纵向转运轨道通向指定的漏斗安装位置,所述横向转运轨道上设有横向转运小车,纵向转运轨道上设有纵向转运小车,横向转运轨道靠近起吊位置的一端设置有吊装孔挑台,所述吊装孔挑台为带有吊装孔的第一平台向起吊方向的延伸平台,第二平台下处于转运点上方的位置设置有第一双门滑轮,第一平台上还设置有卷扬机、第二滑轮,第二平台下处于指定的漏斗安装位置上方设置有一对电动葫芦、预留孔洞预埋钢板,第一平台与第二平台之间处于指定的漏斗安装位置设置有中间平台,漏斗安装位置的中心上方设置滑轮挂点设置有第三滑轮。 Including a first platform and a second platform, the first platform is provided with a horizontal transfer track and a vertical transfer track, the intersection of the horizontal transfer track and the longitudinal transfer track is a transfer point, and the horizontal transfer track leads to the lifting direction , the longitudinal transfer track leads to the designated funnel installation location, the horizontal transfer track is provided with a horizontal transfer trolley, the longitudinal transfer track is provided with a longitudinal transfer trolley, and the end of the transverse transfer track near the lifting position is provided with a hoisting hole platform , the hoisting hole platform is an extension platform from the first platform with hoisting holes to the hoisting direction, the second platform is provided with a first double-door pulley at a position above the transfer point, and the first platform is also provided with a hoist, The second pulley, under the second platform, a pair of electric hoists and a pre-embedded steel plate with reserved holes are arranged above the designated funnel installation position, and an intermediate platform is arranged between the first platform and the second platform at the designated funnel installation position, and the funnel is installed The pulley hanging point is provided with a third pulley above the center of the position.
上述该滑移安装机构为实施小格漏斗滑移安装方法所采用的装置,第一平台、第二平台的高度配合安装高度便于卷扬机、各滑轮、电动葫芦等部件的安装,能够有效保证安全、稳固的实现对小格漏斗实施吊运、转运、安装等步骤过程,避免了以往安装方法中大量的人工拖拉步骤,结构简单稳固,实施方便。 The above-mentioned sliding installation mechanism is a device used to implement the sliding installation method of the small grid funnel. The heights of the first platform and the second platform are matched with the installation height to facilitate the installation of hoists, pulleys, electric hoists and other components, which can effectively ensure safety, Stable implementation of lifting, transfer, installation and other steps for the small grid funnel, avoiding a large number of manual dragging steps in the previous installation method, the structure is simple and stable, and the implementation is convenient.
进一步的,在转运点背离纵向转运方向的一侧设置有第二立柱,在转运点与卷扬机之间设置有第四立柱。第二立柱的位置选择便于转运时挂接手拉葫芦以保证转运安全,第四立柱的位置选择使得滑轮及卷扬机用固定钢丝绳连接时,可以将滑轮先让固定钢丝绳绕立柱一圈,使得吊运更加稳固。 Further, a second column is provided on the side of the transfer point away from the longitudinal transfer direction, and a fourth column is provided between the transfer point and the hoist. The position selection of the second column is convenient for hanging the chain hoist during transfer to ensure the safety of transfer. The position selection of the fourth column allows the pulley and the winch to be connected with a fixed wire rope, and the pulley can be let the fixed wire rope wrap around the column first, making the hoisting easier. stable.
进一步的,所述转运轨道由50㎏/m的轨道钢与使用30#工字钢制成的轨道梁构成,所述转运小车由车轮及24#工字钢制成。50kg/m的轨道钢稳固的配合小格漏斗转运所需的承重量,30#工字钢及24#工字钢均为现有型号,取材方便,同时工字钢的工字口可以自然的作为小车轮的轨道。 Further, the transfer track is made of 50 kg/m track steel and track beams made of 30# I-beam, and the transfer trolley is made of wheels and 24# I-beam. The 50kg/m rail steel is stable to meet the load-bearing capacity required for the transfer of the small grid funnel. Both the 30# I-beam and the 24# I-beam are existing models, which are convenient to obtain materials. At the same time, the I-beam of the I-beam can be naturally Tracks that act as little wheels.
附图说明 Description of drawings
图1是本发明所述小格漏斗滑移安装方法的现场平面图; Fig. 1 is the on-site plan view of the sliding installation method of the small grid funnel of the present invention;
图2是本发明所述小格漏斗滑移安装方法中吊车吊运步骤示意图; Fig. 2 is a schematic diagram of crane lifting steps in the small grid funnel sliding installation method of the present invention;
图3是本发明所述小格漏斗滑移安装方法中转运步骤示意图; Fig. 3 is a schematic diagram of the transfer steps in the sliding installation method of the small cell funnel of the present invention;
图4是本发明所述小格漏斗滑移安装方法中安装步骤示意图。 Fig. 4 is a schematic diagram of the installation steps in the sliding installation method of the small grid funnel according to the present invention.
附图中标记及相应的零部件名称: Marks and corresponding component names in the attached drawings:
10-小格漏斗11-第一平台12-吊装孔挑台121-吊装孔13-吊车131-主臂141-吊装半径142-主臂长度143-吊装角度15-第二平台16-中间平台21-横向转运轨道22-纵向转运轨道31-横向转运小车32-纵向转运小车42-第二立柱43-第三立柱44-第四立柱45-第五立柱47-C轴立柱51-卷扬机52-第一滑轮53-第二滑轮54-钢丝绳55-手拉葫芦56-固定筋板57-电动葫芦58-预留孔洞预埋钢板59-第三滑轮 10-Small grid funnel 11-First platform 12-Hoisting hole platform 121-Hoisting hole 13-Crane 131-Main arm 141-Hoisting radius 142-Main arm length 143-Hoisting angle 15-Second platform 16-Intermediate platform 21 -horizontal transfer track 22-longitudinal transfer track 31-horizontal transfer trolley 32-longitudinal transfer trolley 42-second column 43-third column 44-fourth column 45-fifth column 47-C-axis column 51-hoist 52-th First pulley 53-second pulley 54-wire rope 55-chain hoist 56-fixed rib plate 57-electric hoist 58-reserved hole pre-embedded steel plate 59-third pulley
具体实施方式 detailed description
下面结合实施例及附图,对本发明作进一步地的详细说明,但本发明的实施方式不限于此。 The present invention will be further described in detail below with reference to the embodiments and accompanying drawings, but the embodiments of the present invention are not limited thereto.
本发明公开的一种小格漏斗滑移安装方法,具体步骤如图1、图2、图3、图4中所示如下: A sliding installation method for a small grid funnel disclosed by the present invention, the specific steps are as shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4 as follows:
包括以下步骤,小格漏斗起吊及转运步骤,用起吊装置将待安装的小格漏斗10吊至吊装孔挑台12处的横向转运小车31上,由横向转运小车31转运至横向转运轨道21与纵向转运轨道22的转运处;使用卷扬机51及钢丝绳54配合第一滑轮52与第二滑轮53吊运小格漏斗10,将小格漏斗10从横向转运小车31上转运至纵向转运小车32上;由纵向转运小车32将小格漏斗10运送至指定的漏斗安装位置;所述指定的漏斗安装位置根据制作与安装的编号来确定。 Including the following steps, the lifting and transfer steps of the small grid funnel, the small grid funnel 10 to be installed is hoisted to the horizontal transfer trolley 31 at the hoisting hole platform 12 with a lifting device, and the horizontal transfer trolley 31 is transferred to the horizontal transfer rail 21 and The transfer place of the vertical transfer track 22; use the hoist 51 and the wire rope 54 to cooperate with the first pulley 52 and the second pulley 53 to lift the small grid funnel 10, and transfer the small grid funnel 10 from the horizontal transfer trolley 31 to the longitudinal transfer trolley 32; The small cell hopper 10 is transported to the designated hopper installation position by the vertical transfer trolley 32; the designated hopper installation position is determined according to the production and installation number.
小格漏斗吊运步骤,在漏斗安装位置的中心上方设置滑轮挂点安装第三滑轮59,再使用卷扬机51及钢丝绳54配合第三滑轮59将小格漏斗10从纵向转运小车32吊运至漏斗安装位置下方的中部平台上, The lifting step of the small grid funnel is to set the pulley hanging point above the center of the installation position of the funnel and install the third pulley 59, and then use the winch 51 and the wire rope 54 to cooperate with the third pulley 59 to lift the small grid funnel 10 from the vertical transfer trolley 32 to the funnel On the middle platform below the installation location,
小格漏斗安装步骤,用卷扬机51吊挂小格漏斗10内部,同时在小格漏斗两侧分别挂上一个电动葫芦57后起升,将小格漏斗吊起至卷扬机钢丝绳上限高度时停止起升,这时用小格漏斗两侧所挂的电动葫芦57起升小格漏斗并调整小格漏斗水平,在达到设定的标高标记后,将小格漏斗边沿与设定的标高高度上的预留孔洞预埋钢板58用固定筋板56焊接固定。 The installation steps of the small grid funnel are to use the winch 51 to hang the inside of the small grid funnel 10, and at the same time, hang an electric hoist 57 on both sides of the small grid funnel and then lift it up. When the small grid funnel is hoisted to the upper limit height of the hoist wire rope, the hoisting is stopped. At this time, use the electric hoist 57 hung on both sides of the small grid funnel to lift the small grid funnel and adjust the level of the small grid funnel. Leave hole pre-embedded steel plate 58 to be welded and fixed with fixing rib plate 56.
小格漏斗的安装是将小格漏斗吊运至规定高度的高台,再在指定位置处吊至高台的顶壁进行焊接固定,通常固定于已经固定好的筋板上,通常一次工程需要再一个高台上固定多个小格漏斗,此前安装烧结机小格漏斗的方法为,采用的在每个待安装处的轴线位置将小格进行吊装,这样需要在多个位置将小格漏斗分别用起吊装置吊至高台,再在高台之上的室内使用多个手拉葫芦或者电动葫芦对吊至高台之上的小格漏斗进行位置调整再起吊,因此需要移动多次移动起吊装置,由于配合小格漏斗的起吊装置都为大型起吊装置,因此工程量大,费时,费力,耗时十分之长。由于处于高台的室内限制了起吊装置的移动以及起吊装置本身并不能十分精确的调整放置位置方向,以至于处于高台上的小格漏斗存在歪拉斜吊以及放置位置还不能直接起吊的情况,需要使用多个手拉葫芦对小格漏斗的位置角度进行调整才能进行二次吊运及固定,由于小格漏斗本身重量很大,调整的过程同样十分费时费力。 The installation of the small grid funnel is to lift the small grid funnel to the high platform of the specified height, and then lift it to the top wall of the high platform at the designated position for welding and fixing, usually fixed on the fixed rib plate, usually one project needs another Multiple small grid funnels are fixed on the high platform. The previous method of installing the small grid funnels of the sintering machine is to hoist the small grids at the axis position of each place to be installed. In this way, the small grid funnels need to be hoisted in multiple positions. The device is hoisted to the high platform, and then multiple hand chain hoists or electric hoists are used in the room above the high platform to adjust the position of the small grid funnel hoisted to the high platform before lifting. Therefore, it is necessary to move the lifting device many times. The hoisting devices of the funnel are all large-scale hoisting devices, so the amount of work is large, time-consuming, laborious, and time-consuming. Because the room on the high platform restricts the movement of the lifting device and the lifting device itself cannot adjust the direction of the placement position very accurately, so that the small grid funnel on the high platform is tilted and tilted, and the placement position cannot be directly lifted. Use multiple hand chain hoists to adjust the position and angle of the small grid funnel to perform secondary lifting and fixing. Since the small grid funnel itself is very heavy, the adjustment process is also very time-consuming and laborious.
上述技术实施方案的有益效果包括: The beneficial effects of the above-mentioned technical implementation scheme include:
1、上述技术方案中的整个步骤中中仅需在小格漏斗起吊及转运步骤中所有的小格漏斗都在同一位置使用同一起吊装置进行起吊,减少了起吊装置的移动,由于所需起吊装置的通常为大型起吊装置,节约劳动力,从而节省了大量的机械费用和人工费用; 1. In the whole steps of the above technical scheme, it is only necessary to lift all the small hoppers at the same position and use the same lifting device in the steps of lifting and transferring the small hoppers, which reduces the movement of the lifting device. Due to the required lifting device It is usually a large lifting device, which saves labor, thus saving a lot of machinery costs and labor costs;
2、采用高台横纵转运轨道的设置使得仅需要一次转运即可将小格漏斗运至指定的安装地点,而且转运步骤可以标准化操作,将小格漏斗转运于中间平台上便于进行包括位置和角度调整在内起吊准备,之后仅需在指定位置按照安装步骤中所述方法用电动葫芦起吊即可标准安装,从而避免以往安装方法中大量的人工拖拉步骤,而且可以通过调整轨道位置来保证二次吊运前精确对准高台顶壁的固定筋板; 2. The setting of the horizontal and vertical transfer tracks on the high platform makes it possible to transport the small grid funnel to the designated installation site with only one transfer, and the transfer steps can be standardized. It is convenient to transfer the small grid funnel to the middle platform, including the position and angle. Adjust the internal lifting preparation, and then only need to use the electric hoist to lift at the designated position according to the method described in the installation steps to standard installation, thereby avoiding a large number of manual dragging steps in the previous installation method, and can ensure the second time by adjusting the track position Accurately align the fixed ribs on the top wall of the high platform before hoisting;
3、结构简单稳固,实施方便,相较于之前实际工程中的小格漏斗等安装工作,其中转运就位仅仅用了4天时间,该时间节点应数全国之最,整体工期由两个半月缩短至一个半月。对于建筑区域狭小、路况复杂的烧结机系统施工现场,缩短转运安装时间对于整个系统工程进度都起到极大的促进作用。 3. The structure is simple and stable, and the implementation is convenient. Compared with the installation work of the small grid funnel in the previous actual project, it only took 4 days for the transfer to be in place. This time node should be the most in the country, and the overall construction period is two and a half months. shortened to one and a half months. For the construction site of the sintering machine system with narrow construction area and complex road conditions, shortening the transfer installation time will greatly promote the progress of the entire system project.
所述起吊装置为吊车13,其承重量为25t。25t承重吊车为优选的适应小格漏斗的起吊装置。起吊时也可以用平板车、塔吊进行配合安装。 Described hoisting device is crane 13, and its bearing capacity is 25t. The 25t load-bearing crane is the preferred hoisting device adapted to the small grid funnel. When lifting, it can also be installed with a flatbed truck or a tower crane.
所述吊车13的吊装半径141在8-10米之间,吊装角度143在59-61度之间,主臂长度142范围在17-20米之间。吊装半径、吊装角度、主臂长度的设置为优选的设置,有利于吊车稳固的起吊小格漏斗。 The hoisting radius 141 of the crane 13 is between 8-10 meters, the hoisting angle 143 is between 59-61 degrees, and the main arm length 142 ranges between 17-20 meters. The hoisting radius, hoisting angle, and main arm length are the optimal settings, which are conducive to the stable lifting of the small funnel by the crane.
所述卷扬机51为3t的卷扬机,所述第一滑轮52为5t的双门滑轮,所述第二滑轮53为5t的滑轮,所述第三滑轮59为5t滑轮,所述电动葫芦57为5t的电动葫芦,配合卷扬机、各滑轮及电动葫芦使用的钢丝绳的直径均为18mm。卷扬机、双门滑轮及滑轮、电动葫芦的型号选择为标准型号,在保证留有余量的稳固运输基础上取用方便。 The hoist 51 is a 3t hoist, the first pulley 52 is a 5t double door pulley, the second pulley 53 is a 5t pulley, the third pulley 59 is a 5t pulley, and the electric hoist 57 is a 5t pulley. The diameter of the electric hoist used with the winch, each pulley and the electric hoist is 18mm. The hoist, double-door pulley and pulley, and electric hoist are selected as standard models, which are easy to use on the basis of ensuring a stable transportation with a margin.
将小格漏斗从横向转运小车31上转运至纵向转运小车32上时,设置手拉葫芦55挂在横向转运小车31背离纵向转运方向的一侧与第二立柱之间,将小格漏斗从纵向转运小车32吊运至中部平台16时,在纵向转运小车32背离纵向转运方向的一侧上挂设手拉葫芦55。设置手拉葫芦的目的为转运时存在一定的斜度,因此在横向小车上与立柱之间挂接手拉葫芦进行配合,以保证安全。 When transferring the small grid funnel from the horizontal transfer trolley 31 to the vertical transfer trolley 32, a chain block 55 is set to be hung between the side of the horizontal transfer trolley 31 that deviates from the vertical transfer direction and the second column, and the small grid funnel is moved from the longitudinal When the transfer trolley 32 is hoisted to the middle platform 16, a chain hoist 55 is hung on the side of the longitudinal transfer trolley 32 that deviates from the longitudinal transfer direction. The purpose of setting up the chain block is that there is a certain slope during the transfer, so the chain block is mounted between the horizontal trolley and the column for cooperation to ensure safety.
本发明公开的滑移安装机构,其技术方案如图1、图2、图3、图4中所示,包括8.7m高度的第一平台11、18.7m高度的第二平台15,所述第一平台11上设置有横向转运轨道21、纵向转运轨道22,所述横向转运轨道21与纵向转运轨道22的相交处为转运点,所述横向转运轨道21通向起吊方向,所述纵向转运轨道22通向指定的漏斗安装位置,所述横向转运轨道21上设有横向转运小车31,纵向转运轨道22上设有纵向转运小车32,横向转运轨道21靠近起吊位置的一端设置有吊装孔挑台12,所述吊装孔挑台12为带有吊装孔121的第一平台向起吊方向的延伸平台,吊装孔配合小格漏斗放置,第二平台15下处于转运点上方的位置设置有5t的第一滑轮52,所述第一滑轮52为双门滑轮,第一平台11上还设置有3t的卷扬机51、5t的第二滑轮53,第二平台15下处于指定的漏斗安装位置上方设置有一对5t的电动葫芦57、预留孔洞预埋钢板58,第一平台11与第二平台15之间处于指定的漏斗安装位置设置有中间平台16,漏斗安装位置的中心上方设置滑轮挂点设置有5t的第三滑轮59。 The sliding installation mechanism disclosed in the present invention, its technical solution is shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, comprises the first platform 11 of 8.7m height, the second platform 15 of 18.7m height, described first A platform 11 is provided with a horizontal transfer track 21 and a vertical transfer track 22, the intersection of the horizontal transfer track 21 and the longitudinal transfer track 22 is a transfer point, the horizontal transfer track 21 leads to the lifting direction, and the vertical transfer track 22 leads to the designated funnel installation location, the horizontal transfer track 21 is provided with a horizontal transfer trolley 31, the longitudinal transfer track 22 is provided with a longitudinal transfer trolley 32, and the end of the transverse transfer track 21 near the lifting position is provided with a hoisting hole platform 12. The hoisting hole platform 12 is an extension platform from the first platform with a hoisting hole 121 to the hoisting direction. The hoisting hole is placed in conjunction with a small grid funnel, and the second platform 15 is provided with a 5t second platform above the transfer point. A pulley 52, the first pulley 52 is a double-door pulley, the first platform 11 is also provided with a 3t hoist 51, a 5t second pulley 53, and a pair of hoppers are arranged under the second platform 15 above the designated funnel installation position. A 5t electric hoist 57, a pre-embedded steel plate 58 with reserved holes, an intermediate platform 16 at the designated funnel installation position between the first platform 11 and the second platform 15, and a 5t pulley hanging point above the center of the funnel installation position The third pulley 59.
第一平台的高度配合大烟道规定的安装平台高度,通常为8.7m,第二平台高度配合规定的安装平台顶壁的高度,通常为18.7m。 The height of the first platform matches the height of the installation platform specified by the large flue, usually 8.7m, and the height of the second platform matches the height of the top wall of the installation platform specified, usually 18.7m.
上述该滑移安装机构为实施小格漏斗滑移安装方法所采用的装置,第一平台、第二平台的高度配合安装高度便于卷扬机、各滑轮、电动葫芦等部件的安装,能够有效保证安全、稳固的实现对小格漏斗实施吊运、转运、安装等步骤过程,避免了以往安装方法中大量的人工拖拉步骤,结构简单稳固,实施方便。 The above-mentioned sliding installation mechanism is a device used to implement the sliding installation method of the small grid funnel. The heights of the first platform and the second platform are matched with the installation height to facilitate the installation of hoists, pulleys, electric hoists and other components, which can effectively ensure safety, Stable implementation of lifting, transfer, installation and other steps for the small grid funnel, avoiding a large number of manual dragging steps in the previous installation method, the structure is simple and stable, and the implementation is convenient.
在转运点背离纵向转运方向的一侧设置有第二立柱42,在转运点与卷扬机之间设置有第四立柱44。第二立柱的位置选择便于转运时挂接手拉葫芦以保证转运安全,第四立柱的位置选择使得滑轮及卷扬机用固定钢丝绳连接时,可以将滑轮先让固定钢丝绳绕立柱一圈,使得吊运更加稳固。 A second column 42 is arranged on the side of the transfer point away from the longitudinal transfer direction, and a fourth column 44 is arranged between the transfer point and the hoist. The position selection of the second column is convenient for hanging the chain hoist during transfer to ensure the safety of transfer. The position selection of the fourth column allows the pulley and the winch to be connected with a fixed wire rope, and the pulley can be let the fixed wire rope wrap around the column first, making the hoisting easier. stable.
所述转运轨道由50kg/m的轨道钢与使用30#工字钢制成的轨道梁构成,所述转运小车由车轮及24#工字钢制成。50kg/m的轨道钢稳固的配合小格漏斗转运所需的承重量,30#工字钢及24#工字钢均为现有型号,取材方便,同时工字钢的工字口可以自然的作为小车轮的轨道。 The transfer track is made of 50kg/m rail steel and a track beam made of 30# I-beam, and the transfer trolley is made of wheels and 24# I-beam. The 50kg/m rail steel is stable to meet the load-bearing capacity required for the transfer of the small grid funnel. Both the 30# I-beam and the 24# I-beam are existing models, which are convenient to obtain materials. At the same time, the I-beam of the I-beam can be naturally Tracks that act as little wheels.
采用前文所述的为本发明的各个优选实施例,各个优选实施例中的优选实施方式如果不是明显自相矛盾或以某一优选实施方式为前提,各个优选实施方式都可以任意叠加组合使用,所述实施例以及实施例中的具体参数仅是为了清楚表述发明人的发明验证过程,并非用以限制本发明的专利保护范围,本发明的专利保护范围仍然以其权利要求书为准,凡是运用本发明的说明书及附图内容所作的等同结构变化,同理均应包含在本发明的保护范围内。 The foregoing are various preferred embodiments of the present invention. If the preferred implementations in each preferred embodiment are not obviously self-contradictory or based on a certain preferred implementation, each preferred implementation can be used in any superposition and combination. The specific parameters in the described embodiments and the embodiments are only for clearly expressing the inventor's invention verification process, and are not used to limit the scope of patent protection of the present invention. The scope of patent protection of the present invention is still subject to its claims. Equivalent structural changes made by using the contents of the description and drawings of the present invention should also be included in the protection scope of the present invention.
如上所述,可较好的实现本发明。 As described above, the present invention can be preferably carried out.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410288131.4A CN104016260B (en) | 2014-06-25 | 2014-06-25 | Little lattice funnel slide installation method and slippage installing mechanism |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201410288131.4A CN104016260B (en) | 2014-06-25 | 2014-06-25 | Little lattice funnel slide installation method and slippage installing mechanism |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104016260A CN104016260A (en) | 2014-09-03 |
| CN104016260B true CN104016260B (en) | 2016-03-02 |
Family
ID=51433327
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201410288131.4A Active CN104016260B (en) | 2014-06-25 | 2014-06-25 | Little lattice funnel slide installation method and slippage installing mechanism |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104016260B (en) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104764327B (en) * | 2015-03-26 | 2016-06-29 | 中国五冶集团有限公司 | A kind of sintering engineering internal flue mounting process |
| CN106855356B (en) * | 2015-12-08 | 2019-04-16 | 中国二冶集团有限公司 | The construction method of the skeleton and the feeding equipment on the head of the fast integral translation sintering machine |
| CN109823971A (en) * | 2019-01-31 | 2019-05-31 | 中国能源建设集团广东电力工程局有限公司 | A kind of hoisting structure and hoisting method of steel coal hopper prefabricated member |
| CN110127520B (en) * | 2019-05-10 | 2021-01-01 | 上海二十冶建设有限公司 | Method for installing small-lattice funnel and dust-settling pipe of large sintering machine |
| CN110371852B (en) * | 2019-06-27 | 2020-06-09 | 上海二十冶建设有限公司 | Sintering machine head star wheel and bin installation method |
| CN116853452A (en) * | 2023-06-28 | 2023-10-10 | 友联船厂(蛇口)有限公司 | A tooling and process for overall replacement of the crankshaft and its base of a large ship's main engine |
| CN117300549A (en) * | 2023-11-23 | 2023-12-29 | 中国二十二冶集团有限公司 | Manufacturing and installation methods of steel hyperbolic funnel |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201634333U (en) * | 2010-02-02 | 2010-11-17 | 中交二公局第五工程有限公司 | Super-altitude gantry crane |
| CN102494536A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for dust-fall pipe of sintering chamber |
| CN103046788A (en) * | 2012-12-12 | 2013-04-17 | 中国五冶集团有限公司 | Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin |
| CN203095435U (en) * | 2013-03-22 | 2013-07-31 | 佛山市顺德区金石机械有限公司 | Gantry elevator |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100491495B1 (en) * | 2003-05-21 | 2005-05-27 | 이창언 | Rotating Pulse Jet Bag Filter-RPJF |
-
2014
- 2014-06-25 CN CN201410288131.4A patent/CN104016260B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201634333U (en) * | 2010-02-02 | 2010-11-17 | 中交二公局第五工程有限公司 | Super-altitude gantry crane |
| CN102494536A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for dust-fall pipe of sintering chamber |
| CN103046788A (en) * | 2012-12-12 | 2013-04-17 | 中国五冶集团有限公司 | Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin |
| CN203095435U (en) * | 2013-03-22 | 2013-07-31 | 佛山市顺德区金石机械有限公司 | Gantry elevator |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104016260A (en) | 2014-09-03 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104016089B (en) | Sintering machine large flue slide installation method and track installation mechanism thereof | |
| CN104016260A (en) | Compartment funnel slipping mounting method and slipping mounting mechanism | |
| CN104032967B (en) | Prefabricated assembled frame structure component construction method for hanging | |
| CN106121234B (en) | A kind of mounting tool and installation method of roof large span large-diameter pipeline | |
| CN214326960U (en) | Indoor equipment for existing high-rise building hoisting large-scale device | |
| CN207243334U (en) | A kind of long and narrow working face large-sized transversal component high-altitude system in place | |
| CN204980144U (en) | Be used for narrow space conveyor system of basement | |
| CN104973517B (en) | A kind of electronic gantry platform that installs for sintering machine head device and its using method | |
| CN103967284B (en) | The steel column installation method of reserved stigma docking | |
| CN110759222A (en) | Take quick hoist device of PC wallboard of counter weight | |
| CN108358090A (en) | Pipe tilting vehicle and control method thereof | |
| CN103086276B (en) | A construction method for hoisting a bridge crane in a high-rise well-tower-type building | |
| CN114368672A (en) | Lifting-lug-free self-aligning lifting method for inclined and straight flue of steel-making system | |
| CN101363069B (en) | A simple upper furnace repair equipment and furnace repair process | |
| CN104764327B (en) | A kind of sintering engineering internal flue mounting process | |
| CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
| CN104418240B (en) | The lifting of a kind of flue and group are to method | |
| CN202729645U (en) | Tower crane with elevator | |
| CN206273951U (en) | The hoisting apparatus of attachment type raise scaffold | |
| CN102062538B (en) | Method for mounting head sprocket wheel of belt sintering machine | |
| CN202746764U (en) | Lifting bracket for pipeline butting adjustment | |
| CN100366832C (en) | Construction technique for hoisting steel made coal hopper on-site | |
| CN210002838U (en) | Device for installing steel structure corridor color panels | |
| CN203638979U (en) | Device for mounting tank floor in low-temperature storage tank | |
| CN111379900A (en) | Installation method of indoor horizontal large flue in large sintering plant |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |