CN216549362U CN202122514138.1U CN202122514138U CN216549362U CN 216549362 U CN216549362 U CN 216549362U CN 202122514138 U CN202122514138 U CN 202122514138U CN 216549362 U CN216549362 U CN 216549362U
Authority
CN
China
Prior art keywords
assembling
platform
foundation ditch
foundation pit
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122514138.1U
Other languages
Chinese (zh)
Inventor
马侨飞
李岩
宋世杰
俞世校
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangxiao Steel Structure Henan Co ltd
Original Assignee
Hangxiao Steel Structure Henan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangxiao Steel Structure Henan Co ltd filed Critical Hangxiao Steel Structure Henan Co ltd
Priority to CN202122514138.1U priority Critical patent/CN216549362U/en
Application granted granted Critical
Publication of CN216549362U publication Critical patent/CN216549362U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a hoist device assembles of foundation ditch top component, includes the foundation ditch, is the matrix arrangement in the foundation ditch and has a plurality of angle steelframes, and the parallel is equipped with a plurality of slide rails on the angle steelframe, is equipped with the platform of assembling that can follow slide rail length direction and remove on the slide rail, assembles the height that the top of platform is not less than the foundation ditch, is equipped with the hoisting accessory of at least a pair of symmetry on the spandrel girder of foundation ditch top, and hoisting accessory can be with assembling the position that needs the installation of the component of assembling well on the platform. The assembling platform is constructed above the foundation pit, the height of the platform is not lower than the top elevation of the foundation pit, the cross beam can be completed on the assembling platform and is not limited by the space of the foundation pit, meanwhile, the assembling platform can move on the slide rail, assembled components can be moved to the position under the position needing to be arranged, the assembling platform is lifted to the installation position through the lifting device, the working efficiency of the whole device is high, and the labor intensity of workers is reduced.

Description

Assembling and hoisting device for components above foundation pit
The technical field is as follows:
the utility model belongs to the technical field of steel structure construction, and mainly relates to an assembling and hoisting device for a member above a foundation pit.
Background art:
the large-scale public building mostly adopts a reinforced concrete combined structure system, is complex in stress and has various building functions. In the work progress, often adopt the mode of successive layer construction, in ground concrete structure work progress, subaerial if there is basement or foundation ditch, its top component is like the well word roof beam, and in the work progress for convenience, often all splice the component in the foundation ditch, but in the foundation ditch, the earth's surface environment is more complicated, and the barrier is more, sometimes still can have other people to carry out other construction projects, so assemble in the foundation ditch and when hoist the space limited.
The utility model has the following contents:
in order to overcome the defects, the utility model provides an assembling and hoisting device for a member above a foundation pit.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
the utility model provides a hoist device assembles of foundation ditch top component, includes the foundation ditch, is the matrix arrangement in the foundation ditch and has a plurality of angle steelframes, and the parallel is equipped with a plurality of slide rails on the angle steelframe, is equipped with the platform of assembling that can follow slide rail length direction and remove on the slide rail, assembles the height that the top of platform is not less than the foundation ditch, is equipped with the hoisting accessory of at least a pair of symmetry on the spandrel girder of foundation ditch top, and hoisting accessory can be with assembling the position that needs the installation of the component of assembling well on the platform.
The lifting device comprises a lifting frame, an electric hoist and a fixing piece are arranged on the lifting frame, a bracket is arranged at one end of the fixing piece, which is connected with the lifting frame, and the other end of the fixing piece is fixed on the floor.
The lifting frame comprises an upper frame and a lower frame which are fixedly connected through bolts.
The lower end of the lower frame is welded on the built-in section steel in the bearing beam.
Due to the adoption of the technical scheme, the utility model has the following advantages:
according to the assembling and hoisting device for the components above the foundation pit, the assembling platform is constructed above the foundation pit, the height of the platform is not lower than the top elevation of the foundation pit, the cross beam can be completed on the assembling platform and is not limited by the space of the foundation pit, meanwhile, the assembling platform can move on the slide rail, the assembled components can be moved to the position right below the position needing to be arranged, the components are hoisted to the installation position through the hoisting device, the working efficiency of the whole device is high, and the labor intensity of workers is reduced.
Description of the drawings:
FIG. 1 is a side view of the mounting platform of the present invention;
FIG. 2 is a top view of the mounting platform of the present invention;
FIG. 3 is a schematic view of the overall structure of the present invention;
in the figure: 1. a foundation pit; 2. an angle steel frame; 3. a slide rail; 4. assembling a platform; 5. a spandrel girder; 6. an electric hoist; 7. lifting the hanger; 8. a fixing member; 9. assembling the components; 10. and (4) internally arranging profile steel.
The specific implementation mode is as follows:
the following detailed description of the embodiments of the present invention, presented in the figures, is not intended to limit the scope of the utility model, as claimed, but is merely representative of selected embodiments of the utility model. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Combine the figure a hoist device assembles of foundation ditch top component, including foundation ditch 1, it has a plurality of angle steelframes 2 to be the matrix arrangement in foundation ditch 1, the parallel is equipped with a plurality of slide rails 3 on the angle steelframe 2, be equipped with on the slide rail 3 and follow the assembly platform 4 that 3 length direction of slide rail removed, the top of assembly platform 4 is not less than the height of foundation ditch 1, be equipped with the hoisting accessory of at least a pair of symmetry on the spandrel girder 5 of foundation ditch 1 top, hoisting accessory can be with the assembly component of assembling well on assembly platform 4 hoist to the position that needs the installation.
In order to solve the problem that the assembled components are limited by the space in the foundation pit 1 when being assembled, a plurality of angle steel frames 2 are arranged in the foundation pit 1, slide rails 3 are arranged on the angle steel frames 2, an assembling platform 4 is arranged on the slide rails 3, it needs to be emphasized that the height of the top of the assembling platform 4 is certainly not lower than the depth of the foundation pit, as long as the height of the top of the assembling platform 4 is not lower than the depth of the foundation pit, the components are assembled on the assembling platform 4 and cannot be limited by the original space of the foundation pit, meanwhile, the assembling platform 4 needs to be capable of moving on the slide rails 3, wheels can be arranged at the bottom of the assembling platform 4 and driven by a motor, the assembling platform 4 is moved to a corresponding position according to the specific installation position of the components, after the assembling components 9 are assembled, the components are lifted to the installation position by a lifting device on the upper supporting beam 5.
The lifting device comprises a lifting frame 7, an electric hoist 6 and a fixing part 8 are arranged on the lifting frame 7, a bracket is arranged at one end of the fixing part 8 connected with the lifting frame 7, and the other end of the fixing part is fixed on the floor.
The lifting frame 7 comprises an upper frame and a lower frame which are fixedly connected through bolts.
The lifting frame 7 is designed to be a detachable structure, the fixing frame 8 and the upper frame can be detached, when the assembly work of the assembly component is completed at the position, the upper frame and the fixing frame 8 need to be detached, the upper frame is installed on the lower frame of the bearing beam 5 corresponding to the upper frame according to the position of the assembly component 9 to be installed, the other end of the fixing frame 8 is also fixed on the floor, the component is assembled on the splicing platform 4 and then moved to the corresponding position, the assembly component 9 is lifted to the corresponding position by the electric hoist 6 on the lifting frame for installation, and the installation method of the next assembly component 9 is analogized in sequence.
The lower end of the lower frame is welded on the built-in section steel 10 in the bearing beam 5, so that the safety during hoisting can be ensured.
This design is founded assembly platform 4 in the top of foundation ditch 1, the height of platform is not less than the top elevation of foundation ditch 1, the # -shaped beam can be accomplished on assembly platform 4, do not receive the space restriction of foundation ditch 1, assembly platform 4 can remove on slide rail 3 simultaneously, can remove the component of assembling under the position needs are settled, hoisting up the mounted position through hoisting accessory, whole device work efficiency is high, workman's intensity of labour has still been reduced.
The details of the above are not described in detail since they are prior art.

Claims (4)

1. The utility model provides a hoist device assembles of foundation ditch top component which characterized in that: including the foundation ditch, it has a plurality of angle steelframes to be the matrix arrangement in the foundation ditch, and the parallel is equipped with a plurality of slide rails on the angle steelframe, is equipped with the assembly platform that can follow slide rail length direction and remove on the slide rail, and assembly platform's top is not less than the height of foundation ditch, is equipped with the hoisting accessory of at least a pair of symmetry on the spandrel girder of foundation ditch top, and hoisting accessory can be with assembling the position that the component of assembling that assembles on the assembly platform hoists to needs the installation.
2. The assembling and hoisting device for the components above the foundation pit as claimed in claim 1, wherein: the lifting device comprises a lifting frame, an electric hoist and a fixing piece are arranged on the lifting frame, a bracket is arranged at one end of the fixing piece, which is connected with the lifting frame, and the other end of the fixing piece is fixed on the floor.
3. The assembling and hoisting device for the components above the foundation pit as claimed in claim 2, wherein: the lifting frame comprises an upper frame and a lower frame which are fixedly connected through bolts.
4. The assembling and hoisting device for the components above the foundation pit as claimed in claim 3, wherein: the lower end of the lower frame is welded on the built-in section steel in the bearing beam.
CN202122514138.1U 2021-10-19 2021-10-19 Assembling and hoisting device for components above foundation pit Active CN216549362U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122514138.1U CN216549362U (en) 2021-10-19 2021-10-19 Assembling and hoisting device for components above foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122514138.1U CN216549362U (en) 2021-10-19 2021-10-19 Assembling and hoisting device for components above foundation pit

Publications (1)

Publication Number Publication Date
CN216549362U true CN216549362U (en) 2022-05-17

Family

ID=81567924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122514138.1U Active CN216549362U (en) 2021-10-19 2021-10-19 Assembling and hoisting device for components above foundation pit

Country Status (1)

Country Link
CN (1) CN216549362U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110577A (en) * 2022-08-01 2022-09-27 上海建工一建集团有限公司 Construction method of large basement assembled from periphery to center

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110577A (en) * 2022-08-01 2022-09-27 上海建工一建集团有限公司 Construction method of large basement assembled from periphery to center
CN115110577B (en) * 2022-08-01 2023-11-14 上海建工一建集团有限公司 Construction method for large basement assembled from four sides to center

Similar Documents

Publication Publication Date Title
CN108532769B (en) Jacking construction method of assembled additional elevator shaft structure
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
CN107399656B (en) Outdoor elevator and construction method thereof
CN211923476U (en) Electric hoist lifting system attached to lifting scaffold
CN216549362U (en) Assembling and hoisting device for components above foundation pit
CN106121040A (en) A kind of welding lattice column device and welding method
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
CN108584646B (en) Assembled type additional elevator shaft structure suitable for jacking construction
CN216889750U (en) Detachable movable portal frame for improving hoisting operation safety
CN210563326U (en) Overhead unit type overhead sliding splicing operation platform
CN213356779U (en) Overweight steel column translation transportation installation device
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN210763974U (en) Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN113494127A (en) Construction method for layered lifting of large-span open-web corridor steel platform
CN210366711U (en) Subway station steel bearing structure mounting and dismounting device
CN109205475B (en) Device and method for assembling and disassembling girder type gantry crane in tunnel through connection of trusses
CN211547373U (en) Supervision is with cable-stay bridge cable-stayed tower bottom end rail assembled supporting structure
CN215164722U (en) A construction platform for steel landing stage superstructure installation
JP2003120037A (en) Construction lifting system for multistoried building

Legal Events