CN201458567U - Special angle square for profile steel trolley conductor bracket installation - Google Patents

Special angle square for profile steel trolley conductor bracket installation Download PDF

Info

Publication number
CN201458567U
CN201458567U CN2009200811896U CN200920081189U CN201458567U CN 201458567 U CN201458567 U CN 201458567U CN 2009200811896 U CN2009200811896 U CN 2009200811896U CN 200920081189 U CN200920081189 U CN 200920081189U CN 201458567 U CN201458567 U CN 201458567U
Authority
CN
China
Prior art keywords
angle square
support
installation
trolley conductor
conductor bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200811896U
Other languages
Chinese (zh)
Inventor
林文秀
徐肇新
陈乔
吴秋
邹建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
MCC Shijiu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Shijiu Construction Co Ltd filed Critical MCC Shijiu Construction Co Ltd
Priority to CN2009200811896U priority Critical patent/CN201458567U/en
Application granted granted Critical
Publication of CN201458567U publication Critical patent/CN201458567U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a special angle square for profile steel trolley conductor bracket installation, which belongs to special accessory appliances for trolley conductor bracket installation and solves the problems of high leveling difficulty and slow construction schedule of the trolley conductor bracket in the prior art. The special angle square for profile steel trolley conductor bracket installation comprises an angle square transversal support and an angle square vertical support, wherein one end of the angle square transversal support is perpendicularly connected with one end of the angle square vertical support; the other end of the angle square transversal support is provided with a snap gauge; a roller way screw hole is arranged in the snap gauge; the other end of the angle square vertical support is provided with a bracket splint; and the angle square transversal support is also provided with a level bar. The utility model has the advantages of simple structure and convenient installation, and has obvious effect on installation leveling of the trolley conductor bracket. The utility model can greatly enhance the installation schedule, save labor force and effectively control the potential safety hazard in the construction engineering.

Description

Shaped steel trolley support is installed special-purpose angle square
Technical field
The utility model relates to the accessory appliances that a kind of trolley support is installed, and specifically, relates to a kind of shaped steel trolley support special-purpose angle square is installed.
Background technology
Crane is factory's weight-lifting equipment commonly used, and traverse crane, hoist ceiling crane and electric block etc. are common crane types in the factory building.The supply line of crane generally adopts trolley, and trolley is generally made by angle steel, light rail etc., and the installation of angle steel, light rail trolley all must fix with respective holder, and the installation quality of support and erection schedule directly influence trolley installation quality and progress.
Trolley is installed and is belonged to aloft work, and the weight of trolley support is heavier, and the weight of a support is generally about 24 kilograms, it is the work that extremely is wasted time and energy that the levelling of trolley support is installed, not only need a large amount of workmens, and difficulty of construction is bigger, construction speed is slower.Because installing, the trolley support belongs to aloft work, operation height substantially all reaches more than 10 meters, in the support installation process, except around the crane beam without any the thing that can depend on, the workmen is suspended in the air during construction, buttress support, spot welding support in the construction originally, the levelling support, minimum three to four people, four people that suspend in mid air again also must be in same local operation, also want good teamwork each other, anyone might hurt the personnel of work compound because of carelessness; And the weight of support heavier (single weight support frame reaches 24kg substantially), the people is helping support always in the air, and long thought of time one is easy to paralysis, causes support to fall and hurts sb.'s feelings, and therefore also has bigger danger according to the prior art construction.
The utility model content
The purpose of this utility model is to provide a kind of trolley support that special-purpose angle square is installed, the installation of auxiliary trolley support, thus improve installation rate, shorten the scheduled day of installing, reduce the workmen, save manpower, and the danger factor in the control construction, reduce potential safety hazard.
To achieve these goals, the technical solution adopted in the utility model is as follows:
Shaped steel trolley support is installed special-purpose angle square, comprise perpendicular of horizontal of angle square and angle square, end that described angle square is horizontal and perpendicular vertical connection of an end of propping up of angle square, the other end on horizontal of described angle square is provided with clamp, on clamp, be provided with the roller-way screw, the other end on perpendicular of described angle square is provided with the support clamping plate, is provided with the support screw on the support clamping plate.
Also be provided with spirit level on horizontal of the described angle square.
Described clamp direction is vertical with horizontal direction, the perforate direction and the horizontal direction parallel of roller-way screw on the clamp.
Described support clamping plate direction and horizontal direction parallel, the perforate direction of the screw on the clamping plate is vertical with horizontal direction.
In general, the spacing size between the clamp should correspondingly be slightly larger than the roller-way full size, and the spacing between the support clamping plate should correspondingly be slightly larger than the size of trolley set girt(h), so that install.After each assembly assembling is finished in the utility model, can check the levelness and the squareness of angle square, guarantee the making precision of angle square self by spirit level.
By setting of the present utility model, can be in trolley support installation process fast, determine the whether levelling of trolley support exactly, improved the trolley installation effectiveness greatly, shortened the scheduled day of installing. the more important thing is, angle square is simple in structure, easy for installation, adopt the utility model auxiliary construction, the workmen is reduced to two people, the support of slip support realizes that whole special-purpose angle square has snapped on the roller-way by clamp again by the support clamping plate, only needs a people to buttress support hanging on hurdle or the driving roller-way lower flange of girder during mounting bracket, another people is with support a little with rope on crane beam is walked on stage, whether level gets final product to check the slip support with spirit level then. and personnel reduce, and difficulty of construction reduces, and construction space enlarges, non-Area Of Safe Operation personnel reduce, thereby have significantly reduced the potential safety hazard in the construction.
The utility model is a kind of accessory appliances, is specifically designed to the trolley support is installed.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the structural representation of the utility model-embodiment.
The corresponding title of label in the accompanying drawing: 1-clamp, horizontal of 2-angle square, perpendicular of 3-angle square, 4-support clamping plate, 5-spirit level, 6-roller-way screw, 7-roller-way, 8-trolley support.
The specific embodiment
As shown in Figure 1, shaped steel trolley support is installed special-purpose angle square, comprise perpendicular 3 on horizontal 2 on angle square and angle square, the vertical connection of an end that the end that described angle square is horizontal 2 and angle square are perpendicular 3, the other end on horizontal 2 on described angle square is provided with clamp 1, clamp 1 is vertical with horizontal direction, on clamp 1, be provided with the roller-way screw 6 of perforate direction and horizontal direction parallel, the other end on perpendicular 3 on described angle square is provided with support clamping plate 4, support clamping plate 4 and horizontal direction parallel are provided with the perforate direction support screw vertical with horizontal direction on support clamping plate 4.Also be provided with spirit level 5 on horizontal 2 on the described angle square.
Installation method: as shown in Figure 2, at first clamp 1 is blocked the roller-way 7 of crane beam upper end, and clamp 1 is fixing with roller-way 7 with bolt by roller-way screw 6; Then the end of trolley support 8 is inserted in the support clamping plate 4, and make the center-aligned of the eye that porcelain vase is installed on support clamping plate 4 end edge and the trolley support 8, tighten the bolt trolley support 8 on the clamping plate 4 at last.Check whether level of trolley support, spot welding trolley support after the affirmation level reexamines the squareness of trolley support, and fixing trolley support is promptly finished the installation of a trolley support at last.

Claims (4)

1. shaped steel trolley support is installed special-purpose angle square, it is characterized in that, comprise angle square horizontal (2) and angle square perpendicular (3), one end of described angle square horizontal (2) and perpendicular vertical connection of an end of propping up (3) of angle square, the other end at described angle square horizontal (2) is provided with clamp (1), on clamp (1), be provided with roller-way screw (6), be provided with support clamping plate (4), on support clamping plate (4), be provided with the support screw at the perpendicular other end that props up (3) of described angle square.
2. shaped steel trolley support according to claim 1 is installed special-purpose angle square, it is characterized in that, described angle square also is provided with spirit level (5) on horizontal (2).
3. shaped steel trolley support according to claim 1 is installed special-purpose angle square, it is characterized in that, described clamp (1) direction is vertical with horizontal direction, the perforate direction and the horizontal direction parallel of roller-way screw (6) on the clamp.
4. shaped steel trolley support according to claim 1 is installed special-purpose angle square, it is characterized in that, described support clamping plate (4) direction and horizontal direction parallel, and the perforate direction of the screw on the clamping plate is vertical with horizontal direction.
CN2009200811896U 2009-05-27 2009-05-27 Special angle square for profile steel trolley conductor bracket installation Expired - Lifetime CN201458567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200811896U CN201458567U (en) 2009-05-27 2009-05-27 Special angle square for profile steel trolley conductor bracket installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200811896U CN201458567U (en) 2009-05-27 2009-05-27 Special angle square for profile steel trolley conductor bracket installation

Publications (1)

Publication Number Publication Date
CN201458567U true CN201458567U (en) 2010-05-12

Family

ID=42385921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200811896U Expired - Lifetime CN201458567U (en) 2009-05-27 2009-05-27 Special angle square for profile steel trolley conductor bracket installation

Country Status (1)

Country Link
CN (1) CN201458567U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175462A (en) * 2011-12-20 2013-06-26 中冶宝钢技术服务有限公司 Adjusting and mounting measuring tool for tramway supports
CN103318763A (en) * 2012-03-21 2013-09-25 五冶集团上海有限公司 Trolley line support and manufacturing method thereof
CN104746865A (en) * 2015-04-17 2015-07-01 中国一冶集团有限公司 Rigid body sliding contact line mounting mobile platform and rigid body sliding contact line mounting method thereof
CN105423865A (en) * 2015-12-01 2016-03-23 本钢板材股份有限公司 Measurement appliance for installation precision of trolley conductor of bridge crane
CN113371609A (en) * 2021-07-22 2021-09-10 中国水利水电第五工程局有限公司 Bridge crane trolley line rapid installation device and installation method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103175462A (en) * 2011-12-20 2013-06-26 中冶宝钢技术服务有限公司 Adjusting and mounting measuring tool for tramway supports
CN103175462B (en) * 2011-12-20 2016-02-03 中冶宝钢技术服务有限公司 The support adjustment of Mo electricity road installs and measures instrument
CN103318763A (en) * 2012-03-21 2013-09-25 五冶集团上海有限公司 Trolley line support and manufacturing method thereof
CN103318763B (en) * 2012-03-21 2016-01-27 五冶集团上海有限公司 A kind of trolley conductor bracket method for making
CN104746865A (en) * 2015-04-17 2015-07-01 中国一冶集团有限公司 Rigid body sliding contact line mounting mobile platform and rigid body sliding contact line mounting method thereof
CN105423865A (en) * 2015-12-01 2016-03-23 本钢板材股份有限公司 Measurement appliance for installation precision of trolley conductor of bridge crane
CN113371609A (en) * 2021-07-22 2021-09-10 中国水利水电第五工程局有限公司 Bridge crane trolley line rapid installation device and installation method
CN113371609B (en) * 2021-07-22 2022-09-13 中国水利水电第五工程局有限公司 Bridge crane trolley line rapid installation device and installation method

Similar Documents

Publication Publication Date Title
CN201381166Y (en) Hanging-point adjustable transverse hanging beam
CN201458567U (en) Special angle square for profile steel trolley conductor bracket installation
CN203475851U (en) Device for hoisting steel beam in position
CN203878958U (en) Hanging basket
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN203474231U (en) Steel bar tower safety hoisting device
CN206769170U (en) A kind of furred ceiling conversion layer structure
CN210316214U (en) Assembled steel construction building dysmorphism post
CN216336266U (en) Assembled building element hoist and mount construction platform structure
CN203430009U (en) Construction hanging basket
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN203066491U (en) Locator for installing round tube type connection member
CN206289544U (en) A kind of simple electric nacelle device
CN212295594U (en) Lower hoisting point truss structure of climbing frame
CN107675892A (en) A kind of glass curtain wall monorail hoisting structure
CN203654698U (en) Attached lifting scaffold structure provided with double guide rails
CN203345912U (en) Portable special suspension tool
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN202706271U (en) Assembly skeleton for miniature slabstones of curtain wall and suspension apparatus
CN107700854B (en) Steel plate wall sliding installation device and installation method for super high-rise core tube
CN214935296U (en) Lifting device convenient to big inclination steel column does not have support equipment
CN214144633U (en) Upside-down hanging attached lifting scaffold
CN203654726U (en) Synchronization-adjustment elevating device for template height
CN204848024U (en) Girder steel hoist device for construction
CN215829977U (en) A suspended door formula support for high altitude tower building vestibule fitment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 617000 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee after: MCC SHIJIU CONSTRUCTION Co.,Ltd.

Address before: 617000 East Village street, Panzhihua, Sichuan

Patentee before: MCC SHIJIU CONSTRUCTION Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: CHINA 19TH METALLURGICAL CORPORATION

Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD.

Effective date: 20110329

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 617000 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110329

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Patentee after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd.

Address before: 617000 No. 350 Renmin Street, Sichuan, Panzhihua

Patentee before: MCC SHIJIU CONSTRUCTION Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100512