WO2021109932A1 - Counterweight-equipped device for quick hoisting of pc wall panel - Google Patents

Counterweight-equipped device for quick hoisting of pc wall panel Download PDF

Info

Publication number
WO2021109932A1
WO2021109932A1 PCT/CN2020/132177 CN2020132177W WO2021109932A1 WO 2021109932 A1 WO2021109932 A1 WO 2021109932A1 CN 2020132177 W CN2020132177 W CN 2020132177W WO 2021109932 A1 WO2021109932 A1 WO 2021109932A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel
counterweight
hoisting
lifting
wall panel
Prior art date
Application number
PCT/CN2020/132177
Other languages
French (fr)
Chinese (zh)
Inventor
王佳蓓
张宏
梁熊
代保明
陈文玉
吴云孝
冯苛钊
Original Assignee
中建三局第二建设工程有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201922122929.2U external-priority patent/CN211169496U/en
Priority claimed from CN201911213445.7A external-priority patent/CN110759222A/en
Application filed by 中建三局第二建设工程有限责任公司 filed Critical 中建三局第二建设工程有限责任公司
Publication of WO2021109932A1 publication Critical patent/WO2021109932A1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus

Abstract

A counterweight-equipped device for quick hoisting of a PC wall panel has the following structure: an H-shaped steel beam (1) and a counterweight steel beam (3) are respectively welded to two ends of a balanced main steel beam (2). First steel hoisting lugs (4) are respectively symmetrically welded to two sides of a middle portion on the balanced main steel beam (2). Second steel hoisting lugs (5) are respectively symmetrically welded to two sides of an end portion of the counterweight steel beam (3) on the balanced main steel beam (2). A hole for hoisting is provided on the second steel hoisting lug (5). A counterweight (6) is mounted below the counterweight steel beam (3). Four steel cables (7) are respectively connected to the two first steel hoisting lugs (4) and the two second steel hoisting lugs (5), are then connected to each other as a whole, and are connected to an external truck crane. The PC wall panel is fixed to a hoisting point of the H-shaped steel beam (1), and is connected to the counterweight section and the hoisting lug on the middle section of the balanced main steel beam (2) by means of the steel cable (7). The truck crane is connected to the steel cable (7), hoists PC wall panels at one time, and mounts the PC wall panel to a PC wall panel mounting position having a cantilever structure. The hoisting device facilitates construction, is safe and reliable, and effectively overcomes the difficulty of mounting a PC wall panel on a cantilever structure.

Description

一种带配重的PC墙板快速吊装装置A Quick Hoisting Device for PC Wallboard with Counterweight 技术领域Technical field
本发明属于建筑工程领域,具体涉及一种带配重的PC墙板快速吊装装置。The invention belongs to the field of construction engineering, and in particular relates to a fast lifting device for PC wall panels with counterweights.
背景技术Background technique
预制混凝土结构因具有提高施工工效,提高建筑工程施工质量,减少环境污染等优势,在我国具有广阔的发展前景。在施工过程中,预制构件的吊装是现场施工的生命线,也是影响施工进度的重要因素。Precast concrete structures have the advantages of improving construction efficiency, improving construction quality of construction projects, and reducing environmental pollution, so they have broad development prospects in my country. In the construction process, the hoisting of prefabricated components is the lifeline of on-site construction, and it is also an important factor affecting the construction progress.
通常需对预制墙板在悬挑结构下完成吊装时,需先在墙板对应位置的上方楼板进行开孔,汽车吊将预制墙板先吊至墙边竖起斜靠在已完成的结构上,再从上层楼板开洞处将手拉葫芦放下,工人需爬至内墙板顶部,进行脱钩及换成手拉葫芦上的吊钩,再进行预制内墙板安装。预制内墙吊装是受到室内其他结构的影响,当上层结构为悬挑梁或悬挑板时,预制内墙上端操作空间会十分有限,给施工带来难度。Generally, when the prefabricated wall panels are hoisted under a cantilevered structure, holes must be made in the upper floor slab at the corresponding position of the wall panels. The car crane first hoists the prefabricated wall panels to the side of the wall and leaning against the completed structure. , And then lower the chain hoist from the hole in the upper floor. The worker needs to climb to the top of the inner wall panel, unhook and replace it with the hook on the chain hoist, and then install the prefabricated inner wall panel. The prefabricated interior wall hoisting is affected by other indoor structures. When the upper structure is a cantilever beam or a cantilever slab, the operation space at the end of the prefabricated interior wall will be very limited, which will bring difficulties to the construction.
发明内容Summary of the invention
本发明的目的是为了克服上述现有技术存在的问题及缺陷,提供一种带配重的PC墙板快速吊装装置。本发明装置解决了在悬挑结构下预制墙板吊装的难题,采用吊具直接起吊并安装,现场吊装速度快,避免了对楼板的开凿。The purpose of the present invention is to overcome the above-mentioned problems and defects in the prior art and provide a fast lifting device for PC wall panels with counterweights. The device of the present invention solves the difficult problem of prefabricated wall panel hoisting under the cantilevered structure. The hoisting tool is directly hoisted and installed, the hoisting speed is fast on site, and the excavation of the floor slab is avoided.
本发明的技术方案为:The technical scheme of the present invention is:
一种带配重的PC墙板快速吊装装置,包括工字钢梁、平衡主钢梁、配重钢梁、两个钢制吊耳Ⅰ、两个钢制吊耳Ⅱ、配重块、四根钢丝绳,其特征在于:平衡主钢梁两端分别焊接工字钢梁和配重钢梁,平衡主钢梁上方中间部位两侧分别对称焊接有钢制吊耳Ⅰ,平衡主钢梁上方位于配重钢梁端部两侧分别对称焊接有钢制吊耳Ⅱ,钢制吊耳Ⅱ上设有一个起吊用的孔,配重块安装在配重钢梁下方;四根钢丝绳分别与两个钢制吊耳Ⅰ和两个钢制吊耳Ⅱ相连后汇总成一体与外部的汽车吊相连。A fast lifting device for PC wall panels with counterweights, including I-beams, balanced main steel beams, counterweight steel beams, two steel lifting lugs I, two steel lifting lugs II, counterweights, four A steel wire rope is characterized in that the two ends of the balance main steel beam are welded with an I-beam and a counterweight steel beam, and the two sides of the middle part above the balance main steel beam are symmetrically welded with steel lifting lugs I, and the balance main steel beam is located above The steel lifting lugs Ⅱ are symmetrically welded on both sides of the end of the counterweight steel beam. A lifting hole is provided on the steel lifting lug Ⅱ. The counterweight is installed under the counterweight steel beam; the four steel wire ropes are connected to two The steel lifting lugs I and the two steel lifting lugs II are connected together and connected to an external car crane.
所述工字钢梁上设有多个起吊用的孔,根据PC墙板尺寸便于选择合适孔作为吊装点。The I-beam is provided with a plurality of holes for lifting, and it is convenient to select suitable holes as lifting points according to the size of the PC wallboard.
所述钢制吊耳Ⅰ上设有多个起吊用的孔,便于根据现场实际情况选择钢制吊耳Ⅰ合适孔作为起吊点。The steel lifting lug I is provided with a plurality of holes for lifting, so that it is convenient to select suitable holes for the steel lifting lug I as the lifting point according to the actual situation of the site.
所述配重块为钢制配重块。The counterweight is a steel counterweight.
本发明利用杠杆原理(类似塔吊的起重平衡原理)而设计一种平衡吊装装置。吊装装置一端为工字钢梁,用于吊装PC墙,工字钢梁上设置有多个PC墙板起吊孔,另一端为配重块,配重块按PC墙板最重重量、吊梁的总长度是否利于施工综合考虑其重量。吊装过程中,首先将PC墙板固定至平衡主钢梁PC墙板安装处,配重块安装至平衡主钢梁另一端,通过钢丝绳连接配重块段及悬挑吊装装置中间段的多个起吊孔。汽车吊连接该钢丝绳,则可一次起吊成功并安装至悬挑结构的PC墙板安装处。The invention uses the lever principle (similar to the lifting balance principle of a tower crane) to design a balance lifting device. One end of the hoisting device is an I-beam, which is used to hoist the PC wall. There are multiple PC wallboard lifting holes on the I-beam, and the other end is a counterweight. The counterweight is based on the heaviest weight of the PC wall. Whether the total length is conducive to the construction and consider its weight. During the hoisting process, first fix the PC wall panel to the PC wall panel installation location of the main balance steel beam, install the counterweight to the other end of the main balance steel beam, and connect the counterweight section and the middle section of the cantilever hoisting device through a wire rope. Lifting holes. The car crane is connected with the steel wire rope, and it can be successfully lifted and installed to the PC wall panel installation place of the cantilever structure at one time.
与传统悬挑结构下预制构件吊装相比,本发明直接采用机械吊装,人员仅做墙板调整,无需二次吊装安装,无需对二层楼板进行开孔,且全安装过程,所有荷载均直接作用于吊车上,对二层楼板不产生任何影响,排除了楼板开裂及坍塌的危险。Compared with the hoisting of prefabricated components under the traditional cantilever structure, the present invention directly adopts mechanical hoisting, the personnel only adjusts the wall panel, no secondary hoisting installation is required, and there is no need to open the second floor slab, and the whole installation process, all loads are directly Acting on the crane, it does not have any impact on the second floor slab, eliminating the risk of cracking and collapse of the floor slab.
附图说明Description of the drawings
图1为本发明的立面示意图。Figure 1 is a schematic elevation view of the present invention.
图2为本发明的平面图。Figure 2 is a plan view of the present invention.
图3为本发明的安装示意图。Figure 3 is a schematic diagram of the installation of the present invention.
图4为本发明的使用示意图。Figure 4 is a schematic diagram of the use of the present invention.
具体实施方式Detailed ways
下面结合附图对本发明进行详细的说明:The present invention will be described in detail below in conjunction with the accompanying drawings:
如图1、图2、图3所示,本发明包括工字钢梁1、平衡主钢梁2、配重钢梁3、两个钢制吊耳Ⅰ4、两个钢制吊耳Ⅱ5、钢制配重块6、四根钢丝绳7,平衡主钢梁2两端分别焊接工字钢梁1和配重钢梁3,所述工字钢梁1上设有多个起吊用的孔,平衡主钢梁2上方中间部位两侧分别对称焊接有钢制吊耳Ⅰ4,所述钢制吊耳Ⅰ4上设有多个起吊用的孔,平衡主钢梁2上方位于配重钢梁3端部两侧分别对称焊接有钢制吊耳Ⅱ5,钢制吊耳Ⅱ5上设有一个起吊用的孔,钢制配重块6安装在配重钢梁3下方;四根钢丝绳7分别与两个钢制吊耳Ⅰ4和两个钢制吊耳Ⅱ5相连后汇总成一体与外部的汽车吊相连。As shown in Figure 1, Figure 2, and Figure 3, the present invention includes I-beam 1, balance main steel beam 2, counterweight steel beam 3, two steel lifting lugs I4, two steel lifting lugs II5, steel The balance weight 6 and the four steel wire ropes 7 are prepared, and the two ends of the balance main steel beam 2 are welded with the I-beam 1 and the counterweight steel beam 3 respectively. The I-beam 1 is provided with a plurality of lifting holes for balance The two sides of the upper middle part of the main steel beam 2 are symmetrically welded with steel lifting lugs I4. The steel lifting lugs I4 are provided with multiple lifting holes. The upper part of the balance main steel beam 2 is located at the end of the counterweight steel beam 3 The two sides are symmetrically welded with steel lifting lugs Ⅱ5. The steel lifting lugs Ⅱ5 are provided with a lifting hole. The steel counterweight 6 is installed under the counterweight steel beam 3; the four wire ropes 7 are connected to the two steel The lifting lugs I4 and the two steel lifting lugs II5 are connected together and connected to an external car crane.
如图4所示,使用本发明吊装PC墙板吊装的方法,按以下步骤进行:根据PC墙板重量选择合适的钢制配重块安装至配重钢梁3下,根据PC墙板尺寸及现场实际情况选择工字钢梁1上的吊装点,根据现场实际情况选择平衡主钢梁2上钢制吊耳Ⅰ4合适的起吊点,用钢丝绳7将钢制吊耳Ⅰ4、钢制吊耳Ⅱ5进行可靠连接。汽车吊通过钢丝绳7将PC墙板吊起,水平移动至PC墙板安装部位,PC墙板距安装位置上方500mm高左右略作停顿,施工人员可以手扶墙板,控制墙板下落方向,预制挂板在此缓慢下降。待到距预埋钢筋顶部20mm处,利用反光镜进行钢筋与预留波纹盲孔的对位,预制挂板底部波纹盲孔位置与地面预埋钢筋位置对准后,将墙板缓慢下降,使之平稳就位。预制PC墙板就位后,将螺栓安装在PC钢梁上,先不预紧。根据之前控制线,调整预制构件的水平、垂直及标高,待均调整到误差范围内后将螺栓紧固到设计要求,将螺栓拧紧到设计要求即可。As shown in Figure 4, using the method for lifting PC wall panels of the present invention, proceed as follows: According to the weight of the PC wall panel, select a suitable steel counterweight and install it under the counterweight steel beam 3. According to the PC wall panel size and Choose the hoisting point on the I-beam 1 according to the actual situation of the site, choose the suitable hoisting point of the steel lifting lugs I4 on the balance main steel girder 2 according to the actual situation of the site, and use the steel wire rope 7 to connect the steel lifting lugs I4 and the steel lifting lugs II5 Make a reliable connection. The car crane lifts the PC wall panel through the wire rope 7 and moves it horizontally to the PC wall panel installation position. The PC wall panel is 500mm above the installation position and pauses slightly. The construction staff can hold the wall panel to control the falling direction of the wall panel and prefabricate it. The hanging board slowly descends here. When it is 20mm away from the top of the pre-embedded steel bar, use the reflector to align the steel bar and the reserved corrugated blind hole. After the corrugated blind hole at the bottom of the prefabricated hanging plate is aligned with the position of the embedded steel bar on the ground, slowly lower the wall panel to make It is in place smoothly. After the prefabricated PC wall panel is in place, install the bolts on the PC steel beam without pre-tightening. According to the previous control line, adjust the horizontal, vertical and elevation of the prefabricated components, and tighten the bolts to the design requirements after all adjustments are within the error range, and then tighten the bolts to the design requirements.

Claims (4)

  1. 一种带配重的PC墙板快速吊装装置,包括工字钢梁、平衡主钢梁、配重钢梁、两个钢制吊耳Ⅰ、两个钢制吊耳Ⅱ、配重块、四根钢丝绳,其特征在于:平衡主钢梁两端分别焊接工字钢梁和配重钢梁,平衡主钢梁上方中间部位两侧分别对称焊接有钢制吊耳Ⅰ,平衡主钢梁上方位于配重钢梁端部两侧分别对称焊接有钢制吊耳Ⅱ,钢制吊耳Ⅱ上设有一个起吊用的孔,配重块安装在配重钢梁下方;四根钢丝绳分别与两个钢制吊耳Ⅰ和两个钢制吊耳Ⅱ相连后汇总成一体与外部的汽车吊相连。A fast lifting device for PC wall panels with counterweights, including I-beams, balanced main steel beams, counterweight steel beams, two steel lifting lugs I, two steel lifting lugs II, counterweights, four A steel wire rope is characterized in that the two ends of the balance main steel beam are welded with an I-beam and a counterweight steel beam, and the two sides of the middle part above the balance main steel beam are symmetrically welded with steel lifting lugs I, and the balance main steel beam is located above The steel lifting lugs Ⅱ are symmetrically welded on both sides of the end of the counterweight steel beam. A lifting hole is provided on the steel lifting lug Ⅱ. The counterweight is installed under the counterweight steel beam; the four steel wire ropes are connected to two The steel lifting lugs I and the two steel lifting lugs II are connected together and connected to an external car crane.
  2. 根据权利要求1所述的带配重的PC墙板快速吊装装置,其特征在于:所述工字钢梁上设有多个起吊用的孔。The rapid lifting device for PC wall panels with counterweights according to claim 1, wherein the I-beam is provided with a plurality of lifting holes.
  3. 根据权利要求1或2所述的带配重的PC墙板快速吊装装置,其特征在于:所述钢制吊耳Ⅰ上设有多个起吊用的孔。The PC wall panel quick lifting device with counterweight according to claim 1 or 2, characterized in that: the steel lifting lug I is provided with a plurality of lifting holes.
  4. 根据权利要求3所述的带配重的PC墙板快速吊装装置,其特征在于:所述配重块为钢制配重块。The PC wall panel quick lifting device with counterweight according to claim 3, wherein the counterweight is a steel counterweight.
PCT/CN2020/132177 2019-12-02 2020-11-27 Counterweight-equipped device for quick hoisting of pc wall panel WO2021109932A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201922122929.2U CN211169496U (en) 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight
CN201922122929.2 2019-12-02
CN201911213445.7A CN110759222A (en) 2019-12-02 2019-12-02 Take quick hoist device of PC wallboard of counter weight
CN201911213445.7 2019-12-02

Publications (1)

Publication Number Publication Date
WO2021109932A1 true WO2021109932A1 (en) 2021-06-10

Family

ID=76221423

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/132177 WO2021109932A1 (en) 2019-12-02 2020-11-27 Counterweight-equipped device for quick hoisting of pc wall panel

Country Status (1)

Country Link
WO (1) WO2021109932A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675961A (en) * 1970-06-24 1972-07-11 Charles B Wheeler Horizontal load positioner
CN203545437U (en) * 2013-10-19 2014-04-16 甘肃酒钢集团宏兴钢铁股份有限公司 Stainless steel cold rolling tension roller balance crane
CN104140037A (en) * 2014-07-29 2014-11-12 南京奥捷墙体材料有限公司 Wallboard lifting system
CN204265214U (en) * 2014-11-13 2015-04-15 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of cold rolling shot-blasting machine auger loader maintenance suspender
CN107879239A (en) * 2017-11-24 2018-04-06 常德远大建筑工业有限公司 A kind of out-hung panel hanging method
CN110759222A (en) * 2019-12-02 2020-02-07 中建三局第二建设工程有限责任公司 Take quick hoist device of PC wallboard of counter weight
CN211169496U (en) * 2019-12-02 2020-08-04 中建三局第二建设工程有限责任公司 Take quick hoist device of PC wallboard of counter weight

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675961A (en) * 1970-06-24 1972-07-11 Charles B Wheeler Horizontal load positioner
CN203545437U (en) * 2013-10-19 2014-04-16 甘肃酒钢集团宏兴钢铁股份有限公司 Stainless steel cold rolling tension roller balance crane
CN104140037A (en) * 2014-07-29 2014-11-12 南京奥捷墙体材料有限公司 Wallboard lifting system
CN204265214U (en) * 2014-11-13 2015-04-15 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of cold rolling shot-blasting machine auger loader maintenance suspender
CN107879239A (en) * 2017-11-24 2018-04-06 常德远大建筑工业有限公司 A kind of out-hung panel hanging method
CN110759222A (en) * 2019-12-02 2020-02-07 中建三局第二建设工程有限责任公司 Take quick hoist device of PC wallboard of counter weight
CN211169496U (en) * 2019-12-02 2020-08-04 中建三局第二建设工程有限责任公司 Take quick hoist device of PC wallboard of counter weight

Similar Documents

Publication Publication Date Title
CN106193618B (en) A kind of aerial steel structure truss construction of Long span
CN110759222A (en) Take quick hoist device of PC wallboard of counter weight
CN201411900Y (en) Hydraulic die lifter for chimneys
CN110562868B (en) Hoisting construction method for unit type glass curtain wall of super high-rise building
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN105692470A (en) Internal climbing tower crane and operating method thereof
CN111395641A (en) Precast concrete external wallboard and construction method thereof
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN114215170A (en) Method for lifting super-altitude giant hanging multi-layer connected structure
CN110905261A (en) Ultra-large-span closed stock ground structure for multiple material piling and taking machines and construction method thereof
CN112627550A (en) Hoisting construction method for ultrahigh single-layer portal frame steel structure
CN211169496U (en) Take quick hoist device of PC wallboard of counter weight
WO2021109932A1 (en) Counterweight-equipped device for quick hoisting of pc wall panel
CN107419907A (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN107675792A (en) Steel construction is encorbelmented gallery structure and construction method
CN108894509B (en) Steel structure assembly type house prefabricated sandwich heat-insulation external wall panel construction method without external frame
CN109594697B (en) Construction method and structure of super high-rise built-in unit glass curtain wall
CN214653269U (en) Simple ALC wallboard hoisting equipment
CN114382015A (en) Construction method for vertical rotation of special-shaped steel main tower of cable-stayed bridge
CN108862002B (en) Hoisting device and hoisting method for ultrathin steel plate shear wall in tower crane blind area
CN111188273A (en) Large-section steel truss girder erection system of large-span steel-concrete composite bridge and construction method
CN218757009U (en) Low-clearance steel support replacing structure below trestle bridge
CN205346600U (en) Big plate -girder hoist and mount specialized tool
CN215249037U (en) Assembled outer wall hoist and mount and fixed establishment
CN215331380U (en) Rail type suspension platform

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20896250

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20896250

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20896250

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 16/01/2023)