CN211169496U - Take quick hoist device of PC wallboard of counter weight - Google Patents

Take quick hoist device of PC wallboard of counter weight Download PDF

Info

Publication number
CN211169496U
CN211169496U CN201922122929.2U CN201922122929U CN211169496U CN 211169496 U CN211169496 U CN 211169496U CN 201922122929 U CN201922122929 U CN 201922122929U CN 211169496 U CN211169496 U CN 211169496U
Authority
CN
China
Prior art keywords
steel
wallboard
weight
lugs
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922122929.2U
Other languages
Chinese (zh)
Inventor
王佳蓓
张宏
梁熊
代保明
陈文玉
吴云孝
冯苛钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN201922122929.2U priority Critical patent/CN211169496U/en
Application granted granted Critical
Publication of CN211169496U publication Critical patent/CN211169496U/en
Priority to PCT/CN2020/132177 priority patent/WO2021109932A1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a quick hoisting device of PC wallboard of taking counter weight, the structure is that I-shaped girder steel and counter weight girder steel are welded respectively to balanced main girder steel both ends, the symmetric welding has steel lug I respectively in balanced main girder steel top middle part both sides, the symmetric welding has steel lug II respectively in the position of counter weight girder steel tip both sides above the balanced main girder steel, steel lug II is equipped with a hole of lifting by crane and uses, the balancing weight is installed below the counter weight girder steel; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane. The PC wallboard is fixed to a hoisting point of a hoisting I-shaped steel beam, the balancing weight is installed on the other side of the cantilever steel beam, the balancing weight section and the lifting lug at the middle section of the balance main steel beam are connected through the steel wire rope, and the truck crane is connected with the steel wire rope and can be hoisted and installed to the installation position of the PC wallboard with the cantilever structure at one time. The utility model has the characteristics of the construction is simple and convenient quick, safe and reliable, effectively solves the difficult problem of PC wallboard installation under the structure of encorbelmenting.

Description

Take quick hoist device of PC wallboard of counter weight
Technical Field
The utility model belongs to the building engineering field, concretely relates to take quick hoist device of PC wallboard of counter weight.
Background
The precast concrete structure has the advantages of improving construction efficiency, improving construction quality of building engineering, reducing environmental pollution and the like, and has wide development prospect in China. In the construction process, the hoisting of the prefabricated parts is a life line of site construction and is also an important factor influencing the construction progress.
When the prefabricated wall panel is generally required to be hoisted under an overhanging structure, a hole needs to be formed in a floor above the corresponding position of the wall panel, the prefabricated wall panel is firstly hoisted by a truck crane to the wall edge to be erected and leaned on the completed structure, then a chain block is put down from the hole of the upper floor panel, a worker needs to climb to the top of the inner wall panel to unhook and change the hook into a hook on the chain block, and then the prefabricated inner wall panel is installed. The hoisting of the prefabricated inner wall is influenced by other indoor structures, and when the upper-layer structure is a cantilever beam or a cantilever plate, the operation space at the upper end of the prefabricated inner wall can be very limited, so that the construction difficulty is brought.
Disclosure of Invention
The utility model aims at overcoming the problem and the defect that above-mentioned prior art exists, provide a take quick hoist device of PC wallboard of counter weight. The utility model discloses the device has solved the difficult problem of prefabricated wallboard hoist and mount under the structure of encorbelmenting, adopts the hoist directly to lift by crane and install, and on-the-spot hoist and mount is fast, has avoided the excavation to the floor.
The technical scheme of the utility model is that:
the utility model provides a take quick hoist device of PC wallboard of counter weight, includes I-steel roof beam, balanced main girder steel, counter weight girder steel, two steel lugs I, two steel lugs II, balancing weight, four wire rope, its characterized in that: the balance main steel beam is welded with an I-shaped steel beam and a balance weight steel beam at two ends respectively, steel lugs I are symmetrically welded at two sides of the middle part above the balance main steel beam respectively, steel lugs II are symmetrically welded at two sides of the end part of the balance weight steel beam above the balance main steel beam respectively, a hole for lifting is formed in each steel lug II, and a balancing weight is installed below the balance weight steel beam; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane.
A plurality of holes for hoisting are formed in the I-shaped steel beam, and suitable holes are conveniently selected to serve as hoisting points according to the size of the PC wallboard.
A plurality of holes for hoisting are formed in the steel lifting lug I, and suitable holes of the steel lifting lug I can be conveniently selected to serve as hoisting points according to actual conditions on site.
The balancing weight is a steel balancing weight.
The utility model discloses utilize lever principle (the balanced principle of jack-up of similar tower crane) and design a balanced hoist device. One end of the hoisting device is an I-shaped steel beam for hoisting a PC wall, a plurality of PC wallboard hoisting holes are formed in the I-shaped steel beam, the other end of the I-shaped steel beam is a balancing weight, and the weight of the balancing weight is comprehensively considered according to whether the heaviest weight of the PC wallboard and the total length of the hoisting beam are beneficial to construction. In the hoisting process, the PC wallboard is firstly fixed to the installation position of the PC wallboard of the balance main steel beam, the balancing weight is installed at the other end of the balance main steel beam, and the balancing weight block section and the plurality of hoisting holes in the middle section of the overhanging hoisting device are connected through the steel wire rope. And the truck crane is connected with the steel wire rope, so that the truck crane can be successfully lifted at one time and is installed to the installation position of the PC wallboard of the cantilever structure.
Compare with the hoist and mount of prefabricated component under the traditional structure of encorbelmenting, the utility model discloses directly adopt machinery hoist and mount, the personnel only do the wallboard adjustment, need not secondary hoist and mount installation, need not to carry out the trompil to two floors, and the installation process entirely, all loads all direct action on the crane, do not produce any influence to two floors of floors, have got rid of the danger that the floor ftractures and collapses.
Drawings
Fig. 1 is a schematic elevation view of the present invention.
Fig. 2 is a plan view of the present invention.
Fig. 3 is an installation diagram of the present invention.
Fig. 4 is a schematic view of the present invention.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings:
as shown in fig. 1, 2 and 3, the utility model discloses an i-steel beam 1, balanced main steel beam 2, counterweight steel beam 3, two steel lugs i 4, two steel lugs ii 5, steel counterweight block 6 and four wire ropes 7, the two ends of balanced main steel beam 2 are welded i-steel beam 1 and counterweight steel beam 3 respectively, a plurality of holes for lifting are arranged on i-steel beam 1, steel lugs i 4 are symmetrically welded on both sides of the middle part above balanced main steel beam 2 respectively, a plurality of holes for lifting are arranged on steel lugs i 4, steel lugs ii 5 are symmetrically welded on both sides of the end part of counterweight steel beam 3 above balanced main steel beam 2 respectively, a hole for lifting is arranged on steel lug ii 5, and steel counterweight block 6 is arranged below counterweight steel beam 3; four wire ropes 7 are respectively connected with two steel lifting lugs I4 and two steel lifting lugs II 5 and then are gathered into a whole to be connected with an external truck crane.
As shown in FIG. 4, the method for hoisting PC wallboard of the utility model is carried out according to the following steps: the method comprises the following steps of selecting a proper steel balancing weight according to the weight of a PC wallboard and installing the proper steel balancing weight to a counterweight steel beam 3, selecting a hoisting point on an I-shaped steel beam 1 according to the size of the PC wallboard and the actual situation on site, selecting a proper hoisting point of a steel lifting lug I4 on a balance main steel beam 2 according to the actual situation on site, and reliably connecting the steel lifting lug I4 and a steel lifting lug II 5 by using a steel wire rope 7. The truck crane hoists the PC wallboard through the steel wire rope 7, and horizontal movement to PC wallboard installation position, PC wallboard pause slightly about 500mm high apart from the mounted position top, and constructor can hand the wallboard, control wallboard whereabouts direction, and prefabricated link plate descends slowly here. And after the position 20mm away from the top of the embedded steel bar is reached, aligning the steel bar with the reserved corrugated blind hole by using the reflector, and slowly descending the wallboard to enable the wallboard to be stably positioned after the position of the corrugated blind hole at the bottom of the prefabricated hanging plate is aligned with the position of the ground embedded steel bar. After the prefabricated PC wallboard is in place, the bolt is installed on the PC steel beam and is not pre-tightened. According to the previous control line, the level, the vertical and the elevation of the prefabricated part are adjusted, the bolt is fastened to the design requirement after the prefabricated part is adjusted to be within the error range, and the bolt is screwed to the design requirement.

Claims (4)

1. The utility model provides a take quick hoist device of PC wallboard of counter weight, includes I-steel roof beam, balanced main girder steel, counter weight girder steel, two steel lugs I, two steel lugs II, balancing weight, four wire rope, its characterized in that: the balance main steel beam is welded with an I-shaped steel beam and a balance weight steel beam at two ends respectively, steel lugs I are symmetrically welded at two sides of the middle part above the balance main steel beam respectively, steel lugs II are symmetrically welded at two sides of the end part of the balance weight steel beam above the balance main steel beam respectively, a hole for lifting is formed in each steel lug II, and a balancing weight is installed below the balance weight steel beam; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane.
2. The rapid hoisting device of PC wallboard with counterweight of claim 1, characterized in that: and a plurality of holes for hoisting are arranged on the I-shaped steel beam.
3. The rapid hoisting device for PC wallboard with counterweight according to claim 1 or 2, characterized in that: a plurality of holes for hoisting are formed in the steel lifting lug I.
4. The rapid hoisting device of PC wallboard with counterweight of claim 3, characterized in that: the balancing weight is a steel balancing weight.
CN201922122929.2U 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight Active CN211169496U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201922122929.2U CN211169496U (en) 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight
PCT/CN2020/132177 WO2021109932A1 (en) 2019-12-02 2020-11-27 Counterweight-equipped device for quick hoisting of pc wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922122929.2U CN211169496U (en) 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight

Publications (1)

Publication Number Publication Date
CN211169496U true CN211169496U (en) 2020-08-04

Family

ID=71817690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922122929.2U Active CN211169496U (en) 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight

Country Status (1)

Country Link
CN (1) CN211169496U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021109932A1 (en) * 2019-12-02 2021-06-10 中建三局第二建设工程有限责任公司 Counterweight-equipped device for quick hoisting of pc wall panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021109932A1 (en) * 2019-12-02 2021-06-10 中建三局第二建设工程有限责任公司 Counterweight-equipped device for quick hoisting of pc wall panel

Similar Documents

Publication Publication Date Title
CN110759222A (en) Take quick hoist device of PC wallboard of counter weight
CN205387439U (en) Mast hoisting accessory
CN111395641A (en) Precast concrete external wallboard and construction method thereof
CN201068371Y (en) Self-hoisting tower crane
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
CN105540446A (en) Interior-climbing type lifting platform
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN201908447U (en) Lift-type horizontal safety net
CN112709434A (en) Steel beam mounting method
CN101074087A (en) Self-raising tower crane
CN113668401B (en) Hoisting process based on installation and transportation platform on long-span bridge pier
CN110980500A (en) Balanced stress auxiliary hanging beam and roof structure integral hoisting method
CN203486787U (en) Integral lifting device for cabinet top of Wiggins coal gas cabinet
CN215925647U (en) Arch rib buckle cable anchoring beam for tower buckle integration
WO2021109932A1 (en) Counterweight-equipped device for quick hoisting of pc wall panel
CN104018680A (en) Lifting method for large-span solid-web arc beam
CN210763974U (en) Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material
CN201649667U (en) Reinforcement cage immersion guide frame
CN113802858A (en) Reverse hanging construction method for steel structure roof tile
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN220642173U (en) Hoistway construction elevator platform
CN210594914U (en) Modularization drilling platform panel hoist
CN211714320U (en) Roof structure of tubular high-rise building
CN218969768U (en) Hoisting device for corrugated steel web section beam
CN218912360U (en) Basement reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant