CN110759222A - Take quick hoist device of PC wallboard of counter weight - Google Patents
Take quick hoist device of PC wallboard of counter weight Download PDFInfo
- Publication number
- CN110759222A CN110759222A CN201911213445.7A CN201911213445A CN110759222A CN 110759222 A CN110759222 A CN 110759222A CN 201911213445 A CN201911213445 A CN 201911213445A CN 110759222 A CN110759222 A CN 110759222A
- Authority
- CN
- China
- Prior art keywords
- steel
- steel beam
- wallboard
- hoisting
- counterweight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/18—Implements for finishing work on buildings for setting wall or ceiling slabs or plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a rapid hoisting device for a PC wallboard with a counterweight, which has the structure that an I-shaped steel beam and a counterweight steel beam are respectively welded at two ends of a balance main steel beam, steel lifting lugs I are respectively symmetrically welded at two sides of the middle part above the balance main steel beam, steel lifting lugs II are respectively symmetrically welded at two sides of the end part of the counterweight steel beam above the balance main steel beam, a hole for hoisting is arranged on each steel lifting lug II, and a counterweight block is arranged below the counterweight steel beam; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane. The PC wallboard is fixed to a hoisting point of a hoisting I-shaped steel beam, the balancing weight is installed on the other side of the cantilever steel beam, the balancing weight section and the lifting lug at the middle section of the balance main steel beam are connected through the steel wire rope, and the truck crane is connected with the steel wire rope and can be hoisted and installed to the installation position of the PC wallboard with the cantilever structure at one time. The invention has the characteristics of simple, convenient and quick construction, safety and reliability, and effectively solves the problem of installation of the PC wallboard under the cantilever structure.
Description
Technical Field
The invention belongs to the field of constructional engineering, and particularly relates to a rapid hoisting device for a PC (polycarbonate) wallboard with a balance weight.
Background
The precast concrete structure has the advantages of improving construction efficiency, improving construction quality of building engineering, reducing environmental pollution and the like, and has wide development prospect in China. In the construction process, the hoisting of the prefabricated parts is a life line of site construction and is also an important factor influencing the construction progress.
When the prefabricated wall panel is generally required to be hoisted under an overhanging structure, a hole needs to be formed in a floor above the corresponding position of the wall panel, the prefabricated wall panel is firstly hoisted by a truck crane to the wall edge to be erected and leaned on the completed structure, then a chain block is put down from the hole of the upper floor panel, a worker needs to climb to the top of the inner wall panel to unhook and change the hook into a hook on the chain block, and then the prefabricated inner wall panel is installed. The hoisting of the prefabricated inner wall is influenced by other indoor structures, and when the upper-layer structure is a cantilever beam or a cantilever plate, the operation space at the upper end of the prefabricated inner wall can be very limited, so that the construction difficulty is brought.
Disclosure of Invention
The invention aims to overcome the problems and the defects in the prior art and provide a rapid hoisting device for a PC wallboard with a counterweight. The device solves the difficult problem of hoisting the prefabricated wallboard under the cantilever structure, adopts the lifting appliance to directly hoist and install, has high field hoisting speed, and avoids digging a floor slab.
The technical scheme of the invention is as follows:
the utility model provides a take quick hoist device of PC wallboard of counter weight, includes I-steel roof beam, balanced main girder steel, counter weight girder steel, two steel lugs I, two steel lugs II, balancing weight, four wire rope, its characterized in that: the balance main steel beam is welded with an I-shaped steel beam and a balance weight steel beam at two ends respectively, steel lugs I are symmetrically welded at two sides of the middle part above the balance main steel beam respectively, steel lugs II are symmetrically welded at two sides of the end part of the balance weight steel beam above the balance main steel beam respectively, a hole for lifting is formed in each steel lug II, and a balancing weight is installed below the balance weight steel beam; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane.
A plurality of holes for hoisting are formed in the I-shaped steel beam, and suitable holes are conveniently selected to serve as hoisting points according to the size of the PC wallboard.
A plurality of holes for hoisting are formed in the steel lifting lug I, and suitable holes of the steel lifting lug I can be conveniently selected to serve as hoisting points according to actual conditions on site.
The balancing weight is a steel balancing weight.
The invention designs a balanced hoisting device by utilizing a lever principle (similar to a hoisting balance principle of a tower crane). One end of the hoisting device is an I-shaped steel beam for hoisting a PC wall, a plurality of PC wallboard hoisting holes are formed in the I-shaped steel beam, the other end of the I-shaped steel beam is a balancing weight, and the weight of the balancing weight is comprehensively considered according to whether the heaviest weight of the PC wallboard and the total length of the hoisting beam are beneficial to construction. In the hoisting process, the PC wallboard is firstly fixed to the installation position of the PC wallboard of the balance main steel beam, the balancing weight is installed at the other end of the balance main steel beam, and the balancing weight block section and the plurality of hoisting holes in the middle section of the overhanging hoisting device are connected through the steel wire rope. And the truck crane is connected with the steel wire rope, so that the truck crane can be successfully lifted at one time and is installed to the installation position of the PC wallboard of the cantilever structure.
Compared with the hoisting of the prefabricated part under the traditional overhanging structure, the invention directly adopts mechanical hoisting, personnel only adjust the wall plate, secondary hoisting installation is not needed, holes do not need to be formed on the second floor, in the whole installation process, all loads directly act on a crane, no influence is generated on the second floor, and the danger of cracking and collapsing of the floor is eliminated.
Drawings
Fig. 1 is a schematic elevation view of the present invention.
Fig. 2 is a plan view of the present invention.
Fig. 3 is a schematic view of the installation of the present invention.
Fig. 4 is a schematic diagram of the present invention.
Detailed Description
The invention is described in detail below with reference to the attached drawing figures:
as shown in fig. 1, 2 and 3, the invention comprises an i-shaped steel beam 1, a balance main steel beam 2, a counterweight steel beam 3, two steel lifting lugs i 4, two steel lifting lugs ii 5, a steel counterweight block 6 and four steel wire ropes 7, wherein the i-shaped steel beam 1 and the counterweight steel beam 3 are respectively welded at two ends of the balance main steel beam 2, a plurality of holes for lifting are arranged on the i-shaped steel beam 1, the steel lifting lugs i 4 are respectively symmetrically welded at two sides of the middle part above the balance main steel beam 2, the steel lifting lugs i 4 are respectively provided with a plurality of holes for lifting, the steel lifting lugs ii 5 are respectively symmetrically welded at two sides of the end part of the counterweight steel beam 3 above the balance main steel beam 2, one hole for lifting is arranged on the steel lifting lugs ii 5, and the steel counterweight block 6; four wire ropes 7 are respectively connected with two steel lifting lugs I4 and two steel lifting lugs II 5 and then are gathered into a whole to be connected with an external truck crane.
As shown in FIG. 4, the method for hoisting PC wallboard according to the invention comprises the following steps: the method comprises the following steps of selecting a proper steel balancing weight according to the weight of a PC wallboard and installing the proper steel balancing weight to a counterweight steel beam 3, selecting a hoisting point on an I-shaped steel beam 1 according to the size of the PC wallboard and the actual situation on site, selecting a proper hoisting point of a steel lifting lug I4 on a balance main steel beam 2 according to the actual situation on site, and reliably connecting the steel lifting lug I4 and a steel lifting lug II 5 by using a steel wire rope 7. The truck crane hoists the PC wallboard through the steel wire rope 7, and horizontal movement to PC wallboard installation position, PC wallboard pause slightly about 500mm high apart from the mounted position top, and constructor can hand the wallboard, control wallboard whereabouts direction, and prefabricated link plate descends slowly here. And after the position 20mm away from the top of the embedded steel bar is reached, aligning the steel bar with the reserved corrugated blind hole by using the reflector, and slowly descending the wallboard to enable the wallboard to be stably positioned after the position of the corrugated blind hole at the bottom of the prefabricated hanging plate is aligned with the position of the ground embedded steel bar. After the prefabricated PC wallboard is in place, the bolt is installed on the PC steel beam and is not pre-tightened. According to the previous control line, the level, the vertical and the elevation of the prefabricated part are adjusted, the bolt is fastened to the design requirement after the prefabricated part is adjusted to be within the error range, and the bolt is screwed to the design requirement.
Claims (4)
1. The utility model provides a take quick hoist device of PC wallboard of counter weight, includes I-steel roof beam, balanced main girder steel, counter weight girder steel, two steel lugs I, two steel lugs II, balancing weight, four wire rope, its characterized in that: the balance main steel beam is welded with an I-shaped steel beam and a balance weight steel beam at two ends respectively, steel lugs I are symmetrically welded at two sides of the middle part above the balance main steel beam respectively, steel lugs II are symmetrically welded at two sides of the end part of the balance weight steel beam above the balance main steel beam respectively, a hole for lifting is formed in each steel lug II, and a balancing weight is installed below the balance weight steel beam; four steel wire ropes are respectively connected with the two steel lifting lugs I and the two steel lifting lugs II and then are gathered into a whole to be connected with an external truck crane.
