CN108104858A - It is a kind of can before frame lapping joint support top side protecting mechanism - Google Patents

It is a kind of can before frame lapping joint support top side protecting mechanism Download PDF

Info

Publication number
CN108104858A
CN108104858A CN201711188339.9A CN201711188339A CN108104858A CN 108104858 A CN108104858 A CN 108104858A CN 201711188339 A CN201711188339 A CN 201711188339A CN 108104858 A CN108104858 A CN 108104858A
Authority
CN
China
Prior art keywords
level
support top
fixed network
protecting
string bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711188339.9A
Other languages
Chinese (zh)
Inventor
张建国
王佳奇
车云立
齐文跃
周国有
刘治成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Pingdingshan Tianan Coal Mining Co Ltd
China Pingmei Shenma Energy and Chemical Group Co Ltd
Original Assignee
China University of Mining and Technology CUMT
Pingdingshan Tianan Coal Mining Co Ltd
China Pingmei Shenma Energy and Chemical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT, Pingdingshan Tianan Coal Mining Co Ltd, China Pingmei Shenma Energy and Chemical Group Co Ltd filed Critical China University of Mining and Technology CUMT
Priority to CN201711188339.9A priority Critical patent/CN108104858A/en
Publication of CN108104858A publication Critical patent/CN108104858A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/03Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor having protective means, e.g. shields, for preventing or impeding entry of loose material into the working space or support

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

It is a kind of can before frame lapping joint support top side protecting mechanism, including hydraulic support, three-stage side protecting mechanism and support top mounted on the top beam front end of hydraulic support visit beam, support top is visited beam and is arranged in front of the top beam of hydraulic support, it is hinged with level-one face guard, further include the support top string bag and fixed network anchor pole, the support top string bag is fixed on level-one face guard, the support top string bag includes jacking stent and the shaft type string bag, after the stretching, extension of level-one face guard, jacking stent just visits beam with support top and docks the roof timbering to form top beam front end, the shaft type string bag includes carbon fibre web, carbon fibre web is fixed on by fixed network anchor pole on coal wall.The present invention is esy to use, safe and reliable, adaptable, can be with prevention and control coal wall caving disaster, and can eliminate the danger that bulk wall caving coal body drops, and realizes the safety in production of km deep-well large-mining-height working surface.

Description

It is a kind of can before frame lapping joint support top side protecting mechanism
Technical field
The present invention relates to it is a kind of can before frame lapping joint support top side protecting mechanism, belong to technical field of coal mine equipment.
Background technology
With east China superficial part coal resources exploitation totally, the exploitations of coal resources is gradually shifted to deep, in The working face dynamic disaster problem that this brings simultaneously is also outstanding day by day, especially under the conditions of the high working face of deep, the coal of working face Wall flaps side phenomenon frequently occurs, and becomes the technical barrier of working face safe working.
At present, three-stage side protecting mechanism of hydraulic support is the main means for protecting coal wall.Three-stage side protecting mechanism adapts to high working face Working face mining condition adds in third level protection coal wall safety again under conditions of former two-stage face guard.For example, as it is known that one kind Three-stage side protecting mechanism of hydraulic support, the level-one face guard being hinged including the extensible canopy front end with hydraulic support top beam and setting Level-one wall supporting jack on the extensible canopy;The mandril of the level-one wall supporting jack passes through small with level-one wall supporting postlaminar part Four-bar mechanism is hinged;Secondary protecting side plate is hinged in the front end of level-one face guard, is hinged in the front end of the secondary protecting side plate There is three-stage side protecting plate;Secondary protecting side jack, the mandril and two of the secondary protecting side jack are provided on level-one face guard Grade wall supporting postlaminar part is hinged;Three-stage side protecting jack, the top of the three-stage side protecting jack are provided on secondary protecting side plate Bar is hinged with three-stage side protecting postlaminar part by small four-bar mechanism.
Although above-mentioned three-stage side protecting plate can realize the supporting requirement to working face wall, it can not be to hydraulic support top beam Front top plate carries out supporting, and once three-stage side protecting plate is withdrawn, the wall caving coal body of bulk drops and staff and mining will be set It is standby to damage.Therefore, exposed top plate and processing the wall caving coal body that drops become a great problem of urgent need to resolve in front of protective cradle.
The content of the invention
In order to overcome the above-mentioned deficiency of the prior art, the present invention provide it is a kind of can before frame lapping joint support top wall supporting machine Structure, the side protecting mechanism can fully supporting roof with processing wall caving bulk coal body.
The present invention solve its technical problem the technical solution adopted is that:Including hydraulic support, mounted on the top of hydraulic support The three-stage side protecting mechanism and support top of beam front end visit beam, and support top is visited beam and is arranged in front of the top beam of hydraulic support, with level-one wall supporting Plate is hinged, and further includes the support top string bag and fixed network anchor pole, and the support top string bag includes jacking stent and the shaft type string bag, and the support top string bag is fixed on On level-one face guard, after the stretching, extension of level-one face guard, jacking stent just visits beam with support top and docks the top plate branch to form top beam front end Shield, the shaft type string bag include carbon fibre web, and carbon fibre web is fixed on by fixed network anchor pole on coal wall.
Compared with prior art, it is of the invention it is a kind of can before frame lapping joint support top side protecting mechanism, pass through the support top string bag Jacking stent joint support top, which visits beam, further to carry out supporting to top plate, can realize the supporting to exposed top plate before stent, Wall caving problem caused by effectively preventing top plate roof fall, and pass through fixed network anchor pole and reinforcement supporting is carried out to coal wall, reinforce coal wall;And In the case that there is wall caving in coal wall, can realize to wall caving coal wall fall buffering, specifically using fixed network anchor pole bottom bar with Carbon fibre web compound action, into row buffering and collection, prevents bulk wall caving coal body to personnel and sets to the whereabouts of coal wall caving coal body It is standby to damage.Whole device is esy to use, safe and reliable, adaptable, reduces the cost of wall caving prevention.
Description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is the structure diagram of one embodiment of the invention.
Fig. 2 is operating diagrams of the Fig. 1 under coal wall stabilization.
Fig. 3 is operating diagrams of the Fig. 1 under coal wall unstability.
Fig. 4 is the schematic diagram that fixed network wood bolt fixes diamond shape carbon fibre web in Fig. 1.
Fig. 5 is the structure diagram of the support top string bag in Fig. 1.
In figure:1st, support top visits beam, 2, level-one face guard, 3, secondary protecting side plate, 4, three-stage side protecting plate, 5, the support top string bag, 6, Diamond shape carbon fibre web, 7, fixed network wood bolt, 8, pole cap, 9, jacking stent, 10, the shaft type string bag, 11, level-one wall supporting jack, 12, Secondary protecting side jack, 13, three-stage side protecting jack.
Specific embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, the technical solution in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is The part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's all other embodiments obtained without making creative work, belong to protection scope of the present invention.
Fig. 1 to Fig. 5 shows the structure diagram of a preferred embodiment of the invention, and one kind in Fig. 1 can be spread before frame The side protecting mechanism of joint support top is netted, beam 1, three-stage side protecting mechanism, the support top string bag 5 and fixed network wood anchor are visited including hydraulic support, support top Bar 7, three-stage side protecting mechanism are mounted on the top beam front end of hydraulic support.The side protecting mechanism includes level-one face guard 2, two level is protected Side board 3, three-stage side protecting plate 4, level-one wall supporting jack 11, secondary protecting side jack 12 and three-stage side protecting jack 13, level-one shield Side board 2 is hinged on support top and visits on beam 1, and level-one wall supporting jack 11 is arranged on the top beam of hydraulic support, level-one wall supporting jack 11 mandril is hinged on the hinged place that level-one face guard 2 visits beam 1 with support top, front end and 3 phase of secondary protecting side plate of level-one face guard 2 Hinged, the front end of secondary protecting side plate 3 is hinged three-stage side protecting plate 4, and level-one face guard 2 is equipped with secondary protecting side jack 12, two level The mandril of wall supporting jack 12 is hinged with 3 rear portion of secondary protecting side plate, and three-stage side protecting jack is equipped on secondary protecting side plate 3 13, mandril and 4 rear portion of three-stage side protecting plate of three-stage side protecting jack 13 are hinged.
As shown in figure 3, the support top string bag 5 includes jacking stent 9 and the shaft type string bag 10, the support top string bag 5 is fixed on top level-one On face guard 2, after top level-one face guard 2 stretches, jacking stent 9 just visits beam 1 with support top and docks the top to form top beam front end Slab supporting, the shaft type string bag 10 include diamond shape carbon fibre web 6, and diamond shape carbon fibre web 6 is fixed on by fixed network wood bolt 7 on coal wall. Specifically, the diamond shape carbon fibre web 6 is consolidated by bar in the middle part of fixed network wood bolt mandril, fixed network wood bolt and fixed network wood bolt bottom bar It is scheduled on coal wall, the length of fixed network wood bolt 7 is 2m, and fixed network wood bolt mandril is arranged upwards with horizontal direction into 25 °, fixed network wood anchor The vertical coal wall arrangement of bar, fixed network wood bolt bottom bar are arranged downwards with horizontal direction into 15 ° in the middle part of bar.
In the present embodiment, the fixed network wood bolt 7 is solid wooden cylinder, and the top of fixed network wood bolt 7 is provided with Pole cap 8, the size of pole cap 8 are more than the size of the diamond-shaped meshes of diamond shape carbon fibre web 6.
The present invention can realize the supporting to exposed top plate before stent using in deep-well large-mining-height working surface coal wall supporting, Wall caving problem caused by effectively preventing top plate roof fall can also realize the buffering to fall to wall caving coal wall.Whole device user Just it is, safe and reliable, adaptable, the cost of wall caving prevention is reduced, before being had a wide range of applications in deep-well large cutting height workface Scape.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is every according to According to the technical spirit of the present invention, any simple modification and equal variation are made to above example, each falls within the guarantor of the present invention Within the scope of shield.

Claims (4)

1. it is a kind of can before frame lapping joint support top side protecting mechanism, including hydraulic support, mounted on the top beam front end of hydraulic support Three-stage side protecting mechanism and support top visit beam (1), support top is visited beam (1) and is arranged in front of the top beam of hydraulic support, with level-one wall supporting Plate (2) is hinged, it is characterized in that:The support top string bag (5) and fixed network anchor pole are further included, the support top string bag (5) includes jacking stent (9) and axis The formula string bag (10), the support top string bag (5) are fixed on top level-one face guard (2), after level-one face guard (2) stretching, extension, jacking stent (9) beam (1) is just visited with support top and docks the roof timbering to form top beam front end, the shaft type string bag (10) includes carbon fibre web, and carbon is fine Dimension Netcom crosses fixed network anchor pole and is fixed on coal wall.
2. it is according to claim 1 it is a kind of can before frame lapping joint support top side protecting mechanism, it is characterized in that:The fixed network Anchor pole is the fixed network wood bolt (7) of solid wooden cylinder, and the top of fixed network wood bolt (7) is provided with pole cap (8), and carbon fibre web is adopted With diamond shape carbon fibre web (6), the size of pole cap (8) is more than the size of the mesh of diamond shape carbon fibre web (6).
3. it is according to claim 2 it is a kind of can before frame lapping joint support top side protecting mechanism, it is characterized in that:The diamond shape Carbon fibre web (6) is fixed on by bar in the middle part of fixed network wood bolt mandril, fixed network wood bolt and fixed network wood bolt bottom bar on coal wall, fixed network The length of wood bolt (7) is 2m, and into 25 °, arrangement, fixed network wood bolt middle part bar are vertical upwards with horizontal direction for fixed network wood bolt mandril Coal wall arranges that fixed network wood bolt bottom bar is arranged downwards with horizontal direction into 15 °.
4. according to claim 1 or 2 or 3 it is a kind of can before frame lapping joint support top side protecting mechanism, it is characterized in that:It is described Side protecting mechanism include level-one face guard (2), secondary protecting side plate (3), three-stage side protecting plate (4), level-one wall supporting jack (11), two Grade wall supporting jack (12) and three-stage side protecting jack (13), level-one wall supporting jack (11) are arranged on the top beam of hydraulic support On, the mandril of level-one wall supporting jack (11) is hinged on the hinged place that level-one face guard (2) visits beam (1) with support top, level-one wall supporting The front end of plate (2) is hinged with secondary protecting side plate (3), and the front end of secondary protecting side plate (3) is hinged three-stage side protecting plate (4), level-one shield Side board (2) is equipped with secondary protecting side jack (12), mandril and secondary protecting side plate (3) rear portion phase of secondary protecting side jack (12) It is hinged, three-stage side protecting jack (13) is equipped on secondary protecting side plate (3), mandril and the three-level of three-stage side protecting jack (13) are protected Side board (4) rear portion is hinged.
CN201711188339.9A 2017-11-24 2017-11-24 It is a kind of can before frame lapping joint support top side protecting mechanism Pending CN108104858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711188339.9A CN108104858A (en) 2017-11-24 2017-11-24 It is a kind of can before frame lapping joint support top side protecting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711188339.9A CN108104858A (en) 2017-11-24 2017-11-24 It is a kind of can before frame lapping joint support top side protecting mechanism

Publications (1)

Publication Number Publication Date
CN108104858A true CN108104858A (en) 2018-06-01

Family

ID=62206473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711188339.9A Pending CN108104858A (en) 2017-11-24 2017-11-24 It is a kind of can before frame lapping joint support top side protecting mechanism

Country Status (1)

Country Link
CN (1) CN108104858A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643952A (en) * 2018-07-27 2018-10-12 山东矿机华能装备制造有限公司 Full protection wall supporting gangue stopping device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201071730Y (en) * 2007-01-30 2008-06-11 中煤北京煤矿机械有限责任公司 Three level compound side protection mechanism
CN201310369Y (en) * 2008-12-16 2009-09-16 郑州煤矿机械集团股份有限公司 Tertiary side wall protection structure of hydraulic support
CN101592034A (en) * 2009-06-25 2009-12-02 中煤北京煤矿机械有限责任公司 Super large mining height hydraulic support with super high working resistance
CN201687497U (en) * 2010-04-12 2010-12-29 史之印 Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
CN201843629U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Fiber mesh device used for controlling top plate
CN201857982U (en) * 2010-11-15 2011-06-08 吕国定 Automatic top net laying device
CN203374293U (en) * 2013-03-04 2014-01-01 山西潞安矿业(集团)有限责任公司 Device for preventing coal wall caving of working face from causing personal injury
CN104948211A (en) * 2015-05-31 2015-09-30 山西晋城无烟煤矿业集团有限责任公司 Large mining height end-mining net hanging process
CN205135648U (en) * 2015-11-17 2016-04-06 华北科技学院 Rib wall caving anchor
CN206129303U (en) * 2016-08-31 2017-04-26 华北科技学院 Great mining height rib wall caving reinforcing apparatus

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201071730Y (en) * 2007-01-30 2008-06-11 中煤北京煤矿机械有限责任公司 Three level compound side protection mechanism
CN201310369Y (en) * 2008-12-16 2009-09-16 郑州煤矿机械集团股份有限公司 Tertiary side wall protection structure of hydraulic support
CN101592034A (en) * 2009-06-25 2009-12-02 中煤北京煤矿机械有限责任公司 Super large mining height hydraulic support with super high working resistance
CN201687497U (en) * 2010-04-12 2010-12-29 史之印 Quick wire mesh laying device for shield supports in last cutting stope of fully mechanized mining face
CN201843629U (en) * 2010-11-07 2011-05-25 山东浩珂矿业工程有限公司 Fiber mesh device used for controlling top plate
CN201857982U (en) * 2010-11-15 2011-06-08 吕国定 Automatic top net laying device
CN203374293U (en) * 2013-03-04 2014-01-01 山西潞安矿业(集团)有限责任公司 Device for preventing coal wall caving of working face from causing personal injury
CN104948211A (en) * 2015-05-31 2015-09-30 山西晋城无烟煤矿业集团有限责任公司 Large mining height end-mining net hanging process
CN205135648U (en) * 2015-11-17 2016-04-06 华北科技学院 Rib wall caving anchor
CN206129303U (en) * 2016-08-31 2017-04-26 华北科技学院 Great mining height rib wall caving reinforcing apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643952A (en) * 2018-07-27 2018-10-12 山东矿机华能装备制造有限公司 Full protection wall supporting gangue stopping device

Similar Documents

Publication Publication Date Title
WO2018086328A1 (en) Shield support device fully enclosing soil-like coal working face
CN206625858U (en) A kind of automatic moving type forepoling hydraulic support with side guard plate
CN105604594A (en) Shield-type support frame for sand washer
CN108104858A (en) It is a kind of can before frame lapping joint support top side protecting mechanism
CN203905987U (en) Backfill hydraulic bracket
CN209838448U (en) Supporting device for coal mine tunneling
CN110925005B (en) Hydraulic support for retaining waste rock
CN107060857A (en) Dig the advanced stand device of anchoring integral fully-mechanized digging machine
CN210768846U (en) Coal mine excavation roadway support device
CN211448721U (en) Tunnel excavation supporting device
CN205297613U (en) Formula temporary support support is moved certainly in colliery headwork face in pit
CN106761874A (en) A kind of automatic moving type forepoling hydraulic support with side guard plate
CN205349376U (en) Under constructing, wears by subway shield passageway strutting arrangement for building
CN203230451U (en) Hydraulic support for mining working surface roadway
CN110130964A (en) A kind of temporary supporting device of driving working face and construction method
CN207634099U (en) A kind of advance support rack system
CN209724379U (en) A kind of underground coal mine roof fall deliverance apparatus
CN214273676U (en) Colliery tunnel supporting construction of prevention roof rockfall
CN102392663A (en) Forward supporting hydraulic support and forward supporting hydraulic support system
CN208546180U (en) Super large mining high-covering type hydraulic bracket
CN201835849U (en) Waste rock baffling guard mesh device for hydraulic support
CN206636150U (en) The scaffold of protection type screen bed base is installed
CN203374293U (en) Device for preventing coal wall caving of working face from causing personal injury
CN208310827U (en) Gob side entry forces side column Special anchor rod pallet
CN202882995U (en) Tunnel exit passageway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180601