CN207293981U CN201721299077.9U CN201721299077U CN207293981U CN 207293981 U CN207293981 U CN 207293981U CN 201721299077 U CN201721299077 U CN 201721299077U CN 207293981 U CN207293981 U CN 207293981U
Authority
CN
China
Prior art keywords
tunnel
sand gravel
arc
steel
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721299077.9U
Other languages
Chinese (zh)
Inventor
童耀
孟玉成
张海生
邬美富
陈廷胜
熊平
王林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cggc Foundation Engineering Co Ltd
Original Assignee
Cggc Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cggc Foundation Engineering Co Ltd filed Critical Cggc Foundation Engineering Co Ltd
Priority to CN201721299077.9U priority Critical patent/CN207293981U/en
Application granted granted Critical
Publication of CN207293981U publication Critical patent/CN207293981U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel, including the horizontal walking boom hoisting on tunnel crown and longitudinal running gear on tunnel bottom plate;Laterally in walking boom hoisting, it is close to the column of sand gravel country rock, arc I-steel forms supporting structure with more anchor poles, row track is fixedly welded on arc I-steel by track tie-beam, pull electrified monorail system to be installed on the lower flange of row track, pull lifting cucurbit and hang on the link for pulling electrified monorail system;In longitudinal running gear, rail is respectively arranged with along in two parallel sleepers of tunnel direction laying, rail is connected by wheel carrier of driving a vehicle with bottom girder.The hanging apparatus of two lining trolleys in sand gravel tunnel provided by the utility model, it can solve to carry out two problems for serving as a contrast trolley assembling constructions in sand gravel cavern restricted clearance, it ensure that the continuity and security of two lining trolley assembling constructions, realize the safe efficient construction of two lining trolley assembly in sand gravel tunnel.

Description

The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
Technical field
Underground cavern excavation lining construction field is the utility model is related to, two lining trolley in especially a kind of sand gravel tunnel Hanging apparatus.
Background technology
With the development of water conservancy and hydropower cause, the exploitation of hydraulic and hydroelectric engineering is progressively to western plateau and the exhibition of valley basin Open, build dam condition and become increasingly complex, especially the key construction project under development of the West Regions opportunity, mountain Gao Gushen, coating Deep, complex geologic conditions.When carrying out concrete secondary liner construction to part sand gravel tunnel, due to being limited by execution conditions System, does not possess the assembly that two lining trolleys are carried out by the way of being installed outside hole.Therefore, it is necessary to be installed using in sand gravel tunnel Mode carry out the assembly of two lining trolleys.
It is assembled that two lining trolleys are carried out in sand gravel tunnel, by being subject to tunnel bulk to be limited, can not be used large-scale Lifting appliance is lifted, it is necessary to set suspension centre on tunnel crown, and install two lining trolley hanging apparatus in tunnel.But crown Sand gravel layer country rock is easily lost from the condition for surely, not possessing directly setting suspension centre, while need to consider two lining trolley hanging apparatus Arrangement and installation question.Therefore, the hanging apparatus and its installation method of two lining trolleys in a kind of sand gravel tunnel are studied, favorably In the safe efficient constructions for ensuring the lining of progress two trolley assembly in sand gravel tunnel.
The content of the invention
Technical problem to be solved in the utility model is to provide a kind of hanging apparatus of two lining trolleys in sand gravel tunnel, It can solve to carry out two problems for serving as a contrast trolley assembling constructions in sand gravel cavern restricted clearance, ensure that two lining trolley assembly are applied The continuity and security of work, realize the safe efficient construction of two lining trolley assembly in sand gravel tunnel.
In order to solve the above technical problems, technical solution is used by the utility model:Two lining in a kind of sand gravel tunnel The hanging apparatus of trolley,
Including the horizontal walking boom hoisting on tunnel crown and longitudinal running gear on tunnel bottom plate;
Laterally in walking boom hoisting, it is close to the column of sand gravel country rock, arc I-steel is supported with more anchor pole compositions Structure, row track are fixedly welded on arc I-steel by track tie-beam, are pulled electrified monorail system and are installed on row track Lower flange on, pull lifting cucurbit hang on the link for pulling electrified monorail system;
In longitudinal running gear, rail is respectively arranged with along in two parallel sleepers of tunnel direction laying, rail passes through row Wheel carrier is connected with bottom girder.
Anchor pole is symmetrical arranged 2 rings along at left and right sides of column, arc I-steel, and anchor pole is symmetrical to both sides centered on vault Lay, anchor pole is drilled with angle vertical and is welded in country rock face, anchor pole with column, arc I-steel.
Between arc I-steel and row track, 3 track tie-beams of welding are evenly arranged.
Anchor pole is self-advancing type hollow grouting anchor.
The hanging apparatus of two lining trolleys, has the beneficial effect that in sand gravel tunnel provided by the utility model:
1st, the portion of support structure of sand gravel layer tunnel excavation preliminary bracing, simple for structure, making processing are fully combined Convenient, quick for installation, lifting support performance is stablized, and has reached the beneficial effect for improving lifting efficiency and safety coefficient.
2nd, laterally walking boom hoisting, and by efficiently using two lining platforms is set with reference to the preliminary bracing of sand gravel tunnel excavation Garage's walking system and bottom girder as longitudinal running gear, form can laterally, the combined hanging of two lining trolleys that vertically moves Device, realizes the safe efficient assembly of the two lining trolleys in sand gravel tunnel, effectively reduces assembled in the hole of two lining trolleys Construction cost, advantage is provided for follow-up tunnel concrete Second Lining Construction.
3rd, column, crown arc I-steel, connecting plate, to pull the components such as electrified monorail system be standard component, apparatus structure letter Single, installation, dismounting safe and convenient, have reached safety, economy, the beneficial effect efficiently constructed.
The hanging apparatus of two lining trolleys, solves and is limited in sand gravel cavern in sand gravel tunnel provided by the utility model The problem of two lining trolley assembling constructions is carried out in space, the continuity and security of two lining trolley assembling constructions is ensure that, realizes The safe efficient construction of two lining trolley assembly in sand gravel tunnel.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples:
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the top view of the utility model longitudinal direction running gear.
Embodiment
Embodiment one
As depicted in figs. 1 and 2, in a kind of sand gravel tunnel two lining trolleys hanging apparatus,
Including the horizontal walking boom hoisting on tunnel crown and longitudinal running gear on tunnel bottom plate;
Laterally in walking boom hoisting, it is close to the column 1 of sand gravel country rock 12, arc I-steel 2 is formed with more anchor poles 3 Supporting structure, row track 4 are fixedly welded on arc I-steel 2 by track tie-beam 5, are pulled electrified monorail system 6 and are installed on On the lower flange of row track 4, pull lifting cucurbit 7 and hang on the link for pulling electrified monorail system 6;
In longitudinal running gear, rail 9 is respectively arranged with along in two parallel sleepers 8 of tunnel direction laying, rail 9 passes through Driving wheel carrier 10 is connected with bottom girder 11.
Column 1, arc I-steel 2 are anchored on sand gravel country rock 12 by way of anchor pole 3 uses bolt-spary supports;Column It is attached between 1 and arc I-steel 2 by connecting plate using bolt.
The left and right sides of anchor pole 3 along column 1, arc I-steel 2 is symmetrical arranged 2 rings, and anchor pole 3 is centered on vault to both sides Symmetrical to lay, anchor pole 3 is drilled with angle vertical and is welded in country rock face, anchor pole 3 with column 1, arc I-steel 2.
Between arc I-steel 2 and row track 4,3 track tie-beams 5 of welding are evenly arranged, wherein 2 rails in left and right Road tie-beam 5 is arranged symmetrically.
Anchor pole 3 be 3m long SD25N self-advancing type hollow grouting anchors, array pitch 0.6m, pitch-row 1.5m.
Connecting plate uses the steel plate processing and fabricating of 10mm thickness, using the bolt of M12 × 40.
Electrified monorail system is pulled using 5 tons, lifting cucurbit is pulled using 5 tons.
Embodiment two
A kind of construction method for carrying out two lining trolley assembly in sand gravel tunnel using above-mentioned two lining trolley hanging apparatus, This method comprises the following steps:
Step 1:The mounting hole section country rock of the horizontal walking boom hoisting of long 3m is digged using high-power digging machine, two Avris wall respectively digs 0.5m, and crown digs 2.5m upwards, and carries out country rock spray shield using concrete;
Step 2:Digged in country rock and 3 root post, 1 spacing 1m is respectively erected on the both sides side wall of section, spelled respectively in 1 upper end of column Fill, connect 3 Pin steel arch-shelfs of the corresponding formation of crown arc I-steel 2, and carried out after using reinforcement welding with adjacent segment steel arch-shelf Linked network, crown arc I-steel 2 are connected by screw bolts with column 1 by connecting plate;
Step 3:The 1 hollow slip casting of row's self-advancing type is respectively drilled with the surrounding rock of chamber of column 1, the left and right sides of arc I-steel 2 Anchor pole 3, is welded after 3 slip casting of anchor pole with column 1, arc I-steel 2;
Step 4:Country rock progress anchoring shotcrete with wire mesh supporting is digged to the mounting hole section of laterally walking boom hoisting;
Step 5:Both ends after the 4 adjustment level of row track of long 4m are welded to the crown arc for digging section middle position The both sides of shape I-steel 5, it is consistent that 4 each connection end of row track cuts into welding segmental arc corresponding with arc I-steel 2 Arc, it is ensured that welding it is full firmly;
Step 6:Between arc I-steel 2 and row track 4,3 track tie-beams 5 of welding are evenly arranged, wherein, in Between 1 track tie-beam 5 it is placed in the middle, the track tie-beam 5 of left and right 2 is arranged symmetrically, and track tie-beam 5 respectively connects upper end and cuts The arc consistent into welding segmental arc corresponding with arc I-steel 2, it is ensured that welding is full firmly;
Step 7:2 sets 5 tons of the electrified monorail system 6 that pulls is installed on the lower flange of row track 4, and 2 sets 5 tons are pulled Lifting cucurbit 7 hangs on 2 sets of links for pulling electrified monorail system 6 respectively, that is, forms laterally walking boom hoisting;
Step 8:Deformation observation point, periodic monitoring sedimentation and deformation value are installed in 4 center of row track;
Step 9:On two lining trolley lifting hole section bottom plates, first lay railway sleepers according to two lining trolley traveling steel rail design spacing 8, after on sleeper 8 steel rail laying 9, and reinforced with railway spike;
Step 10:Coordinate digging machine that driving wheel carrier 10 is placed on rail 9 using laterally walking boom hoisting, and do interim Support, according to the distance and wheel carrier orientation of wheel carrier before and after 11 adjusting of centerline of bottom girder, and levels up fixation;
Step 11:Bottom girder 11 is hung on driving wheel carrier 10 using laterally walking boom hoisting, blending bolt, which is reinforced, faces When support, that is, form longitudinal running gear;
Step 12:Two lining trolley bottom girders 11 are sailed out of into laterally walking lifting by the rail 9 of drive a vehicle wheel carrier 10 along laying Below device, then the portal member of two lining trolleys is hoisted to using loading machine and pulls 7 lower section of lifting cucurbit;
Step 13:2 suspension centres two served as a contrast on trolley portal member pull lifting cucurbit 7 by steel wire rope with 2 respectively On suspension hook hang up properly, Synchronous lifting 2 pull lifting cucurbit 7, by two lining trolley portal members be promoted to setting height(from bottom);
Step 14:Two lining trolley bottom girders 11 are moved to by the rail 9 of drive a vehicle wheel carrier 10 along laying and are laterally walked Below device for hoisting, then electrified monorail system 6 is pulled by laterally walking and is hung the two lining trolley portal members that lifting cucurbit 7 lifts by crane are pulled Loaded in 11 relative position of bottom girder, blending bolt is fixed temporarily;
Step 15:Repeat step 12 lifts two lining trolley portal members in place, and assembly forms two piece by piece to step 14 Serve as a contrast trolley door frame;
Step 16:Repeat step 12, by moving back and forth longitudinal running gear, coordinates laterally walking lifting dress to step 15 The lifting of the lining trolley of progress two, assembly are put, longeron, crossbeam, column, template and oil cylinder etc. two is served as a contrast into trolley main structural components successively Lift in place, and the assembled lining of formation two trolleys,
Complete the two lining trolley installation in sand gravel tunnel.

Claims (4)

  1. A kind of 1. hanging apparatus of two lining trolleys in sand gravel tunnel, it is characterised in that:
    Including the horizontal walking boom hoisting on tunnel crown and longitudinal running gear on tunnel bottom plate;
    Laterally in walking boom hoisting, it is close to sand gravel country rock(12)Column(1), arc I-steel(2)With more anchor poles(3) Form supporting structure, row track(4)Pass through track tie-beam(5)It is fixedly welded on arc I-steel(2)On, pull single track row Car(6)It is installed on row track(4)Lower flange on, pull lifting cucurbit(7)Hang on and pull electrified monorail system(6)Link On;
    In longitudinal running gear, along two parallel sleepers of tunnel direction laying(8)On be respectively arranged with rail(9), rail(9)It is logical Space wheel carrier(10)With bottom girder(11)Connection.
  2. 2. the hanging apparatus of two lining trolleys in sand gravel tunnel according to claim 1, it is characterised in that:Anchor pole(3)Edge Column(1), arc I-steel(2)The left and right sides be symmetrical arranged 2 rings, anchor pole(3)Symmetrically laid to both sides centered on vault, Anchor pole(3)Angle vertical is drilled with country rock face, anchor pole(3)With column(1), arc I-steel(2)Welded.
  3. 3. the hanging apparatus of two lining trolleys in sand gravel tunnel according to claim 1, it is characterised in that:In arc I-shaped Steel(2)With row track(4)Between, it is evenly arranged 3 track tie-beams of welding(5).
  4. 4. the hanging apparatus of two lining trolleys in sand gravel tunnel according to claim 1, it is characterised in that:Anchor pole(3)For Self-advancing type hollow grouting anchor.
CN201721299077.9U 2017-10-10 2017-10-10 The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel Active CN207293981U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721299077.9U CN207293981U (en) 2017-10-10 2017-10-10 The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721299077.9U CN207293981U (en) 2017-10-10 2017-10-10 The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel

Publications (1)

Publication Number Publication Date
CN207293981U true CN207293981U (en) 2018-05-01

Family

ID=62414713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721299077.9U Active CN207293981U (en) 2017-10-10 2017-10-10 The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel

Country Status (1)

Country Link
CN (1) CN207293981U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453660A (en) * 2019-07-31 2019-11-15 中国三峡建设管理有限公司 A kind of big cross section polymorphic structure one-time-concreting molding construction device and method
CN113503129A (en) * 2021-07-30 2021-10-15 江西蓝翔重工有限公司 Single-rail hydraulic anchor rod drill carriage and roadway tunneling construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110453660A (en) * 2019-07-31 2019-11-15 中国三峡建设管理有限公司 A kind of big cross section polymorphic structure one-time-concreting molding construction device and method
CN113503129A (en) * 2021-07-30 2021-10-15 江西蓝翔重工有限公司 Single-rail hydraulic anchor rod drill carriage and roadway tunneling construction method

Similar Documents

Publication Publication Date Title
CN101914897B (en) Construction method of single main cable inclined-suspender earth anchored suspension bridge
CN101230785B (en) Construction method for large section and multiple sections tunnel lining
CN103485288B (en) A kind ofly pass through both wired double-deck jacking culvert construction technology
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN108532465A (en) A kind of construction method of Through Steel case arch bridge
CN109538238A (en) A kind of tunnel arch prefabricated pipe section constructing device and control method
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN106284109B (en) On across both wired bridge main beam method for dismounting
CN101806220A (en) Structure extending open tunnel for existing rapid transit railway tunnel
CN112746569B (en) Old bridge ecological demolition structure and construction method
CN201650302U (en) Eiking clear hole structure of existing high speed railway tunnel
CN108423565B (en) The erection and Demolition Construction method of U-shaped twin beams gantry crane with hook
CN207293981U (en) The hanging apparatus of two lining trolleys in a kind of sand gravel tunnel
CN202703579U (en) Large slope inclined shaft rail transport construction apparatus
CN212503680U (en) Hoisting system for large-scale bridge crane heavy workpiece
CN109505309A (en) A kind of shift system of piping lane segment and the piping lane installation method of application shift system
CN105484166A (en) Ladder-shaped mast type cantilever assembling crane
CN209444345U (en) A kind of tunnel arch prefabricated pipe section constructing device
CN103670449B (en) Coal bunker partial sealing support technology
CN102277839A (en) Open hole construction additionally arranged on existing electrified railway and rapid construction method thereof
CN113668399B (en) Construction method of half-through tied steel box arch bridge
CN109930610A (en) Constrained environment foundation pit adds the construction method of steel pipe mixing diagonal brace using concrete
CN215591798U (en) Curtain wall plate traction transfer device for tower crane dismantling part
CN114701949A (en) Method for installing main girder of bridge crane of main power house of pump station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant