CN105033556A - 强夯机顶部臂架组对工装 - Google Patents
强夯机顶部臂架组对工装 Download PDFInfo
- Publication number
- CN105033556A CN105033556A CN201510545364.2A CN201510545364A CN105033556A CN 105033556 A CN105033556 A CN 105033556A CN 201510545364 A CN201510545364 A CN 201510545364A CN 105033556 A CN105033556 A CN 105033556A
- Authority
- CN
- China
- Prior art keywords
- underframe
- vertical spacing
- spacing post
- beams
- bearing pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本发明公开了一种强夯机顶部臂架组对工装,包括底架、沿着底架长度方向均布的至少两根横梁和竖向固定安装在底架上的一列竖向限位柱,竖向限位柱位于横梁同一侧,所述横梁的长度方向与底架的宽度方向一致、且在底架定面上居中安装,所述横梁的长度从底架左端向右端递增,竖向限位柱的数量与横梁的数量相等;根据强夯机顶部臂架的弦杆和腹杆位置,安装在底架上的横梁和竖向限位柱与挂钩形成定位空间,安装完成三根弦杆后即可焊接腹杆,腹杆端部位置利用横梁和竖向限位柱定位,只需测量相对角度后焊接即可,能够有效保证顶部臂架直线度和整体组装对角线,组对成的顶部臂标准化程度高,能够互换,提高作业效率,避免报废。
Description
技术领域
本发明涉及一种强夯机顶部臂架焊接技术领域,油气涉及一种强夯机顶部臂架组对工装。
背景技术
随着工业工程大型化和巨型化的发展,在装备制造、工程安装方面,对起重机允许起重质量要求逐步提高,起重机或者强夯机均利用动臂作为支撑结构,但是,随着起重质量的提高,对动臂强度要求也越来越高,动臂自身重量也逐步提高,在一定程度上限制起重机或者强夯机起重质量的提高,为此,一些大型化的起重机和强夯机均开始采用钢桁架式动臂结构,一方面,钢桁架结构在能够满足支撑强度的前提下,自身质量大大下降,另外一方面,钢桁架分段设置,可以根据不同起重物进行长度调整,扩大起重机的适用范围,满足装备制造和工程安装方面大型化和巨型化作业的要求。
一般的钢桁架式动臂的顶部臂架包括四根围成四棱台形状的弦杆和固定焊接在四根弦杆之间的腹杆,在具体安装过程中,目前基本上采用人工组对的方式进行焊接,此种方式在制作当中存在臂架直线度超差、整体组装对角线超差、角度不正确、组偏,不能互换,生产效率低,对工人技能要求高等缺点,并且影响连接头的组对严重时导致报废,造成原材料浪费。
发明内容
本发明所要解决的技术问题是提供一种强夯机顶部臂架组对工装,根据强夯机顶部臂架的弦杆和腹杆位置,安装在底架上的横梁和竖向限位柱与挂钩形成定位空间,位于下部的两根弦杆通过竖向限位柱和横梁定位,横梁两端设置限位槽,下部的两根弦杆直接放入限位槽内即可定位,下部两根弦杆的两端与位于底架两端的两根横梁对齐即可,位于上部的一个弦杆利用安装在竖向限位柱顶端的挂钩定位安装,安装完成三根弦杆后即可焊接腹杆,腹杆端部位置利用横梁和竖向限位柱定位,只需测量相对角度后焊接即可,能够有效保证顶部臂架直线度和整体组装对角线,组对成的顶部臂标准化程度高,能够互换,提高作业效率,避免报废。
为解决上述技术问题,本发明所采取的技术方案是:一种强夯机顶部臂架组对工装,包括底架、沿着底架长度方向均布的至少两根横梁和竖向固定安装在底架上的一列竖向限位柱,竖向限位柱位于横梁同一侧,所述横梁的长度方向与底架的宽度方向一致、且在底架定面上居中安装,所述横梁的长度从底架左端向右端递增,竖向限位柱的数量与横梁的数量相等。
所述竖向限位柱的高度从底架左端向右端依次增加,所述竖向限位柱与底架纵向中心线之间的距离从左至右依次增大,所述竖向限位柱顶端安装用于支撑顶部臂架上弦管的挂钩。
所述竖向限位柱顶端水平固定安装销轴,销轴的轴线与底架的长度方向相同,所述挂钩穿设在销轴一端,销轴另外一端借助于开口销固定,所述挂钩包括柄部和钩部,所述柄部穿射在销轴上的通孔内、且柄部的轴线与销轴的轴线垂直,柄部位于销轴两侧处均配套安装固定螺母。
所述竖向限位柱为槽钢,槽钢下端与底架焊接,槽钢外立面与底架之间安装斜支撑。
所述横梁与竖向限位柱以及挂钩行程的半开式空间与强夯机顶部臂架半幅轮廓相同。
