CN100366832C - Construction technique for hoisting steel made coal hopper on-site - Google Patents

Construction technique for hoisting steel made coal hopper on-site Download PDF

Info

Publication number
CN100366832C
CN100366832C CNB2005100745335A CN200510074533A CN100366832C CN 100366832 C CN100366832 C CN 100366832C CN B2005100745335 A CNB2005100745335 A CN B2005100745335A CN 200510074533 A CN200510074533 A CN 200510074533A CN 100366832 C CN100366832 C CN 100366832C
Authority
CN
China
Prior art keywords
coal hopper
steel made
steel
made coal
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100745335A
Other languages
Chinese (zh)
Other versions
CN1696043A (en
Inventor
齐朝华
王玉玺
祁进荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 3 Power Construction Engineering Co ltd Inner Mongolia Autonomous Region
Original Assignee
No 3 Power Construction Engineering Co ltd Inner Mongolia Autonomous Region
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 3 Power Construction Engineering Co ltd Inner Mongolia Autonomous Region filed Critical No 3 Power Construction Engineering Co ltd Inner Mongolia Autonomous Region
Priority to CNB2005100745335A priority Critical patent/CN100366832C/en
Publication of CN1696043A publication Critical patent/CN1696043A/en
Application granted granted Critical
Publication of CN100366832C publication Critical patent/CN100366832C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a construction technique for hoisting steel made coal hoppers on-site, which is characterized in that two parallel cantilever tracks are arranged at the lower edge of a roof steel beam of a workshop which needs to be provided with a steel made coal hopper, and each track is suspended with an electric block; the group below the cantilever tracks is laid with a pair of tracks which are provided with a dolly. The steel made coal hopper is produced in segments, and then is hoisted by the electric block in segments to be moved into the workshop. The steel made coal hopper is placed on the dolly which is drawn to the installation position of the steel made coal hopper by a hoister, and then, a chain block hoists the coal hopper away from the dolly, and finally, the chain block is lowered down to place the steel made coal hopper to the installation position. The present invention has the installation sequence that firstly, the bottommost section of the steel made coal hopper is positioned, and then the first section of the steel made coal hopper is arranged on an upper layer of a ring beam of the workshop; then, the second section, the third section and till the last second section of the steel made coal hopper are installed. In the process of installation, all welding seams are welded fully, and then the bottommost section of the steel made coal hopper is butted and welded with the previous section of the steel made coal hopper, and finally, a steel made coal hopper seat is arranged. The present invention has the advantages of simple construction technique, short period of installation construction and low cost, and no influence on the construction of civil engineering of the workshop. The present invention is suitable for the installation construction of steel made coal hoppers of thermal power plants.

Description

The construction technology of hoisting steel made coal hopper on-site
Technical field
The present invention relates to a kind of construction technology of hoisting steel made coal hopper on-site.
Background technology
Steel coal hopper is the device of steam power station indispensability, and it is shaped as: top is that cylindrical silo bottom is the combination of conical silo.Steel coal hopper normally is installed in the C-D axle of power plant's deoxygenation bunker bay, traditional construction method of installation is to adopt crane lifting, because steel coal hopper height height, weight is big, crane often can not the Integratively hoisted in position, so generally be lifting ability according to hanging device, the steel coal hopper merogenesis is manufactured, treat that the factory building civil engineering construction is when be fit to installing the height layer of steel coal hopper, by crane the steel coal hopper of merogenesis is lifted successively and to overlay corresponding position and do temporary fixed, after the C-D axle framework for the treatment of the deoxygenation bunker bay binds, with manually with the steel coal hopper of merogenesis from the top down by the joint butt joint, weld in place.This construction method of installation stops the construction of agent structure and must will influence the scaffold complete removal in steel coal hopper hoisting passage and district in place when needing factory building civil engineering construction to the height layer that is fit to the installation steel coal hopper, so not only can cause the delay of civil engineering worker duration, and lifting the time needs two-shipper to lift, to guarantee the vertical lifting of member, according to each power plant's construction experience, under situation about not being affected by other factors, only Diao Zhuan duration the shortest is 35 days, and is long in time limit, cost is high.
Summary of the invention
The purpose of this invention is to provide a kind of installation duration short, cost is low, and is simple and easy to do, the construction technology of the hoisting steel made coal hopper on-site that the construction of factory building civil works is had no effect.
Construction technology of the present invention is as follows:
The steel roof joist lower edge that the factory building of steel coal hopper is installed in desire is provided with two parallel cantilever tracks, hangs an electric block on every track; Lay a secondary carriage walking track on the ground below the cantilever track, being provided with one on the carriage walking track can be along the track cross level travelling car; The steel coal hopper merogenesis is manufactured,, respectively each section is transported under the factory building according to the erection procedure of determining in the constructure scheme by Pallet Truck, electric block along the cantilever orbital motion outside factory building, the steel coal hopper merogenesis is sling, vertical-lift, and in factory building, move, steel coal hopper is placed on the dolly that can move horizontally, dolly is by the installation site of hoist engine running under power to steel coal hopper, by mounted jack in advance coal bunker is hung dolly, dolly withdraws from, and transfers jack steel coal hopper is placed into the installation site; Its erection sequence is: earlier that a nethermost joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out again the 2nd the joint, the 3rd the joint ..., the 2nd joint reciprocal installation, in installation process, behind the whole full welds of all weld seams, mention a nethermost joint with Chain block again, dock, weld with a joint on it, carry out the installation of steel coal hopper seat at last.
Advantage of the present invention is: construction technology is simple and easy to do, and the installation duration is short, cost is low, and the construction of factory building civil works is had no effect.
Description of drawings
Fig. 1 is an installation schematic diagram of the present invention; Fig. 2 is the steel coal hopper vertical-lift schematic diagram of the K of Fig. 1 to amplification; Fig. 3 is the nethermost joint of a steel coal hopper schematic diagram in place.
The specific embodiment
Embodiment:
Present embodiment is at the newly-built 2 * 300MW unit in steam power station, a specific embodiments of supporting steel coal hopper.With reference to accompanying drawing, steel roof joist lower edge at 22 meters layers of power plant's deoxygenation bunker bay C-D axle adopts track to fix two parallel cantilever tracks of being made by the 32# i iron 4 with girder steel lifting-point device 3, the cantilever of cantilever track 4 stretches out outside the factory building, and adopting drag-line 2 and upper strata factory building to fix, lifting altitude of suspension is 10 tons of electric blocks 1 of 30 meters on every track 4; On the ground below the cantilever track 4, lay a secondary carriage walking track 6, on carriage walking track 6, be provided with one and can move horizontally dolly 5 along track 6; 47 tons of steel coal hopper 7 substances, making 5 periods of time-divisions manufactures respectively, by Pallet Truck according to the erection procedure of determining in the constructure scheme, respectively each section is transported under the factory building, electric block 1 runs to outside the factory building along cantilever track 4, steel coal hopper 7 merogenesis are sling, vertical-lift is to 22 meters layers of the deoxygenation bunker bay C-D of power plant axle, electric block 1 moves in factory building, steel coal hopper 7 is placed on the dolly 5 that can move horizontally, and dolly 5 is by the installation site of hoist engine running under power to steel coal hopper, by mounted jack 8 in advance steel coal hopper 7 hung dolly 5, dolly 5 withdraws from, and transfers jack 8 steel coal hopper 7 is placed into the installation site; Its erection sequence is: earlier that the 5th joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out the installation of the 2nd joint, the 3rd joint, the 4th joint again, in installation process, behind the whole full welds of all weld seams, mention the 5th joint with Chain block again, dock, weld with the 4th joint, carry out the installation of steel coal hopper seat at last.
Construction technology of the present invention and other major projects construction mutually noninterfere, parallel line production do not take the main construction period, have accelerated construction speed greatly.

Claims (1)

1. the construction technology of a hoisting steel made coal hopper on-site is characterized in that: the steel roof joist lower edge that the factory building of steel coal hopper is installed in desire is provided with two parallel cantilever tracks, hangs an electric block on every track; Lay a secondary carriage walking track on the ground below the cantilever track, being provided with one on the carriage walking track can be along the track cross level travelling car; The steel coal hopper merogenesis is manufactured,, respectively each section is transported under the factory building according to the erection procedure of determining in the constructure scheme by Pallet Truck, electric block along the cantilever orbital motion outside factory building, the steel coal hopper merogenesis is sling, vertical-lift, and in factory building, move, steel coal hopper is placed on the dolly that can move horizontally, dolly is by the installation site of hoist engine running under power to steel coal hopper, by mounted jack in advance coal bunker is hung dolly, dolly withdraws from, and transfers jack steel coal hopper is placed into the installation site; Its erection sequence is: earlier that a nethermost joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out again the 2nd the joint, the 3rd the joint ..., the 2nd joint reciprocal installation, in installation process, behind the whole full welds of all weld seams, mention a nethermost joint with Chain block again, dock, weld with a joint on it, carry out the installation of steel coal hopper seat at last.
CNB2005100745335A 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site Expired - Fee Related CN100366832C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100745335A CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100745335A CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Publications (2)

Publication Number Publication Date
CN1696043A CN1696043A (en) 2005-11-16
CN100366832C true CN100366832C (en) 2008-02-06

Family

ID=35348963

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100745335A Expired - Fee Related CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Country Status (1)

Country Link
CN (1) CN100366832C (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012088653A1 (en) * 2010-12-27 2012-07-05 中国二十冶集团有限公司 Pre-assembling, lifting, moving and emplacing method for large factory and mine equipment
CN102363963B (en) * 2011-10-24 2015-06-10 无锡速捷脚手架工程有限公司 Wall template full-piece slide type dismantling device
CN109649867A (en) * 2018-11-28 2019-04-19 中国化学工程第十四建设有限公司 Polypropylene product degassing cabin upside-down construction technique
CN109823971A (en) * 2019-01-31 2019-05-31 中国能源建设集团广东电力工程局有限公司 A kind of steel coal hopper prefabricated part hanging structure and hanging method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2108561A (en) * 1981-10-15 1983-05-18 Gartner & Co J Process for the installation of curtain walls and wall elements
CN2203303Y (en) * 1994-12-08 1995-07-12 王建成 Coke oven door mount-and-dismount device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2108561A (en) * 1981-10-15 1983-05-18 Gartner & Co J Process for the installation of curtain walls and wall elements
CN2203303Y (en) * 1994-12-08 1995-07-12 王建成 Coke oven door mount-and-dismount device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
火电厂主厂房钢煤斗的制造与安装. 王文璋.电力建设,第24卷第4期卷. 2003 *
综合吊装技术在酒钢热电厂主厂房工程上的应用. 李航星,王庆.甘肃科技,第38卷第2002年第5期. *
防止钢煤斗变形的吊装工艺. 黄佩兵.水利电力机械,第23卷第4期卷. 2001 *

Also Published As

Publication number Publication date
CN1696043A (en) 2005-11-16

Similar Documents

Publication Publication Date Title
CN104878693B (en) Lateral girder erection structure for truss double-girder type bridge girder erection machine, construction method of erection structure, and lateral girder erection method based on erection structure
CN107013038B (en) A kind of steel structure slipping of building roof lighting Zhongting changes column construction method
CN104016089B (en) Sintering machine large flue slide installation method and track installation mechanism thereof
CN206616184U (en) Coke oven loss flue dust dust gathering arrester supporting construction
CN107044114A (en) Large-scale penstock inversion construction method in a kind of high vertical shaft
CN103967284B (en) The steel column installation method of reserved stigma docking
CN103123016A (en) Construction method for laying gas pipelines along bridge
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
CN104016260B (en) Little lattice funnel slide installation method and slippage installing mechanism
CN111794754A (en) Pipe piece assembled derrick and construction method thereof
CN110318468B (en) Auxiliary device and method for installing eccentric space net rack
CN111675111A (en) Boiler hoisting sling in closed plant area and construction method
CN110159057B (en) Mounting and construction method for smoke pipe of technically improved factory building
CN202689016U (en) Cofferdam assembling and lifting platform for double-wall steel cofferdam construction of deep-water bridge pier
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN102226497B (en) Manufacturing method of large rubber rolling curtain sealed dry-type gas holder
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN210766417U (en) Pier-spanning lifting beam support device at side position of bridge
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN107842246A (en) A kind of chimney steel beam hydraulic lifting high-altitude integral slipping hanging apparatus and method
CN111792540A (en) Full reverse construction method for hanging movable electric hoist on main structure beam slab
CN206616185U (en) The loss flue dust dust gathering arrester of coke oven installs chassis
CN102776874A (en) Hoisting technique of long and thin structural single chip
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080206