CN104089088A - Installation method for pipeline with annual polypropylene conveying capacity being thirty thousand tons - Google Patents

Installation method for pipeline with annual polypropylene conveying capacity being thirty thousand tons Download PDF

Info

Publication number
CN104089088A
CN104089088A CN201410303765.2A CN201410303765A CN104089088A CN 104089088 A CN104089088 A CN 104089088A CN 201410303765 A CN201410303765 A CN 201410303765A CN 104089088 A CN104089088 A CN 104089088A
Authority
CN
China
Prior art keywords
pipeline
pressure
pipe
test
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410303765.2A
Other languages
Chinese (zh)
Other versions
CN104089088B (en
Inventor
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Yitong Plastic Industry Co., Ltd.
Original Assignee
Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Gaopu Petroleum Engineering Technology Co Ltd filed Critical Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority to CN201410303765.2A priority Critical patent/CN104089088B/en
Publication of CN104089088A publication Critical patent/CN104089088A/en
Application granted granted Critical
Publication of CN104089088B publication Critical patent/CN104089088B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/0243Laying or reclaiming pipes on land, e.g. above the ground above ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Cleaning In General (AREA)

Abstract

The invention discloses an installation method for a pipeline with the annual polypropylene conveying capacity being thirty thousand tons. The method comprises the steps that a sand blasting machine is adopted to conduct sand blasting and corrosion prevention on a carbon steel tube, and the outer wall is painted evenly; a surveying instrument is adopted to conduct surveying and paying-off, and a set cut position is found accurately to be marked; groove preparation is carried out; an argon arc welding mode is adopted for welding the pipeline, and lifting and installation are carried out; after the pipeline system is qualified through inspection, system purging pressure testing, including cleaning, purging, washing and pressure testing, is carried out according to the using requirements; the purging and washing method is determined according to the using requirements of the pipeline and a working medium and the dirty degree of the inner surface of the pipeline; after the pipeline system is qualified through water washing, water needs to be drained completely. The installation method is simple in process and high in installation precision, installation efficiency is improved, polypropylene leakage is avoided, environment is protected, and the problem that polypropylene leakage is caused when an existing pipeline installation process is slow and the installation precision is not high enough is solved.

Description

A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines
Technical field
The present invention relates to a kind of method, the installation method that especially to relate to a kind of year quantity delivered be 300,000 tons of polyacrylic pipelines.
Background technique
Oil claims again crude oil, be a kind of thickness, dark brown (sometimes a little green) liquid.There is petroleum storage upper crustal some areas.It is mixed and is formed by different hydrocarbons, and its chief component composition is alkane, goes back in addition the elements such as sulfur-bearing, oxygen, nitrogen, phosphorus, vanadium in oil.Oil is mainly used as fuel oil and gasoline, fuel oil and gasoline composition one of most important primary energy in the world.Oil is also that many chemical industry products are as the raw material of solution, chemical fertilizer, pesticide and plastics etc.Oil is mainly hydrocarbon.It is mixed and is formed by different hydrocarbons, the chemical element of composition oil is mainly carbon (83% ~ 87%), hydrogen (11% ~ 14%), and all the other are sulphur (0.06% ~ 0.8%), nitrogen (0.02% ~ 1.7%), oxygen (0.08% ~ 1.82%) and minor metallic element (Ni-V-Fe, antimony etc.).The chief component that is closed the hydro carbons forming and formed oil by carbon and hydrogenation, accounts for 95% ~ 99%, and various hydro carbons are divided into by its structure: alkane, cycloalkane, aromatic hydrocarbon.General natural oil does not often contain alkene and the alkynes that quantity does not wait in secondary operations product containing alkene.Sulfur-bearing, oxygen, nitrogen compound are harmful to petroleum products, in petroleum processing, should remove as far as possible.Stone oil properties is different because of the place of production, and density is 0.8 ~ 1.0 gram per centimeter, and range of viscosities is very wide, solidifying point difference very large (30 ~-60 degrees Celsius), boiling spread is more than normal temperature to 500 degree Celsius, dissolves in multiple organic solvent, water insoluble, but can form emulsion with water.But the composition of the oil in different oil fields and appearance can be distinguished very large.The extractive matter of oil can be for the production of polypropylene, and polypropylene is a kind of hemicrystalline thermoplastic.Have higher impact resistance, mechanical property is tough, anti-multiple organic solvent and acid and alkali corrosion.Being widely used in industrial quarters, is one of usually common macromolecular material.Be mainly used in the production of various long and short polypropylene fibers, the fire-retardant component for the production of polypropylene woven bag, food bag, injection-molded article etc. for the production of electrical equipment, telecommunication, lamp decoration, lighting installation and television set.In a large amount of polyacrylic conveyings, need to adopt special pipeline to carry, and traditional pipeline installation process is slow, and exists installation precision inadequate, cause polyacrylic leakage phenomenon, there is potential safety hazard.
Summary of the invention
The object of the invention is to overcome above-mentioned existing pipeline installation process slow; and exist installation precision inadequate, cause polyacrylic leakage problem, the installation method that to have designed a kind of year quantity delivered be 300,000 tons of polyacrylic pipelines; this installation method process is simple; installation precision is high, and installation efficiency raising, has avoided polyacrylic leakage; protect environment; solve existing pipeline installation process slow, and existed installation precision inadequate, caused polyacrylic leakage problem.
Object of the present invention is achieved through the following technical solutions: a kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines, comprises the following steps:
(a) sandblast, anticorrosion: adopt sandblasting machine to carry out sandblast to carbon steel tubing anticorrosion, ensure that the inside and outside wall sandblast of carbon steel tubing is even, then evenly brush paint at outer wall;
(b) measuring point unwrapping wire: adopt mapper to survey and draw unwrapping wire to carbon steel tubing, the incision site of finding setting accurately identifies;
(c) groove processing: the groove processing of pipeline adopts: abrasive wheel cutting machine, electric angle grinder, beveling machine are processed; In groove and mother metal flawless, layering in edge 15mm, be mingled with, the defect such as breakage, burr, remove oxide, greasy dirt, slag and other objectionable impurities of groove face, keep clean, after groove turbidity test check that groove processes, groove turbidity test are checked to front in group, if find that pipeline section part is dirty, must take clean measure, if desired, do polishing treatment at welding surface;
(d) group is to, welding: adopt the mode of argon arc welding to carry out the welding of pipeline, position while welding must not be less than 100mm apart from the bending starting point of bend pipe, and must not be less than tube outer diameter; When pipeline nominal diameter is less than 150mm, the distance of two butt welds of pipe can not be less than tube outer diameter, and is not less than 50mm; When pipeline nominal diameter is more than or equal to 150mm, the distance of two butt welds of pipe is not less than 150mm; When pipe crimping circle welding joint counterpart, two longitudinal weld spacing should be greater than 100mm; Weldment group to front should by groove face and near the oil, paint, dirt, rust etc. of mother metal (inside and outside wall) clean out, until send metallic lustre, weldment group to time should accomplish that inwall flushes, pipe group to time should be straight, Welding Angular Deformation is measured at 200mm place, distance interface center, large-diameter welded steel pipe group to time, its longitudinal weld should mutually stagger and be no less than 100mm, and in easy check point;
(e) propping up lifting installs: suspension and support position should be correct, and installation should be led solid, and pipe contacts with supporting surface should be good; Suspension rod is answered at right angle setting; Fixed support should be fixed before compensation device pre-stretching or precompression; The slip surface of guiding or sliding support should be clean smooth, must not have crooked and bite phenomenon;
(f) pipeline purging pressure testing: pipe-line system is after passed examination, should carry out the pressure testing of system purge by usage requirement, comprise cleaning, purge, rinse and pressure testing, blow-washing method should be according to the usage requirement of pipeline, the degree of fouling of working medium and inner surface of pipeline is determined, hydraulic pressure test should be used industrial water, Austenitic stainless steel pipe road system taking water when medium is tested, chloride ion content in water must not exceed 50mg/L, the temperature of liquid when fluid pressure test, pipe-line system liquid must not be lower than 5 DEG C, and should be higher than the brittle transition temperature of metallic material, when fluid pressure test, should slowly boost, after reaching test pressure, stop pressing 10min, then be down to design pressure, stop pressing 30min, should be with not step-down, without leaking, nothing is deformed into intensity and leak test is qualified, pneumatic test test pressure is by 1.15 times of values of design pressure, when pneumatic test, should progressively slowly increase pressure, when pressure rise to test pressure 50% time, voltage stabilizing 3min, no abnormal or leak, continue to boost step by step by 10% of test pressure, every grade of voltage stabilizing 3min, until test pressure, voltage stabilizing 10min, again by Pressure Drop to design pressure, spraying neutral stabilizer checks pressure testing system, pipeline is without distortion, nothing leakage is intensity and leak test is qualified, conveying gas body medium pipeline should adopt air purge, conveying liquid body medium pipeline should adopt water to rinse, carry gas medium pipeline should use steam blowing, nominal diameter is more than or equal to the pipeline of 600mm, adopt labor cleaning, non-heat distribution pipeline must not be used steam blowing, before purge, should check pipeline to prop up, the firm degree of suspension bracket, should give if desired reinforcing, when pipeline purging, system maximum pressure must not exceed the design pressure of e-quipment and pipe system, the purging thing that system purges must not pollute surrounding devices and pipeline, and must not enter qualified pipeline, before pipeline purging, orifice plate, the modulating valve that flange connects, important valve, throttle valve, safety valve, instrument etc. should be removed, valve and instrument for welding should be taked protective measure, do not allow equipment and the pipeline of purge to isolate with purge and wash system, when pipe-line system steam blowing, the insulation of pipe-line system should complete substantially, steam blowing should first carry out heating coil, the thermal walking of the pipeline in heating coil process should be in allowed band, pipe-line system water rinses and should carry out continuously, the water colour of exhaust port and transparency and entrance water colour and transparency visual consistent be qualified, after the flushing of pipe-line system water is qualified, should be by water emptying.
In sum; the invention has the beneficial effects as follows: this installation method process is simple; installation precision is high; and installation efficiency improves; avoid polyacrylic leakage, protected environment, solved existing pipeline installation process slow; and exist installation precision inadequate, cause polyacrylic leakage problem.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment 1:
Year quantity delivered is an installation method for 300,000 tons of polyacrylic pipelines, comprises the following steps:
(a) sandblast, anticorrosion: adopt sandblasting machine to carry out sandblast to carbon steel tubing anticorrosion, ensure that the inside and outside wall sandblast of carbon steel tubing is even, then evenly brush paint at outer wall;
(b) measuring point unwrapping wire: adopt mapper to survey and draw unwrapping wire to carbon steel tubing, the incision site of finding setting accurately identifies;
(c) groove processing: the groove processing of pipeline adopts: abrasive wheel cutting machine, electric angle grinder, beveling machine are processed; In groove and mother metal flawless, layering in edge 15mm, be mingled with, the defect such as breakage, burr, remove oxide, greasy dirt, slag and other objectionable impurities of groove face, keep clean, after groove turbidity test check that groove processes, groove turbidity test are checked to front in group, if find that pipeline section part is dirty, must take clean measure, if desired, do polishing treatment at welding surface;
(d) group is to, welding: adopt the mode of argon arc welding to carry out the welding of pipeline, position while welding must not be less than 100mm apart from the bending starting point of bend pipe, and must not be less than tube outer diameter; When pipeline nominal diameter is less than 150mm, the distance of two butt welds of pipe can not be less than tube outer diameter, and is not less than 50mm; When pipeline nominal diameter is more than or equal to 150mm, the distance of two butt welds of pipe is not less than 150mm; When pipe crimping circle welding joint counterpart, two longitudinal weld spacing should be greater than 100mm; Weldment group to front should by groove face and near the oil, paint, dirt, rust etc. of mother metal (inside and outside wall) clean out, until send metallic lustre, weldment group to time should accomplish that inwall flushes, pipe group to time should be straight, Welding Angular Deformation is measured at 200mm place, distance interface center, large-diameter welded steel pipe group to time, its longitudinal weld should mutually stagger and be no less than 100mm, and in easy check point;
(e) propping up lifting installs: suspension and support position should be correct, and installation should be led solid, and pipe contacts with supporting surface should be good; Suspension rod is answered at right angle setting; Fixed support should be fixed before compensation device pre-stretching or precompression; The slip surface of guiding or sliding support should be clean smooth, must not have crooked and bite phenomenon;
(f) pipeline purging pressure testing: pipe-line system is after passed examination, should carry out the pressure testing of system purge by usage requirement, comprise cleaning, purge, rinse and pressure testing, blow-washing method should be according to the usage requirement of pipeline, the degree of fouling of working medium and inner surface of pipeline is determined, hydraulic pressure test should be used industrial water, Austenitic stainless steel pipe road system taking water when medium is tested, chloride ion content in water must not exceed 50mg/L, the temperature of liquid when fluid pressure test, pipe-line system liquid must not be lower than 5 DEG C, and should be higher than the brittle transition temperature of metallic material, when fluid pressure test, should slowly boost, after reaching test pressure, stop pressing 10min, then be down to design pressure, stop pressing 30min, should be with not step-down, without leaking, nothing is deformed into intensity and leak test is qualified, pneumatic test test pressure is by 1.15 times of values of design pressure, when pneumatic test, should progressively slowly increase pressure, when pressure rise to test pressure 50% time, voltage stabilizing 3min, no abnormal or leak, continue to boost step by step by 10% of test pressure, every grade of voltage stabilizing 3min, until test pressure, voltage stabilizing 10min, again by Pressure Drop to design pressure, spraying neutral stabilizer checks pressure testing system, pipeline is without distortion, nothing leakage is intensity and leak test is qualified, conveying gas body medium pipeline should adopt air purge, conveying liquid body medium pipeline should adopt water to rinse, carry gas medium pipeline should use steam blowing, nominal diameter is more than or equal to the pipeline of 600mm, adopt labor cleaning, non-heat distribution pipeline must not be used steam blowing, before purge, should check pipeline to prop up, the firm degree of suspension bracket, should give if desired reinforcing, when pipeline purging, system maximum pressure must not exceed the design pressure of e-quipment and pipe system, the purging thing that system purges must not pollute surrounding devices and pipeline, and must not enter qualified pipeline, before pipeline purging, orifice plate, the modulating valve that flange connects, important valve, throttle valve, safety valve, instrument etc. should be removed, valve and instrument for welding should be taked protective measure, do not allow equipment and the pipeline of purge to isolate with purge and wash system, when pipe-line system steam blowing, the insulation of pipe-line system should complete substantially, steam blowing should first carry out heating coil, the thermal walking of the pipeline in heating coil process should be in allowed band, pipe-line system water rinses and should carry out continuously, the water colour of exhaust port and transparency and entrance water colour and transparency visual consistent be qualified, after the flushing of pipe-line system water is qualified, should be by water emptying.
This installation method process is simple, and installation precision is high, and installation efficiency raising, has avoided polyacrylic leakage, has protected environment, has solved existing pipeline installation process slow, and has existed installation precision inadequate, causes polyacrylic leakage problem.
The above; it is only preferred embodiment of the present invention; not the present invention is done to any pro forma restriction, any simple modification, equivalent variations that every foundation technology of the present invention, method are done above embodiment in fact, within all falling into protection scope of the present invention.

Claims (1)

1. quantity delivered is an installation method for 300,000 tons of polyacrylic pipelines year, it is characterized in that, comprises the following steps:
(a) sandblast, anticorrosion: adopt sandblasting machine to carry out sandblast to carbon steel tubing anticorrosion, ensure that the inside and outside wall sandblast of carbon steel tubing is even, then evenly brush paint at outer wall;
(b) measuring point unwrapping wire: adopt mapper to survey and draw unwrapping wire to carbon steel tubing, the incision site of finding setting accurately identifies;
(c) groove processing: the groove processing of pipeline adopts: abrasive wheel cutting machine, electric angle grinder, beveling machine are processed; In groove and mother metal flawless, layering in edge 15mm, be mingled with, the defect such as breakage, burr, remove oxide, greasy dirt, slag and other objectionable impurities of groove face, keep clean, after groove turbidity test check that groove processes, groove turbidity test are checked to front in group, if find that pipeline section part is dirty, must take clean measure, if desired, do polishing treatment at welding surface;
(d) group is to, welding: adopt the mode of argon arc welding to carry out the welding of pipeline, position while welding must not be less than 100mm apart from the bending starting point of bend pipe, and must not be less than tube outer diameter; When pipeline nominal diameter is less than 150mm, the distance of two butt welds of pipe can not be less than tube outer diameter, and is not less than 50mm; When pipeline nominal diameter is more than or equal to 150mm, the distance of two butt welds of pipe is not less than 150mm; When pipe crimping circle welding joint counterpart, two longitudinal weld spacing should be greater than 100mm; Weldment group to front should by groove face and near the oil, paint, dirt, rust etc. of mother metal (inside and outside wall) clean out, until send metallic lustre, weldment group to time should accomplish that inwall flushes, pipe group to time should be straight, Welding Angular Deformation is measured at 200mm place, distance interface center, large-diameter welded steel pipe group to time, its longitudinal weld should mutually stagger and be no less than 100mm, and in easy check point;
(e) propping up lifting installs: suspension and support position should be correct, and installation should be led solid, and pipe contacts with supporting surface should be good; Suspension rod is answered at right angle setting; Fixed support should be fixed before compensation device pre-stretching or precompression; The slip surface of guiding or sliding support should be clean smooth, must not have crooked and bite phenomenon;
(f) pipeline purging pressure testing: pipe-line system is after passed examination, should carry out the pressure testing of system purge by usage requirement, comprise cleaning, purge, rinse and pressure testing, blow-washing method should be according to the usage requirement of pipeline, the degree of fouling of working medium and inner surface of pipeline is determined, hydraulic pressure test should be used industrial water, Austenitic stainless steel pipe road system taking water when medium is tested, chloride ion content in water must not exceed 50mg/L, the temperature of liquid when fluid pressure test, pipe-line system liquid must not be lower than 5 DEG C, and should be higher than the brittle transition temperature of metallic material, when fluid pressure test, should slowly boost, after reaching test pressure, stop pressing 10min, then be down to design pressure, stop pressing 30min, should be with not step-down, without leaking, nothing is deformed into intensity and leak test is qualified, pneumatic test test pressure is by 1.15 times of values of design pressure, when pneumatic test, should progressively slowly increase pressure, when pressure rise to test pressure 50% time, voltage stabilizing 3min, no abnormal or leak, continue to boost step by step by 10% of test pressure, every grade of voltage stabilizing 3min, until test pressure, voltage stabilizing 10min, again by Pressure Drop to design pressure, spraying neutral stabilizer checks pressure testing system, pipeline is without distortion, nothing leakage is intensity and leak test is qualified, conveying gas body medium pipeline should adopt air purge, conveying liquid body medium pipeline should adopt water to rinse, carry gas medium pipeline should use steam blowing, nominal diameter is more than or equal to the pipeline of 600mm, adopt labor cleaning, non-heat distribution pipeline must not be used steam blowing, before purge, should check pipeline to prop up, the firm degree of suspension bracket, should give if desired reinforcing, when pipeline purging, system maximum pressure must not exceed the design pressure of e-quipment and pipe system, the purging thing that system purges must not pollute surrounding devices and pipeline, and must not enter qualified pipeline, before pipeline purging, orifice plate, the modulating valve that flange connects, important valve, throttle valve, safety valve, instrument etc. should be removed, valve and instrument for welding should be taked protective measure, do not allow equipment and the pipeline of purge to isolate with purge and wash system, when pipe-line system steam blowing, the insulation of pipe-line system should complete substantially, steam blowing should first carry out heating coil, the thermal walking of the pipeline in heating coil process should be in allowed band, pipe-line system water rinses and should carry out continuously, the water colour of exhaust port and transparency and entrance water colour and transparency visual consistent be qualified, after the flushing of pipe-line system water is qualified, should be by water emptying.
CN201410303765.2A 2014-06-30 2014-06-30 A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines Active CN104089088B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410303765.2A CN104089088B (en) 2014-06-30 2014-06-30 A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410303765.2A CN104089088B (en) 2014-06-30 2014-06-30 A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines

Publications (2)

Publication Number Publication Date
CN104089088A true CN104089088A (en) 2014-10-08
CN104089088B CN104089088B (en) 2016-03-23

Family

ID=51636830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410303765.2A Active CN104089088B (en) 2014-06-30 2014-06-30 A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines

Country Status (1)

Country Link
CN (1) CN104089088B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649867A (en) * 2018-11-28 2019-04-19 中国化学工程第十四建设有限公司 Polypropylene product degassing cabin upside-down construction technique
CN109926803A (en) * 2019-04-24 2019-06-25 日照港达船舶重工有限公司 A kind of jack-up unit guide pile system fluid pressure line construction technology

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644469A (en) * 2018-05-22 2018-10-12 山西省工业设备安装集团有限公司 The construction technology of main steam system pipeline in a kind of Steam Turbine

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6353988B1 (en) * 2000-02-25 2002-03-12 Atlantic Richfield Company Method of installing a highly tensioned suspended pipeline
CN101290075A (en) * 2008-06-06 2008-10-22 陕西化建工程有限责任公司 Long conveying pipeline construction method capable of simultaneously clearing pipe and testing pressure
CN103791158A (en) * 2014-01-17 2014-05-14 洛阳广鑫建设集团有限公司 Nitrogen and argon pipeline construction technology
CN103791157A (en) * 2014-01-17 2014-05-14 洛阳广鑫建设集团有限公司 Construction technology for natural gas pipeline

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6353988B1 (en) * 2000-02-25 2002-03-12 Atlantic Richfield Company Method of installing a highly tensioned suspended pipeline
CN101290075A (en) * 2008-06-06 2008-10-22 陕西化建工程有限责任公司 Long conveying pipeline construction method capable of simultaneously clearing pipe and testing pressure
CN103791158A (en) * 2014-01-17 2014-05-14 洛阳广鑫建设集团有限公司 Nitrogen and argon pipeline construction technology
CN103791157A (en) * 2014-01-17 2014-05-14 洛阳广鑫建设集团有限公司 Construction technology for natural gas pipeline

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
唐芳珍: "谈化工工艺管道的合理安装", 《化学工程和装备》 *
陶祥: "浅谈煤矿大直径瓦斯抽采管道安装工艺及施工方法", 《现代物业·新建设》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109649867A (en) * 2018-11-28 2019-04-19 中国化学工程第十四建设有限公司 Polypropylene product degassing cabin upside-down construction technique
CN109926803A (en) * 2019-04-24 2019-06-25 日照港达船舶重工有限公司 A kind of jack-up unit guide pile system fluid pressure line construction technology

Also Published As

Publication number Publication date
CN104089088B (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN104816076B (en) A kind of pipe pipe butt weld technologies for steel method of continuous pipe
CN104089088B (en) A kind of year quantity delivered is the installation method of 300,000 tons of polyacrylic pipelines
CN104801839B (en) The welding procedure of austenitic stainless steel and chrome molybdenum heat resisting steel
CN109084080B (en) CSP pipeline prefabricating construction method
CA2920639C (en) Method for protecting a welded joint between pipes having an interior coating
CN103791157A (en) Construction technology for natural gas pipeline
CN107451394A (en) Evaluation method for X80 pipeline girth weld crack-type defect residual intensities
CN101498394B (en) Oil gas pipeline rapid pressured plugging apparatus and plugging method
CN101927388A (en) Winter welding construction method of long-distance transport pipe line
CN103791158A (en) Nitrogen and argon pipeline construction technology
CN104454238B (en) A kind of pipeline mounting construction method of rocket RP-1 propellant transfer system
CN105276336A (en) Method for preventing corrosion in welded pipe and pipe used for method
CN104416333A (en) Process for manufacturing steel seamless tees
CN106545691A (en) A kind of natural gas line construction technology
CN108788400A (en) A kind of welding method of petroleum gas air delivering pipeline system and gas pipeline
CN109834365A (en) A kind of processing method for small-bore internal coat pipeline butt welding
CN108509758B (en) Method for calculating allowable stress of oil and gas pipeline under ditch
CN104295844A (en) Crosslinked polyethylene pipe fitting parallel tee joint for intelligent prefabricated directly-buried insulating pipe and manufacturing method thereof
Radkevych et al. Damage to the metal of industrial pipelines in a hydrogen sulfide environment
CN204874758U (en) Degrease equipment of almag pipeline
CN103878469B (en) A kind of zirconium and it's alloy welding procedure
CN201377655Y (en) Fast pressurized plugging device of oil and gas pipeline
CN204805837U (en) Connecting device is moulded to steel
CN103245466A (en) Pigging and pressure testing method for long distance pipeline coal transportation
CN204062205U (en) A kind of Novel composite pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Deng Liping

Inventor before: Zhou Bin

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170427

Address after: 610000 Sichuan city of Chengdu province high tech Zone sub road B AVIC International Plaza No. 88 building 1002

Patentee after: SICHUAN XINGZHI ZHIHUI INTELLECTUAL PROPERTY OPERATION CO., LTD.

Address before: 610000 Chenghua District, Sichuan, Jianshe Road, No. 56,

Patentee before: The Chengdu general petroleum works technology of height Co., Ltd

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181015

Address after: 610000 Rong Ou, 144 Qingbaijiang Road, Chengdu, Sichuan.

Patentee after: Chengdu Zhi Rong Chuang Intellectual Property Operation Co., Ltd.

Address before: 610000 B 1002, China Aviation International Plaza, 88 Jiao Zi Road, Chengdu hi tech Zone, Sichuan

Patentee before: SICHUAN XINGZHI ZHIHUI INTELLECTUAL PROPERTY OPERATION CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190718

Address after: 310000 East Sanlian Road 269, Jiangnan Town, Tonglu County, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou Yitong Plastic Industry Co., Ltd.

Address before: 610000 No. 144 Qingjiang Middle Road, Qingbaijiang District, Chengdu City, Sichuan Province (Chengou Pioneering Courtyard)

Patentee before: Chengdu Zhi Rong Chuang Intellectual Property Operation Co., Ltd.

TR01 Transfer of patent right