所述底架为由槽钢焊接成的矩形框架结构。
采用上述技术方案所产生的有益效果在于:根据强夯机顶部臂架的弦杆和腹杆位置,安装在底架上的横梁和竖向限位柱与挂钩形成定位空间,位于下部的两根弦杆通过竖向限位柱和横梁定位,横梁两端设置限位槽,下部的两根弦杆直接放入限位槽内即可定位,下部两根弦杆的两端与位于底架两端的两根横梁对齐即可,位于上部的一个弦杆利用安装在竖向限位柱顶端的挂钩定位安装,安装完成三根弦杆后即可焊接腹杆,腹杆端部位置利用横梁和竖向限位柱定位,只需测量相对角度后焊接即可,能够有效保证顶部臂架直线度和整体组装对角线,组对成的顶部臂标准化程度高,能够互换,提高作业效率,避免报废。
附图说明
图1是本发明主视图;
图2是图1的左视图;
图3是图1的俯视图;
图4是挂钩安装部位放大图;
图5是本发明使用状态示意图;
在附图中:1、底架;2、横梁;3、竖向限位柱;4、销轴;5、挂钩;6、斜支撑;7、顶部臂架。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细的说明。
本发明公开了一种如图1-3所示的强夯机顶部臂架组对工装,包括底架1、沿着底架1长度方向均布的至少两根横梁2和竖向固定安装在底架1上的一列竖向限位柱3,竖向限位柱3位于横梁2同一侧,所述横梁2的长度方向与底架1的宽度方向一致、且在底架1定面上居中安装,所述横梁2的长度从底架1左端向右端递增,竖向限位柱3的数量与横梁2的数量相等;所述竖向限位柱3的高度从底架1左端向右端依次增加,所述竖向限位柱3与底架1纵向中心线之间的距离从左至右依次增大,所述竖向限位柱3顶端安装用于支撑顶部臂架上弦管的挂钩5;所述竖向限位柱3顶端水平固定安装销轴4,销轴4的轴线与底架1的长度方向相同,所述挂钩5穿设在销轴4一端,销轴4另外一端借助于开口销固定,所述挂钩5包括柄部和钩部,所述柄部穿射在销轴4上的通孔内、且柄部的轴线与销轴4的轴线垂直,柄部位于销轴4两侧处均配套安装固定螺母(参见附图4);所述竖向限位柱3为槽钢,槽钢下端与底架1焊接,槽钢外立面与底架1之间安装斜支撑6;所述横梁2与竖向限位柱3以及挂钩5行程的半开式空间与强夯机顶部臂架半幅轮廓相同;所述底架1为由槽钢焊接成的矩形框架结构。
在具体应用过程中,首先根据强夯机顶部臂架的弦杆和腹杆位置(参见附图5),安装在底架上的横梁和竖向限位柱与挂钩形成定位空间,位于下部的两根弦杆通过竖向限位柱和横梁定位,横梁两端设置限位槽,下部的两根弦杆直接放入限位槽内即可定位,下部两根弦杆的两端与位于底架两端的两根横梁对齐即可,位于上部的一个弦杆利用安装在竖向限位柱顶端的挂钩定位安装,安装完成三根弦杆后即可焊接腹杆,腹杆端部位置利用横梁和竖向限位柱定位,只需测量相对角度后焊接即可,能够有效保证顶部臂架直线度和整体组装对角线,组对成的顶部臂标准化程度高,能够互换,提高作业效率,避免报废。
Claims (6)
1.一种强夯机顶部臂架组对工装,其特征在于:包括底架(1)、沿着底架(1)长度方向均布的至少两根横梁(2)和竖向固定安装在底架(1)上的一列竖向限位柱(3),竖向限位柱(3)位于横梁(2)同一侧,所述横梁(2)的长度方向与底架(1)的宽度方向一致、且在底架(1)定面上居中安装,所述横梁(2)的长度从底架(1)左端向右端递增,竖向限位柱(3)的数量与横梁(2)的数量相等。
2.根据权利要求1所述的强夯机顶部臂架组对工装,其特征在于:所述竖向限位柱(3)的高度从底架(1)左端向右端依次增加,所述竖向限位柱(3)与底架(1)纵向中心线之间的距离从左至右依次增大,所述竖向限位柱(3)顶端安装用于支撑顶部臂架上弦管的挂钩(5)。
3.根据权利要求2所述的强夯机顶部臂架组对工装,其特征在于:所述竖向限位柱(3)顶端水平固定安装销轴(4),销轴(4)的轴线与底架(1)的长度方向相同,所述挂钩(5)穿设在销轴(4)一端,销轴(4)另外一端借助于开口销固定,所述挂钩(5)包括柄部和钩部,所述柄部穿射在销轴(4)上的通孔内、且柄部的轴线与销轴(4)的轴线垂直,柄部位于销轴(4)两侧处均配套安装固定螺母。
4.根据权利要求3所述的强夯机顶部臂架组对工装,其特征在于:所述竖向限位柱(3)为槽钢,槽钢下端与底架(1)焊接,槽钢外立面与底架(1)之间安装斜支撑(6)。
5.根据权利要求4所述的强夯机顶部臂架组对工装,其特征在于:所述横梁(2)与竖向限位柱(3)以及挂钩(5)行程的半开式空间与强夯机顶部臂架半幅轮廓相同。
6.根据权利要求5所述的强夯机顶部臂架组对工装,其特征在于:所述底架(1)为由槽钢焊接成的矩形框架结构。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510545364.2A CN105033556B (zh) | 2015-08-31 | 2015-08-31 | 强夯机顶部臂架组对工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510545364.2A CN105033556B (zh) | 2015-08-31 | 2015-08-31 | 强夯机顶部臂架组对工装 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105033556A true CN105033556A (zh) | 2015-11-11 |
CN105033556B CN105033556B (zh) | 2017-07-18 |
Family
ID=54440833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510545364.2A Active CN105033556B (zh) | 2015-08-31 | 2015-08-31 | 强夯机顶部臂架组对工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105033556B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107671473A (zh) * | 2017-09-27 | 2018-02-09 | 纽科伦(新乡)起重机有限公司 | 一种建筑养护设备的立柱与导向车轮组对工装 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5612353B2 (zh) * | 1976-07-14 | 1981-03-20 | ||
JPS58551A (ja) * | 1981-06-22 | 1983-01-05 | 株式会社日立製作所 | トラス構造の製作方法およびその装置 |
JPH05185255A (ja) * | 1992-01-13 | 1993-07-27 | Kiwa Giken Kk | レーザ加工システム |
CN101633082A (zh) * | 2009-08-21 | 2010-01-27 | 长沙金阳机械设备科技开发有限公司 | 汽车起重机副臂厚薄壁构造件防变形的焊接方法 |
CN201592324U (zh) * | 2009-11-26 | 2010-09-29 | 自贡天成工程机械有限公司 | 塔式起重机过渡节的组焊工装 |
CN202144008U (zh) * | 2011-06-17 | 2012-02-15 | 长沙中联重工科技发展股份有限公司 | 通用焊接用工艺装备 |
CN203726044U (zh) * | 2014-01-13 | 2014-07-23 | 浙江虎霸建设机械有限公司 | 一种塔式起重机起重臂拼焊工装 |
CN204221249U (zh) * | 2014-09-30 | 2015-03-25 | 浙江虎霸建设机械有限公司 | 塔式起重机标准节拼焊装置 |
CN204975845U (zh) * | 2015-08-31 | 2016-01-20 | 南车石家庄车辆有限公司 | 强夯机顶部臂架组对工装 |
-
2015
- 2015-08-31 CN CN201510545364.2A patent/CN105033556B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5612353B2 (zh) * | 1976-07-14 | 1981-03-20 | ||
JPS58551A (ja) * | 1981-06-22 | 1983-01-05 | 株式会社日立製作所 | トラス構造の製作方法およびその装置 |
JPH05185255A (ja) * | 1992-01-13 | 1993-07-27 | Kiwa Giken Kk | レーザ加工システム |
CN101633082A (zh) * | 2009-08-21 | 2010-01-27 | 长沙金阳机械设备科技开发有限公司 | 汽车起重机副臂厚薄壁构造件防变形的焊接方法 |
CN201592324U (zh) * | 2009-11-26 | 2010-09-29 | 自贡天成工程机械有限公司 | 塔式起重机过渡节的组焊工装 |
CN202144008U (zh) * | 2011-06-17 | 2012-02-15 | 长沙中联重工科技发展股份有限公司 | 通用焊接用工艺装备 |
CN203726044U (zh) * | 2014-01-13 | 2014-07-23 | 浙江虎霸建设机械有限公司 | 一种塔式起重机起重臂拼焊工装 |
CN204221249U (zh) * | 2014-09-30 | 2015-03-25 | 浙江虎霸建设机械有限公司 | 塔式起重机标准节拼焊装置 |
CN204975845U (zh) * | 2015-08-31 | 2016-01-20 | 南车石家庄车辆有限公司 | 强夯机顶部臂架组对工装 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107671473A (zh) * | 2017-09-27 | 2018-02-09 | 纽科伦(新乡)起重机有限公司 | 一种建筑养护设备的立柱与导向车轮组对工装 |
Also Published As
Publication number | Publication date |
---|---|
CN105033556B (zh) | 2017-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203546626U (zh) | 钢管混凝土拱桥吊杆更换装置 | |
CN103266778B (zh) | 可拆三角形胎架及钢桁架拼装施工方法 | |
CN111794127A (zh) | 一种超高悬浇梁0#块支架的反力预压系统及预压方法 | |
CN201738597U (zh) | 高、大截面梁型钢及钢管组合式支撑系统 | |
CN101633483B (zh) | 一种钢结构网架整体提升装置 | |
CN105369745A (zh) | 一种桥梁支座更换顶升反力架 | |
CN207160223U (zh) | 一种可变支点销接式钢桁架平台 | |
CN204625045U (zh) | 一种钢结构吊装用门型支架式吊装装置 | |
CN204975845U (zh) | 强夯机顶部臂架组对工装 | |
CN203808094U (zh) | 一种可调节式塔吊钢平台基础 | |
CN105033556A (zh) | 强夯机顶部臂架组对工装 | |
CN204975847U (zh) | 中间臂架组对工装端部定位支撑 | |
CN109138272B (zh) | 一种超高层钢棒群连接固定装置及方法 | |
CN204975846U (zh) | 强夯机基础臂架组对工装 | |
CN205116146U (zh) | 强夯机中间臂架组对工装 | |
CN202249004U (zh) | 改进型钢结构厂房结构 | |
CN202742511U (zh) | 一种装配式制梁台座 | |
CN205527291U (zh) | 一种用于吊装两块叠合板的框型架 | |
CN212128878U (zh) | 一种基于销棒法的圆柱墩盖梁施工托架 | |
CN202388183U (zh) | H型钢数控切割机举升设备 | |
CN202913356U (zh) | 桥梁施工用承重架 | |
CN112049017A (zh) | 一种现浇箱梁用贝雷架整体落架装置及施工工艺 | |
CN105033554B (zh) | 强夯机基础臂架组对工装 | |
CN215164727U (zh) | 一种用于钢箱梁悬臂安装的提升装置 | |
CN105544955A (zh) | 一种电梯井工具式操作钢平台及其制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 051430 Shijiazhuang Province, Luancheng City, Shijiazhuang province equipment Industrial Park, Yu Xiang street, No. 168 Applicant after: CRRC SHIJIAZHUANG CO., LTD. Address before: 050000 Shijiazhuang Province, Luancheng City, Shijiazhuang province equipment Industrial Park, Yu Xiang street, No. 168 Applicant before: CSR SHIJIAZHUANG ROLLING STOCK WORKS |
|
GR01 | Patent grant | ||
GR01 | Patent grant |