CN108263974A - It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building - Google Patents
It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building Download PDFInfo
- Publication number
- CN108263974A CN108263974A CN201710001714.8A CN201710001714A CN108263974A CN 108263974 A CN108263974 A CN 108263974A CN 201710001714 A CN201710001714 A CN 201710001714A CN 108263974 A CN108263974 A CN 108263974A
- Authority
- CN
- China
- Prior art keywords
- stainless steel
- hanging basket
- tower crane
- bolt
- transport system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/20—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
- B66C23/205—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures for use on top of roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A kind of tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building, it is characterised in that include the following steps:A, with several first stainless steel bolts(8)By two piece of first stainless steel plate(7)It is fixedly clamped in tower crane cantilever(2)The left and right sides of end, b, the hanging basket that will be built by upright bar and cross bar(4)It is placed on parapet(18)On the ground of metope bottom, c, in parapet(18)Metope bottom ground accordingly sets two concrete piers according to hanging basket length(16), d, provide two steel wire ropes(5), make one end of two steel wire ropes around tower crane cantilever(2)The stainless steel bolt of end one week, and with stainless steel steel wire rope card(10)It is fixed.The present invention's has the advantages of hanging basket transport system is simple in structure, sets up conveniently, speeds up the work, reduces security risk, reduces engineering cost and improve economic benefit of engineering for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade.
Description
Technical field
The present invention relates to a kind of hanging basket transport system erection method, specifically, being that one kind is in for outside vertical surface of building
The tower crane hanging basket transport system erection method of oblique facade.
Background technology
It is oblique facade that outside vertical surface of building is frequently encountered in construction project, it is common practice that sets up scaffold construction, ties
Scaffold is with regard to overall pulling down after the completion of structure construction.However when founding decoration surface construction outside, oblique facade sets up out-mould scaffold again again
Frame, some roofing moulding positions will also set up Overhanging Outside Scaffold, cause the increase of financial cost and security risk.
Therefore known tiltedly facade hanging basket transport system there are problems that it is above-mentioned various inconvenient and.
Invention content
The purpose of the present invention is to propose a kind of safe and reliable tower crane hanging basket for being in oblique facade for outside vertical surface of building
Transport system erection method.
To achieve the above object, technical solution of the invention is:
A kind of tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building, it is characterised in that including following
Step:
A, two piece of first stainless steel plate is fixedly clamped in the left and right sides of tower crane cantilever end with several stainless steel bolts, two
Stainless steel bolt is installed between block stainless steel plate;
B, the hanging basket being built by upright bar and cross bar is placed on the ground of parapet metope bottom, daughter is compared on the top of parapet
The lower part of wall is protruded in oblique facade;The hanging basket both sides towards parapet pole tip with several stainless steel bolts by two piece
Two stainless steel plates are fixedly clamped in the left and right sides of upright bar, install stainless steel bolt between two piece of second stainless steel plate, make cunning
Slipping is clamped between two piece of second stainless steel plate, and pulley is made to protrude from hanging basket side, is become the second stainless steel plate and is hung
The cantilever of basket;Hanging basket is connect by hoist cable with the main suspension hook of tower crane cantilever top;
C, on parapet metope bottom ground, according to hanging basket length, accordingly two concrete piers of setting, the interior installation of concrete pier anchor
Bolt;Or anchor bolt bolt is installed in respective storey concrete structure position;
D, two steel wire ropes are provided, make one end of two steel wire ropes around the stainless steel bolt one week of tower crane cantilever end, and use
Stainless steel steel wire rope card is fixed;The other end of two steel wire ropes respectively penetrates the pulley of hanging basket both sides, then passes through gaily decorated basket spiral shell
Bolt is connect or with concrete pier anchor bolt pre-buried in the concrete pier of two, parapet metope bottom ground by gaily decorated basket spiral shell
The anchor bolt that bolt is installed with respective storey concrete structure position is bolted, and is adjusted flower basket bolt tense wire rope, is made two bar steels
Cord becomes hanging basket and makees in the movable rail that the oblique facade of parapet moves up and down under the main suspension hook driving of tower crane.
The present invention's can also use for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade
Following technical measures are further realized.
Aforementioned method, wherein the specification of first stainless steel plate is 100 × 160 × 10mm stainless steel plates.
Aforementioned method, wherein the specification of the pulley is 150mm stainless steel pulleys.
Aforementioned method, wherein the long 1-8m of the hanging basket.
Aforementioned method, wherein the specification of second stainless steel plate is 100 × 160 × 10mm stainless steel plates.
Aforementioned method, wherein the specification of the steel wire rope is 12mm steel wire ropes.
Aforementioned method, wherein the stainless steel steel wire rope card is 6# stainless steel steel wire rope cards.
Aforementioned method, wherein the specification of second stainless steel bolt is 25mm stainless steel bolts.
After adopting the above technical scheme, the tower crane hanging basket transport system for being in oblique facade for outside vertical surface of building of the present invention
Erection method has the following advantages:
1st, hanging basket transport system is simple in structure, sets up conveniently;
2nd, it by the improvement set to hanging basket, speeds up the work, reduces security risk;
3rd, engineering cost is reduced, improves economic benefit of engineering.
Description of the drawings
Fig. 1 is the tower crane hanging basket transport system structure diagram of the embodiment of the present invention;
Fig. 2 is the P1 positions enlarged drawing in Fig. 1;
Fig. 3 is the P2 positions enlarged drawing in Fig. 1;
Fig. 4 is the P3 positions enlarged drawing in Fig. 1.
In figure:1 tower crane, 2 tower crane cantilevers, 3 pulleys, 4 hanging baskets, 5 steel wire ropes, 6 steel wire rope fixed seats, 7 first stainless steel plates,
8 first stainless steel bolts, 9 stainless steel bolts, 10 stainless steel steel wire rope cards, 11 columns, 12 second stainless steel clamping plates, 13 second
Stainless steel bolt, 14 flower basket bolts, 15 concrete pier anchor bolts, 16 concrete piers, 17 roofings, 18 parapets.
Specific embodiment
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The tower crane hanging basket transport system erection method sequence of construction for being in oblique facade for outside vertical surface of building of the present invention:
Anchor bolt installation → steel wire rope peace is fixed in cantilever for basket installation → band bolt clamping plate installation → hanging basket assembly → pulley is installed →
Dress → security inspection.
Referring now to Fig. 1, Fig. 1 is the tower crane hanging basket transport system structure diagram of the embodiment of the present invention.
The tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building of the present invention, it is characterised in that
Include the following steps:
A, two piece of first stainless steel plate 7 is fixedly clamped in the left and right two of 2 end of tower crane cantilever with four the first stainless steel bolts 8
Stainless steel bolt 9 is installed in side between two piece of first stainless steel plate;The specification of first stainless steel plate 7 for 100 × 160 ×
10mm stainless steel plates.
B, the hanging basket 4 being built by upright bar and cross bar is placed on 18 metope bottom ground of parapet, parapet it is upper
Portion is in oblique facade than the lower part protrusion of parapet;Four the first stainless steels of pole tip in the hanging basket both sides towards parapet
Two piece of second stainless steel plate 12 is fixedly clamped in the left and right sides of upright bar by bolt 8, is installed between two piece of second stainless steel plate
Second stainless steel bolt 13 makes the slip of pulley 3 be clamped between two piece of second stainless steel plate 12, and pulley is made to protrude from hanging basket side
Face makes the second stainless steel plate 12 become the cantilever of hanging basket;Hanging basket 4 is connect by hoist cable with the main suspension hook at 2 top of tower crane cantilever;Institute
The specification for stating pulley 3 is 150mm stainless steel pulleys.4 length of hanging basket is 7m.The specification of second stainless steel plate 12 is
100 × 160 × 10mm stainless steel plates.The specification of second stainless steel bolt 13 is 25mm stainless steel bolts.
C, two concrete piers are accordingly set according to hanging basket length on 18 metope bottom ground of parapet(16), concrete pier
Interior installation anchor bolt 15.
D, the stainless steel bolt for circular 2 end of tower crane cantilever in one end that two steel wire ropes 5 make two steel wire ropes is provided one week,
And it is fixed with stainless steel steel wire rope card 10;The other end of two steel wire ropes respectively penetrates the pulley 3 of hanging basket both sides, then passes through
Flower basket bolt 14 is connect with concrete pier anchor bolt 15 pre-buried in 18 two, metope bottom ground concrete pier 16 of parapet,
Or connect by flower basket bolt 14 with the anchor bolt bolt 15 that respective storey concrete structure position is installed, it adjusts flower basket bolt and draws
Tight steel wire rope 5 makes two steel wire ropes 5 become hanging basket 4 and makees in the up and down motion of 18 oblique facade of parapet under the main suspension hook driving of tower crane
Movable rail.The specification of the steel wire rope 5 is 12mm steel wire ropes.The stainless steel steel wire rope card 10 is 6# stainless steel steel
Cord rope card.
The present invention for outside vertical surface of building in oblique facade tower crane hanging basket transport system set up during, in order to ensure
The safety of hanging basket, concrete pier anchor bolt must be fixed, and anchor bolt can carry out drawing experiment when necessary.As guide rail
The tension that should not draw of steel wire rope 5, and must can be used by security inspection rear.
The present invention has substantive distinguishing features and significant technological progress, and of the invention is in oblique facade for outside vertical surface of building
Tower crane hanging basket transport system erection method, by the improvement to hanging basket, reduce financial cost and security risk, accelerate work
Cheng Jindu, so as to improve project benefits.
The present invention's dreams of for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade in middle smelting
It is used in luxuriant growth project alien invasion curtain wall installing engineering, has reached design effect, significant effect reduces construction time and cost.
The angle on alien invasion curtain wall top evagination in the engineering, curtain wall and ground is 70 degree.
Embodiment 2
Other than in respective storey concrete structure position installation anchor bolt bolt 15 to replace concrete pier 16, remaining same embodiment
1。
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field
Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, it is all equivalent
Technical solution should also belong to scope of the invention, should be limited by each claim.
Claims (8)
1. it is a kind of for outside vertical surface of building be in oblique facade tower crane hanging basket transport system erection method, it is characterised in that including with
Lower step:
A, with several first stainless steel bolts(8)By two piece of first stainless steel plate(7)It is fixedly clamped in tower crane cantilever(2)End
Stainless steel bolt is installed in the left and right sides between two piece of first stainless steel plate(9);
B, the hanging basket that will be built by upright bar and cross bar(4)It is placed on parapet(18)On the ground of metope bottom, parapet it is upper
Portion is protruded than the lower part of parapet in oblique facade;Several first stainless steels of pole tip in the hanging basket both sides towards parapet
Bolt(8)By two piece of second stainless steel plate(12)It is fixedly clamped in the left and right sides of upright bar, between two piece of second stainless steel plate
Second stainless steel bolt is installed(13), make pulley(3)Slip is clamped in two piece of second stainless steel plate(12)Between, and pulley is made to dash forward
For hanging basket side, make the second stainless steel plate(12)As the cantilever of hanging basket;Hanging basket(4)Pass through hoist cable and tower crane cantilever(2)Top
The main suspension hook connection in portion;
C, in parapet(18)Metope bottom ground accordingly sets two concrete piers according to hanging basket length(16), in concrete pier
Anchor bolt is installed(15);Or anchor bolt bolt is installed in respective storey concrete structure position(15);
D, two steel wire ropes are provided(5), make one end of two steel wire ropes around tower crane cantilever(2)The stainless steel bolt one of end
Week, and with stainless steel steel wire rope card(10)It is fixed;The other end of two steel wire ropes respectively penetrates the pulley of hanging basket both sides(3),
Then pass through flower basket bolt(14)With parapet(18)Two, metope bottom ground concrete pier(16)In pre-buried concrete pier
Anchor bolt(15)Connection passes through flower basket bolt(14)With the anchor bolt bolt of respective storey concrete structure position installation
(15)Connection adjusts flower basket bolt tense wire rope(5), make two steel wire ropes(5)As hanging basket(4)In the main suspension hook driving of tower crane
It is lower to make in parapet(18)The movable rail that oblique facade moves up and down.
2. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, first stainless steel plate(7)Specification be 100 × 160 × 10mm stainless steel plates.
3. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, the pulley(3)Specification be 150mm stainless steel pulleys.
4. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, the hanging basket(4)Long 1-8m.
5. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, second stainless steel plate(12)Specification be 100 × 160 × 10mm stainless steel plates.
6. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, the steel wire rope(5)Specification be 12mm steel wire ropes.
7. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, the stainless steel steel wire rope card(10)For 6# stainless steel steel wire rope cards.
8. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1,
It is characterized in that, second stainless steel bolt(13)Specification be 25mm stainless steel bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710001714.8A CN108263974A (en) | 2017-01-03 | 2017-01-03 | It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710001714.8A CN108263974A (en) | 2017-01-03 | 2017-01-03 | It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108263974A true CN108263974A (en) | 2018-07-10 |
Family
ID=62770679
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710001714.8A Pending CN108263974A (en) | 2017-01-03 | 2017-01-03 | It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108263974A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110748140A (en) * | 2019-11-04 | 2020-02-04 | 中宇博机械制造股份有限公司 | Track beam hanging basket special for stepped curtain wall |
CN116290719A (en) * | 2023-04-12 | 2023-06-23 | 中国建筑第四工程局有限公司 | Cable-stayed mechanism capable of adjusting distance between hanging basket and wall |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663301A (en) * | 2013-12-12 | 2014-03-26 | 无锡华科机械设备有限公司 | Inward-inclined type hanging basket device |
CN204343644U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | A kind of Novel hanging basket fastening devices for curtain wall construction |
CN204983613U (en) * | 2015-08-05 | 2016-01-20 | 中建一局集团第二建筑有限公司 | Hoist and mount system of cell board curtain installation |
CN105298103A (en) * | 2015-10-09 | 2016-02-03 | 宁波建乐建筑装潢有限公司 | Outwards-inclining hanging basket construction device |
-
2017
- 2017-01-03 CN CN201710001714.8A patent/CN108263974A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103663301A (en) * | 2013-12-12 | 2014-03-26 | 无锡华科机械设备有限公司 | Inward-inclined type hanging basket device |
CN204343644U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | A kind of Novel hanging basket fastening devices for curtain wall construction |
CN204983613U (en) * | 2015-08-05 | 2016-01-20 | 中建一局集团第二建筑有限公司 | Hoist and mount system of cell board curtain installation |
CN105298103A (en) * | 2015-10-09 | 2016-02-03 | 宁波建乐建筑装潢有限公司 | Outwards-inclining hanging basket construction device |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110748140A (en) * | 2019-11-04 | 2020-02-04 | 中宇博机械制造股份有限公司 | Track beam hanging basket special for stepped curtain wall |
CN116290719A (en) * | 2023-04-12 | 2023-06-23 | 中国建筑第四工程局有限公司 | Cable-stayed mechanism capable of adjusting distance between hanging basket and wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108643544B (en) | High-altitude overhanging construction platform support system and construction method | |
CN206521197U (en) | A kind of adjustable balance hoisting beam | |
CN104948211A (en) | Large mining height end-mining net hanging process | |
CN214220561U (en) | Building slope facade diversion rail formula hanging flower basket construction platform | |
CN111021749A (en) | Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof | |
CN112952661B (en) | Installation structure and construction method for laying cable in narrow space | |
CN109252521B (en) | Equipment for pulling out steel pipe pile in water in limited space under steel beam and construction method thereof | |
CN106150057B (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN108462117A (en) | A kind of skyscraper cable-laying gear and its application method | |
CN108263974A (en) | It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building | |
CN216235734U (en) | Vertical transportation hoisting structure for curtain wall unit plate | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN204663003U (en) | Anchor ear type vestibule truss Steel Structure hoisting hanger | |
CN108675170A (en) | Roofing monorail crane and its construction method | |
CN211142840U (en) | Suspension bridge main push-towing rope erects system | |
CN205936608U (en) | Vertical shaft concrete and quick slip form construction device of rock mass grout | |
CN105155832B (en) | A kind of hanging basket equipment and its moving method | |
CN209353734U (en) | For installing the double-track device of curtain wall | |
CN206051364U (en) | A kind of curtain wall profiles boom hoisting | |
CN202039299U (en) | Totally-closed hanging basket | |
CN212613654U (en) | Curtain wall construction system suitable for high-rise building with special-shaped giant columns | |
CN107524285A (en) | A kind of external wall construction suspension bracket and its installation method | |
CN208830687U (en) | Slip rope formula high-altitude operation platform | |
CN104528506B (en) | Mine hoist and unhooking test method thereof | |
CN208235590U (en) | A kind of rectangle vertical shaft sliding sash turning-over |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180710 |
|
RJ01 | Rejection of invention patent application after publication |