CN104948211A - Large mining height end-mining net hanging process - Google Patents

Large mining height end-mining net hanging process Download PDF

Info

Publication number
CN104948211A
CN104948211A CN201510287282.2A CN201510287282A CN104948211A CN 104948211 A CN104948211 A CN 104948211A CN 201510287282 A CN201510287282 A CN 201510287282A CN 104948211 A CN104948211 A CN 104948211A
Authority
CN
China
Prior art keywords
net
flexible net
wire rope
flexible
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510287282.2A
Other languages
Chinese (zh)
Inventor
程波
袁春奎
刘二进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201510287282.2A priority Critical patent/CN104948211A/en
Publication of CN104948211A publication Critical patent/CN104948211A/en
Pending legal-status Critical Current

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a coal mining technology, in particular to a large mining height end-mining net hanging process. The problem of flexible net roll hanging in the large mining height last phase in coal mine mining work is solved. The large mining height end-mining net hanging process comprises the steps that a flexible net roll and a support set are arranged in parallel, all support stand columns are provided with manual winches respectively, the manual winches are connected with a steel wire rope, and a pulley is arranged on a top beam; singular frames hang a net, and even-number frames wrap the net; coal cutting is started, and the frames need to be pulled forwards after coal cutting; the winches are loosened, the steel wire rope is made to drop, the flexible net roll is put down and unfolded, a frame is pulled forwards, the upper side of the flexible net is fixed, in the frame pulling process, and part of the flexible net is unfolded and can be laid between a top plate and the support top beam; in the forward moving process of the hung net, transverse steel wire ropes and longitudinal steel wire ropes are hung below the flexible net, a framework is formed by the criss-cross steel wire ropes, and the flexible net is of a supported support dismantling channel structure. The processes that workers carry the net on the shoulder, lie on the net and mount the plate beam in the metal net process are reduced, and the labor intensity of the workers is greatly reduced. Above all, the steel wire ropes are innovatively used for enhancing the strength of the flexible net, and the safety of support dismantling work is guaranteed.

Description

Linked network technique is adopted at high working face end
Technical field
The present invention relates to a kind of coal winning technology, be specially a kind of high working face end and adopt linked network technique.
Background technology
during coal mine machinery melts and adopts,adopting that end, face adopts is the final tache of coal-face, be also that can the face end of adopting be adopted and be completed smoothly safely for the important step that frame prepares is removed in the face of adopting, and is related to that can mine normally be connected smoothly.Particularly large-mining-height working surface, mining height is large, and equipment is large, and roof conditions is complicated, selects correct last excavating technology most important.Technology is adopted at traditional high working face end, be coal-face arrived distance stop adopting line certain distance time, adopt close plating net and beat the method that anchor pole combines and fix top board.Need in operation manually to shoulder net, repeatedly enter scraper-trough conveyer linked network, upper beam slab, not only labour intensity is large, consuming time longer, and safety is not high.The flexible net having brought into use a kind of h to make at present, to replace wire lath, carry out the fixing top board of linked network operation, but how carrying out rapidly and efficiently linked network is one of technical issues that need to address in work.
Summary of the invention
The present invention is in order to solve in coal mining work, and the flexible net in high working face latter stage is wrapping with the problem of net, provides a kind of high working face end and adopts linked network technique.
Technical scheme of the present invention is, linked network technique is adopted at a kind of high working face end, and step comprises:
(1), erection stage, distance stops adopting line 20 meters of, flexible net volume and support group is be arranged in parallel, in all bracket upright post install a hand winch, connecting steel wire ropes on hand winch, back timber installs pulley; Single digit frame cat net, dual number digits frame blanket net; By the hand winch on single digit frame, flexible reel wire marginal portion is lifted, be suspended on the support anchor rod on top board, then by the hand winch on dual number digits frame, flexible reel wire is caught rise; Again by the wire rope of odd number frame cat net, become blanket net, under making top board, soar in space, ensures that coal-winning machine passes through smoothly;
(2), start coal cutting, need after having cut to try to stop people from fighting each other forward; Unclamp capstan winch, wire rope is fallen, put down by flexible net volume and launch, face guard is got;
(3), forward try to stop people from fighting each other, flexible net top is fixed, and in the process of trying to stop people from fighting each other, the flexible net of deploying portion can be taped against the position between top board and set cap,
(4) reach of, trying to stop people from fighting each other terminates, receive face guard, re-use hand winch to tighten up wire rope and risen by flexible net volume pocket, carry out next round circulation coal cutting, circulation coal cutting and lapping are until end is adopted at end, in linked network reach process, below flexible net, hang horizontal wire rope, and longitudinal steel wire rope, forming wire rope is in length and breadth skeleton, flexible net be support remove frame channel design.
Compared with prior art, technique of the present invention is adopted in process at end, creatively have employed the quick end that " flexible net+wire rope " combine and adopt linked network technique, adopt novel flexible net to replace conventional metals net, and flexible net on reinforce horizontal and vertical wire rope.Flexible net has very strong toughness, and tensile strength is higher, can not cause net fragmentation, distortion because of roof cracking or large area wall caving, contributes to improving the stability that construction is adopted at end.Install with means of transportation easy, greatly reduce the labour intensity of staff, the simple and safe coefficient of technique is high, does not need frequently to enter scraper-trough conveyer, time saving and energy saving, greatly increases work efficiency.Only need a linked network, safety improves greatly, and conventional metals network process end is adopted and approximately needed 7-8 days again, and this technique only needs 3-4 days.This technique last only needs worker stands on support, use capstan winch to draw in the net, and puts net.Both ensure that the intensity of net, in turn ensure that the speed of online.Decrease wire lath technique workman and shoulder net, the techniques such as net, upper plate-girder of lying prone, greatly alleviate the labour intensity of workman.The most important thing is that we innovatively use wire rope to strengthen the intensity of flexible net, also ensure that the safety of removing frame work like this.
Accompanying drawing explanation
Fig. 1 is one of present invention process block diagram
Fig. 2 is present invention process block diagram two
Fig. 3 is present invention process block diagram three
In figure: 1-bracket upright post, 2-hand winch, 3-rib, 4-coal-winning machine, 5-flexible net volume, 6-pulley, 7-wire rope, 8-hydraulic support group.
Detailed description of the invention
High working face, normally adopts, and does not need linked network, and the stage is adopted at end, (distance stops adopting line 20 meters of), needs to adjust mining height, reduces mining height, is beneficial to envelope side and top board linked network, flexible net volume, wide about 140 meters, grows up about 15 meters,
Linked network technique is adopted at a kind of high working face end, and step comprises:
(1), erection stage, as schematically shown in Figure 1, flexible net volume 5 and support group 8 be arranged in parallel, all bracket upright post 1 install hand winch 2 additional, back timber is installed pulley 6, wire rope 7 on hand winch on single digit support is through back timber pulley, and under wear flexible net volume 5, be fixed on back timber front end again, flexible net volume is caught, steel wire penetrating back timber pulley on hand winch on dual number digits support, more forward through water chestnut or the suspension ring of back timber front end, be finally directly fixedly connected with flexible net edge;
(2), start coal cutting, before coal-winning machine 4 coal cutting, operation sheet numerical digit hand winch reclaims wire rope together, and flexible net volume is held up, vacating space, coal-winning machine starts coal cutting, (coal cutting 0.8 meter of dark left and right); As schematically shown in Figure 1,
(3), try to stop people from fighting each other forward, after a coal cutting terminates, as schematically shown in Figure 2, unclamp hand winch, flexible net is put down, because flexible net is fixed on one side, flexible net is stretched out in decline, and reach of then trying to stop people from fighting each other (about 0.8 meter), in the process of reach, the top that the flexible net pulled open is brought into support directly contacts with top board (flexible net is laid about 0.8 meter)
(4), try to stop people from fighting each other to move forward and terminate, as schematically shown in Figure 3, more manually flexible reel wire is caught rise by capstan winch, vacates coal cutting passage, carries out next coal cutting, circulates and so forth, until end is adopted at end; In linked network reach process, below flexible net, every 500mm hangs wire rope horizontal together, after linked network terminates, then hangs longitudinal steel wire rope, hangs one longitudinal steel wire rope every 300mm.Forming wire rope is in length and breadth skeleton, flexible net be support remove frame channel design.
Specific operation process is as follows, and flexible net adopts and install hand winch additional in bracket upright post, is hung in support front-axle beam upper end.Before linked network, first by odd number support hand winch wire rope (with supporting can self-locking gib head) through the fixed pulley on set cap, more directly to hang over selvage wire rope through rear below flexible net volume 5.
Then regain even numbers support secondary protecting side plate to being 90 ° of Angle Position with one-level face guard, personnel by stair or stirrup on support secondary protecting side plate.Then at anchor pole place, top, even numbers support front, water chestnut and hoisting ring are installed.By the wire rope on even numbers support capstan winch successively through the water chestnut on the pulley on back timber and top, corresponding support front anchor pole or hoisting ring, finally directly hang over apart from the mesh of flexible net 300-500mm.Such formation odd number frame blanket net, the pattern that even numbers frame draws in the net, just can circulate coal cutting afterwards.
Vertical and horizontal wire rope is laid, and in order to ensure removing frame safety, we adopt fixed lateral and longitudinal steel wire rope in flexible net, to strengthen its intensity, ensure that the safety of removing frame is carried out smoothly.
(1) intensity of transverse steel wire rope reinforcing network: the 1m place launched in flexible net starts to join first time wire rope.Specific practice: more than disposable connection three times wire rope.From linked network, 1m place starts upper first time Φ 15.5mm wire rope, and every the upper wire rope of 500mm, first, second wire rope is first connected before linked network, then linked network is carried out, be convenient to connect wire rope, the later wire rope of the 3rd time distance second time wire rope 500mm(the 3rd time is connecting along place under the little face guard of support).Require: use bifilar 16# twine to twist together, kink spacing is not more than 300mm, and per pass kink is no less than three circles, and often plow wire rope spacing 500mm, about go up 25-27 and plow wire rope, wire rope is at each 1-2m that has more than needed out of frame head and tail termination frame.Can overlap if wire rope falls short of, wire rope lap segment is no less than 2m, and connects firm with being no less than 3 wire clips, and the lap segment of front and back wire rope twice staggers the distance of at least more than 10m as far as possible.
(2) intensity of longitudinal steel wire rope reinforcing network: after hanging net, wire rope one is fixed on the hoisting ring or water chestnut pushing up anchor pole place between every frame frame, cable wire end is firm with being no less than 1 wire clips connection, adjacent frame support secondary protecting side plate is first regained to being 90 ° of Angle Position with one-level face guard when hanging wire rope, loadlock rack, and be responsible for nursing blocking wedge by sight recluse person.Support conditions is checked by footman cadre, and perform " tapping " look between frame and front-axle beam live carbon live cash, after confirming safety, personnel by stair or stirrup on support secondary protecting side plate, system hangs up properly safety belt, being hung over by wire rope between frame pushes up on the water chestnut of anchor pole, and between whole operational period, personnel must be noted that erect-position, forbids to stand on two frame front-axle beam centre positions.Longitudinal steel wire rope connects the bifilar 16# twine kink of use, and kink spacing is not more than 300mm, and per pass kink is no less than three circles.

Claims (2)

1. a linked network technique is adopted at high working face end, it is characterized in that step comprises:
1), erection stage, distance stops adopting line 20 meters of, flexible net volume and support group is be arranged in parallel, in all bracket upright post install a hand winch, connecting steel wire ropes on hand winch, back timber installs pulley; Single digit frame cat net, dual number digits frame blanket net; By the hand winch on single digit frame, flexible reel wire marginal portion is lifted, be suspended on the support anchor rod on top board, then by the hand winch on dual number digits frame, flexible reel wire is caught rise; Again by the wire rope of odd number frame cat net, become blanket net, under making top board, soar in space, ensures that coal-winning machine passes through smoothly;
2), start coal cutting, need after having cut to try to stop people from fighting each other forward; Unclamp capstan winch, wire rope is fallen, put down by flexible net volume and launch, face guard is got;
3), forward try to stop people from fighting each other, flexible net top is fixed, and in the process of trying to stop people from fighting each other, the flexible net of deploying portion can be taped against the position between top board and set cap,
4) reach of, trying to stop people from fighting each other terminates, receive face guard, re-use hand winch to tighten up wire rope and risen by flexible net volume pocket, carry out next round circulation coal cutting, circulation coal cutting and lapping are until end is adopted at end, in linked network reach process, below flexible net, hang horizontal wire rope, and longitudinal steel wire rope, forming wire rope is in length and breadth skeleton, flexible net be support remove frame channel design.
2. linked network technique is adopted at high working face end according to claim 1, it is characterized in that step comprises:
1), erection stage, flexible net volume (5) and support group (8) be arranged in parallel, all bracket upright post (1) install hand winch (2) additional, back timber is installed pulley (6), wire rope (7) on hand winch on single digit support is through back timber pulley, and under wear flexible net volume (5), be fixed on back timber front end again, flexible net volume is caught, steel wire penetrating back timber pulley on hand winch on dual number digits support, again forward through water chestnut or the suspension ring of back timber front end, be finally directly fixedly connected with flexible net edge;
2), start coal cutting, before coal-winning machine (4) coal cutting, operation sheet numerical digit hand winch reclaims wire rope together, and flexible net volume is held up, vacating space, coal-winning machine starts coal cutting,
3), try to stop people from fighting each other forward, after a coal cutting terminates, unclamp hand winch, flexible net put down, because flexible net is fixed, flexible net is stretched out in decline, then to try to stop people from fighting each other reach, in the process of reach, the top that the flexible net pulled open is brought into support directly contacts with top board
4), try to stop people from fighting each other to move forward and terminate, more manually flexible reel wire is caught rise by capstan winch, vacates coal cutting passage, carries out next coal cutting, circulates and so forth, until end is adopted at end; In linked network reach process, below flexible net, every 500mm hangs wire rope horizontal together, after linked network terminates, then hangs longitudinal steel wire rope, hangs one longitudinal steel wire rope every 300mm, and the wire rope formed in length and breadth is skeleton, flexible net be support remove frame channel design.
CN201510287282.2A 2015-05-31 2015-05-31 Large mining height end-mining net hanging process Pending CN104948211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510287282.2A CN104948211A (en) 2015-05-31 2015-05-31 Large mining height end-mining net hanging process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510287282.2A CN104948211A (en) 2015-05-31 2015-05-31 Large mining height end-mining net hanging process

Publications (1)

Publication Number Publication Date
CN104948211A true CN104948211A (en) 2015-09-30

Family

ID=54163219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510287282.2A Pending CN104948211A (en) 2015-05-31 2015-05-31 Large mining height end-mining net hanging process

Country Status (1)

Country Link
CN (1) CN104948211A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569698A (en) * 2016-03-15 2016-05-11 兖州煤业股份有限公司 Long-distance net setting and drawing device at coal face
CN106351679A (en) * 2016-11-09 2017-01-25 安徽理工大学 Soil similar coal working face fully sealed shield support device
CN106401623A (en) * 2016-11-09 2017-02-15 安徽理工大学 Full-closed coal mining device for soil-like coal working face and coal mining method of full-closed coal mining device
CN107023310A (en) * 2017-06-09 2017-08-08 浩珂科技有限公司 The separate zone production quick lapping technique of large area
CN108104858A (en) * 2017-11-24 2018-06-01 中国平煤神马能源化工集团有限责任公司 It is a kind of can before frame lapping joint support top side protecting mechanism
CN108775250A (en) * 2018-08-10 2018-11-09 北京天地华泰矿业管理股份有限公司 Adopt online Lanyard device and equipment recovery method in a kind of end applied to coal mine fully-mechanized mining working
CN108952779A (en) * 2018-07-31 2018-12-07 中国神华能源股份有限公司 Gib and device for layering
CN109931084A (en) * 2017-12-19 2019-06-25 淮北矿业股份有限公司 A kind of laying method of coal working face protective net
CN110454163A (en) * 2019-08-30 2019-11-15 陕煤集团神木红柳林矿业有限公司 A kind of quick end of fully-mechanized mining working, which is adopted, withdraws Ji Cheongju coal technique
CN110985075A (en) * 2019-12-27 2020-04-10 中国矿业大学(北京) Automatic flexible net releasing device for longwall coal face in final mining stage and using method thereof
CN112196529A (en) * 2020-09-30 2021-01-08 兖州煤业股份有限公司 Large-height-difference advanced mining stop process
CN115263397A (en) * 2022-07-28 2022-11-01 河南赢创矿山工程有限公司 Hydraulic device for temporary support of coal mine tunnel excavation working face

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1068168A (en) * 1991-06-24 1993-01-20 北京煤矿机械厂 Hydraulic prop of mechanically laying and connecting network
RU2381367C1 (en) * 2009-02-16 2010-02-10 ОАО "Уральский научно-исследовательский и проектный институт галургии" (ОАО "Галургия") Crib work
CN201687497U (en) * 2010-04-12 2010-12-29 史之印 Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
CN201843629U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Fiber mesh device used for controlling top plate
CN201857982U (en) * 2010-11-15 2011-06-08 吕国定 Automatic top net laying device
CN204827445U (en) * 2015-05-21 2015-12-02 中国矿业大学(北京) Tail system gathers at large mining height fully -mechanized working face end
CN105134266A (en) * 2015-08-24 2015-12-09 天地科技股份有限公司 Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1068168A (en) * 1991-06-24 1993-01-20 北京煤矿机械厂 Hydraulic prop of mechanically laying and connecting network
RU2381367C1 (en) * 2009-02-16 2010-02-10 ОАО "Уральский научно-исследовательский и проектный институт галургии" (ОАО "Галургия") Crib work
CN201687497U (en) * 2010-04-12 2010-12-29 史之印 Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
CN201843629U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Fiber mesh device used for controlling top plate
CN201857982U (en) * 2010-11-15 2011-06-08 吕国定 Automatic top net laying device
CN204827445U (en) * 2015-05-21 2015-12-02 中国矿业大学(北京) Tail system gathers at large mining height fully -mechanized working face end
CN105134266A (en) * 2015-08-24 2015-12-09 天地科技股份有限公司 Support method for fully-mechanized coal mining face full-negative-pressure withdrawing channel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李嵚: "28202工作面使用柔性纤维网收尾的研究", 《山西焦煤科技》 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569698A (en) * 2016-03-15 2016-05-11 兖州煤业股份有限公司 Long-distance net setting and drawing device at coal face
CN106351679A (en) * 2016-11-09 2017-01-25 安徽理工大学 Soil similar coal working face fully sealed shield support device
CN106401623A (en) * 2016-11-09 2017-02-15 安徽理工大学 Full-closed coal mining device for soil-like coal working face and coal mining method of full-closed coal mining device
WO2018086327A1 (en) * 2016-11-09 2018-05-17 安徽理工大学 Full-closed coal mining device for soil-like coal working face and coal mining method thereof
CN107023310A (en) * 2017-06-09 2017-08-08 浩珂科技有限公司 The separate zone production quick lapping technique of large area
CN108104858A (en) * 2017-11-24 2018-06-01 中国平煤神马能源化工集团有限责任公司 It is a kind of can before frame lapping joint support top side protecting mechanism
CN109931084A (en) * 2017-12-19 2019-06-25 淮北矿业股份有限公司 A kind of laying method of coal working face protective net
CN108952779A (en) * 2018-07-31 2018-12-07 中国神华能源股份有限公司 Gib and device for layering
CN108952779B (en) * 2018-07-31 2020-04-03 中国神华能源股份有限公司 Temporary support and lapping device
CN108775250A (en) * 2018-08-10 2018-11-09 北京天地华泰矿业管理股份有限公司 Adopt online Lanyard device and equipment recovery method in a kind of end applied to coal mine fully-mechanized mining working
CN108775250B (en) * 2018-08-10 2024-02-13 北京天地华泰矿业管理股份有限公司 Last-mining net-surfing rope hanging device applied to fully-mechanized coal mining face and equipment recovery method
CN110454163A (en) * 2019-08-30 2019-11-15 陕煤集团神木红柳林矿业有限公司 A kind of quick end of fully-mechanized mining working, which is adopted, withdraws Ji Cheongju coal technique
CN110454163B (en) * 2019-08-30 2024-03-26 陕煤集团神木红柳林矿业有限公司 Rapid non-mining withdrawing and coal cleaning process for fully mechanized coal mining face
CN110985075A (en) * 2019-12-27 2020-04-10 中国矿业大学(北京) Automatic flexible net releasing device for longwall coal face in final mining stage and using method thereof
CN112196529A (en) * 2020-09-30 2021-01-08 兖州煤业股份有限公司 Large-height-difference advanced mining stop process
CN115263397A (en) * 2022-07-28 2022-11-01 河南赢创矿山工程有限公司 Hydraulic device for temporary support of coal mine tunnel excavation working face

Similar Documents

Publication Publication Date Title
CN104948211A (en) Large mining height end-mining net hanging process
CN104631810B (en) High altitude moving hanging basket system and construction method
CN203080894U (en) Building steel structure construction protector
CN204199686U (en) Without outrigger concrete parapet formwork system
CN102409838A (en) Moveable operating platform and method for constructing suspended ceiling of roof by using same
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN104818858B (en) Indoor heavy electrical cabinet hanging method
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN213596814U (en) Movable three-dimensional crossing type multipurpose suspension bridge construction platform
CN211899163U (en) Construction structure of roof steel structure platform slope glass curtain wall
CN105952130B (en) A kind of suspension platform installation method for the construction of building cornice position
CN105926917B (en) Steel structure cornices exterior trim surface construction suspension platform and its building method and method for dismounting
CN202012205U (en) Safe anti-falling net
CN208981895U (en) Lifting and self-climbing combined mechanism for erecting power transmission tower
CN106284961A (en) Small-sized attachment type raise scaffold
CN115306137A (en) Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof
CN202039299U (en) Totally-closed hanging basket
CN209839329U (en) Support frame is used in water supply pipe installation
CN205472340U (en) People's passageway on instrument formula tower crane
CN108263974A (en) It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN212428008U (en) Lower supporting type overhanging scaffold construction device
CN202926348U (en) U-shaped shed fixing device
RU2438963C1 (en) Attachment tower crane with tower connections and device to attach crane tower to high-rise building, method of extending crane tower and device to this end
CN213804912U (en) Collapsible crossbeam construction hanging flower basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150930

RJ01 Rejection of invention patent application after publication