2. The rapid hoisting device of PC wallboard with counterweight of claim 1, characterized in that: and a plurality of holes for hoisting are arranged on the I-shaped steel beam.
3. The rapid hoisting device for PC wallboard with counterweight according to claim 1 or 2, characterized in that: a plurality of holes for hoisting are formed in the steel lifting lug I.
4. The rapid hoisting device of PC wallboard with counterweight of claim 3, characterized in that: the balancing weight is a steel balancing weight.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911213445.7A CN110759222A (en) | 2019-12-02 | 2019-12-02 | Take quick hoist device of PC wallboard of counter weight |
PCT/CN2020/132177 WO2021109932A1 (en) | 2019-12-02 | 2020-11-27 | Counterweight-equipped device for quick hoisting of pc wall panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911213445.7A CN110759222A (en) | 2019-12-02 | 2019-12-02 | Take quick hoist device of PC wallboard of counter weight |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110759222A true CN110759222A (en) | 2020-02-07 |
Family
ID=69340761
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911213445.7A Pending CN110759222A (en) | 2019-12-02 | 2019-12-02 | Take quick hoist device of PC wallboard of counter weight |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110759222A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111517221A (en) * | 2020-03-27 | 2020-08-11 | 海洋石油工程(青岛)有限公司 | Pipe fitting hoisting and assembling method |
CN111608402A (en) * | 2020-05-23 | 2020-09-01 | 成都市天柱建筑工程有限公司 | Connecting device for prefabricated house and connecting method thereof |
CN112061341A (en) * | 2020-08-13 | 2020-12-11 | 沪东中华造船(集团)有限公司 | Tilting bucket tool and using method thereof |
WO2021109932A1 (en) * | 2019-12-02 | 2021-06-10 | 中建三局第二建设工程有限责任公司 | Counterweight-equipped device for quick hoisting of pc wall panel |
-
2019
- 2019-12-02 CN CN201911213445.7A patent/CN110759222A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021109932A1 (en) * | 2019-12-02 | 2021-06-10 | 中建三局第二建设工程有限责任公司 | Counterweight-equipped device for quick hoisting of pc wall panel |
CN111517221A (en) * | 2020-03-27 | 2020-08-11 | 海洋石油工程(青岛)有限公司 | Pipe fitting hoisting and assembling method |
CN111608402A (en) * | 2020-05-23 | 2020-09-01 | 成都市天柱建筑工程有限公司 | Connecting device for prefabricated house and connecting method thereof |
CN112061341A (en) * | 2020-08-13 | 2020-12-11 | 沪东中华造船(集团)有限公司 | Tilting bucket tool and using method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110759222A (en) | Take quick hoist device of PC wallboard of counter weight | |
CN201411900Y (en) | Hydraulic die lifter for chimneys | |
CN101537976B (en) | Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof | |
CN205387439U (en) | Mast hoisting accessory | |
CN105692470A (en) | Internal climbing tower crane and operating method thereof | |
CN101566005B (en) | Chimney hydraulic mould lifting device | |
CN103352576A (en) | Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack | |
CN201068371Y (en) | Self-hoisting tower crane | |
CN211169496U (en) | Take quick hoist device of PC wallboard of counter weight | |
CN105540446A (en) | Interior-climbing type lifting platform | |
CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
CN201102883Y (en) | Steel cable sliding and lifting device | |
WO2021109932A1 (en) | Counterweight-equipped device for quick hoisting of pc wall panel | |
CN210763974U (en) | Be suitable for reverse construction method to get soil mouthful and pass suspension type electric hoist for material | |
CN110606435B (en) | Suspension type electric hoist suitable for reverse construction method soil taking port transferring materials | |
CN113802858A (en) | Reverse hanging construction method for steel structure roof tile | |
CN111893898A (en) | Suspension splicing bridge building system with pier hoisting and transportation splicing separated and construction method thereof | |
CN201649667U (en) | Reinforcement cage immersion guide frame | |
CN218912360U (en) | Basement reinforced structure | |
CN212953807U (en) | Large-span high-altitude steel trestle segmentation unit integral hoisting device | |
CN217378638U (en) | Splicing seam adjusting device for mounting prefabricated box channel and box culvert | |
CN211714320U (en) | Roof structure of tubular high-rise building | |
CN209369372U (en) | A kind of overhanging hanging beam | |
CN220642173U (en) | Hoistway construction elevator platform | |
CN219279306U (en) | Single-machine lifting ground wall-connected reinforcement cage device in narrow space |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |