CN210316214U - Assembled steel construction building dysmorphism post - Google Patents

Assembled steel construction building dysmorphism post Download PDF

Info

Publication number
CN210316214U
CN210316214U CN201920887138.6U CN201920887138U CN210316214U CN 210316214 U CN210316214 U CN 210316214U CN 201920887138 U CN201920887138 U CN 201920887138U CN 210316214 U CN210316214 U CN 210316214U
Authority
CN
China
Prior art keywords
hole
support column
supporting column
movably connected
assembled steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920887138.6U
Other languages
Chinese (zh)
Inventor
荆文超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Xinguangzheng Steel Structure Co ltd
Original Assignee
Qingdao Xinguangzheng Steel Structure Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Xinguangzheng Steel Structure Co ltd filed Critical Qingdao Xinguangzheng Steel Structure Co ltd
Priority to CN201920887138.6U priority Critical patent/CN210316214U/en
Application granted granted Critical
Publication of CN210316214U publication Critical patent/CN210316214U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an assembled steel construction building dysmorphism post relates to building technical field, this assembled steel construction building dysmorphism post, the on-line screen storage device comprises a base, the first support column of center fixedly connected with at base top, the top of first support column is provided with the second support column, first card hole has been seted up to the surface of second support column, the inside swing joint in first card hole has first bolt, the movable groove has been seted up at the top of second support column. This assembled steel construction building dysmorphism post, through setting up first card hole and first bolt to set up second card hole on first support column, not only conveniently remove second support column and first support column, can also be fixed with second support column and first support column, be convenient for adjust the distance between mounting bracket to the base, thereby rise or reduce the crossbeam, can remove and adjust second support column and first support column, thereby manpower and material resources that consume when having reduced the installation dysmorphism post.

Description

Assembled steel construction building dysmorphism post
Technical Field
The utility model relates to a building technical field specifically is an assembled steel construction building dysmorphism post.
Background
Buildings assembled from prefabricated parts at the site are called fabricated buildings. The prefabricated member is divided into five types, namely a block building, a plate building, a box type building, a framework plate building, a lifting plate and a storey building according to the form and the construction method of the prefabricated member, the special-shaped column adopted by the traditional building is not suitable for supporting and installing the assembly type building, the building period is long, the use is inconvenient, and simultaneously, the manpower and the material resources are consumed, so that the assembly type steel structure building special-shaped column is provided.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an assembled steel construction building dysmorphism post has solved the support and the installation that traditional building adopted the dysmorphism post is not suitable for assembly type building, and the construction period is longer, uses and inconvenient, has not only consumeed the problem of manpower and material resources simultaneously.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
an assembly type steel structure building special-shaped column comprises a base, wherein a first supporting column is fixedly connected to the center of the top of the base, a second supporting column is arranged at the top of the first supporting column, a first clamping hole is formed in the outer surface of the second supporting column, a first bolt is movably connected to the inside of the first clamping hole, a movable groove is formed in the top of the second supporting column, a supporting column is fixedly connected to the inside of the movable groove, a first threaded groove is formed in the outer surface of the supporting column, a first through hole is formed in one end, away from the first supporting column, of the second supporting column, and a screw is movably connected to the inside of the first through hole;
the utility model discloses a fixing device for fixing a car seat, including first support column, second support column, the top of second support column is provided with the mounting bracket, the equal fixedly connected with installation piece all around of mounting bracket, the bottom fixedly connected with sliding sleeve of mounting bracket, the draw-in groove has been seted up to one side of installation piece, the inside joint of draw-in groove has the crossbeam, the second through-hole has been seted up at the top of mounting bracket, the inside swing joint of second through-hole has the second bolt, the one end that the installation piece was kept away from to the crossbeam is provided with the link, the third through-hole has been seted up to the surface of installation piece and link, the inside swing joint of third through-hole has the screw thread post.
Optionally, the bottom of the second supporting column is provided with a bottom groove;
the first supporting column is movably connected with the inner wall of the bottom groove.
Optionally, a second clamping hole is formed in the outer surface of the first support column;
the first bolt penetrates through the inside of the first clamping hole and is movably connected with the inner wall of the second clamping hole.
Optionally, the outer surface of the sliding sleeve is movably connected with the inner wall of the movable groove;
the inner wall of the sliding sleeve is movably connected with the outer surface of the pillar.
Optionally, the screw penetrates through the first through hole and the sliding sleeve and is in threaded connection with the inner part of the first threaded groove.
Optionally, the second bolt penetrates through the inside of the second through hole and is movably connected with the inner wall of the fourth through hole.
Optionally, the threaded column penetrates through the inside of the third through hole and is movably connected with the inner wall of the fourth through hole;
and nuts are in threaded connection with both ends of the threaded column.
Optionally, the number of the third through holes, the number of the fourth through holes and the number of the positioning piles are all several;
the positioning pile penetrates through the inside of the base and is fixedly connected with the ground.
(III) advantageous effects
The utility model provides an assembled steel construction building dysmorphism post possesses following beneficial effect:
(1) this assembled steel construction building dysmorphism post, through set up first card hole and first bolt on the second support column, and set up the second card hole on first support column, not only conveniently remove second support column and first support column, can also be fixed with second support column and first support column, be convenient for adjust the distance between mounting bracket to the base, thereby rise or reduce the crossbeam, when constructor uses, hang in first card hole or second card hole with the couple earlier, can hoist second support column and first support column, align first card hole and second card hole again, thereby make first bolt insert the second card hole from first card hole, can be fixed with second support column and first support column, can remove and adjust second support column and first special-shaped column, thereby manpower and material resources of consumption when having reduced the installation.
(2) This assembled steel construction building dysmorphism post, through setting up the link, can make and connect more closely between two crossbeams, be convenient for improve the stability among the building connection process, when constructor uses, make two crossbeams insert in the link, insert the screw thread post in third through-hole and fourth through-hole again, later install the nut at screw thread post both ends, thereby it is fixed with two crossbeams to fix the link, it is inseparabler to make to connect between two crossbeams, the purpose of improving building connection in-process stability has been reached.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of a second support pillar of the present invention;
fig. 3 is a schematic top view of the mounting frame of the present invention;
fig. 4 is a schematic structural view of the connection frame of the present invention.
In the figure: 1-base, 2-first support column, 3-second support column, 4-first clamping hole, 5-first bolt, 6-movable groove, 7-support column, 8-first thread groove, 9-first through hole, 10-screw, 11-mounting frame, 12-mounting block, 13-sliding sleeve, 14-clamping groove, 15-cross beam, 16-second through hole, 17-second bolt, 18-third through hole, 19-thread column, 20-fourth through hole, 21-connecting frame, 22-positioning pile and 23-second clamping hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-4, the present invention provides a technical solution:
an assembly type steel structure building special-shaped column comprises a base 1, wherein a first supporting column 2 is fixedly connected to the center of the top of the base 1, a second supporting column 3 is arranged at the top of the first supporting column 2, a first clamping hole 4 is formed in the outer surface of the second supporting column 3, a first bolt 5 is movably connected inside the first clamping hole 4, the second supporting column 3 and the first bolt 5 are arranged on the second supporting column 3, and a second clamping hole 23 is formed in the first supporting column 2, so that the second supporting column 3 and the first supporting column 2 can be conveniently moved, the second supporting column 3 and the first supporting column 2 can be fixed, the distance between a mounting frame 11 and the base 1 can be conveniently adjusted, a crossbeam can be lifted or lowered, when a constructor uses the assembly type steel structure building special-shaped column, the second supporting column 3 and the first supporting column 2 can be lifted by a lifting hook, and the first clamping hole 4 and the second clamping hole 23 are aligned, the first bolt 5 is inserted into the second clamping hole 23 from the first clamping hole 4, the second support column 3 and the first support column 2 can be fixed, and the second support column 3 and the first support column 2 can be moved and adjusted, so that manpower and material resources consumed during installation of the special-shaped column are reduced, a movable groove 6 is formed in the top of the second support column 3, a support column 7 is fixedly connected to the inside of the movable groove 6, a first threaded groove 8 is formed in the outer surface of the support column 7, a first through hole 9 is formed in one end, far away from the first support column 2, of the second support column 3, and a screw 10 is movably connected to the inside of the first through hole 9;
the top of the second supporting column 3 is provided with a mounting frame 11, the periphery of the mounting frame 11 is fixedly connected with a mounting block 12, the bottom of the mounting frame 11 is fixedly connected with a sliding sleeve 13, one side of the mounting block 12 is provided with a clamping groove 14, a cross beam 15 is clamped inside the clamping groove 14, the top of the mounting frame 11 is provided with a second through hole 16, a second bolt 17 is movably connected inside the second through hole 16, one end of the cross beam 15, which is far away from the mounting block 12, is provided with a connecting frame 21, the two cross beams 15 can be connected more tightly by arranging the connecting frame 21, the stability in the building connection process is convenient to improve, when in use, the two cross beams 15 are inserted into the connecting frame 21, the threaded column 19 is inserted into the third through hole 18 and the fourth through hole 20, nuts are then installed at two ends of the threaded column 19, so that the connecting frame 21 is fixed with the two cross, the purpose of improving the stability of the building in the connecting process is achieved, the third through hole 18 is formed in the outer surfaces of the mounting block 12 and the connecting frame 21, the threaded column 19 is movably connected inside the third through hole 18, the fourth through holes 20 are formed in the outer surfaces of the two ends of the cross beam 15, and the positioning pile 22 is arranged at the top of the base 1.
As an optional technical solution of the utility model:
the bottom of the second supporting column 3 is provided with a bottom groove;
the first supporting column 2 is movably connected with the inner wall of the bottom groove.
As an optional technical solution of the utility model:
the outer surface of the first support column 2 is provided with a second clamping hole 23;
the first pin 5 penetrates through the first clamping hole 4 and is movably connected with the inner wall of the second clamping hole 23.
As an optional technical solution of the utility model:
the outer surface of the sliding sleeve 13 is movably connected with the inner wall of the movable groove 6;
the inner wall of the sliding sleeve 13 is movably connected with the outer surface of the pillar 7.
As an optional technical solution of the utility model:
the screw 10 penetrates the first through hole 9 and the sliding sleeve 13 and is screw-coupled with the inside of the first screw groove 8.
As an optional technical solution of the utility model:
the second pin 17 penetrates through the second through hole 16 and is movably connected with the inner wall of the fourth through hole 20.
As an optional technical solution of the utility model:
the threaded column 19 penetrates through the inside of the third through hole 18 and is movably connected with the inner wall of the fourth through hole 20;
both ends of the threaded post 19 are threadedly connected with nuts.
As an optional technical solution of the utility model:
the number of the third through holes 18, the number of the fourth through holes 20 and the number of the positioning piles 22 are all a plurality;
the positioning pile 22 penetrates through the inside of the base 1 and is fixedly connected with the ground.
When in use, a user carries the special-shaped column and the accessories to a construction site by a truck, then assembles the special-shaped column and the accessories by a large-scale traction machine such as a crane, firstly hangs the special-shaped column and the accessories in the second clamping hole 23 by a hook, lifts the first support column 2 to a planned position, then puts the first support column 2 down to enable the base 1 to be attached to the ground, then fixes the base 1 to the ground by a positioning pile 22, then installs the second support column 3 on the first support column 2 by the same method, aligns the first clamping hole 4 with the second clamping hole 23, then inserts the first bolt 5 into the second clamping hole 23 from the first clamping hole 4 to enable the second support column 3 and the first support column 2 to be fixed, then lifts the mounting frame 11 by the crane to enable the sliding sleeve 13 on the mounting frame 11 to be inserted into the movable groove 6 in the second support column 3, and simultaneously fixes the mounting block 11 and the cross beam 15 by the second bolt 17 and the threaded column 19, then, the cross beams 15 are lifted, one ends of the cross beams 15 are inserted into the clamping grooves 14, the situations that the construction period is long, the use is inconvenient are avoided, then the two cross beams 15 are inserted into the connecting frame 21, the threaded columns 19 are inserted into the third through hole 18 and the fourth through hole 20, and then nuts are installed at two ends of the threaded columns 19, so that the connecting frame 21 and the two cross beams 15 are fixed.
In conclusion, when the assembly type steel structure building special-shaped column is used, the first clamping hole 4 and the first bolt 5 are arranged on the second support column 3, the second clamping hole 23 is arranged on the first support column 2, the second support column 3 and the first support column 2 can be conveniently moved, the second support column 3 and the first support column 2 can be fixed, the distance between the mounting frame 11 and the base 1 can be conveniently adjusted, so that the cross beam can be raised or lowered, when a constructor uses the assembly type steel structure building special-shaped column, the second support column 3 and the first support column 2 can be lifted by hanging the lifting hook in the first clamping hole 4 or the second clamping hole 23, the first clamping hole 4 and the second clamping hole 23 are aligned, so that the first bolt 5 is inserted into the second clamping hole 23 from the first clamping hole 4, the second support column 3 and the first support column 2 can be fixed, the second support column 3 and the first support column 2 can be moved and adjusted, and the consumed manpower and material resources in the installation of the special-shaped column can be reduced, through setting up link 21, can make and connect inseparabler between two crossbeams 15, be convenient for improve the stability among the building connection process, when constructor used, make two crossbeams 15 insert in link 21, insert threaded column 19 again in third through hole 18 and fourth through hole 20, later install the nut at threaded column 19 both ends, thereby it is fixed with two crossbeams 15 with link 21, it is inseparabler to make to connect between two crossbeams 15, the purpose of improving building connection in-process stability has been reached.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides an assembled steel construction building dysmorphism post, includes base (1), its characterized in that:
a first supporting column (2) is fixedly connected to the center of the top of the base (1), a second supporting column (3) is arranged at the top of the first supporting column (2), a first clamping hole (4) is formed in the outer surface of the second supporting column (3), a first bolt (5) is movably connected to the inside of the first clamping hole (4), a movable groove (6) is formed in the top of the second supporting column (3), a supporting column (7) is fixedly connected to the inside of the movable groove (6), a first threaded groove (8) is formed in the outer surface of the supporting column (7), a first through hole (9) is formed in one end, away from the first supporting column (2), of the second supporting column (3), and a screw (10) is movably connected to the inside of the first through hole (9);
the top of the second supporting column (3) is provided with a mounting frame (11), the periphery of the mounting frame (11) is fixedly connected with mounting blocks (12), the bottom of the mounting frame (11) is fixedly connected with a sliding sleeve (13), one side of the mounting block (12) is provided with a clamping groove (14), a cross beam (15) is clamped inside the clamping groove (14), the top of the mounting frame (11) is provided with a second through hole (16), the inside of the second through hole (16) is movably connected with a second bolt (17), one end of the cross beam (15) far away from the mounting block (12) is provided with a connecting frame (21), the outer surfaces of the mounting block (12) and the connecting frame (21) are provided with third through holes (18), the inside of the third through holes (18) is movably connected with a threaded column (19), the outer surfaces of two ends of the cross beam (15) are provided with fourth through holes (20, the top of the base (1) is provided with a positioning pile (22).
2. An assembled steel structural building profiled pole as claimed in claim 1,
the bottom of the second supporting column (3) is provided with a bottom groove;
the first supporting column (2) is movably connected with the inner wall of the bottom groove.
3. An assembled steel structural building profiled pole as claimed in claim 1,
a second clamping hole (23) is formed in the outer surface of the first supporting column (2);
the first bolt (5) penetrates through the inside of the first clamping hole (4) and is movably connected with the inner wall of the second clamping hole (23).
4. An assembled steel structural building profiled pole as claimed in claim 1,
the outer surface of the sliding sleeve (13) is movably connected with the inner wall of the movable groove (6);
the inner wall of the sliding sleeve (13) is movably connected with the outer surface of the pillar (7).
5. An assembled steel structural building profiled pole as claimed in claim 1,
the screw (10) penetrates through the first through hole (9) and the sliding sleeve (13) and is in threaded connection with the inner part of the first thread groove (8).
6. An assembled steel structural building profiled pole as claimed in claim 1,
the second bolt (17) penetrates through the interior of the second through hole (16) and is movably connected with the inner wall of the fourth through hole (20).
7. An assembled steel structural building profiled pole as claimed in claim 1,
the threaded column (19) penetrates through the inside of the third through hole (18) and is movably connected with the inner wall of the fourth through hole (20);
and nuts are in threaded connection with both ends of the threaded column (19).
8. An assembled steel structural building profiled pole as claimed in claim 7,
the number of the third through holes (18), the number of the fourth through holes (20) and the number of the positioning piles (22) are all a plurality;
the positioning pile (22) penetrates through the inside of the base (1) and is fixedly connected with the ground.
CN201920887138.6U 2019-06-13 2019-06-13 Assembled steel construction building dysmorphism post Active CN210316214U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920887138.6U CN210316214U (en) 2019-06-13 2019-06-13 Assembled steel construction building dysmorphism post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920887138.6U CN210316214U (en) 2019-06-13 2019-06-13 Assembled steel construction building dysmorphism post

Publications (1)

Publication Number Publication Date
CN210316214U true CN210316214U (en) 2020-04-14

Family

ID=70143656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920887138.6U Active CN210316214U (en) 2019-06-13 2019-06-13 Assembled steel construction building dysmorphism post

Country Status (1)

Country Link
CN (1) CN210316214U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113482173A (en) * 2021-07-17 2021-10-08 江苏溧阳建设集团有限公司 House building upright post structure
CN114439030A (en) * 2020-11-04 2022-05-06 中建三局绿色产业投资有限公司 Height-adjustable stiffness steel column base foundation device and application method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114439030A (en) * 2020-11-04 2022-05-06 中建三局绿色产业投资有限公司 Height-adjustable stiffness steel column base foundation device and application method thereof
CN113482173A (en) * 2021-07-17 2021-10-08 江苏溧阳建设集团有限公司 House building upright post structure
CN113482173B (en) * 2021-07-17 2022-10-21 江苏溧阳建设集团有限公司 House building upright post structure

Similar Documents

Publication Publication Date Title
CN210316214U (en) Assembled steel construction building dysmorphism post
CN110439249B (en) Overhanging bearing frame and mounting method thereof
CN112428194A (en) Auxiliary tool for mounting lifting fin
CN116623939A (en) Tool type suspension steel template construction method
CN209816672U (en) Attached cantilever bracket structure
CN106869508B (en) A kind of rotation lifting of assembled architecture steel box column is welded and fixed mounting process in place
CN219098488U (en) Auxiliary machine tool convenient for hoisting and positioning installation of assembled building components
CN219259316U (en) Wind-driven generator blade hoisting structure
CN220621124U (en) Unit curtain wall hoisting and hanging basket installing guide rail system
CN216042552U (en) Local device of strengthening of scaffold frame for construction
CN211058009U (en) Assembled steel construction building dysmorphism post
CN218595861U (en) Sandwich plate hoisting clamp
CN216889779U (en) Auxiliary temporary supporting device for hoisting of assembled vertical component
CN213741899U (en) Special-shaped steel truss mounting structure encorbelments
CN212687396U (en) Bridge crane frame beam convenient to installation
CN210086544U (en) Novel fixed code and connecting structure thereof
CN219973860U (en) Steel frame structure outer wall hanging basket fixed mounting device
CN216305332U (en) Guide rail upright post for building construction
CN215573498U (en) Road bridge bearing capacity test detection device
CN219771610U (en) Base structure of winch rotary crane
CN215830054U (en) A positioning tool for I-steel roof beam
CN220848062U (en) Hoisting screw rod embedded component
CN216664516U (en) Steel structure foundation bolt pre-embedded positioning plate
CN210032630U (en) Interim fixing device of adjustable horizontal component
CN113323361B (en) Construction method of high-altitude supporting operation frame based on bottom steel platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant