CN1696043A - Construction technique for hoisting steel made coal hopper on-site - Google Patents

Construction technique for hoisting steel made coal hopper on-site Download PDF

Info

Publication number
CN1696043A
CN1696043A CN 200510074533 CN200510074533A CN1696043A CN 1696043 A CN1696043 A CN 1696043A CN 200510074533 CN200510074533 CN 200510074533 CN 200510074533 A CN200510074533 A CN 200510074533A CN 1696043 A CN1696043 A CN 1696043A
Authority
CN
China
Prior art keywords
coal hopper
steel
joint
track
factory building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510074533
Other languages
Chinese (zh)
Other versions
CN100366832C (en
Inventor
齐朝华
王玉玺
祁进荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No3 Power Construction Engineering Co Ltd Inner Mongolia Autonomous Region
Original Assignee
No3 Power Construction Engineering Co Ltd Inner Mongolia Autonomous Region
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Power Construction Engineering Co Ltd Inner Mongolia Autonomous Region filed Critical No3 Power Construction Engineering Co Ltd Inner Mongolia Autonomous Region
Priority to CNB2005100745335A priority Critical patent/CN100366832C/en
Publication of CN1696043A publication Critical patent/CN1696043A/en
Application granted granted Critical
Publication of CN100366832C publication Critical patent/CN100366832C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A construction technology for hoisting and installing the coal bunker composed of several segments made of steel includes such steps as arranging two parallel cantilever tracks under a steel beam, laying down a track on the ground, hanging an electric pulley-type lifter to each cantilever track, manufacturing each segment of coal bunker, using a cart to transport it along the ground track to the installation position, lifting said segments one by one while welding, and installing the base of coal bunker.

Description

The construction technology of hoisting steel made coal hopper on-site
Technical field
The present invention relates to a kind of construction technology of hoisting steel made coal hopper on-site.
Background technology
Steel coal hopper is the device of thermal powerplant indispensability, and it is shaped as: top is that cylindrical silo bottom is the combination of conical silo.Steel coal hopper normally is installed in the C-D axle of power plant's deoxygenation bunker bay, traditional construction method of installation is to adopt crane lifting, because steel coal hopper height height, weight is big, crane often can not the Integratively hoisted in position, so generally be lifting ability according to hanging device, the steel coal hopper merogenesis is manufactured, treat that the factory building civil engineering construction is when be fit to installing the height layer of steel coal hopper, by crane the steel coal hopper of merogenesis is lifted successively and to overlay corresponding position and do working fastening, after the C-D axle framework for the treatment of the deoxygenation bunker bay binds, with manually with the steel coal hopper of merogenesis from the top down by the joint butt joint, weld in place.This construction method of installation stops the construction of agent structure and must will influence the scaffold complete removal in steel coal hopper hoisting passage and district in place when needing factory building civil engineering construction to the height layer that is fit to the installation steel coal hopper, so not only can cause the delay of civil engineering worker duration, and lifting the time needs two-shipper to lift, to guarantee the vertical lifting of member, according to each power plant's construction experience, under situation about not being affected by other factors, only Diao Zhuan duration the shortest is 35 days, and is long in time limit, cost is high.
Summary of the invention
The purpose of this invention is to provide a kind of installation duration short, cost is low, and is simple and easy to do, the construction technology of the hoisting steel made coal hopper on-site that the construction of factory building civil engineering is had no effect.
Construction technology of the present invention is as follows:
The steel roof joist lower edge that the factory building of steel coal hopper is installed in desire is provided with two parallel cantilever tracks, hangs an electric block on every track; Lay a secondary carriage walking track on the ground below the cantilever track, being provided with one on the carriage walking track can be along the track cross level travelling car; The steel coal hopper merogenesis is manufactured,, respectively each section is transported under the factory building according to the erection procedure of determining in the arrangement and method for construction by Pallet Truck, electric block along the cantilever orbital motion outside factory building, the steel coal hopper merogenesis is sling, vertical-lift, and in factory building, move, but steel coal hopper is placed on the dolly of parallel motion, dolly is by the installation site of winch running under power to steel coal hopper, by mounted jack in advance coal bunker is hung dolly, dolly withdraws from, and transfers jack steel coal hopper is placed into the installation site; Its sequence of erection is: earlier that a nethermost joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out again the 2nd the joint, the 3rd the joint ..., the 2nd joint reciprocal installation, in installation process, behind the whole full welds of all weld seams, mention a nethermost joint with chain block again, dock, weld with a joint on it, carry out the installation of steel coal hopper seat at last.
Advantage of the present invention is: construction technology is simple and easy to do, and the installation duration is short, cost is low, and the construction of factory building civil engineering is had no effect.
Description of drawings
Fig. 1 is an installation scheme drawing of the present invention; Fig. 2 is the steel coal hopper vertical-lift scheme drawing of the K of Fig. 1 to amplification; Fig. 3 is the nethermost joint of a steel coal hopper scheme drawing in place.
The specific embodiment
Embodiment:
Present embodiment is at the newly-built 2 * 300MW unit of thermal powerplant, a specific embodiments of supporting steel coal hopper.With reference to accompanying drawing, steel roof joist lower edge at 22 meters layers of power plant's deoxygenation bunker bay C-D axle adopts track to fix two parallel cantilever tracks of being made by the 32# I-beam section 4 with girder steel lifting-point device 3, the cantilever of cantilever track 4 stretches out outside the factory building, and adopting drag-line 2 and upper strata factory building to fix, lifting altitude of suspension is 10 tons of electric blocks 1 of 30 meters on every track 4; Lay a secondary carriage walking track 6 on the ground below the cantilever track 4, being provided with one on carriage walking track 6 can be along track 6 parallel motion dolly 5; 47 tons of steel coal hopper 7 substances, making 5 periods of time-divisions manufactures respectively, by Pallet Truck according to the erection procedure of determining in the arrangement and method for construction, respectively each section is transported under the factory building, electric block 1 runs to outside the factory building along cantilever track 4, steel coal hopper 7 merogenesis are sling, vertical-lift is to 22 meters layers of the deoxygenation bunker bay C-D of power plant axle, electric block 1 moves in factory building, but steel coal hopper 7 is placed on the dolly 5 of parallel motion, dolly 5 is by the installation site of winch running under power to steel coal hopper, by mounted jack 8 in advance steel coal hopper 7 hung dolly 5, dolly 5 withdraws from, and transfers jack 8 steel coal hopper 7 is placed into the installation site; Its sequence of erection is: earlier that the 5th joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out the installation of the 2nd joint, the 3rd joint, the 4th joint again, in installation process, behind the whole full welds of all weld seams, mention the 5th joint with chain block again, dock, weld with the 4th joint, carry out the installation of steel coal hopper seat at last.
Construction technology of the present invention and other main constructions construction mutually noninterfere, parallel line production do not take the main construction period, have accelerated construction speed greatly.

Claims (1)

1. the construction technology of a hoisting steel made coal hopper on-site is characterized in that: the steel roof joist lower edge that the factory building of steel coal hopper is installed in desire is provided with two parallel cantilever tracks, hangs an electric block on every track; Lay a secondary carriage walking track on the ground below the cantilever track, being provided with one on the carriage walking track can be along the track cross level travelling car; The steel coal hopper merogenesis is manufactured,, respectively each section is transported under the factory building according to the erection procedure of determining in the arrangement and method for construction by Pallet Truck, electric block along the cantilever orbital motion outside factory building, the steel coal hopper merogenesis is sling, vertical-lift, and in factory building, move, but steel coal hopper is placed on the dolly of parallel motion, dolly is by the installation site of winch running under power to steel coal hopper, by mounted jack in advance coal bunker is hung dolly, dolly withdraws from, and transfers jack steel coal hopper is placed into the installation site; Its sequence of erection is: earlier that a nethermost joint steel coal hopper is in place, and as far as possible to transferring, its top is installed can enough spaces, installs the 1st then and saves in last layer factory building ring beam, after the firm welding, carry out again the 2nd the joint, the 3rd the joint ..., the 2nd joint reciprocal installation, in installation process, behind the whole full welds of all weld seams, mention a nethermost joint with chain block again, dock, weld with a joint on it, carry out the installation of steel coal hopper seat at last.
CNB2005100745335A 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site Expired - Fee Related CN100366832C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100745335A CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100745335A CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Publications (2)

Publication Number Publication Date
CN1696043A true CN1696043A (en) 2005-11-16
CN100366832C CN100366832C (en) 2008-02-06

Family

ID=35348963

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100745335A Expired - Fee Related CN100366832C (en) 2005-05-26 2005-05-26 Construction technique for hoisting steel made coal hopper on-site

Country Status (1)

Country Link
CN (1) CN100366832C (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102363963A (en) * 2011-10-24 2012-02-29 无锡速捷脚手架工程有限公司 Wall template full-piece slide type dismantling device
WO2012088653A1 (en) * 2010-12-27 2012-07-05 中国二十冶集团有限公司 Pre-assembling, lifting, moving and emplacing method for large factory and mine equipment
CN109649867A (en) * 2018-11-28 2019-04-19 中国化学工程第十四建设有限公司 Polypropylene product degassing cabin upside-down construction technique
CN109823971A (en) * 2019-01-31 2019-05-31 中国能源建设集团广东电力工程局有限公司 A kind of steel coal hopper prefabricated part hanging structure and hanging method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3140990C2 (en) * 1981-10-15 1994-10-27 Gartner & Co J Wall element
CN2203303Y (en) * 1994-12-08 1995-07-12 王建成 Coke oven door mount-and-dismount device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012088653A1 (en) * 2010-12-27 2012-07-05 中国二十冶集团有限公司 Pre-assembling, lifting, moving and emplacing method for large factory and mine equipment
CN102363963A (en) * 2011-10-24 2012-02-29 无锡速捷脚手架工程有限公司 Wall template full-piece slide type dismantling device
CN102363963B (en) * 2011-10-24 2015-06-10 无锡速捷脚手架工程有限公司 Wall template full-piece slide type dismantling device
CN109649867A (en) * 2018-11-28 2019-04-19 中国化学工程第十四建设有限公司 Polypropylene product degassing cabin upside-down construction technique
CN109823971A (en) * 2019-01-31 2019-05-31 中国能源建设集团广东电力工程局有限公司 A kind of steel coal hopper prefabricated part hanging structure and hanging method

Also Published As

Publication number Publication date
CN100366832C (en) 2008-02-06

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN201411900Y (en) Hydraulic die lifter for chimneys
CN104016089B (en) Sintering machine large flue slide installation method and track installation mechanism thereof
CN103075025A (en) Wholly lifting construction method for asymmetric structure of huge overhang steel of high-rise building
CN206616184U (en) Coke oven loss flue dust dust gathering arrester supporting construction
CN110847062A (en) Construction method for whole-hole assembly double-width erection in 80-meter-span wide steel box girder factory
CN100366832C (en) Construction technique for hoisting steel made coal hopper on-site
CN104016260B (en) Little lattice funnel slide installation method and slippage installing mechanism
CN101566005A (en) Chimney hydraulic mould lifting device
CN104973517A (en) Electric gantry platform for installing sintering machine head equipment and application method thereof
CN104895336A (en) Method for installing stiff mixed-structure steel girders in place
CN108396749B (en) Installation system and installation method of steel support in foundation pit
JP6374353B2 (en) How to build a bridge
CN108625270A (en) Nose girder gantry crane installs bridge prefabrication box girder construction method
CN210766417U (en) Pier-spanning lifting beam support device at side position of bridge
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN209338005U (en) A kind of mobile height leg gantry crane of erecting beam construction
CN102776874A (en) Hoisting technique of long and thin structural single chip
CN206616185U (en) The loss flue dust dust gathering arrester of coke oven installs chassis
CN207293981U (en) The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN102587287B (en) Construction method for integral lifting of single channel girders of single-span channel girder bridge
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN103982046A (en) Lifting and installation method of buckling restrained braces

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080206