CN101586400A - Blocking partition adding type lift installation method of net rack - Google Patents

Blocking partition adding type lift installation method of net rack Download PDF

Info

Publication number
CN101586400A
CN101586400A CNA2008100478111A CN200810047811A CN101586400A CN 101586400 A CN101586400 A CN 101586400A CN A2008100478111 A CNA2008100478111 A CN A2008100478111A CN 200810047811 A CN200810047811 A CN 200810047811A CN 101586400 A CN101586400 A CN 101586400A
Authority
CN
China
Prior art keywords
rack
pin
net rack
blocks
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100478111A
Other languages
Chinese (zh)
Inventor
李汇
刘平华
储勤洲
陈敬堂
欧阳霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China No15 Metallurgical Construction Co Ltd
Original Assignee
China No15 Metallurgical Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China No15 Metallurgical Construction Co Ltd filed Critical China No15 Metallurgical Construction Co Ltd
Priority to CNA2008100478111A priority Critical patent/CN101586400A/en
Publication of CN101586400A publication Critical patent/CN101586400A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention is a kind of blocking partition adding type lift installation method of net rack, mainly comprises the steps: the first step, according to the rack longitudinal length rack is divided into several rack machining cells; In second step, net rack blocks is made in assembling on ground; In the 3rd step, sling at net rack blocks both sides installation lifting gear and with net rack blocks; In the 4th step, add grid respectively along the net rack blocks both sides; The 5th goes on foot, and connects the rod member between each rack machining cell in the high-altitude; The present invention has significantly reduced amount of high-altitude operation because most of operations can be finished on ground, and is safe and reliable, easy construction, and the construction quality height greatly reduces engineering cost simultaneously, has improved economic benefit.

Description

Blocking partition adding type lift installation method of net rack
(1) technical field:
The present invention relates to a kind of construction techniques, specifically is a kind of blocking partition adding type lift installation method of net rack.
(2) background technology:
At present, domestic rack install adopt the high-altitude sliding method,, high altitude bulk method, whole lift method.
1, high-altitude sliding method: promptly adopt the slide rail of laying in advance, set up and movably assemble the fetal membrane frame.Unit truss assembly unit is good with pulling equipment moves to the installation site.
Its shortcoming: higher to the construction plant conditional request, because of directive wheel walking deflection easily causes installing the rack journal offset.Design of net shell-type scaffold and sliding rail basis thereof once have high input, and construction cost is higher.The work high above the ground unit is installed, and security risk is bigger.
2, high altitude bulk method: promptly adopt steel pipe scaffold to set up full hall rack assembly unit fetal membrane, the constructor carries out the rack installation on the fetal membrane frame.
Its shortcoming: though this method does not need large lifting equipment, the working security height need take a large amount of circulation materials, and shelf to take the amount of tearing open big, the construction operation phase is long, its rack welding quality is difficult for guaranteeing.
3, integral installation method: rack becomes whole at installation on ground, with crane gear its integral body is risen to design attitude then and is fixed.
Its shortcoming: though do not need tall and big assembling support, work high above the ground is few, easily guarantees welding quality.But the rack overall weight is big, need select the big equipment of lifting capacity for use, and technical sophistication.If adopt poly-machine lifting crane, rack is subject to turn round and weld cracking, and construction cost is higher.
(3) summary of the invention:
Purpose of the present invention proposes a kind of large-scale hoisting machinery that need not exactly, and most of assembling operation can be finished on ground, and engineering cost is low, safe and reliable blocking partition adding type lift installation method of net rack.
Blocking partition adding type lift installation method of net rack, it is characterized in that comprising the steps: the first step, according to whole rack longitudinal length and used lifting gear lifting ability rack is divided into several rack machining cells, and determines the Pin number of single rack that each machining cell comprises; In second step, make the net rack blocks that the part rack by the single racks of described some Pin is constituted in ground assembling; In the 3rd step, sling at net rack blocks both sides installation lifting gear and with net rack blocks; The 4th step, add grid respectively along the net rack blocks both sides, every interpolation one lattice to two side shifting lifting gear once, promptly promote a grid height, have added all until promoting, and this rack machining cell is seated on the bearing; The 5th step repeated second to FOUR EASY STEPS, finished the making of several rack machining cells one by one, connected the rod member between each rack machining cell then in the high-altitude, promptly made whole rack.
Described lifting gear adopts the mast crane gear.
The assembling making step of described net rack blocks is: a. at the part lower edge of the single rack of installation on ground the one Pin, uprightly and with steel pipe withstands the lower edge ball with lower edge earlier then; B. comply with upright successively the 2nd Pin of quadrat method, the 3rd Pin ... single rack part lower edge, connect the vertical rod member between every Pin, prefabricated quadrangular pyramid in advance is installed then; C. weld winding up of the single rack of every Pin, and connect wind up between every Pin horizontal and vertical rod member, promptly.
The present invention has absorbed the more advanced CONTROLLED INTEGRAL LIFT TECHNOLOGY that present domestic rack construction is adopted, sliding technology, different is to need not large-scale hoisting machinery, but hangs hoisted in position by mast lifting gear and kart, and rack welding and assembly unit are all finished on ground.Therefore, compared with prior art, more can guarantee welding quality, significantly reduce amount of high-altitude operation, safe and reliable, easy construction, machinery expenses is low, greatly reduces engineering cost, has improved economic benefit.
(4) description of drawings:
Fig. 1 is a rack machining cell master apparent direction schematic diagram;
Fig. 2 is net rack blocks installation on ground schematic diagram I;
Fig. 3 is net rack blocks installation on ground schematic diagram II;
Fig. 4 is net rack blocks installation on ground schematic diagram III;
Fig. 5 is the main apparent direction schematic diagram that adds grid in the net rack blocks both sides;
Fig. 6 overlooks the direction schematic diagram by the net rack blocks that the single rack of 6 Pin constitutes.
(5) specific embodiment:
Embodiment: with 180 meters of longitudinal lengths, 90 meters of spans, high 31 meters indoor coal storage yard rack processing and fabricating is that example describes, referring to accompanying drawing, among the figure, 1-net rack blocks part, 2-adds rack part, 3-lower edge, the 4-steel pipe, 5-lower edge ball, the 6-quadrangular pyramid, 7-winds up, the 8-mast, the 9-cable wind rope, 10-adds grid, 11-bearing, the single rack of 12-the one Pin, the single rack of 13-the 2nd Pin, the single rack of 14-the 3rd Pin, the single rack of 15-the 4th Pin, the single rack of 16-the 5th Pin, the single rack of 17-the 6th Pin.The first step, according to the vertical 180 meters length of rack and the lifting ability (hoist engine 20T, crane 16T) of employed mast lifting gear, this rack is divided into five rack machining cells to be processed respectively, long 36 meters of each rack machining cell, comprise the single rack of 6 Pin, 6 meters of every Pin longitudinal lengths, the rack part 2 that each rack machining cell is added in both sides one by one by the net rack blocks part 1 that forms at installation on ground and the back of slinging constitutes, referring to Fig. 1.Second step, earlier make the net rack blocks that the part rack by the single rack of 6 Pin is constituted in the ground assembling, its concrete steps comprise: a. elder generation is at the part lower edge 3 of the single rack 12 of installation on ground the one Pin, then that lower edge is upright, as shown in Figure 2, and withstand lower edge ball 5 with steel pipe 4 and prevent that the rack downwarp from launching; B. with the lower edge of the single rack of upright the 2nd Pin of quadrat method, the 3rd Pin, the 4th Pin, the 5th Pin, the 6th Pin (numbering is followed successively by 13,14,15,16,17), connect the vertical rod member between every Pin, prefabricated quadrangular pyramid 6 in advance is installed then, as shown in Figure 3; That c. welds the single rack of every Pin winds up 7, and connects wind up between every Pin horizontal and vertical rod member, promptly is assembled into net rack blocks 1, with reference to figure 4; The 3rd step, four masts 8 are installed altogether in the net rack blocks both sides, referring to Fig. 5, Fig. 6, mast is made by δ 235 * 12 seamless steel pipes, and every mast tiltedly draws four road cable wind ropes 9, and the elevator poplar is adopted 20T, assembly pulley adopts 4 * 4, be aided with the 16T crane when mast moves, net rack blocks is sling, general height of lift is advisable for overhead about 2.5 meters with the net rack blocks both sides; The 4th step, add grid 10 respectively simultaneously along the net rack blocks both sides, every interpolation one lattice to the both sides movable mast once, promptly promote a grid height, have added whole grids until promoting, and more whole rack machining cell are seated on the bearing 11, as shown in fig. 1; The 5th step repeated aforementioned four steps and finished five unit trusses that constitute this indoor coal storage yard rack one by one, connected the rod member between these five unit trusses then in the high-altitude, promptly made whole rack.

Claims (3)

1. blocking partition adding type lift installation method of net rack, it is characterized in that comprising the steps: the first step, according to whole rack longitudinal length and used lifting gear lifting ability rack is divided into several rack machining cells, and determines the Pin number of single rack that each machining cell comprises; In second step, make the net rack blocks that the part rack by the single racks of described some Pin is constituted in ground assembling; In the 3rd step, sling at net rack blocks both sides installation lifting gear and with net rack blocks; The 4th step, add grid respectively along the net rack blocks both sides, every interpolation one lattice to two side shifting lifting gear once, promptly promote a grid height, have added all until promoting, and this rack machining cell is seated on the bearing; The 5th step repeated second to FOUR EASY STEPS, finished the making of several rack machining cells one by one, connected the rod member between each rack machining cell then in the high-altitude, promptly made whole rack.
2. blocking partition adding type lift installation method of net rack according to claim 1 is characterized in that: described lifting gear adopts the mast crane gear.
3. blocking partition adding type lift installation method of net rack according to claim 1 and 2, it is characterized in that: the assembling making step of described net rack blocks is: a. at the part lower edge of the single rack of installation on ground the one Pin, uprightly and with steel pipe withstands the lower edge ball with lower edge earlier then; B. comply with upright successively the 2nd Pin of quadrat method, the 3rd Pin ... single rack part lower edge, connect the vertical rod member between every Pin, prefabricated quadrangular pyramid in advance is installed then; C. weld winding up of the single rack of every Pin, and connect wind up between every Pin horizontal and vertical rod member, promptly.
CNA2008100478111A 2008-05-22 2008-05-22 Blocking partition adding type lift installation method of net rack Pending CN101586400A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100478111A CN101586400A (en) 2008-05-22 2008-05-22 Blocking partition adding type lift installation method of net rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100478111A CN101586400A (en) 2008-05-22 2008-05-22 Blocking partition adding type lift installation method of net rack

Publications (1)

Publication Number Publication Date
CN101586400A true CN101586400A (en) 2009-11-25

Family

ID=41370808

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100478111A Pending CN101586400A (en) 2008-05-22 2008-05-22 Blocking partition adding type lift installation method of net rack

Country Status (1)

Country Link
CN (1) CN101586400A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102445A (en) * 2011-03-09 2011-06-22 中国建筑第八工程局有限公司 Partitioning lifting construction method for huge weld ball net rack
CN102179651A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections
CN102767289A (en) * 2012-07-12 2012-11-07 广州建筑股份有限公司 Asymmetric and integrated lifting construction method for large scale grid structure
CN102864938A (en) * 2012-10-15 2013-01-09 中国建筑第八工程局有限公司 Unloading method of net frame lifting frames
CN102953553A (en) * 2012-11-14 2013-03-06 中冶天工集团有限公司 Method for mounting large-span pipe truss by using boom luffing mechanism
CN102995909A (en) * 2012-11-14 2013-03-27 中冶天工集团有限公司 Space latticed shell coordinate rotation assembly method
CN104060840A (en) * 2014-06-25 2014-09-24 广州市第三建筑工程有限公司 Construction method for lifting large-span dome net rack by using bolt sphere truss lifter
CN104097914A (en) * 2014-07-24 2014-10-15 中交一航局第五工程有限公司 Installation method of crossing-conveyor closed tunnel meshed frame at wharf yard
CN105048317A (en) * 2015-06-25 2015-11-11 许继集团有限公司 On-site installation method for suspension type valve tower
CN105386605A (en) * 2015-11-13 2016-03-09 中建六局土木工程有限公司 Installing and constructing method for special-shaped steel truss for large space and ladder-form grandstand
CN107363438A (en) * 2017-06-15 2017-11-21 上海二十冶建设有限公司 Large-area welding net structure assembling method
CN108643364A (en) * 2018-05-17 2018-10-12 中国十九冶集团有限公司 It is single to encircle gradual rack installation method
CN112112284A (en) * 2020-09-25 2020-12-22 河南省安装集团有限责任公司 Integral jacking construction method for net rack
CN114215366A (en) * 2021-12-29 2022-03-22 浙江精工钢结构集团有限公司 Lifting construction method for dense hanging points of large-span arched roof
CN117569615A (en) * 2024-01-17 2024-02-20 北京建工集团有限责任公司 Ultra-long rod hoisting structure for annular closed folded plate reticulated shell structure and construction method

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102445A (en) * 2011-03-09 2011-06-22 中国建筑第八工程局有限公司 Partitioning lifting construction method for huge weld ball net rack
CN102179651A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 On-site plane trusses of extra-large welded ball net frame and method for splicing three-dimensional sections
CN102767289A (en) * 2012-07-12 2012-11-07 广州建筑股份有限公司 Asymmetric and integrated lifting construction method for large scale grid structure
CN102864938A (en) * 2012-10-15 2013-01-09 中国建筑第八工程局有限公司 Unloading method of net frame lifting frames
CN102953553B (en) * 2012-11-14 2015-04-15 中冶天工集团有限公司 Method for mounting large-span pipe truss by using boom luffing mechanism
CN102995909A (en) * 2012-11-14 2013-03-27 中冶天工集团有限公司 Space latticed shell coordinate rotation assembly method
CN102953553A (en) * 2012-11-14 2013-03-06 中冶天工集团有限公司 Method for mounting large-span pipe truss by using boom luffing mechanism
CN104060840A (en) * 2014-06-25 2014-09-24 广州市第三建筑工程有限公司 Construction method for lifting large-span dome net rack by using bolt sphere truss lifter
CN104097914A (en) * 2014-07-24 2014-10-15 中交一航局第五工程有限公司 Installation method of crossing-conveyor closed tunnel meshed frame at wharf yard
CN105048317A (en) * 2015-06-25 2015-11-11 许继集团有限公司 On-site installation method for suspension type valve tower
CN105386605A (en) * 2015-11-13 2016-03-09 中建六局土木工程有限公司 Installing and constructing method for special-shaped steel truss for large space and ladder-form grandstand
CN107363438A (en) * 2017-06-15 2017-11-21 上海二十冶建设有限公司 Large-area welding net structure assembling method
CN108643364A (en) * 2018-05-17 2018-10-12 中国十九冶集团有限公司 It is single to encircle gradual rack installation method
CN112112284A (en) * 2020-09-25 2020-12-22 河南省安装集团有限责任公司 Integral jacking construction method for net rack
CN114215366A (en) * 2021-12-29 2022-03-22 浙江精工钢结构集团有限公司 Lifting construction method for dense hanging points of large-span arched roof
CN117569615A (en) * 2024-01-17 2024-02-20 北京建工集团有限责任公司 Ultra-long rod hoisting structure for annular closed folded plate reticulated shell structure and construction method
CN117569615B (en) * 2024-01-17 2024-03-22 北京建工集团有限责任公司 Ultra-long rod hoisting structure for annular closed folded plate reticulated shell structure and construction method

Similar Documents

Publication Publication Date Title
CN101586400A (en) Blocking partition adding type lift installation method of net rack
CN106284668B (en) A kind of large span large-spatial structures roofing truss installation method
CN102767303B (en) Precast concrete tower and construction method thereof
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN103410670B (en) Truss type wind-driven generator tower frame and there is the wind power generating set of this pylon
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN102767235A (en) Long-span spherical reticulated shell coal yard structure and construction method thereof
CN102322172B (en) Power facility tower with cone hollow interlayer concrete-filled steel tube lattice structure
CN102464273A (en) Offshore fan installing platform and fan integral installation rotary holding and lifting mechanism
CN212689520U (en) Quick butt-joint type operation platform
CN103806639A (en) Steel tube truss support system for silo top and construction method of steel tube truss support system
CN203222919U (en) Circular-arc-shaped coal storage steel shed of net rack structure
CN203394685U (en) Lattice wind turbine tower and wind turbine generator system comprising same
CN102786004B (en) Integrally moving on-load hydraulic lifting system without mooring rope and lifting method
CN102102643A (en) Lattice hollow-concrete-filled steel tube tower for wind generating set
CN103615111A (en) Silo top construction method
CN105484503A (en) Inclined shuttle-shaped space truss hoisting method
CN103352576A (en) Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack
CN102817341A (en) Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly
CN203834928U (en) Automatic climbing formwork
CN203320927U (en) Extensible special lifting platform for corrosion protection reconstruction of chimney
CN110656723B (en) Rail support for sliding construction of cylindrical arch shell roof
KR101319019B1 (en) Method of establishing wind power generator and apparatus thereof
CN203947758U (en) Novel hydraulic automatic climbing discharging platform
CN103195660B (en) A kind of pylon of truss structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20091125