CN204983613U - Hoist and mount system of cell board curtain installation - Google Patents

Hoist and mount system of cell board curtain installation Download PDF

Info

Publication number
CN204983613U
CN204983613U CN201520582503.4U CN201520582503U CN204983613U CN 204983613 U CN204983613 U CN 204983613U CN 201520582503 U CN201520582503 U CN 201520582503U CN 204983613 U CN204983613 U CN 204983613U
Authority
CN
China
Prior art keywords
lift
basket support
board curtain
horizontal outrigger
curtain wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520582503.4U
Other languages
Chinese (zh)
Inventor
刘鹏
方天文
冯慧玲
霍永君
季文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical Second Construction Co Ltd of China Construction First Group Co Ltd
Priority to CN201520582503.4U priority Critical patent/CN204983613U/en
Application granted granted Critical
Publication of CN204983613U publication Critical patent/CN204983613U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a hoist and mount system of cell board curtain installation, including hanging flower basket support and running gear, the hanging flower basket support is by arranging the stand on the roofing in, the horizontal outrigger of being connected with the stand, the counter weight of horizontal outrigger end has an indisputable counter weight post of counter weight with being connected, the end of encorbelmenting of horizontal outrigger stretches out the parapet, outside a week interval arrangement of building is followed to the hanging flower basket support, fixed connection is held with encorbelmenting of horizontal outrigger in proper order in running gear's top, running gear includes the annular slide rail that centers on building outside a week, connect in the lower extreme of annular slide rail and on annular slide rail adjustable horizontally's electric block, with electric block's bottom fixed connection's steel wire lifting rope and be fixed in the lifting hook of the cell board curtain of steel wire lifting rope bottom. The utility model discloses simple structure, security are reliable, utilize present hanging flower basket support, need not take the mechanical equipment handling, guarantee to have improved cell board curtain hoist and mount efficiency of construction under the safe prerequisite of construction by a wide margin, have not only practiced thrift the time limit for a project, have more reduced construction cost's input.

Description

The Lift-on/Lift-off System that a kind of unit board curtain wall is installed
Technical field
The utility model relates to a kind of the realm of building construction, particularly a kind of installation system for unit board curtain wall.
Background technology
The architectural construction of current executive information systems is more and more novel, unit board curtain wall with its lightly attractive in appearance, batch production processing stage is high, installation rate is fast etc., and advantage is able to frequent use in executive information systems, but the thing followed is because curtain wall panel description is many, construction hoisting difficulty is large, utilize the construction method of the plant equipment trolley units plate curtain walls such as traditional crane to there is handling efficiency low, cost is high-technology problem comparatively.Therefore unit board curtain wall install hanging method select construction safety, cost and duration control effect larger.
Utility model content
The purpose of this utility model is to provide the Lift-on/Lift-off System that a kind of unit board curtain wall is installed, and solving the plant equipment trolley units plate curtain walls such as traditional crane, to there is handling efficiency low, the technical problem that cost is higher, the duration is longer.
For achieving the above object, the utility model adopts following technical scheme:
The Lift-on/Lift-off System that a kind of unit board curtain wall is installed, comprise hanging basket support and walking mechanism, described hanging basket support is by the column be placed on roofing, the horizontal outrigger be connected with column, the counterweight post with balance weight iron be connected with the Balance weight end of horizontal outrigger, the end of encorbelmenting of described horizontal outrigger stretches out parapet, described hanging basket support is arranged along the outside one-week interval of building, the top of walking mechanism is fixedly connected with the end of encorbelmenting of horizontal outrigger successively, described walking mechanism comprises the endless glide of a week outside building, be connected to the lower end of endless glide and the electric block that can move horizontally in endless glide, the wire sling be fixedly connected with the bottom of electric block and be fixed on the suspension hook of unit board curtain wall of wire sling bottom.
The upper and lower both sides of the end of encorbelmenting of described horizontal outrigger are respectively equipped with the fixation kit be made up of with the supporting plate of the type of falling Ω Ω type buckle, the middle part of fixation kit forms the fastening space of the end of encorbelmenting of horizontal outrigger, the both wings corner place of fixation kit has bolt hole, the first double end set bolt is installed with successively in bolt hole, the bottom welding of described supporting plate has upper junction plate, the welded top of endless glide has lower connecting plate, and upper junction plate is fixedly connected with lower connecting plate.
The distance that described hanging basket support is arranged along the outside one-week interval of building is for being not more than 3m.
Described endless glide is i iron or H profile steel.
Described upper junction plate and lower connecting plate are measure-alike rectangular slab, the corner place of rectangular slab all has bolt hole, the top flange plate of described endless glide and the correspondence position of rectangular slab also have bolt hole, are installed with the second double end set bolt successively in the bolt hole that upper junction plate, lower connecting plate and top flange plate correspondence has.
Compared with prior art the utility model has following characteristics and beneficial effect:
Simple structure of the present utility model, safety reliably, utilizing existing hanging basket support, without the need to the mechanical lifting apparatus such as tower crane or cantilever crane, more without the need to setting up scaffold, greatly having saved construction material cost.
The utility model does not need to take plant equipment handling, significantly improves unit board curtain wall lifting construction efficiency, not only saved the construction period, more decreased the input of construction cost under the prerequisite ensureing construction safety.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is structural representation of the present utility model.
Fig. 2 of the present utility modelly overlooks layout schematic diagram.
Fig. 3 is the structural representation of Fig. 1 interior joint A.
Fig. 4 is the right side TV structure schematic diagram in Fig. 3.
Fig. 5 is the plan structure schematic diagram in Fig. 3.
Fig. 6 is the structural representation of buckle or supporting plate.
Fig. 7 is the structural representation of upper junction plate or lower connecting plate.
Reference numeral: 1-hanging basket support, 1.1-column, the horizontal outrigger of 1.2-, 1.3-counterweight post, 2-roofing, 3-parapet, 4-building, 5-endless glide, 5.1-top flange plate, 6-electric block, 7-wire sling, 8-suspension hook, 9-buckle, 10-supporting plate, 11-first double end set bolt, 12-upper junction plate, 13-lower connecting plate, 14-second double end set bolt, 15-unit board curtain wall.
Detailed description of the invention
Embodiment is see shown in Fig. 1-2, the Lift-on/Lift-off System that a kind of unit board curtain wall is installed, comprise hanging basket support 1 and walking mechanism, described hanging basket support 1 is by the column 1.1 be placed on roofing 2, the horizontal outrigger 1.2 be connected with column 1.1, the counterweight post 1.3 with balance weight iron be connected with the Balance weight end of horizontal outrigger 1.2, the end of encorbelmenting of described horizontal outrigger 1.2 stretches out parapet 3, described hanging basket support 1 is arranged along the outside one-week interval of building 4, the top of walking mechanism is fixedly connected with the end of encorbelmenting of horizontal outrigger successively, described walking mechanism comprises the endless glide 5 of a week outside building, be connected to the lower end of endless glide 5 and the electric block 6 that can move horizontally in endless glide 5, the wire sling 7 be fixedly connected with the bottom of electric block 6 and be fixed on the suspension hook 8 of unit board curtain wall 15 of wire sling 7 bottom.
Shown in Fig. 3-7, the upper and lower both sides of the end of encorbelmenting of described horizontal outrigger 1.2 are respectively equipped with the fixation kit be made up of with the supporting plate 10 of the type of falling Ω Ω type buckle 9, the middle part of fixation kit forms the fastening space of the end of encorbelmenting of horizontal outrigger 1.2, the both wings corner place of fixation kit has bolt hole, the first double end set bolt 11 is installed with successively in bolt hole, the bottom welding of described supporting plate 10 has upper junction plate 12, the welded top of endless glide 5 has lower connecting plate 13, and upper junction plate 12 is fixedly connected with lower connecting plate 13.
Described hanging basket support 1 is not more than 3m along the distance a of the outside one-week interval layout of building 4.
Described endless glide 5 is i iron or H profile steel.
Described upper junction plate 12 and lower connection 13 are measure-alike rectangular slab, the corner place of rectangular slab all has bolt hole, the top flange plate 5.1 of described endless glide 5 also has bolt hole with the correspondence position of rectangular slab, is installed with the second double end set bolt 14 successively in the bolt hole that upper junction plate, lower connecting plate and top flange plate correspondence has.
In the present embodiment, described endless glide 5 is No. 20 i iron, and the first double end set bolt 11 and the second double end set bolt 14 are M14 high-strength bolt or are greater than the high-strength bolt of M14.
The construction method of the Lift-on/Lift-off System lifting elements plate curtain wall utilizing this unit board curtain wall to install, step is as follows:
Step one: according to engineering characteristic, carries out the line setting of hanging basket support in conjunction with on-site actual situations and Track desigh layout.
Step 2: according to the position location of hanging basket support, installs hanging basket support, and hanging basket support is 150mm by the fulcrum on fabric structure limit from structure back gauge.
Step 3: at the bottom welding upper junction plate 12 of supporting plate 10, and assembly and connection assembly, make the end of encorbelmenting of horizontal outrigger through the fastening space in the middle part of fixation kit, tighten the first double end set bolt 11.
Step 4: weld lower connecting plate 13 on the top flange plate 5.1 of endless glide 5, uses the fastening upper junction plate 12 of the second double end set bolt 14 and lower connecting plate 13, stationary annular slide rail 5.
Wherein all adopt full weld between supporting plate 10 and upper junction plate 12, between top flange plate 5.1 and lower connecting plate 13, weld bead height must not be less than 8mm.High-strength bolt must be tightened.
Step 5: use the horizontal glacing flatness of measurement of correlation instrument to installation process middle orbit to check, guarantee that track is in same level, circular orbit can run well use.
Step 6: the electric block installing walking mechanism, debugs the walking electric block of installation simultaneously, guarantees that it can stability and safety running.
Step 7: install wire sling 7 and suspension hook 8, and the track equipment completing test is carried out an acceptance inspection, can drop into after acceptance(check) and the lifting of unit board curtain wall is used.

Claims (5)

1. the Lift-on/Lift-off System of a unit board curtain wall installation, comprise hanging basket support (1) and walking mechanism, described hanging basket support (1) is by the column (1.1) be placed on roofing (2), the horizontal outrigger (1.2) be connected with column (1.1), the counterweight post (1.3) with balance weight iron be connected with the Balance weight end of horizontal outrigger (1.2), the end of encorbelmenting of described horizontal outrigger (1.2) stretches out parapet (3), it is characterized in that: described hanging basket support (1) is arranged along the outside one-week interval of building (4), the top of walking mechanism is fixedly connected with the end of encorbelmenting of horizontal outrigger successively, described walking mechanism comprises the endless glide (5) of a week outside building, be connected to the lower end of endless glide (5) and the electric block (6) that can move horizontally in endless glide (5), the suspension hook (8) of the wire sling (7) be fixedly connected with the bottom of electric block (6) and the unit board curtain wall (15) that is fixed on wire sling (7) bottom.
2. the Lift-on/Lift-off System of unit board curtain wall installation according to claim 1, it is characterized in that: the upper of end of encorbelmenting of described horizontal outrigger (1.2), lower both sides are respectively equipped with the fixation kit be made up of the supporting plate (10) of Ω type buckle (9) and the type of falling Ω, the middle part of fixation kit forms the fastening space of the end of encorbelmenting of horizontal outrigger (1.2), the both wings corner place of fixation kit has bolt hole, the first double end set bolt (11) is installed with successively in bolt hole, the bottom welding of described supporting plate (10) has upper junction plate (12), the welded top of endless glide (5) has lower connecting plate (13), upper junction plate (12) is fixedly connected with lower connecting plate (13).
3. the Lift-on/Lift-off System installed of unit board curtain wall according to claim 1 and 2, is characterized in that: the distance that described hanging basket support (1) is arranged along the outside one-week interval of building (4) is for being not more than 3m.
4. the Lift-on/Lift-off System of unit board curtain wall installation according to claim 1 and 2, is characterized in that: described endless glide (5) is i iron or H profile steel.
5. the Lift-on/Lift-off System of unit board curtain wall installation according to claim 4, it is characterized in that: described upper junction plate (12) and lower connecting plate (13) are measure-alike rectangular slab, the corner place of rectangular slab all has bolt hole, the top flange plate (5.1) of described endless glide (5) and the correspondence position of rectangular slab also have bolt hole, are installed with the second double end set bolt (14) successively in the bolt hole that upper junction plate, lower connecting plate and top flange plate correspondence has.
CN201520582503.4U 2015-08-05 2015-08-05 Hoist and mount system of cell board curtain installation Expired - Fee Related CN204983613U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520582503.4U CN204983613U (en) 2015-08-05 2015-08-05 Hoist and mount system of cell board curtain installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520582503.4U CN204983613U (en) 2015-08-05 2015-08-05 Hoist and mount system of cell board curtain installation

Publications (1)

Publication Number Publication Date
CN204983613U true CN204983613U (en) 2016-01-20

Family

ID=55117995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520582503.4U Expired - Fee Related CN204983613U (en) 2015-08-05 2015-08-05 Hoist and mount system of cell board curtain installation

Country Status (1)

Country Link
CN (1) CN204983613U (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888230A (en) * 2016-04-21 2016-08-24 江河创建集团股份有限公司 Lifting device for building curtain wall construction and construction method thereof
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN106812301A (en) * 2017-02-24 2017-06-09 中国建筑第八工程局有限公司 A kind of mounting structure and installation method of built on stilts hanging basket
CN108263974A (en) * 2017-01-03 2018-07-10 五冶集团上海有限公司 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building
CN108483212A (en) * 2018-05-28 2018-09-04 中国建筑第八工程局有限公司 Cladding glass installation self-control electric hoist hanger system and its hanging method
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN109231088A (en) * 2018-10-25 2019-01-18 无锡恒尚装饰工程有限公司 Top of building erecting by overhang
CN109296213A (en) * 2018-10-24 2019-02-01 李锦荣 A kind of Mobile crane using skyscraper brush window machine track curtain wall construction
CN109487927A (en) * 2018-09-10 2019-03-19 深圳市建艺装饰集团股份有限公司 Rope net supporting type glass curtain wall and construction method
CN110424808A (en) * 2019-08-07 2019-11-08 上海市机械施工集团有限公司 A kind of covering construction method of steel construction indirect cool tower
CN110485698A (en) * 2019-08-28 2019-11-22 中国建筑第八工程局有限公司 Horizontally moveable hanging basket sliding system
CN112302327A (en) * 2018-12-18 2021-02-02 陈乐宇 High-altitude hoisting operation device
CN113279556A (en) * 2021-04-23 2021-08-20 浙江省二建建设集团有限公司 A assembled hangs slidable scaffold frame subassembly for old house transformation
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888230A (en) * 2016-04-21 2016-08-24 江河创建集团股份有限公司 Lifting device for building curtain wall construction and construction method thereof
CN106382001A (en) * 2016-08-31 2017-02-08 中建三局第建设工程有限责任公司 Parapet wall mold supporting frame capable of being moved and revolved
CN108263974A (en) * 2017-01-03 2018-07-10 五冶集团上海有限公司 It is in the tower crane hanging basket transport system erection method of oblique facade for outside vertical surface of building
CN106812301A (en) * 2017-02-24 2017-06-09 中国建筑第八工程局有限公司 A kind of mounting structure and installation method of built on stilts hanging basket
CN108483212A (en) * 2018-05-28 2018-09-04 中国建筑第八工程局有限公司 Cladding glass installation self-control electric hoist hanger system and its hanging method
CN108675170A (en) * 2018-07-19 2018-10-19 上海建工七建集团有限公司 Roofing monorail crane and its construction method
CN109487927A (en) * 2018-09-10 2019-03-19 深圳市建艺装饰集团股份有限公司 Rope net supporting type glass curtain wall and construction method
CN109487927B (en) * 2018-09-10 2023-09-19 深圳市建艺装饰集团股份有限公司 Cable net supporting type glass curtain wall and construction method
CN109296213A (en) * 2018-10-24 2019-02-01 李锦荣 A kind of Mobile crane using skyscraper brush window machine track curtain wall construction
CN109231088A (en) * 2018-10-25 2019-01-18 无锡恒尚装饰工程有限公司 Top of building erecting by overhang
CN112302327A (en) * 2018-12-18 2021-02-02 陈乐宇 High-altitude hoisting operation device
CN110424808A (en) * 2019-08-07 2019-11-08 上海市机械施工集团有限公司 A kind of covering construction method of steel construction indirect cool tower
CN110485698A (en) * 2019-08-28 2019-11-22 中国建筑第八工程局有限公司 Horizontally moveable hanging basket sliding system
CN110485698B (en) * 2019-08-28 2021-07-09 中国建筑第八工程局有限公司 Sliding system capable of horizontally moving hanging basket
CN113279556A (en) * 2021-04-23 2021-08-20 浙江省二建建设集团有限公司 A assembled hangs slidable scaffold frame subassembly for old house transformation
CN113914638A (en) * 2021-11-29 2022-01-11 中国建筑一局(集团)有限公司 Overhanging steel beam double-rail curtain wall hoisting system and curtain wall plate hoisting method

Similar Documents

Publication Publication Date Title
CN204983613U (en) Hoist and mount system of cell board curtain installation
CN201433079Y (en) High-altitude inclined supporting wire lifting device for construction curtain wall
CN109372243A (en) A kind of hanging basket system for the installation of steel construction metal Roof bottom plate
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN105019664A (en) High-altitude slipping installation method for compartment-type electric room
CN103669882B (en) Utilize wire rope to do in industrial premises method that track carries out Components installation
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN103288002A (en) Simple combination portal upper-air heavy-article hoisting device
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN205076637U (en) Derrick material hoist
CN108999404B (en) Construction method for grid suspended ceiling in tall space
CN204980945U (en) Supplementary tower crane dismounting device
CN205575534U (en) Lattice formula groined type support body lifting means
CN105366559A (en) Small hoisting machine fixed on channel steel framework
CN103375029B (en) Prestressed dome lifting cantilever crane
CN204162235U (en) Lift crosshead safety overhauling device
CN201142537Y (en) Large span cable bridge rack installation mold
CN203878957U (en) Protective screen module unit
CN103470854A (en) Turnover pile top cable bridge fixed on civil engineering platform
CN203229334U (en) Lifting framework for lifting and translating single steel member
CN104326331A (en) Safety maintenance device of upper beam of elevator
CN206751210U (en) The multi-thread boom hoisting of shiftable track
CN206259672U (en) A kind of architectural electricity box supporting adn fixing device
CN215492423U (en) Falling protector static load test frame
CN204731102U (en) Multi-functional indoor structure charger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120