CN107419907A - A kind of steel-making tower steel structure platform is staggered installation of welding method - Google Patents
A kind of steel-making tower steel structure platform is staggered installation of welding method Download PDFInfo
- Publication number
- CN107419907A CN107419907A CN201710779990.7A CN201710779990A CN107419907A CN 107419907 A CN107419907 A CN 107419907A CN 201710779990 A CN201710779990 A CN 201710779990A CN 107419907 A CN107419907 A CN 107419907A
- Authority
- CN
- China
- Prior art keywords
- platform
- prop
- lower prop
- steel
- welding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 59
- 239000010959 steel Substances 0.000 title claims abstract description 59
- 238000003466 welding Methods 0.000 title claims abstract description 52
- 238000009434 installation Methods 0.000 title claims abstract description 43
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000009628 steelmaking Methods 0.000 title claims abstract description 9
- 239000010410 layer Substances 0.000 claims abstract description 66
- 238000010276 construction Methods 0.000 claims abstract description 20
- 238000005259 measurement Methods 0.000 claims abstract description 10
- 239000011229 interlayer Substances 0.000 claims abstract description 4
- 239000000725 suspension Substances 0.000 claims description 7
- 238000005476 soldering Methods 0.000 claims description 3
- 238000011900 installation process Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Welding method is staggered installation of the invention discloses a kind of steel-making tower steel structure platform, using supporting role of the halfpace during interlayer stage+module, is resisted due to welding deformation caused by welding concentrated stress, its step is substantially:First, preparation of construction:1), basic repetition measurement;2), component is marched into the arena repetition measurement;2nd, lower platform and component installation:Steel column is first installed, then one layer of platform and two-layer platform are installed successively, one layer of platform is welded after two-layer platform installs;3rd, upper brace and component installation:Upper prop is installed, then installs three layers of platform member, two-layer platform is welded after installing, with this upward erecting and welding.The erecting and welding method of the present invention, ensure that the orderly progress of erecting and welding, while improve efficiency of construction and installation accuracy.
Description
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of steel-making tower steel structure platform is staggered installation of welding side
Method.
Background technology
The skyscraper of full steel structure compares more at home at present, and main pooled applications are in conference and exhibition center, grand theater, physical culture
In terms of shop and indivedual Business Buildings.And the high-rise steel structure of metallurgical system construction is concentrated mainly on converter and blast furnace region, highly exist
60m or 80m or so.The characteristics of converter system steel structure platform is that the more discrepancy in elevation of layer are big, and centralized arrangement has jumbo, converter system
The comprehensive progress of Steel Structure Installation directly affects the installation effectiveness of steelmaking system.
In general, technique steel construction in converter region takes incremental pattern to be installed by chapter, lift, install,
The installation of landing beam, welding etc., but for multi-storey steel structure installation, welding sequence has a great influence to structure both shrinks how
Ensure that it is the emphasis controlled to make steel tower steel structure platform and in order, precisely install.
The content of the invention
The purpose of this invention is welded aiming in steel-making high building multi-storey steel structure conventional mounting welding process due to concentrating
Scoop out power and cause the skew of steel columns of steel structures perpendicularity, welding contraction distortion, solve control platform erecting and welding method, to improve
The efficiency of Steel Structure Installation, quality stability and the problem of reduce job safety risk.
To solve the above problems, the present invention provides following technical scheme:
A kind of steel-making tower steel structure platform is staggered installation of welding method, is in interlayer stage+module using halfpace
During supporting role, resist due to welding deformation caused by welding concentrated stress, its construction procedure is as follows:
Step 1: preparation of construction
A, surveying setting-out, repetition measurement is carried out to steel-column foundation using theodolite and spirit level, measuring goes out steel-column foundation in length and breadth
To center line;
B, component site acceptance, the component marched into the arena is checked, the size of component carries out repetition measurement and is identified;
Step 2: lower platform and component installation
A, lower prop I, lower prop II, lower prop III are lifted successively, and lower prop I, lower prop II, lower prop are measured using theodolite and spirit level
III perpendicularity and absolute altitude;
B, once grouting is carried out after centering to lower prop I, lower prop II, lower prop III, grouting height control is away from steel column base
Plinth upper surface about 200mm;
C, one layer of platform of construction:
Construction transverse frame beam and vertical Vierendeel girder:First installation transverse frame beam between lower prop I and lower prop II, utilize
Crane gear lifts Vierendeel girder the bracket upper surface to steel column I and steel column II, Vierendeel girder is kept water with steel column I and steel column II
It is flat, connecting plate I is installed and high-strength bolt that both sides take, high-strength bolt, which need to pass through, just twists and twist eventually;
Vertical Vierendeel girder is identical with the mode of installation transverse frame beam with the connected mode of steel column;Consequently, it is possible to vertical frame
Set a roof beam in place, transverse frame beam lower prop I, lower prop II, lower prop III are connected it is integral, connected mode be high-strength bolt connection, wouldn't weld
Connect;
Construct vertical platform secondary beam and horizontal platform secondary beam:After girder I and girder II are installed, lifted using crane gear
Secondary beam, connecting plate II, installation bolt, then welded seam are installed successively;Other vertical platform secondary beam, horizontal platforms in the platform
Secondary beam mounting means is identical;
D, construct two-layer platform, the component mounting means same layer platform in two-layer platform;
E, start to weld the component in one layer of platform after two-layer platform installs;First soldering frame is set a roof beam in place and steel column I, steel column
The beam upper end weld seam of II connection, then welded grider lower end weld seam;
Step 3: upper brace and component installation
A, while Member Welding in one layer of platform, start that upper prop I, upper prop II, upper prop III are installed, and respectively with
Post I, lower prop II, the butt welding of lower prop III;
Component in three layers of platform, mounting means same layer platform and two-layer platform are installed b,;
C, after the component in three layers of platform installs, then the Vierendeel girder carried out in two-layer platform connects with steel column I, steel column II
The welding of the beam upper end weld seam, beam lower end weld seam that connect, the welding manner of welding manner same layer platform;
D, the component installation in four layers of platform is carried out, mounting means is identical with last layer platform, then carries out three layers of platform
Interior Vierendeel girder connecting welding work;
E, the Vierendeel girder connecting welding work in four layers of platform is finally carried out;
F, back-grouting work is carried out to the suspension column of lower prop I, lower prop II, lower prop III.
Further, in above-mentioned steps three the installation centering of upper prop I, upper prop II, upper prop III with the lower prop in step 2, but
The centering point of perpendicularity is with upper prop I, upper prop II, the top center of upper prop III and lower prop I, lower prop II, the suspension column center pair of lower prop III
It should be worth.
Compared with prior art, beneficial effects of the present invention are:
1) this method avoids because Vierendeel girder concentration welding and caused by welding deformation and influence the perpendicularity of steel column, then
The difficulty for causing upper platform to install, ensure the orderly progress of erecting and welding, improve efficiency of construction and installation accuracy;
2) present invention improves product quality and operating efficiency, significantly reduces security risk, reduces large-scale crane
Using man-hour, engineering cost is reduced;With practicality and operability.
Brief description of the drawings
Fig. 1 is the elevation of steel structure platform construction of the present invention;
Fig. 2 is the top view of steel structure platform construction of the present invention;
Fig. 3 is beam-column scheme of installation of the present invention;
Fig. 4 is the scheme of installation of middle girder and secondary beam of the present invention;
In figure:
1- steel-column foundations, 2- lower props I, 3- lower props II, 4- lower props III, mono- layer of platform of 5-, 6- two-layer platforms, 7- steel columns, 8-
Vertical Vierendeel girder, 9- transverse frames beam, the vertical platform secondary beams of 10-, 11- horizontal platforms secondary beam, 12- upper props I, 13- upper props II,
14- upper props III, tri- layers of platforms of 15-, tetra- layers of platforms of 16-, 17- once groutings, 18- back-groutings, 19- steel columns I, 20- steel columns II,
21- Vierendeel girders, 22- connecting plates I, 23- high-strength bolts, 24- beams upper end weld seam, 25- beams lower end weld seam, 26- girders I, 27- girders
IIth, 28- connecting plates II, 29- installation bolts, 30- weld seams, 31- secondary beams.
Embodiment
To further describe the present invention, with reference to implementing, the invention will be further described with accompanying drawing.
As shown in Figures 1 to 4, a kind of tower steel structure platform of making steel of the present invention is staggered installation of welding method, is to utilize
Supporting role of the halfpace during interlayer stage+module, resist due to welding deformation caused by welding concentrated stress, its
Construction procedure is as follows:
Step 1: preparation of construction
A, surveying setting-out, repetition measurement is carried out to steel-column foundation 1 using theodolite and spirit level, carries out repetition measurement and be to ensure that steel column hangs down
The premise of straight degree installation quality, then measuring go out the vertically and horizontally center line of steel-column foundation 1;
B, component site acceptance, the component marched into the arena is checked, the size of component carries out repetition measurement and is identified.
Step 2: lower platform and component installation
A, lower prop I 2, lower prop II 3, lower prop III 4 are lifted successively, and lower prop I 2, lower prop II are measured using theodolite and spirit level
3rd, the perpendicularity and absolute altitude of lower prop III 4, the measurement of perpendicularity should be carried out from capital to suspension column;
B, once grouting 17 is carried out after centering to lower prop I 2, lower prop II 3, lower prop III 4, grouting height control is away from steel
The upper surface of column foundation 1 about 200mm, to ensure the stability of steel column;
C, one layer of platform 5 of construction:
Construction transverse frame beam 9 and vertical Vierendeel girder (8):First installation transverse frame between lower prop I 2 and lower prop II 3
Beam 9, Vierendeel girder 21 is lifted into bracket upper surface to steel column I 19 and steel column II 20 using crane gear, makes Vierendeel girder 21 and steel
Post I 19 and the keep level of steel column II 20, install the high-strength bolt 23 that connecting plate I 22 and both sides take, high-strength bolt 23 need by
Just twist and twist eventually;
Vertical Vierendeel girder 8 is identical with the mode of installation transverse frame beam 9 with the connected mode of steel column 7;It is consequently, it is possible to vertical
Vierendeel girder 8, transverse frame beam 9 are integral by lower prop I 2, lower prop II 3, the connection of lower prop III 4, and connected mode is that high-strength bolt 23 connects
Connect, wouldn't weld;
Construct vertical platform secondary beam 10 and horizontal platform secondary beam 11:After girder I 26 and girder II 27 are installed, lifting is utilized
Equipment hoisting secondary beam 31, connecting plate II 28, installation bolt 29, then welded seam 30 are installed successively;Other in the platform are vertical
Platform secondary beam 10, the mounting means of horizontal platform secondary beam 11 are same;
D, construct two-layer platform 6, the component mounting means same layer platform 5 in two-layer platform 6;
E, two-layer platform 6 starts to weld the component in one layer of platform 5 after installing;First soldering frame set a roof beam in place 21 with steel column I
19th, the beam upper end weld seam 24 that steel column II 20 connects, then welded grider lower end weld seam 25;
Step 3: upper brace and component installation
A, while Member Welding in one layer of platform 5, start that upper prop I 12, upper prop II 13, upper prop III 14 are installed, and
Respectively with lower prop I 2, lower prop II 3, the butt welding of lower prop III 4;
Component in three layers of platform 15, mounting means same layer platform 5 and two-layer platform 6 are installed b,;
C, after the component in three layers of platform 15 installs, then carry out Vierendeel girder 21 in two-layer platform 6 and steel column I 19,
The welding of beam upper end weld seam 24, beam lower end weld seam 25 that steel column II 20 connects, the welding manner of welding manner same layer platform 5;
D, the component installation in four layers of platform 16 is carried out, mounting means is identical with last layer platform 5, then carries out three layers and put down
The connecting welding of Vierendeel girder 21 work in platform 15;
E, the connecting welding of Vierendeel girder 21 work in four layers of platform 16 is finally carried out;
F, the suspension column progress back-grouting 18 to lower prop I 2, lower prop II 3, lower prop III 4 works.
In the present embodiment, in step 3 the installation centering of upper prop I 12, upper prop II 13, upper prop III 14 with step 2
Lower prop, but the centering point of perpendicularity be with upper prop I 12, upper prop II 13, the top center of upper prop III 14 and lower prop I 2, lower prop II 3, under
The suspension column center respective value of post III 4.
In the present embodiment, the welding of Vierendeel girder 21 is carried out after stage+module above it, and two-layer platform 6 is pacified
Install and finish one layer of platform 5 of welding, three layers of construction of platform 15 finish welding two-layer platform 6, by that analogy until last layer of platform
Welding is completed.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (2)
1. a kind of steel-making tower steel structure platform is staggered installation of welding method, it is characterized in that:Put down using halfpace in interlayer
Supporting role in platform installation process, resist because welding deformation, its construction procedure are as follows caused by welding concentrated stress:
Step 1: preparation of construction
A, surveying setting-out, repetition measurement is carried out to steel-column foundation (1) using theodolite and spirit level, measuring goes out the vertical of steel-column foundation (1)
Cross central line;
B, component site acceptance, the component marched into the arena is checked, the size of component carries out repetition measurement and is identified;
Step 2: lower platform and component installation
A, lower prop I (2), lower prop II (3), lower prop III (4) are lifted successively, using theodolite and spirit level measure lower prop I (2), under
Post II (3), the perpendicularity of lower prop III (4) and absolute altitude;
B, once grouting (17) is carried out after centering to lower prop I (2), lower prop II (3), lower prop III (4), grouting height control exists
Away from steel-column foundation (1) upper surface about 200mm;
C, one layer of platform (5) of construction:
Construction transverse frame beam (9) and vertical Vierendeel girder (8):First installation transverse direction frame between lower prop I (2) and lower prop II (3)
Set a roof beam in place (9), Vierendeel girder (21) is lifted to the bracket upper surface of steel column I (19) and steel column II (20) using crane gear, makes frame
Set a roof beam in place (21) and steel column I (19) and steel column II (20) keep level, connecting plate I (22) is installed and high-strength bolt that both sides take
(23), high-strength bolt (23), which need to pass through, just twists and twists eventually;
Vertical Vierendeel girder (8) is identical with the mode of installation transverse frame beam (9) with the connected mode of steel column (7);It is consequently, it is possible to perpendicular
To Vierendeel girder (8), transverse frame beam (9) that lower prop I (2), lower prop II (3), lower prop III (4) connection is integral, connected mode is
High-strength bolt (23) connects, and wouldn't weld;
Construct vertical platform secondary beam (10) and horizontal platform secondary beam (11):After girder I (26) and girder II (27) installation, utilize
Crane gear lifting secondary beam (31), connecting plate II (28), installation bolt (29), then welded seam (30) are installed successively;The platform
Interior other vertical platform secondary beams (10), horizontal platform secondary beam (11) mounting means are identical;
D, construct two-layer platform (6), the component mounting means same layer platform (5) in two-layer platform (6);
E, two-layer platform (6) starts to weld the component in one layer of platform (5) after installing;First soldering frame is set a roof beam in place (21) and steel column
I (19), the beam upper end weld seam (24) of steel column II (20) connection, then welded grider lower end weld seam (25);
Step 3: upper brace and component installation
A, while Member Welding in one layer of platform (5), start that upper prop I (12), upper prop II (13), upper prop III are installed
(14), and respectively with lower prop I (2), lower prop II (3), lower prop III (4) butt welding;
Component in three layers of platform (15), mounting means same layer platform (5) and two-layer platform (6) b, are installed;
C, after the component in three layers of platform (15) installs, then the Vierendeel girder (21) and steel column I in two-layer platform (6) are carried out
(19), the welding of the beam upper end weld seam (24), beam lower end weld seam (25) of steel column II (20) connection, welding manner same layer platform
(5) welding manner;
D, the component installation in four layers of platform (16) is carried out, mounting means is identical with last layer platform (5), then carries out three layers and put down
Vierendeel girder (21) connecting welding work in platform (15);
E, Vierendeel girder (21) connecting welding work in four layers of platform (16) is finally carried out;
F, back-grouting (18) work is carried out to the suspension column of lower prop I (2), lower prop II (3), lower prop III (4).
2. a kind of steel-making tower steel structure platform according to claim 1 is staggered installation of welding method, it is characterized in that:Step
Upper prop I (12) in rapid three, upper prop II (13), the installation centering of upper prop III (14) are with the lower prop in step 2, but perpendicularity is looked for
It is with upper prop I (12), upper prop II (13), upper prop III (14) top center and lower prop I (2), lower prop II (3), lower prop III (4) on schedule
Suspension column center respective value.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710779990.7A CN107419907B (en) | 2017-09-01 | 2017-09-01 | A kind of steel-making tower steel structure platform is staggered installation of welding method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710779990.7A CN107419907B (en) | 2017-09-01 | 2017-09-01 | A kind of steel-making tower steel structure platform is staggered installation of welding method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107419907A true CN107419907A (en) | 2017-12-01 |
| CN107419907B CN107419907B (en) | 2019-08-06 |
Family
ID=60435632
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710779990.7A Active CN107419907B (en) | 2017-09-01 | 2017-09-01 | A kind of steel-making tower steel structure platform is staggered installation of welding method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107419907B (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984637A (en) * | 2019-12-09 | 2020-04-10 | 中国十七冶集团有限公司 | Steel structure modular installation method for steelmaking oxygen lance valve station |
| CN112127477A (en) * | 2020-10-30 | 2020-12-25 | 中国十七冶集团有限公司 | Large-scale steel-making high-span solid-web type steel column and installation method thereof |
| CN114045370A (en) * | 2021-10-29 | 2022-02-15 | 中国华冶科工集团有限公司 | Method and device for quickly installing blast furnace body frame |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0932349A (en) * | 1995-07-24 | 1997-02-04 | Shimizu Corp | Construction method of building |
| CN104563512A (en) * | 2015-01-30 | 2015-04-29 | 上海绿地建设(集团)有限公司 | Construction method of tall building steel structure |
| CN104631844A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Steel column mounting operation platform and mounting method thereof |
-
2017
- 2017-09-01 CN CN201710779990.7A patent/CN107419907B/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0932349A (en) * | 1995-07-24 | 1997-02-04 | Shimizu Corp | Construction method of building |
| CN104631844A (en) * | 2014-12-31 | 2015-05-20 | 上海市机械施工集团有限公司 | Steel column mounting operation platform and mounting method thereof |
| CN104563512A (en) * | 2015-01-30 | 2015-04-29 | 上海绿地建设(集团)有限公司 | Construction method of tall building steel structure |
Non-Patent Citations (2)
| Title |
|---|
| 李俊龙: "某转炉炼钢厂塔楼改建工程钢结构安装技术", 《施工技术》 * |
| 李俊龙: "韶钢三钢3号转炉工程塔楼钢结构安装施工技术", 《南方金属》 * |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984637A (en) * | 2019-12-09 | 2020-04-10 | 中国十七冶集团有限公司 | Steel structure modular installation method for steelmaking oxygen lance valve station |
| CN112127477A (en) * | 2020-10-30 | 2020-12-25 | 中国十七冶集团有限公司 | Large-scale steel-making high-span solid-web type steel column and installation method thereof |
| CN114045370A (en) * | 2021-10-29 | 2022-02-15 | 中国华冶科工集团有限公司 | Method and device for quickly installing blast furnace body frame |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107419907B (en) | 2019-08-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103291076B (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
| CN102296858B (en) | Cement production line clinker storage warehouse roof steel structure and construction method thereof | |
| CN114232805B (en) | Construction method of ultrahigh-height large-span steel concrete beam hanging structure | |
| CN205558304U (en) | Hoist and mount system of large -scale steel gallery truss | |
| CN106703416A (en) | Lifting method of steel structure roof truss pulling bar in narrow space | |
| CN110847375A (en) | A large-span truss construction method and large-span truss structure | |
| CN107060070A (en) | Load transfer device and construction method for hoisting steel gallery by using same | |
| CN113914223A (en) | High-pier arc-shaped upper cross beam light-weight bracket system and mounting method thereof | |
| CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
| CN116043713A (en) | A Method for Erection of Steel Girders of Suspension Bridge by Vertical Assembly and Lifting in Air | |
| CN102337782A (en) | Lift system for constructing truss platform on top of tall and large space and construction method for lift system | |
| CN107419907B (en) | A kind of steel-making tower steel structure platform is staggered installation of welding method | |
| CN103216103A (en) | Pre-deformation construction method for mounting oblique-arc-shaped combined steel-structured column of annular roof | |
| CN205558306U (en) | Big profiled steel structure vestibule hoist and mount hoisting frame | |
| CN102777044B (en) | Hoisting method of steel-structured spraying layer of urea prilling tower | |
| CN110984637B (en) | Steel structure modular installation method for steelmaking oxygen lance valve station | |
| CN107675792A (en) | Steel construction is encorbelmented gallery structure and construction method | |
| CN110318468B (en) | Auxiliary device and method for installing eccentric space net rack | |
| CN117145043A (en) | Prefabricated corridor, corridor end connection structure and construction method | |
| CN107934778A (en) | The lifting erecting device and method of AP1000 nuclear island super large shield doors | |
| CN113323404A (en) | Installation method of integrated steel truss | |
| CN102259794A (en) | Method for installing overall combined type crane beam | |
| CN113404199B (en) | Installation method of umbrella-shaped roof structure | |
| CN113585097B (en) | Construction process suitable for mounting bridge girder erection machine | |
| CN105908978A (en) | Integral hoisting method of deformed steel roof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |