CN108263974A - It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building - Google Patents

It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building Download PDF

Info

Publication number
CN108263974A
CN108263974A CN201710001714.8A CN201710001714A CN108263974A CN 108263974 A CN108263974 A CN 108263974A CN 201710001714 A CN201710001714 A CN 201710001714A CN 108263974 A CN108263974 A CN 108263974A
Authority
CN
China
Prior art keywords
stainless steel
hanging basket
tower crane
bolt
transport system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710001714.8A
Other languages
Chinese (zh)
Inventor
刘忠剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201710001714.8A priority Critical patent/CN108263974A/en
Publication of CN108263974A publication Critical patent/CN108263974A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/205Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures for use on top of roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building, it is characterised in that include the following steps:A, with several first stainless steel bolts(8)By two piece of first stainless steel plate(7)It is fixedly clamped in tower crane cantilever(2)The left and right sides of end, b, the hanging basket that will be built by upright bar and cross bar(4)It is placed on parapet(18)On the ground of metope bottom, c, in parapet(18)Metope bottom ground accordingly sets two concrete piers according to hanging basket length(16), d, provide two steel wire ropes(5), make one end of two steel wire ropes around tower crane cantilever(2)The stainless steel bolt of end one week, and with stainless steel steel wire rope card(10)It is fixed.The present invention's has the advantages of hanging basket transport system is simple in structure, sets up conveniently, speeds up the work, reduces security risk, reduces engineering cost and improve economic benefit of engineering for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade.

Description

It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building
Technical field
The present invention relates to a kind of hanging basket transport system erection method, specifically, being that one kind is in for outside vertical surface of building The tower crane hanging basket transport system erection method of oblique facade.
Background technology
It is oblique facade that outside vertical surface of building is frequently encountered in construction project, it is common practice that sets up scaffold construction, ties Scaffold is with regard to overall pulling down after the completion of structure construction.However when founding decoration surface construction outside, oblique facade sets up out-mould scaffold again again Frame, some roofing moulding positions will also set up Overhanging Outside Scaffold, cause the increase of financial cost and security risk.
Therefore known tiltedly facade hanging basket transport system there are problems that it is above-mentioned various inconvenient and.
Invention content
The purpose of the present invention is to propose a kind of safe and reliable tower crane hanging basket for being in oblique facade for outside vertical surface of building Transport system erection method.
To achieve the above object, technical solution of the invention is:
A kind of tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building, it is characterised in that including following Step:
A, two piece of first stainless steel plate is fixedly clamped in the left and right sides of tower crane cantilever end with several stainless steel bolts, two Stainless steel bolt is installed between block stainless steel plate;
B, the hanging basket being built by upright bar and cross bar is placed on the ground of parapet metope bottom, daughter is compared on the top of parapet The lower part of wall is protruded in oblique facade;The hanging basket both sides towards parapet pole tip with several stainless steel bolts by two piece Two stainless steel plates are fixedly clamped in the left and right sides of upright bar, install stainless steel bolt between two piece of second stainless steel plate, make cunning Slipping is clamped between two piece of second stainless steel plate, and pulley is made to protrude from hanging basket side, is become the second stainless steel plate and is hung The cantilever of basket;Hanging basket is connect by hoist cable with the main suspension hook of tower crane cantilever top;
C, on parapet metope bottom ground, according to hanging basket length, accordingly two concrete piers of setting, the interior installation of concrete pier anchor Bolt;Or anchor bolt bolt is installed in respective storey concrete structure position;
D, two steel wire ropes are provided, make one end of two steel wire ropes around the stainless steel bolt one week of tower crane cantilever end, and use Stainless steel steel wire rope card is fixed;The other end of two steel wire ropes respectively penetrates the pulley of hanging basket both sides, then passes through gaily decorated basket spiral shell Bolt is connect or with concrete pier anchor bolt pre-buried in the concrete pier of two, parapet metope bottom ground by gaily decorated basket spiral shell The anchor bolt that bolt is installed with respective storey concrete structure position is bolted, and is adjusted flower basket bolt tense wire rope, is made two bar steels Cord becomes hanging basket and makees in the movable rail that the oblique facade of parapet moves up and down under the main suspension hook driving of tower crane.
The present invention's can also use for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade Following technical measures are further realized.
Aforementioned method, wherein the specification of first stainless steel plate is 100 × 160 × 10mm stainless steel plates.
Aforementioned method, wherein the specification of the pulley is 150mm stainless steel pulleys.
Aforementioned method, wherein the long 1-8m of the hanging basket.
Aforementioned method, wherein the specification of second stainless steel plate is 100 × 160 × 10mm stainless steel plates.
Aforementioned method, wherein the specification of the steel wire rope is 12mm steel wire ropes.
Aforementioned method, wherein the stainless steel steel wire rope card is 6# stainless steel steel wire rope cards.
Aforementioned method, wherein the specification of second stainless steel bolt is 25mm stainless steel bolts.
After adopting the above technical scheme, the tower crane hanging basket transport system for being in oblique facade for outside vertical surface of building of the present invention Erection method has the following advantages:
1st, hanging basket transport system is simple in structure, sets up conveniently;
2nd, it by the improvement set to hanging basket, speeds up the work, reduces security risk;
3rd, engineering cost is reduced, improves economic benefit of engineering.
Description of the drawings
Fig. 1 is the tower crane hanging basket transport system structure diagram of the embodiment of the present invention;
Fig. 2 is the P1 positions enlarged drawing in Fig. 1;
Fig. 3 is the P2 positions enlarged drawing in Fig. 1;
Fig. 4 is the P3 positions enlarged drawing in Fig. 1.
In figure:1 tower crane, 2 tower crane cantilevers, 3 pulleys, 4 hanging baskets, 5 steel wire ropes, 6 steel wire rope fixed seats, 7 first stainless steel plates, 8 first stainless steel bolts, 9 stainless steel bolts, 10 stainless steel steel wire rope cards, 11 columns, 12 second stainless steel clamping plates, 13 second Stainless steel bolt, 14 flower basket bolts, 15 concrete pier anchor bolts, 16 concrete piers, 17 roofings, 18 parapets.
Specific embodiment
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The tower crane hanging basket transport system erection method sequence of construction for being in oblique facade for outside vertical surface of building of the present invention:
Anchor bolt installation → steel wire rope peace is fixed in cantilever for basket installation → band bolt clamping plate installation → hanging basket assembly → pulley is installed → Dress → security inspection.
Referring now to Fig. 1, Fig. 1 is the tower crane hanging basket transport system structure diagram of the embodiment of the present invention.
The tower crane hanging basket transport system erection method for being in oblique facade for outside vertical surface of building of the present invention, it is characterised in that Include the following steps:
A, two piece of first stainless steel plate 7 is fixedly clamped in the left and right two of 2 end of tower crane cantilever with four the first stainless steel bolts 8 Stainless steel bolt 9 is installed in side between two piece of first stainless steel plate;The specification of first stainless steel plate 7 for 100 × 160 × 10mm stainless steel plates.
B, the hanging basket 4 being built by upright bar and cross bar is placed on 18 metope bottom ground of parapet, parapet it is upper Portion is in oblique facade than the lower part protrusion of parapet;Four the first stainless steels of pole tip in the hanging basket both sides towards parapet Two piece of second stainless steel plate 12 is fixedly clamped in the left and right sides of upright bar by bolt 8, is installed between two piece of second stainless steel plate Second stainless steel bolt 13 makes the slip of pulley 3 be clamped between two piece of second stainless steel plate 12, and pulley is made to protrude from hanging basket side Face makes the second stainless steel plate 12 become the cantilever of hanging basket;Hanging basket 4 is connect by hoist cable with the main suspension hook at 2 top of tower crane cantilever;Institute The specification for stating pulley 3 is 150mm stainless steel pulleys.4 length of hanging basket is 7m.The specification of second stainless steel plate 12 is 100 × 160 × 10mm stainless steel plates.The specification of second stainless steel bolt 13 is 25mm stainless steel bolts.
C, two concrete piers are accordingly set according to hanging basket length on 18 metope bottom ground of parapet(16), concrete pier Interior installation anchor bolt 15.
D, the stainless steel bolt for circular 2 end of tower crane cantilever in one end that two steel wire ropes 5 make two steel wire ropes is provided one week, And it is fixed with stainless steel steel wire rope card 10;The other end of two steel wire ropes respectively penetrates the pulley 3 of hanging basket both sides, then passes through Flower basket bolt 14 is connect with concrete pier anchor bolt 15 pre-buried in 18 two, metope bottom ground concrete pier 16 of parapet, Or connect by flower basket bolt 14 with the anchor bolt bolt 15 that respective storey concrete structure position is installed, it adjusts flower basket bolt and draws Tight steel wire rope 5 makes two steel wire ropes 5 become hanging basket 4 and makees in the up and down motion of 18 oblique facade of parapet under the main suspension hook driving of tower crane Movable rail.The specification of the steel wire rope 5 is 12mm steel wire ropes.The stainless steel steel wire rope card 10 is 6# stainless steel steel Cord rope card.
The present invention for outside vertical surface of building in oblique facade tower crane hanging basket transport system set up during, in order to ensure The safety of hanging basket, concrete pier anchor bolt must be fixed, and anchor bolt can carry out drawing experiment when necessary.As guide rail The tension that should not draw of steel wire rope 5, and must can be used by security inspection rear.
The present invention has substantive distinguishing features and significant technological progress, and of the invention is in oblique facade for outside vertical surface of building Tower crane hanging basket transport system erection method, by the improvement to hanging basket, reduce financial cost and security risk, accelerate work Cheng Jindu, so as to improve project benefits.
The present invention's dreams of for outside vertical surface of building in the tower crane hanging basket transport system erection method of oblique facade in middle smelting It is used in luxuriant growth project alien invasion curtain wall installing engineering, has reached design effect, significant effect reduces construction time and cost. The angle on alien invasion curtain wall top evagination in the engineering, curtain wall and ground is 70 degree.
Embodiment 2
Other than in respective storey concrete structure position installation anchor bolt bolt 15 to replace concrete pier 16, remaining same embodiment 1。
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, it is all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (8)

1. it is a kind of for outside vertical surface of building be in oblique facade tower crane hanging basket transport system erection method, it is characterised in that including with Lower step:
A, with several first stainless steel bolts(8)By two piece of first stainless steel plate(7)It is fixedly clamped in tower crane cantilever(2)End Stainless steel bolt is installed in the left and right sides between two piece of first stainless steel plate(9);
B, the hanging basket that will be built by upright bar and cross bar(4)It is placed on parapet(18)On the ground of metope bottom, parapet it is upper Portion is protruded than the lower part of parapet in oblique facade;Several first stainless steels of pole tip in the hanging basket both sides towards parapet Bolt(8)By two piece of second stainless steel plate(12)It is fixedly clamped in the left and right sides of upright bar, between two piece of second stainless steel plate Second stainless steel bolt is installed(13), make pulley(3)Slip is clamped in two piece of second stainless steel plate(12)Between, and pulley is made to dash forward For hanging basket side, make the second stainless steel plate(12)As the cantilever of hanging basket;Hanging basket(4)Pass through hoist cable and tower crane cantilever(2)Top The main suspension hook connection in portion;
C, in parapet(18)Metope bottom ground accordingly sets two concrete piers according to hanging basket length(16), in concrete pier Anchor bolt is installed(15);Or anchor bolt bolt is installed in respective storey concrete structure position(15);
D, two steel wire ropes are provided(5), make one end of two steel wire ropes around tower crane cantilever(2)The stainless steel bolt one of end Week, and with stainless steel steel wire rope card(10)It is fixed;The other end of two steel wire ropes respectively penetrates the pulley of hanging basket both sides(3), Then pass through flower basket bolt(14)With parapet(18)Two, metope bottom ground concrete pier(16)In pre-buried concrete pier Anchor bolt(15)Connection passes through flower basket bolt(14)With the anchor bolt bolt of respective storey concrete structure position installation (15)Connection adjusts flower basket bolt tense wire rope(5), make two steel wire ropes(5)As hanging basket(4)In the main suspension hook driving of tower crane It is lower to make in parapet(18)The movable rail that oblique facade moves up and down.
2. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, first stainless steel plate(7)Specification be 100 × 160 × 10mm stainless steel plates.
3. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, the pulley(3)Specification be 150mm stainless steel pulleys.
4. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, the hanging basket(4)Long 1-8m.
5. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, second stainless steel plate(12)Specification be 100 × 160 × 10mm stainless steel plates.
6. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, the steel wire rope(5)Specification be 12mm steel wire ropes.
7. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, the stainless steel steel wire rope card(10)For 6# stainless steel steel wire rope cards.
8. it is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building as described in claim 1, It is characterized in that, second stainless steel bolt(13)Specification be 25mm stainless steel bolts.
CN201710001714.8A 2017-01-03 2017-01-03 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building Pending CN108263974A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710001714.8A CN108263974A (en) 2017-01-03 2017-01-03 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710001714.8A CN108263974A (en) 2017-01-03 2017-01-03 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building

Publications (1)

Publication Number Publication Date
CN108263974A true CN108263974A (en) 2018-07-10

Family

ID=62770679

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710001714.8A Pending CN108263974A (en) 2017-01-03 2017-01-03 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building

Country Status (1)

Country Link
CN (1) CN108263974A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748140A (en) * 2019-11-04 2020-02-04 中宇博机械制造股份有限公司 Track beam hanging basket special for stepped curtain wall
CN116290719A (en) * 2023-04-12 2023-06-23 中国建筑第四工程局有限公司 Cable-stayed mechanism capable of adjusting distance between hanging basket and wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663301A (en) * 2013-12-12 2014-03-26 无锡华科机械设备有限公司 Inward-inclined type hanging basket device
CN204343644U (en) * 2014-12-19 2015-05-20 中建三局集团有限公司 A kind of Novel hanging basket fastening devices for curtain wall construction
CN204983613U (en) * 2015-08-05 2016-01-20 中建一局集团第二建筑有限公司 Hoist and mount system of cell board curtain installation
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103663301A (en) * 2013-12-12 2014-03-26 无锡华科机械设备有限公司 Inward-inclined type hanging basket device
CN204343644U (en) * 2014-12-19 2015-05-20 中建三局集团有限公司 A kind of Novel hanging basket fastening devices for curtain wall construction
CN204983613U (en) * 2015-08-05 2016-01-20 中建一局集团第二建筑有限公司 Hoist and mount system of cell board curtain installation
CN105298103A (en) * 2015-10-09 2016-02-03 宁波建乐建筑装潢有限公司 Outwards-inclining hanging basket construction device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110748140A (en) * 2019-11-04 2020-02-04 中宇博机械制造股份有限公司 Track beam hanging basket special for stepped curtain wall
CN116290719A (en) * 2023-04-12 2023-06-23 中国建筑第四工程局有限公司 Cable-stayed mechanism capable of adjusting distance between hanging basket and wall

Similar Documents

Publication Publication Date Title
CN108643544B (en) High-altitude overhanging construction platform support system and construction method
CN206521197U (en) A kind of adjustable balance hoisting beam
CN104948211A (en) Large mining height end-mining net hanging process
CN214220561U (en) Building slope facade diversion rail formula hanging flower basket construction platform
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN112952661B (en) Installation structure and construction method for laying cable in narrow space
CN109252521B (en) Equipment for pulling out steel pipe pile in water in limited space under steel beam and construction method thereof
CN106150057B (en) A kind of split blade type hydraulic pressure lift climbing frame
CN108462117A (en) A kind of skyscraper cable-laying gear and its application method
CN108263974A (en) It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building
CN216235734U (en) Vertical transportation hoisting structure for curtain wall unit plate
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN204663003U (en) Anchor ear type vestibule truss Steel Structure hoisting hanger
CN108675170A (en) Roofing monorail crane and its construction method
CN211142840U (en) Suspension bridge main push-towing rope erects system
CN205936608U (en) Vertical shaft concrete and quick slip form construction device of rock mass grout
CN105155832B (en) A kind of hanging basket equipment and its moving method
CN209353734U (en) For installing the double-track device of curtain wall
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN202039299U (en) Totally-closed hanging basket
CN212613654U (en) Curtain wall construction system suitable for high-rise building with special-shaped giant columns
CN107524285A (en) A kind of external wall construction suspension bracket and its installation method
CN208830687U (en) Slip rope formula high-altitude operation platform
CN104528506B (en) Mine hoist and unhooking test method thereof
CN208235590U (en) A kind of rectangle vertical shaft sliding sash turning-over

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180710

RJ01 Rejection of invention patent application after publication