CN105048317B - A kind of installation method of in-site installation suspension type valve tower - Google Patents
A kind of installation method of in-site installation suspension type valve tower Download PDFInfo
- Publication number
- CN105048317B CN105048317B CN201510356636.4A CN201510356636A CN105048317B CN 105048317 B CN105048317 B CN 105048317B CN 201510356636 A CN201510356636 A CN 201510356636A CN 105048317 B CN105048317 B CN 105048317B
- Authority
- CN
- China
- Prior art keywords
- valve group
- top layer
- valve
- suspention
- lower floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 62
- 239000000725 suspension Substances 0.000 title claims abstract description 40
- 238000000034 method Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 15
- 239000010959 steel Substances 0.000 claims abstract description 15
- 239000012212 insulator Substances 0.000 claims description 9
- 238000010276 construction Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The present invention provides a kind of installation method of in-site installation suspension type valve tower, first, the top layer valve group of lift valve tower to setting height has been suspended in midair using jack up unit, the setting height refers to the height that the staff being available on field ground will be arranged on below top layer valve group close to first lower floor's valve group of top layer valve group, then by jack up unit step up top layer valve group and during stepping up by the staff on field ground being sequentially connected in series below first lower floor's valve group from top to bottom by remaining each lower floor's valve group successively, finally, the height that the lower end for continuing to lift up the suspention attachment structure that extremely can be connected on the top girder steel built at the scene for top layer valve group and top by top layer valve group by jack up unit is connected, and top layer valve group is connected with the lower end of the suspention attachment structure.Installation effectiveness is high, is effectively reduced the work high above the ground time of staff, reduces difficulty of construction and construction risk, while, it is not necessary to staff possesses work high above the ground experience, reduces the requirement to staff.
Description
Technical field
The present invention relates to a kind of installation method of in-site installation suspension type valve tower.
Background technology
Converter valve plays act as the nucleus equipment of DC transmission system to the reliable and stable operation of lifting DC transmission system
The effect of sufficient weight, is that country advocates the technology for developing, encouraging innovations energetically.Converter valve equipment on-site installation work is that equipment is thrown
Important step before fortune, its mounting process technology directly determines that can converter valve equipment or even whole DC power transmission line be grown
Phase, safe and reliable operation.Therefore, converter valve equipment Installation Technology is improved to play the reliability service for improving converter valve equipment
Very important effect.
Converter valve design mainly uses indoor suspension type valve tower structure, and the design of suspension type valve tower structure is simple, and has
Good anti-seismic performance.At present, use disclosed in the Chinese invention patent application such as application publication number for CN102611097A more
The assemble method of flexible DC power transmission suspension type valve tower suspension type valve tower is installed, during installation, first pass through suspention attachment structure
By the hanging of top layer valve group below the girder steel of valve Room building, then successively will be each by suspending attachment structure in midair below top layer valve group
Individual lower floor's valve group is suspended in the lower section of top layer valve group.
When in use, whole installation process needs by electric block and hoistable platform, all assemblings above-mentioned assemble method
Connection work is required for carrying out operation in high-altitude, it is necessary to hoistable platform is back and forth lifted, and difficulty of construction is big, risk is big, to liter
Drop platform is higher by degree, and whole scene installment work is less efficient.
The content of the invention
The present invention provides a kind of installation method of in-site installation suspension type valve tower, to solve to be suspended in midair present in prior art
The in-site installation of formula valve tower is mainly causes in-site installation danger technical problem high, less efficient in work high above the ground.
The technical scheme of the installation method of in-site installation suspension type valve tower provided by the present invention is:A kind of in-site installation hangs
The installation method of hanging valve tower, first, the top layer valve group of lift valve tower has been suspended in midair to setting height using jack up unit, and the setting is high
Spend to be available for the staff on field ground that first lower floor's valve group close to top layer valve group of valve tower is arranged on into top layer valve group
The height of lower section, then steps up top layer valve group and during stepping up by the work on field ground by jack up unit
Personnel's being sequentially connected in series below first lower floor's valve group from top to bottom by remaining each lower floor's valve group successively, finally, is filled by raising
Put and continue to lift up top layer valve group and extremely the suspention that top layer valve group and top are connected on the top girder steel built at the scene can be connected knot
The connected height in the lower end of structure, and top layer valve group is connected with the lower end of the suspention attachment structure.
Before using top layer valve group to the setting height described in jack up unit suspention raising, by the suspention connection knot
The top of structure is connected on the top girder steel built at the scene.
Described suspention attachment structure is suspension insulator.
First described lower floor's valve group by suspend in midair with the suspention attachment structure identical draw bail be serially connected in it is described
Top layer valve group lower section, described remaining each lower floor's valve group is passed sequentially through suspends in midair with the suspention attachment structure identical draw bail
It is serially connected in corresponding lower floor's valve group lower section.
Described jack up unit is many electric blocks of synchronization action of fixed building top at the scene.
Described top layer valve group includes top frame and the valve layer top apparatus in top frame, and jack up unit leads to
Cross suspention raising top frame to the setting height and during raising by the staff on field ground by valve layer top
Portion's equipment is arranged in top frame and top layer valve group is risen into setting height with described in realization.
The beneficial effects of the invention are as follows:In the installation method of in-site installation suspension type valve tower provided by the present invention, first
The top layer valve group of valve tower is suspended in midair using jack up unit has risen to setting height to cause that the staff on field ground can be by
First lower floor's valve group is arranged on top layer valve group lower section, then by remaining each lower floor's valve group during top layer valve group is stepped up
Be sequentially connected in series below first lower floor's valve group, finally again by top layer valve group be connected on the top girder steel built at the scene in advance
The lower end for suspending attachment structure in midair is connected, and is finally completed the in-site installation of suspension type valve group, in-site installation side provided by the present invention
In method, stepped up during top layer valve group moves up in uprisal device, by the staff on field ground by each
Lower floor's valve group lower section for being connected in top layer valve group successively, with the scene for carrying out work high above the ground by hoistable platform in the prior art
Installation method is compared, and not only installation effectiveness is high, is also effectively reduced the work high above the ground time of staff, is effectively reduced to lifting
The degree of dependence of platform, reduces work high above the ground danger, reduces difficulty of construction and construction risk, while, it is not necessary to staff has
Standby work high above the ground experience, reduces the requirement to staff.
Further, jack up unit is many electric blocks of synchronization action of fixed building top at the scene, using same
The electric block of step action, can not only lift Hoisting Security coefficient, can also lift site operation efficiency, reduce construction cost.
Further, jack up unit is by suspending raising top frame in midair to the setting height and during raising by existing
Be arranged on valve layer top apparatus in top frame and rise to top layer valve group with described in realization by the staff on Ground
Setting height, during top layer valve group is assembled, has been realized rising to the setting height, and top layer valve group is assembled not in addition
Individually arrangement installation time, improves operating efficiency.
Brief description of the drawings
Fig. 1 is the installation method in-site installation suspension type valve tower for using in-site installation suspension type valve tower provided by the present invention
The step of one schematic diagram;
Fig. 2 is the installation method in-site installation suspension type valve tower for using in-site installation suspension type valve tower provided by the present invention
The step of two in suspend in midair top layer valve group top frame schematic diagram;
Fig. 3 is the installation method in-site installation suspension type valve tower for using in-site installation suspension type valve tower provided by the present invention
The step of two in top frame install valve layer top apparatus schematic diagram;
Fig. 4 is the installation method in-site installation suspension type valve tower for using in-site installation suspension type valve tower provided by the present invention
The step of two in the schematic diagram of each lower floor's valve group is installed successively;
Fig. 5 is the installation method in-site installation suspension type valve tower for using in-site installation suspension type valve tower provided by the present invention
The step of three schematic diagrames.
Specific embodiment
A kind of embodiment of the installation method of in-site installation suspension type valve tower, the installation method in the embodiment is as follows:
First, suspended the top layer valve group of lift valve tower in midair to setting height using jack up unit, the setting height refer to be available for it is existing
The height that staff on Ground will be arranged on below top layer valve group close to first lower floor's valve group of top layer valve group;
Then, top layer valve group is stepped up and during stepping up by the work people on field ground by jack up unit
Member's being sequentially connected in series below first lower floor's valve group from top to bottom by remaining each lower floor's valve group successively;
Finally, continuing to lift up top layer valve group by jack up unit extremely can be by the connected top built at the scene of top layer valve group and top
The connected height in the lower end of the suspention attachment structure on portion's girder steel, and top layer valve group is consolidated with the lower end of the suspention attachment structure
Even.
In this installation embodiment of the method, suspention attachment structure is specially suspension insulator, and jack up unit is specially fixed
The many electric blocks of synchronization action on the top girder steel built at the scene.
In fact, can be before using top layer valve group to the setting height described in jack up unit suspention raising, will be described
The top for suspending attachment structure in midair is connected on the top girder steel built at the scene.
In the suspension type valve tower 10 of the installation method in-site installation converter valve provided using above-described embodiment, can be according to
Step is carried out as shown in Figures 1 to 5:
Step one, as shown in figure 1, fixed in advance as the outstanding of suspention attachment structure on the top girder steel 1 built at the scene
Insulator 2 is hung, upper end and the top girder steel 1 of suspension insulator 2 are connected, and four synchronization actions of installation on top girder steel 1
Electric block 3 is constituting jack up unit.
Step 2, as shown in Figure 2 to Figure 3, top frame 4 is included and in top frame 4 due to top layer valve group
Valve layer top apparatus, the top frame 4 of the top layer valve group that first can be sling first by electric block lifts by crane top frame in electric block
During 4, valve layer top apparatus are arranged in top frame 4 on the ground by the staff on field ground 5, with complete
Into the assembling of top layer valve group, meanwhile, whole top layer valve group is lifted by crane to setting height, setting height refers to the work being available on field ground
Making personnel will be arranged on height below top layer valve group, and then, ground at the scene close to first lower floor's valve group of top layer valve group
On staff when top layer valve group is promoted at setting height, can be close to the first lower floor valve group suspention string of top layer valve group
The lower section of top layer valve group is connected on, then, top layer valve group is stepped up and during stepping up by live ground by jack up unit
Staff on face being sequentially connected in series below first lower floor's valve group from top to bottom by remaining each lower floor's valve group 6 successively, and
And, described remaining each lower floor's valve group 6 is passed sequentially through and is connected in suspension insulator structure identical draw bail suspention
Corresponding lower floor's valve group lower section, after whole suspension type valve tower is completed on the ground, is integrally slowly lifted by crane with electric block,
Until by the top frame 4 of the top layer valve group of suspension type valve tower 10 and be connected in top girder steel on suspension insulator 2 lower end
It is fixed together.
Step 3, as shown in figure 5, removing the electric block on the girder steel of top.
It is above-mentioned in actual use, step one be preparation, and step 3 then be round-off work.
In the embodiment of above-mentioned installation method, top layer valve group includes top frame and the valve layer top in top frame
Portion's equipment, jack up unit is by suspending raising top frame in midair to the setting height and during raising by field ground
Be arranged on valve layer top apparatus in top frame top layer valve group risen into setting height with described in realization by staff.On
The valve layer top apparatus the stated structure such as including top barrier cover and corresponding valve module.In other embodiments, it is also possible in advance
Top layer valve group is assembled, the top layer valve group for having assembled to setting height is directly lifted by crane by jack up unit.
In above-mentioned installation method, suspention attachment structure uses suspension insulator, in other embodiments, suspends attachment structure in midair
Draw bail commonly used in the prior art can also be used.
In above-mentioned installation method, each lower floor's valve group can successively suspend concatenation in midair by suspension insulator, it would however also be possible to employ existing
The connecting mode for having each lower floor's valve group of suspension type valve tower in technology is coupled successively.
Claims (5)
1. a kind of installation method of in-site installation suspension type valve tower, it is characterised in that:First, lift valve has been suspended in midair using jack up unit
To setting height, the setting height is the staff that is available on field ground by valve tower close to top layer valve to the top layer valve group of tower
Group first lower floor's valve group be arranged on top layer valve group below height, then by jack up unit step up top layer valve group and by
In step lifting process by the staff on field ground being sequentially connected in series from top to bottom by remaining each lower floor's valve group successively
First lower floor's valve group lower section, finally, continuing to lift up top layer valve group by jack up unit can extremely be connected in now top layer valve group and top
The height that the lower end of the suspention attachment structure on the top girder steel of field building is connected, and top layer valve group is connected knot with the suspention
The lower end of structure is connected, and described jack up unit is many electric blocks of synchronization action of fixed building top at the scene.
2. the installation method of in-site installation suspension type valve tower according to claim 1, it is characterised in that:Using raising dress
Before putting top layer valve group to the setting height described in suspention raising, the top of the suspention attachment structure is connected and is built at the scene
On the top girder steel built.
3. the installation method of in-site installation suspension type valve tower according to claim 1 and 2, it is characterised in that:Described is outstanding
Attachment structure is hung for suspension insulator.
4. the installation method of in-site installation suspension type valve tower according to claim 1 and 2, it is characterised in that:Described
One lower floor's valve group is serially connected in the top layer valve group lower section by being suspended in midair with the suspention attachment structure identical draw bail, described
Remaining each lower floor's valve group is passed sequentially through and is serially connected in corresponding lower floor with the suspention attachment structure identical draw bail suspention
Valve group lower section.
5. the installation method of in-site installation suspension type valve tower according to claim 1 and 2, it is characterised in that:Described top
Layer valve group includes top frame and the valve layer top apparatus in top frame, and jack up unit is by suspending raising top frame in midair
Valve layer top apparatus are arranged on top by frame to the setting height and by the staff on field ground during raising
Top layer valve group is risen into setting height with described in realization on framework.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510356636.4A CN105048317B (en) | 2015-06-25 | 2015-06-25 | A kind of installation method of in-site installation suspension type valve tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510356636.4A CN105048317B (en) | 2015-06-25 | 2015-06-25 | A kind of installation method of in-site installation suspension type valve tower |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105048317A CN105048317A (en) | 2015-11-11 |
CN105048317B true CN105048317B (en) | 2017-07-07 |
Family
ID=54454648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510356636.4A Active CN105048317B (en) | 2015-06-25 | 2015-06-25 | A kind of installation method of in-site installation suspension type valve tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105048317B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343302B (en) * | 2020-10-31 | 2021-11-30 | 安徽蓝凯塑钢门窗装饰有限公司 | Installation method of aluminum alloy doors and windows of high-rise building group |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102167265A (en) * | 2011-03-11 | 2011-08-31 | 中国电力科学研究院 | DC (direct current) converter valve hoisting system |
CN102611097A (en) * | 2012-03-27 | 2012-07-25 | 许继集团有限公司 | Flexible direct current transmission suspended type valve tower, assembly method and suspension connection structure thereof |
CN104632088A (en) * | 2015-01-04 | 2015-05-20 | 宝鸡石油机械有限责任公司 | Petroleum drilling machine tower-shaped derrick sleeving mounting method |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101586400A (en) * | 2008-05-22 | 2009-11-25 | 中国十五冶金建设有限公司 | Blocking partition adding type lift installation method of net rack |
CN104555833B (en) * | 2014-12-12 | 2020-01-03 | 中国核工业二三建设有限公司 | Method for hoisting steel inner cylinder of chimney |
CN104695752B (en) * | 2015-03-17 | 2017-11-10 | 哈尔滨工业大学 | Rapid rush-repair Tower System and its erection method |
-
2015
- 2015-06-25 CN CN201510356636.4A patent/CN105048317B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102167265A (en) * | 2011-03-11 | 2011-08-31 | 中国电力科学研究院 | DC (direct current) converter valve hoisting system |
CN102611097A (en) * | 2012-03-27 | 2012-07-25 | 许继集团有限公司 | Flexible direct current transmission suspended type valve tower, assembly method and suspension connection structure thereof |
CN104632088A (en) * | 2015-01-04 | 2015-05-20 | 宝鸡石油机械有限责任公司 | Petroleum drilling machine tower-shaped derrick sleeving mounting method |
Also Published As
Publication number | Publication date |
---|---|
CN105048317A (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102587646B (en) | Hydraulic lifting self-ascending template system of intelligent independent unit structure | |
CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
CN209052240U (en) | A kind of tool for super high-rise building duplex elevator vertical transport | |
CN106698208B (en) | A kind of hanging device and hanging method for being transported outside high-rise building | |
CN107954306A (en) | Precast stair Lift-on/Lift-off System and hanging method | |
CN108286332A (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type bylinder system and construction method | |
CN205429566U (en) | Crossing structure | |
CN105048317B (en) | A kind of installation method of in-site installation suspension type valve tower | |
CN115538792A (en) | Residential building machine installation construction method and structure | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN107130517B (en) | It is a kind of fine-tuning from promotion closure mould bases base apparatus and its operating method | |
CN205955160U (en) | Antiskid lattice formula elevartor shaft removes operation platform | |
CN113216636A (en) | Suspended steel structure reverse construction method construction device and construction method | |
CN101993002B (en) | Automatic lift type shaft hanging stage | |
CN110616909B (en) | Construction method of suspension track system at bottom of connecting bridge of super high-rise building | |
CN208122299U (en) | A kind of concrete of crossing soars aloft beam from climbing monoblock type tub system | |
AU2016300492B2 (en) | Assembly method for DC converter valve | |
CN208934392U (en) | Construction mould bases | |
CN103359588B (en) | Folding-jib Trapezoidal elevator hanging basket | |
CN209244229U (en) | A kind of pin-connected panel suspention steel platform | |
CN203320415U (en) | Novel large-scale pier coating operation hanging basket | |
CN201473159U (en) | Self-controlled lifting type suspension sinking platform for vertical shaft | |
CN207405808U (en) | Large-tonnage HMD damper systems | |
CN111196566A (en) | Construction structure and construction method of super high-rise inner climbing tower crane | |
CN221143611U (en) | Steel structure installation device combining air bag and lifting frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |