CN102167265A - DC (direct current) converter valve hoisting system - Google Patents

DC (direct current) converter valve hoisting system Download PDF

Info

Publication number
CN102167265A
CN102167265A CN2011100594519A CN201110059451A CN102167265A CN 102167265 A CN102167265 A CN 102167265A CN 2011100594519 A CN2011100594519 A CN 2011100594519A CN 201110059451 A CN201110059451 A CN 201110059451A CN 102167265 A CN102167265 A CN 102167265A
Authority
CN
China
Prior art keywords
lift
electric block
load
converter valve
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100594519A
Other languages
Chinese (zh)
Other versions
CN102167265B (en
Inventor
李跃
孙立波
查鲲鹏
朱家骝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2011100594519A priority Critical patent/CN102167265B/en
Publication of CN102167265A publication Critical patent/CN102167265A/en
Application granted granted Critical
Publication of CN102167265B publication Critical patent/CN102167265B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

The invention relates to a DC (direct current) converter valve hoisting system. The system includes control devices and mechanical devices, wherein the control devices include a position sensor, a PLC (programmable logic controller), a frequency converter and an operation power supply; the mechanical devices include electric hoists, a bearing structure, supporting structures, an electric pin penetrating/withdrawing mechanism, and a bearing steel beam; the supporting structures are connected above the bearing structure; the electric hoists are mounted on the supporting structures; the electric pin penetrating/withdrawing mechanism is arranged on the bearing steel beam; motors are mounted on the electric hoists; two ends of the frequency converter are connected with the motors of the electric hoists and the PLC respectively; the operation power supply is connected with the motors of the electric hoists; the position sensor is connected with the PLC and the electric hoists respectively; and the electric hoists are fixed on the bearing steel beam through the supporting structures and the bearing structure, thereby forming the hoisting system. The system adopts the high precision frequency conversion control, realizes the accurate synchronization control based on the four electric hoists, well solves the hoisting problem of a valve tray, and greatly improves the hoisting efficiency of the valve tray of a converter valve.

Description

A kind of DC converter valve Lift-on/Lift-off System
Technical field
The present invention relates to a kind of DC converter valve system, specifically will be referred to a kind of DC converter valve Lift-on/Lift-off System.
Background technology
DC converter valve insulation type test will be suspended to the experiment hall top with a complete test product valve tower usually and test, because experiment hall is generally steel structure, and point of suspension position very high (30 meters), the converter valve tower of tens tons of gross weights be suspended in midair, hanging device that must design specialized carries out converter valve tower crane dress.
Usually need special tool at engineering site lifting DC converter valve, but because engineering site is disposably and permanently installed, adopt manual chain block etc. to carry out lifting operation more, degree of automation is low, waste time and energy, and the lifting inefficiency.
Summary of the invention
The purpose of this invention is to provide a kind of easy and simple to handlely, safe and reliable, stable, the degree of automation height can be used for lifting the DC converter valve of dissimilar and specification, flexibly and the stronger Lift-on/Lift-off System of comformability.
The present invention adopts following proposal to realize purpose of the present invention:
A kind of DC converter valve Lift-on/Lift-off System, its improvements are that described Lift-on/Lift-off System comprises control setup and mechanical device; Described control setup comprises position transduser, PLC controller, frequency converter and operating power; Described mechanical device comprises electric block, load larrying member, supporting construction, electronic pin mechanism, the load-bearing girder steel of wearing off; Described load larrying member top connects supporting construction; Described electric block is installed on the supporting construction; The described electronic pin mechanism that wears off is arranged on the load-bearing girder steel;
On the described electric block motor is installed; Described frequency converter two ends are connected with described PLC controller with the motor of electric block respectively; Described operating power is connected with the motor of electric block; Described position transduser is connected with electric block with the PLC controller respectively; Adopt between the motor of described position transduser and electric block that flexure spring is coaxial to be connected; Described electric block is fixed on the load-bearing girder steel by supporting construction and load larrying member, finally forms Lift-on/Lift-off System.
A kind of optimized technical scheme provided by the invention is: the quantity of described electric block is 4, described 4 electric block synchronized operations, and maximum synchronous error is less than 2 centimetres, and when accumulated error was greater than 5 centimetres synchronously, system was automatically locked.
Second optimized technical scheme provided by the invention is: be equiped with blocking device on the described load-bearing girder steel, described blocking device uses wears pin and out of stock control.
The 3rd optimized technical scheme provided by the invention is: described Lift-on/Lift-off System below is provided with the lifting change-over panel, and described lifting change-over panel is the framed structure that is welded into by I-beam section or channel-section steel; Described lifting change-over panel and load-bearing girder steel adopt wears pin and out of stock detouchable mechanical connection manner automatically.
Compared with prior art, the beneficial effect that reaches of the present invention is:
1, DC converter valve Lift-on/Lift-off System provided by the invention has been realized 4 synchronous liftings of electric block and decline, servo-actuated equilibrium function, speed can be regulated between 8cm/min~80cm/min continuously, maximum synchronous error is less than 2 centimetres, when accumulated error is greater than 5 centimetres synchronously, system is automatically locked, thereby has guaranteed hoisting process safety and stationarity;
2, DC converter valve Lift-on/Lift-off System provided by the invention is provided with the emergency descent function, when in the operational process during Lift-on/Lift-off System et out of order, can use the highest fault landing function of priority, and the direct control electric block guarantees that hanging device safety reduces to ground;
3, DC converter valve Lift-on/Lift-off System provided by the invention has strengthened the position transduser serviceability, position transduser has adopted the coaxial, flexible connection mode with being connected of electric block motor deboost axle, the vibrations that can effectively avoid high speed revolution to cause have improved the stability and the reliability of system's operation;
4, DC converter valve Lift-on/Lift-off System provided by the invention has adopted and has worn pin and out of stock control automatically, has realized the detouchable mechanical connection manner between lifting change-over panel and load-bearing girder steel, improves the alerting ability that Lift-on/Lift-off System uses.
Description of drawings
Fig. 1 is Lift-on/Lift-off System control principle figure;
Fig. 2 is the birds-eye view of Lift-on/Lift-off System;
Fig. 3 is the front view of Lift-on/Lift-off System.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is described in further detail.
Lift-on/Lift-off System provided by the invention comprises control setup and mechanical device, and the control setup of Lift-on/Lift-off System comprises position transduser, PLC controller, frequency converter and operating power; Motor is installed on the electric block; Motor is installed on the electric block; The frequency converter two ends are connected with the PLC controller with the motor of electric block respectively; Operating power is connected with the motor of electric block; Position transduser is connected with electric block with the PLC controller respectively; Adopt between the motor of position transduser and electric block that flexure spring is coaxial to be connected; Lift-on/Lift-off System control principle figure as shown in Figure 1.
The mechanical device of Lift-on/Lift-off System comprises electric block, load larrying member, supporting construction, electronic pin mechanism, the load-bearing girder steel of wearing off; The load larrying member top connects supporting construction; Electric block is installed on the supporting construction; The electronic pin mechanism that wears off is arranged on the load-bearing girder steel; Electric block is fixed on the load-bearing girder steel by supporting construction and load larrying member; The birds-eye view of Lift-on/Lift-off System and front view are shown in Fig. 2 and 3.
By load larrying member and supporting construction 4 electric blocks are fixed on the load-bearing girder steel in the Lift-on/Lift-off System, draw coupling end from the deceleration axle head of electric block, reliably be connected with position transduser by flexure spring, 9 cover locking devices on the load-bearing girder steel, have been installed simultaneously, be used for locking lifting change-over panel, blocking device uses to be worn pin and moves back pin control, and by position transduser (on raise spacing, wear that pin puts in place, out of stock putting in place) whether monitoring lifting change-over panel hang and put in place, all measurements are connected with electrical control cubicles by cable with control signal; Measurement and control signal are input to the PLC controller, PLC judges the mode of operation of 4 electric blocks according to position signal, and calculate the suspension hook position of electric block according to position sensor signal, accuracy control frequency converter output voltage frequency, thus realization is to the adjusting and the control of 4 electric block motor speeds; Every coaxial two cover position transdusers that connected of electric block, can accurately gather the electric block motor speed signal, at any time adjust frequency converter frequency, accuracy control suspension hook position, guarantee the net synchronization capability of 4 electric block operations, improved safety, stability and the reliability of DC converter valve lifting operation.
Should be noted that at last: only illustrate that in conjunction with the foregoing description technical scheme of the present invention is not intended to limit.Those of ordinary skill in the field are to be understood that: those skilled in the art can make amendment or are equal to replacement the specific embodiment of the present invention, but these modifications or change are all among the claim protection domain that application is awaited the reply.

Claims (4)

1. a DC converter valve Lift-on/Lift-off System is characterized in that, described Lift-on/Lift-off System comprises control setup and mechanical device; Described control setup comprises position transduser, PLC controller, frequency converter and operating power; Described mechanical device comprises electric block, load larrying member, supporting construction, electronic pin mechanism, the load-bearing girder steel of wearing off; Described load larrying member top connects supporting construction; Described electric block is installed on the supporting construction; The described electronic pin mechanism that wears off is arranged on the load-bearing girder steel;
On the described electric block motor is installed; Described frequency converter two ends are connected with described PLC controller with the motor of electric block respectively; Described operating power is connected with the motor of electric block; Described position transduser is connected with electric block with the PLC controller respectively; Adopt between the motor of described position transduser and electric block that flexure spring is coaxial to be connected; Described electric block is fixed on the load-bearing girder steel by supporting construction and load larrying member, finally forms Lift-on/Lift-off System.
2. as claim 1 DC converter valve Lift-on/Lift-off System, it is characterized in that the quantity of described electric block is 4, described 4 electric block synchronized operations, maximum synchronous error is less than 2 centimetres, and when accumulated error was greater than 5 centimetres synchronously, system was automatically locked.
3. as claim 1 DC converter valve Lift-on/Lift-off System, it is characterized in that, be equiped with blocking device on the described load-bearing girder steel, described blocking device uses wears pin and out of stock control.
4. as claim 1 DC converter valve Lift-on/Lift-off System, it is characterized in that described Lift-on/Lift-off System below is provided with the lifting change-over panel, described lifting change-over panel is the framed structure that is welded into by I-beam section or channel-section steel; Described lifting change-over panel and load-bearing girder steel adopt wears pin and out of stock detouchable mechanical connection manner automatically.
CN2011100594519A 2011-03-11 2011-03-11 DC (direct current) converter valve hoisting system Active CN102167265B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100594519A CN102167265B (en) 2011-03-11 2011-03-11 DC (direct current) converter valve hoisting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100594519A CN102167265B (en) 2011-03-11 2011-03-11 DC (direct current) converter valve hoisting system

Publications (2)

Publication Number Publication Date
CN102167265A true CN102167265A (en) 2011-08-31
CN102167265B CN102167265B (en) 2013-11-27

Family

ID=44488623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100594519A Active CN102167265B (en) 2011-03-11 2011-03-11 DC (direct current) converter valve hoisting system

Country Status (1)

Country Link
CN (1) CN102167265B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102502411A (en) * 2011-08-19 2012-06-20 河南卫华重型机械股份有限公司 Accurate automatic positioning control system of crane and method thereof
CN105048317A (en) * 2015-06-25 2015-11-11 许继集团有限公司 On-site installation method for suspension type valve tower
CN114380226A (en) * 2021-12-24 2022-04-22 安徽克鲁克智能装备有限公司 Synchronous operation system and operation method for one-way array type multi-lifting mechanism

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111943023B (en) * 2020-08-13 2022-11-22 中国南方电网有限责任公司超高压输电公司大理局 Converter valve tower hoisting device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4305513A (en) * 1979-10-04 1981-12-15 Renner Manufacturing Slack cable sensing apparatus
CN1054752A (en) * 1990-03-02 1991-09-25 章大章 Electric antishake device for container's crane
DE4418519A1 (en) * 1994-05-27 1995-11-30 Eliasmoeller Hans Stacked material container pick=up equipment
JP2003212475A (en) * 2002-01-21 2003-07-30 Ishikawajima Harima Heavy Ind Co Ltd Remote operation device for container crane
JP3434401B2 (en) * 1995-12-27 2003-08-11 日立建機株式会社 Crane hook overwind prevention device
US20080006806A1 (en) * 2006-06-05 2008-01-10 Hall David R Lifting Assembly
CN101381055A (en) * 2008-09-22 2009-03-11 沪东中华造船(集团)有限公司 Method for rotating large-sized object using four-hook gantry crane
CN201634332U (en) * 2010-02-02 2010-11-17 中铁十一局集团第六工程有限公司 Heavy girder gantry crane

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4305513A (en) * 1979-10-04 1981-12-15 Renner Manufacturing Slack cable sensing apparatus
CN1054752A (en) * 1990-03-02 1991-09-25 章大章 Electric antishake device for container's crane
DE4418519A1 (en) * 1994-05-27 1995-11-30 Eliasmoeller Hans Stacked material container pick=up equipment
JP3434401B2 (en) * 1995-12-27 2003-08-11 日立建機株式会社 Crane hook overwind prevention device
JP2003212475A (en) * 2002-01-21 2003-07-30 Ishikawajima Harima Heavy Ind Co Ltd Remote operation device for container crane
US20080006806A1 (en) * 2006-06-05 2008-01-10 Hall David R Lifting Assembly
CN101381055A (en) * 2008-09-22 2009-03-11 沪东中华造船(集团)有限公司 Method for rotating large-sized object using four-hook gantry crane
CN201634332U (en) * 2010-02-02 2010-11-17 中铁十一局集团第六工程有限公司 Heavy girder gantry crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102502411A (en) * 2011-08-19 2012-06-20 河南卫华重型机械股份有限公司 Accurate automatic positioning control system of crane and method thereof
CN102502411B (en) * 2011-08-19 2015-07-01 河南卫华重型机械股份有限公司 Accurate automatic positioning control system of crane and method thereof
CN105048317A (en) * 2015-06-25 2015-11-11 许继集团有限公司 On-site installation method for suspension type valve tower
CN105048317B (en) * 2015-06-25 2017-07-07 许继集团有限公司 A kind of installation method of in-site installation suspension type valve tower
CN114380226A (en) * 2021-12-24 2022-04-22 安徽克鲁克智能装备有限公司 Synchronous operation system and operation method for one-way array type multi-lifting mechanism
CN114380226B (en) * 2021-12-24 2024-06-04 安徽克鲁克智能装备有限公司 Synchronous operation system and operation method for unidirectional array type multi-lifting mechanism

Also Published As

Publication number Publication date
CN102167265B (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN102167265B (en) DC (direct current) converter valve hoisting system
CN205099211U (en) Hoist anti -swing device
CN205222428U (en) Interval adjustable balance hanger
CN203095447U (en) Automatic multiplying power variable lifting hook device
CN201821226U (en) Lifting device of large synchronous motor
CN102849625A (en) Spreader anti-sway controlling method of overhead traveling crane
CN104060835A (en) Lifting-sliding construction method for single plane truss
CN201058788Y (en) Bridge crane electronic scale steel cable weight compensating unit
CN203158963U (en) Device for monitoring tension of steel wire ropes of multi-rope friction hoist on line
CN201347327Y (en) Electric control system of cable crane
CN202379605U (en) Angle detection device of arm support and crane with same
CN201924579U (en) Safety protection device for attached lifting scaffolds
CN204265341U (en) Can the tower machine anticollision terminal of measuring wind
CN201152025Y (en) Electric vibration and tampering vehicle
CN103334466B (en) A kind of Full-automatic sludge induction system
CN204823804U (en) Bridge crane platform of walking
CN210029726U (en) Anti-swing control device of crane
CN202245696U (en) Tool for quickly changing guide in short-stress linear chuck type mill
CN204873547U (en) Container bridge crane hoist intelligent security case device
CN206014288U (en) A kind of extra large work folding-jib crane released rope detecting device
CN205405147U (en) Container shipment case position automatic determination device
CN201359526Y (en) Electric block steelyard
EP2700604A1 (en) Anti-sway control method and arrangement
CN202897861U (en) Crane for loading and unloading in nuclear power plant
CN204847836U (en) Balance beam is hung to multi -functional lifting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130424

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130424

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant