CN109649867A - Polypropylene product degassing cabin upside-down construction technique - Google Patents

Polypropylene product degassing cabin upside-down construction technique Download PDF

Info

Publication number
CN109649867A
CN109649867A CN201811433749.XA CN201811433749A CN109649867A CN 109649867 A CN109649867 A CN 109649867A CN 201811433749 A CN201811433749 A CN 201811433749A CN 109649867 A CN109649867 A CN 109649867A
Authority
CN
China
Prior art keywords
degassing cabin
lower section
degassing
cabin
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811433749.XA
Other languages
Chinese (zh)
Inventor
林俊
刘伟
胡杰光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Chemical Engineering No14 Construction Co Ltd
Original Assignee
China National Chemical Engineering No14 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Chemical Engineering No14 Construction Co Ltd filed Critical China National Chemical Engineering No14 Construction Co Ltd
Priority to CN201811433749.XA priority Critical patent/CN109649867A/en
Publication of CN109649867A publication Critical patent/CN109649867A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D88/00Large containers
    • B65D88/54Large containers characterised by means facilitating filling or emptying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

Polypropylene product degassing cabin upside-down construction technique of the present invention; docking lifting technique is fixed and drawn high upwards by sectional vertical lifting, lower section; major diameter arc board group is to, welding quality control technology; " slope protection " method plant bottom case grouting technique; equipment inner wall is movable to hang platform construction technology; the construction technologies such as the protection of inside and outside wall apparatus body and measure of starting to exchange fire; ensure product degassing cabin it is long-term, efficiently, stable operation while; be conducive to improve project management level, save cost, lifting construction efficiency, shorten construction period, it is ensured that construction quality.

Description

Polypropylene product degassing cabin upside-down construction technique
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of polypropylene product degassing cabin upside-down construction work Skill.
Background technique
Product degassing cabin is a large scale equipment in Polypropylene Project, is the chief component of powder deactivation unit.Add Nitrogen after heat enters from degassing cabin bottom parallel works, uniformly diffuses through entire powder layer, by connecing with the reverse of powder Touching blows out the hydro carbons in powder, and then nitrogen and the hydro carbons of entrainment enter hydro carbons recovery system, and the hydro carbons circulation of recycling makes With.
400,000 tons/year of polypropylene plants of existing XX good fortune base propane comprehensive utilization of resources project, product degassing cabin is mounted on poly- Unit degassing cabin frame 44.800m, equipment gross weight 124T, overall length 39.835m, material S30403, operating pressure 0.024MPa are closed, 0.35 MPa of gas-tight test pressure, 70 DEG C of operating temperature, working media polypropylene powder.Product degassing cabin due to transportation reasons, The practical arrival in scene is divided into two sections, and wherein upper semisection outer dimension is 11.115m long, diameter 6.5m, net weight 63T, outside lower semisection For shape having a size of 29.720m long, diameter 4.4m, net weight 61T, lifting construction is difficult.
Summary of the invention
To solve the above problems, the invention discloses polypropylene product degassing cabin upside-down construction technique, segmental hoisting, Ensure product degassing cabin it is long-term, efficiently, stable operation while, improve project management level, save cost, lifting construction effect Rate shortens construction period, it is ensured that construction quality.
In order to achieve the above objectives, technical scheme is as follows:
Polypropylene product degassing cabin upside-down construction technique, it is characterised in that: the following steps are included:
(1) process pipe for placing 8m high vertically in polymerized unit degassing cabin frame is put in absolute altitude Equipment Foundations centre bit Plummet is set, guarantees that pipeline center is consistent with equipment center using plummet, while pipeline centering is guaranteed that upper surface is smooth;
(2) degassing cabin lower section is first lifted, stops falling when the bottom centrum flange port of degassing cabin lower section is apart from ground 8m, make The lifting lug of gas storehouse lower section is pulled with 4 electric block symmetrical inclineds, promotes electric block, the strength of suspension hook is transferred to electric block Master is hung wirerope again afterwards to shed, adjusts 4 electric blocks, makes the smooth pipe for being placed on process pipe of cone flange face of lower section On mouth iron plate, flange face does not stress;
(3) before lifting degassing cabin upper section, dismountable movable platform, lower half are made using angle steel according to the size of degassing cabin lower section After section is fixed, dismountable movable platform is installed in degassing cabin lower section inner upper, and movable platform is bundled in " rice " word branch In support, while " rice " word is supported and fixed on degassing cabin lower section inner wall;
(4) before degassing cabin upper section is in place, 6cm slope protection is built up on the inside of secondary grout layer using cement mortar, then by degassing cabin The skirt support area of upper section is placed on support inclined sizing block;
(5) lifting of degassing cabin upper section is in place, using inclined sizing block by its levelling capturing;
(6) it forms a team up and down: degassing cabin lower section is promoted by electric block, after upper and lower section unfitness of butt joint is met the requirements, carry out inside and outside Start to weld after wall device main body protection and measure of starting to exchange fire;
(7) " rice " the word support in degassing cabin is removed, and is released using hoist engine from cone flange port;
(8) weld seam, support zone are ground using Carborundum wheel, remove burr, the welding bead reinforcement, overlap on surface, then make It is thrown with wool wheel essence to design requirement;
(9) gas pressure test is carried out;
(10) degassing cabin is kept the temperature according to design requirement after the completion of gas pressure test.
Further, step (6) promotes degassing cabin lower section by electric block, when degassing cabin lower section does not stop to be up promoted to When on the inside of two grooves at a distance of 0.5cm, if there is inner wall misalignment phenomenon, one piece of support of welding in the support of lower semisection " rice " word Part carries out symmetrical local directed complete set to degassing cabin upper section with 2 screw jack, when unfitness of butt joint is met the requirements, at adjustment Wall is fixed using stainless steel shoe;After the completion of adjustment, then inner wall is checked, after unfitness of butt joint is all satisfied requirement, is carried out inside and outside Start to weld after wall device main body protection and measure of starting to exchange fire.
Further, welding described in step (6) refers to 4-8 welders while symmetrical, discontinuity carries out argon arc welding and takes Basic skill or training makees, and E308-16 welding rod is recycled to be filled capping.
Further, before step (6) welding in group to applying lime wash on the following inside and outside wall of weld seam, and will using fire blanket Lid is filled out in detachable movable platform surrounding gap, while building extraordinary maintenance frame in degassing cabin surrounding.
Further, step (9) carries out first closing exhaust outlet when gas pressure test, opens intake valve, presses " pressure testing curve Figure " rises pressure slowly, when pressure rises to 0.035 MPa, pressure maintaining 10 minutes, then to butt weld and connecting portion into The first leakage of row checks, boosts to 0.175MPa after qualified, such as without exception, gradually rises by every grade for the differential of 0.035MPa thereafter To 0.35MPa, pressure maintaining 30 minutes, are checked under test pressure;It is down to 0.3045MPa after qualification, and keeps 20-30h again It is secondary to carry out leakage inspection, exhaust valve is opened after qualified, is depressurized to zero-bit.
The beneficial effects of the present invention are:
Polypropylene product degassing cabin upside-down construction technique of the present invention, is lifted by sectional vertical, until upper semisection faces When fix, then lower semisection up is fallen to draw, butt welding circumferential weld and welding quality control technology, " slope protection " method plant bottom case Grouting technique, equipment inner wall is movable to hang platform construction technology, and inside and outside wall apparatus body is protected and the construction technologies such as measure of starting to exchange fire, Ensure product degassing cabin it is long-term, efficiently, stable operation while, be conducive to improve project management level, save cost, promoted Construction efficiency shortens construction period, it is ensured that construction quality.
Detailed description of the invention
Fig. 1 is installation procedure figure of the invention.
Fig. 2 is degassing cabin lower section erection drawing of the present invention.
Fig. 3 is movable platform schematic diagram of the present invention.
Fig. 4 is slope protection schematic diagram of the present invention.
Fig. 5 is group to measure schematic diagram.
Fig. 6 is gas pressure test curve graph.
Specific embodiment
With reference to the accompanying drawings and detailed description, the present invention is furture elucidated, it should be understood that following specific embodiments are only For illustrating the present invention rather than limiting the scope of the invention.
1, product degassing cabin lower semisection lifts
According to the detail parameters of field device, main hang selects 31 heavy industry 500T crawler crane (SCC5000A) FJ90m principal arms, 12m Fixed auxiliary operating condition, tail of sauntering select 220T truck crane, lower semisection lifting in completion, as shown in Figure 1.
Lower semisection is first carried out to fix
In cone flange port with 24 cun of 8m long of lower portion placement of process pipe before lower semisection lifting, in 44.800m absolute altitude equipment Plummet is placed in base center position, guarantees that pipeline center is consistent with equipment center using plummet, while will be in the guarantee of pipeline centering Surfacing.The slow fallen downward of product degassing cabin is kept in hoisting process, when lower semisection cone flange port is apart from the left side ground 8m Stop continuing to fall (stopping when namely just having come to process pipe) when right, pulls down half using 4 20T electric block symmetrical inclineds The lifting lug of section, slowly promotes electric block, and the strength of suspension hook, which is transferred to after electric block, which main will hang wirerope again, sheds, slowly Slowly 4 electric blocks of adjustment, on the iron plate being placed on interim process pipe for keeping centrum flange face smooth, flange face can not be by Power.
Section steel manufacture temporary spacing can be used in the middle part of degassing cabin lower semisection, prevent lower semisection from swinging, cause cone method It is deformed after blue face discontinuity.
2. making dismountable movable platform after product degassing cabin lower semisection is fixed using angle steel to pacify inside degassing cabin Movable platform is filled, and movable platform is bundled in the support of " rice " word, while by " rice " word bracing reinforcement, being made using angle steel Distachable platform can it is safer, more easily implementation group to, welding, polishing etc. a series of constructions.
3, " slope protection " method grouting prepares
Because degassing cabin upper semisection outer wall is spaced closely together with device framework, secondary grout layer inner side template is difficult supporting, if mentioned Preceding supporting can damage again because equipment adjusts, therefore before degassing cabin upper section is in place using cement mortar on the inside of secondary grout layer The concrete " slope protection " of 6cm or so is built up, as shown in figure 4, before slope protection does not solidify, by the equipment support of degassing cabin side " sitting paddle " is placed on support inclined sizing block, last foundation bolt connection, such simple and practical in structure, easy for construction, and Slope protection after solidification can prevent concrete excessive, can effectively avoid inner side template from damaging hollow caused by spillage, while energy Pollution of the high strength grout to equipment surface is prevented well.It is to be noted that the weight of the upper semisection of degassing cabin passes through Equipment support is all pressed on parallels, and degassing cabin upper semisection is that no weight pushes down lower semisection.
4, the lifting of degassing cabin upper semisection in place, using inclined sizing block by its levelling capturing.
5, welding
Slowly promote lower semisection by electric block, in lifting process the moment guarantee centrum flange port and temporary pipeline upper surface away from From consistent, it can tentatively guarantee the verticality of equipment entirety in this way.
When group to weld seam mutually from 5cm when, first with steel square check degassing cabin inner wall unfitness of butt joint, and pass through electronic calabash Reed adjustment, as far as possible control unfitness of butt joint.
When lower semisection does not stop to be up promoted on the inside of two grooves at a distance of 0.5cm, if there is inner wall misalignment phenomenon, under One piece of supporting element is welded in half section of " rice " word support, symmetrical local directed complete set is carried out to upper semisection using 2 20T screw jack, When unfitness of butt joint is met the requirements, inner wall at adjustment is fixed using stainless steel shoe, as shown in Figure 5.
After the completion of adjustment, then inner wall is checked, after unfitness of butt joint is all satisfied requirement, the 4-8 welderings with corresponding qualification Work is symmetrical simultaneously, discontinuity carries out argon arc welding bottoming work, and E308-16 welding rod is recycled to be filled the work such as capping.
In group to applying lime wash on the following inside and outside wall of weld seam before welding, and using fire blanket by detachable movable platform four Lid is filled out in all gaps, can effectively prevent welding spark to the damage of equipment inner wall burnishing surface in this way, accomplish to apparatus body at Product protection.Extraordinary maintenance is built in degassing cabin surrounding simultaneously, prevents the influence of external environment welding quality.
6, subsequent construction
" rice " the word support in degassing cabin is removed, and is released using hoist engine from cone flange port.
It is ground using the position that the Carborundum wheel of 80 ~ 120 mesh polishes the needs such as weld seam, support, removes surface Burr, welding bead reinforcement, overlap etc. reuse wool wheel essence and throw to design requirement.
7, exhaust outlet is closed when gas pressure test, opens intake valve, slowly increase pressure by " pressure testing curve graph ", is pressed When " pressure testing curve graph " rises to 0.035 MPa, pressure maintaining 10 minutes, then butt weld and connecting portion are carried out first Leakage checks, slowly boosts to 0.175MPa after qualified, such as without exception, is gradually increased to by every grade for the differential of 0.035MPa thereafter 0.35MPa, pressure maintaining 30 minutes, are checked under test pressure.When being down to 0.3045MPa after qualification, and keeping sufficiently long Between carry out leakage inspection again, open exhaust valve after qualified, be slowly depressured, until zero-bit.
8, degassing cabin is kept the temperature according to design requirement after the completion of gas pressure test.
Polypropylene product degassing cabin upside-down construction technique of the present invention when degassing cabin lower semisection is fixed, don't incite somebody to action It is integrally placed on temporary support process pipe, it should allow electric block to bear its gravity, can effectively avoid cone flange port Stress is excessive and causes the damage of equipment.
First the inner wall perimeter of upper lower semisection commissure is checked before degassing cabin lifting, it is inconsistent effectively to evade perimeter Caused to organize pair, a series of problems, such as misalignment is excessive, early discovery is early to be solved.
Wanted when welding strict guarantee simultaneously, symmetrically, intermittent sequence of construction, fixed baffle should not be removed in welding process, Welding deformation can be reduced well in this way.
Because the requirement of degassing cabin smoothness of inner wall is very high, therefore the measure of starting to exchange fire centainly is carried out in welding, prevents welding spark Splashing, which is attached on equipment inner wall, damages original burnishing surface, causes secondary do over again.
The technical means disclosed in the embodiments of the present invention is not limited only to technological means disclosed in above embodiment, further includes Technical solution consisting of any combination of the above technical features.

Claims (5)

1. polypropylene product degassing cabin upside-down construction technique, it is characterised in that: the following steps are included:
(1) process pipe for placing 8m high vertically in polymerized unit degassing cabin frame is put in absolute altitude Equipment Foundations centre bit Plummet is set, guarantees that pipeline center is consistent with equipment center using plummet, while pipeline centering is guaranteed that upper surface is smooth;
(2) degassing cabin lower section is first lifted, stops falling when the bottom centrum flange port of degassing cabin lower section is apart from ground 8m, make The lifting lug of gas storehouse lower section is pulled with 4 electric block symmetrical inclineds, promotes electric block, the strength of suspension hook is transferred to electric block Master is hung wirerope again afterwards to shed, adjusts 4 electric blocks, makes the smooth pipe for being placed on process pipe of cone flange face of lower section On mouth iron plate, flange face does not stress;
(3) before lifting degassing cabin upper section, dismountable movable platform, lower half are made using angle steel according to the size of degassing cabin lower section After section is fixed, dismountable movable platform is installed in degassing cabin lower section inner upper, and movable platform is bundled in " rice " word branch In support, while " rice " word is supported and fixed on degassing cabin lower section inner wall;
(4) before degassing cabin upper section is in place, 6cm slope protection is built up on the inside of secondary grout layer using cement mortar, then by degassing cabin The skirt support area of upper section is placed on support inclined sizing block;
(5) lifting of degassing cabin upper section is in place, using inclined sizing block by its levelling capturing;
(6) it forms a team up and down: degassing cabin lower section is promoted by electric block, after upper and lower section unfitness of butt joint is met the requirements, carry out inside and outside Start to weld after wall device main body protection and measure of starting to exchange fire;
(7) " rice " the word support in degassing cabin is removed, and is released using hoist engine from cone flange port;
(8) weld seam, support zone are ground using Carborundum wheel, remove burr, the welding bead reinforcement, overlap on surface, then make It is thrown with wool wheel essence to design requirement;
(9) gas pressure test is carried out;
(10) degassing cabin is kept the temperature according to design requirement after the completion of gas pressure test.
2. polypropylene product degassing cabin upside-down construction technique according to claim 1, it is characterised in that: step (6) is logical It crosses electric block and promotes degassing cabin lower section, when degassing cabin lower section does not stop to be up promoted on the inside of two grooves at a distance of 0.5cm, if going out When existing inner wall misalignment phenomenon, one piece of supporting element is welded in the support of lower semisection " rice " word, with 2 screw jack on degassing cabin The symmetrical local directed complete set of Duan Jinhang is fixed inner wall at adjustment using stainless steel shoe when unfitness of butt joint is met the requirements;Adjustment is completed Afterwards, then to inner wall it checks, after unfitness of butt joint is all satisfied requirement, starts after carrying out the protection of inside and outside wall apparatus body and measure of starting to exchange fire Welding.
3. polypropylene product degassing cabin upside-down construction technique according to claim 1, it is characterised in that: step (6) institute The welding stated refers to that 4-8 welders are symmetrical simultaneously, discontinuity carries out argon arc welding bottoming work, recycle E308-16 welding rod into Row filling capping.
4. polypropylene product degassing cabin upside-down construction technique according to claim 1, it is characterised in that: step (6) weldering In group to applying lime wash on the following inside and outside wall of weld seam before connecing, and detachable movable platform surrounding gap is filled out using fire blanket Lid, while extraordinary maintenance frame is built in degassing cabin surrounding.
5. polypropylene product degassing cabin upside-down construction technique according to claim 1, it is characterised in that: step (9) into Exhaust outlet is first closed when row gas pressure test, opens intake valve, slowly increase pressure by " pressure testing curve graph ", pressure rises When to 0.035 MPa, pressure maintaining 10 minutes, first leakage then is carried out to butt weld and connecting portion and is checked, is boosted after qualified It is such as without exception to 0.175MPa, it is gradually increased to 0.35MPa for the differential of 0.035MPa by every grade thereafter, is protected under test pressure Pressure 30 minutes, is checked;It is down to 0.3045MPa after qualification, and 20-30h is kept to carry out leakage inspection again, is opened after qualified Exhaust valve is depressurized to zero-bit.
CN201811433749.XA 2018-11-28 2018-11-28 Polypropylene product degassing cabin upside-down construction technique Pending CN109649867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811433749.XA CN109649867A (en) 2018-11-28 2018-11-28 Polypropylene product degassing cabin upside-down construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811433749.XA CN109649867A (en) 2018-11-28 2018-11-28 Polypropylene product degassing cabin upside-down construction technique

Publications (1)

Publication Number Publication Date
CN109649867A true CN109649867A (en) 2019-04-19

Family

ID=66111702

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811433749.XA Pending CN109649867A (en) 2018-11-28 2018-11-28 Polypropylene product degassing cabin upside-down construction technique

Country Status (1)

Country Link
CN (1) CN109649867A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900021A (en) * 2019-11-28 2020-03-24 中国化学工程第三建设有限公司 Reactor assembly welding method in narrow space of dehydrogenation device frame
CN115263062A (en) * 2022-09-28 2022-11-01 中化二建集团有限公司 Flange assembly type aluminum-magnesium stock bin construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696043A (en) * 2005-05-26 2005-11-16 内蒙古自治区第三电力建设工程有限责任公司 Construction technique for hoisting steel made coal hopper on-site
CN103273281A (en) * 2013-06-20 2013-09-04 中航虹波风电设备有限公司 Construction technology for thin-wall barrel bodies
CN104033878A (en) * 2014-05-29 2014-09-10 中国五冶集团有限公司 Boiler steel frame combination and installation process of sintering machine circular cooler
CN104089088A (en) * 2014-06-30 2014-10-08 成都高普石油工程技术有限公司 Installation method for pipeline with annual polypropylene conveying capacity being thirty thousand tons
CN104420694A (en) * 2013-08-21 2015-03-18 五冶集团上海有限公司 General mounting method for benzene hydrogenation engineering tower equipment
CN105781205A (en) * 2015-11-30 2016-07-20 中国化学工程第三建设有限公司 In-place guiding device for segmented hoisting and air pairing of heavy tower equipment
CN108644469A (en) * 2018-05-22 2018-10-12 山西省工业设备安装集团有限公司 The construction technology of main steam system pipeline in a kind of Steam Turbine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1696043A (en) * 2005-05-26 2005-11-16 内蒙古自治区第三电力建设工程有限责任公司 Construction technique for hoisting steel made coal hopper on-site
CN103273281A (en) * 2013-06-20 2013-09-04 中航虹波风电设备有限公司 Construction technology for thin-wall barrel bodies
CN104420694A (en) * 2013-08-21 2015-03-18 五冶集团上海有限公司 General mounting method for benzene hydrogenation engineering tower equipment
CN104033878A (en) * 2014-05-29 2014-09-10 中国五冶集团有限公司 Boiler steel frame combination and installation process of sintering machine circular cooler
CN104089088A (en) * 2014-06-30 2014-10-08 成都高普石油工程技术有限公司 Installation method for pipeline with annual polypropylene conveying capacity being thirty thousand tons
CN105781205A (en) * 2015-11-30 2016-07-20 中国化学工程第三建设有限公司 In-place guiding device for segmented hoisting and air pairing of heavy tower equipment
CN108644469A (en) * 2018-05-22 2018-10-12 山西省工业设备安装集团有限公司 The construction technology of main steam system pipeline in a kind of Steam Turbine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110900021A (en) * 2019-11-28 2020-03-24 中国化学工程第三建设有限公司 Reactor assembly welding method in narrow space of dehydrogenation device frame
CN115263062A (en) * 2022-09-28 2022-11-01 中化二建集团有限公司 Flange assembly type aluminum-magnesium stock bin construction method
CN115263062B (en) * 2022-09-28 2023-01-31 中化二建集团有限公司 Flange assembly type aluminum-magnesium stock bin construction method

Similar Documents

Publication Publication Date Title
CN102051995B (en) Hoisting method of hyperbolic water-tower water tank and hoisting device
CN205000256U (en) Cast -in -place case roof beam of high mound of bridge construction support system
CN108019076A (en) Large-size rebar concrete silo construction method and the device for conical shell construction
CN102505846B (en) Steel pipe column bearing table girder connection construction method
CN105177202B (en) A kind of blast furnace overhaul method
WO2015021693A1 (en) Method of constructing steel chimney cylinder by upside-down mounting
CN109649867A (en) Polypropylene product degassing cabin upside-down construction technique
CN101858161A (en) Construction method of low-temperature double-wall storage tanks
CN109097516A (en) The construction method of blast furnace overhaul engineering replacement last furnace shell
CN106836836B (en) A kind of secondary hydraulic lifting installation method of Flue Gas Desulphurization for Coal-burning Power Plant tower transformation
CN105200173A (en) Cross construction method of replacing furnace shells and cooling walls of blast furnaces
CN105448366B (en) A kind of installation method of Nuclear Power Station Condensers
CN202658590U (en) Integral assembled drilling platform
CN102494536B (en) Construction method for dust-fall pipe of sintering chamber
CN202139255U (en) Tooling platform for assembling converter body equipment
CN110195514A (en) A kind of segment-shaped dome concreting method
CN115744671B (en) Steel lining bottom plate and truncated cone modularized hoisting device and hoisting method
CN109055638A (en) A kind of method of last furnace shell and cooled bottom water crossed construction
CN108015519B (en) The drawing process covered in blast furnace
CN202055506U (en) Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container
CN109825658A (en) Method for treating air leakage of hot blast stove bottom plate
CN204783059U (en) Poling combination bow member of tunnel work face of processing landslide
CN115095153A (en) Concrete chimney construction method without internal mold
CN114193583A (en) Method for quickly repairing collapsed refractory brick
CN208964987U (en) The heat treatment tooling of nuclear power safety injection tank end socket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190419

RJ01 Rejection of invention patent application after publication