CN212295594U - Lower hoisting point truss structure of climbing frame - Google Patents
Lower hoisting point truss structure of climbing frame Download PDFInfo
- Publication number
- CN212295594U CN212295594U CN202021646292.3U CN202021646292U CN212295594U CN 212295594 U CN212295594 U CN 212295594U CN 202021646292 U CN202021646292 U CN 202021646292U CN 212295594 U CN212295594 U CN 212295594U
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- point truss
- truss
- climbing
- hoisting point
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a building tool technical field discloses a lower hoisting point truss structure of climbing frame, pole setting in the hoisting point truss under the climbing frame, one side of pole setting is provided with a plurality of hoisting point truss horizontal poles under the climbing frame in the hoisting point truss under the climbing frame, the one end of climbing frame lower hoisting point truss horizontal pole is connected with the outer pole setting of climbing frame lower hoisting point truss, install lower hoisting point in the outer pole setting of climbing frame lower hoisting point truss. The utility model discloses simple structure, safe light, the assembly use the degree of difficulty lower, and manufacturing process is simple, and application scope is wide, and circulated use both can realize the safe handling of guarantee attached lift scaffold, can also save a large amount of manual works, improve the efficiency of construction simultaneously effectively.
Description
Technical Field
The utility model relates to a building tool technical field especially relates to a lower hoisting point truss structure of climbing frame.
Background
An attached lifting scaffold is called a lifting frame for short, is commonly called a climbing frame, is external protection construction equipment used in high-rise and super high-rise building construction, and mainly comprises climbing frame accessories, a lifting system, a control system and the like. The attached lifting scaffold needs to use a ring chain hoist as traction power in the lifting process, and when the ring chain hoist is used as the traction power, if the hoist hook is directly hung on a climbing frame main frame or a guide rail, if traction force is large, stress concentration at the position can be caused to easily deform so as to cause potential safety hazards, and therefore in the climbing frame construction lifting operation of a high-rise building, a lifting point truss with enough strength is independently designed to be attached to a frame body so as to ensure the safety of the lifting operation.
At present, a lower lifting point truss of an attached lifting scaffold used in the industry is as shown in fig. 1, the specification is overlarge, the structure is correspondingly overlarge, the manufacturing process is complex, the cost is high, the weight is heavy, time and labor are consumed during installation and use, and the difficulty is increased for transportation and construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a lower hoisting point truss structure of climbing frame has simple structure, and is safe light, and the assembly is used the degree of difficulty lower, and manufacturing process is simple, and the application is wide, and circulated use's advantage has solved the lower hoisting point truss specification of the attached lifting scaffold who uses in the trade too big, and the structure is corresponding too complicated moreover, and the manufacturing procedure is complicated, with high costs, the weight is heavy, consuming time when installing and using the power, for the problem of transportation and the construction increase degree of difficulty.
According to the utility model discloses climb lower hoisting point truss structure of frame, pole setting in the hoisting point truss under the frame of climbing, one side of pole setting is provided with a plurality of hoisting point truss horizontal poles under the frame of climbing in the hoisting point truss under the frame, the one end of climbing frame lower hoisting point truss horizontal pole is connected with the outer pole setting of hoisting point truss under the frame of climbing, climb and install lower hoisting point in the outer pole setting of hoisting point truss under the frame.
Furthermore, the upper part of one end of the lower lifting point truss cross rod of the climbing frame is provided with a small rectangular steel plate of the lower lifting point truss of the climbing frame, and the small rectangular steel plate of the lower lifting point truss of the climbing frame is fixedly connected with the inner vertical rod of the lower lifting point truss of the climbing frame.
Furthermore, all be provided with on the little rectangle steel sheet of the hoisting point truss under the frame of climbing and run through the mouth, run through the mouth all with set up in the frame of climbing on the pole setting in the hoisting point truss under the frame of climbing in the pole setting pole in the hoisting point truss under the frame pole through the pole hole parallel and level.
And furthermore, a lower climbing frame hoisting point truss steel plate is fixed in the middle between the inner vertical rod of the lower climbing frame hoisting point truss and the outer vertical rod of the lower climbing frame hoisting point truss, and the lower climbing frame hoisting point truss steel plate is fixed on a lower climbing frame hoisting point truss cross rod through bolts.
Furthermore, a plurality of inclined web members of the lower climbing frame hoisting point truss are obliquely arranged between the outer vertical rod of the lower climbing frame hoisting point truss and the inner vertical rod of the lower climbing frame hoisting point truss.
Furthermore, all be provided with the bolt in the pole setting through-hole in the hoisting point truss under the climbing frame, the bolt passes pole setting through-hole in the hoisting point truss under the climbing frame and with guide rail pole setting fixed connection.
Furthermore, one side of the guide rail vertical rod is provided with a guide rail, and a horizontal truss is movably connected in the guide rail.
Furthermore, the bolts in the through holes of the vertical rods in the climbing frame lower hoisting point truss sequentially penetrate through the guide rail vertical rods and the guide rail and are sequentially fixedly connected with the guide rail vertical rods and the guide rail through threads.
Furthermore, a connecting bolt penetrates through the middle of the cross rod of the lower lifting point truss of the climbing frame and is fixedly connected with the horizontal truss.
Compared with the prior art, the utility model beneficial effect who has is:
the novel scaffold has the advantages of simple structure, safety, light weight, low assembly and use difficulty, simple manufacturing process, wide application range and cyclic use, can overcome the defects of the prior art that the frame body is deformed due to stress concentration, the weight of part of lower hoisting point trusses is large, the processing period is long, the transportation cost is high, the later installation difficulty is increased, the construction cost is improved, and the construction efficiency is low, can realize the safe use of the attached lifting scaffold, and can effectively save a large amount of labor and improve the construction efficiency.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic perspective view of a lower suspension point truss in the prior art;
fig. 2 is a schematic perspective view of a lower suspension point truss structure of a climbing frame according to the present invention;
fig. 3 is a schematic structural view of a lower lifting point in a lower lifting point truss structure of the climbing frame of the present invention;
fig. 4 is a schematic view of a connection between a lower hoisting point truss and a lower hoisting point in a lower hoisting point truss structure of the climbing frame of the present invention;
fig. 5 is a top view of a connection between a lower suspension point truss and a lower suspension point in a lower suspension point truss structure of the climbing frame of the present invention;
fig. 6 is an assembly schematic diagram of a guide rail upright rod, a guide rail and a horizontal truss in a lower hoisting point truss structure of the climbing frame.
In the figure: 1-climbing frame lower lifting point truss inner vertical rod, 2-climbing frame lower lifting point truss outer vertical rod, 3-climbing frame lower lifting point truss cross rod, 4-climbing frame lower lifting point truss diagonal web member, 5-horizontal truss, 6-guide rail vertical rod, 7-guide rail, 8-climbing frame lower lifting point truss inner vertical rod through hole, 9-climbing frame lower lifting point truss small rectangular steel plate, 10-lower lifting point, 11-lower lifting point truss and 12-climbing frame lower lifting point truss steel plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following describes the implementation of the present invention in detail with reference to specific embodiments.
The same or similar reference numerals in the drawings of the present embodiment correspond to the same or similar components; in the description of the present invention, it should be understood that if there are the terms "upper", "lower", "left", "right", etc. indicating the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, it is only for convenience of description and simplification of the description, but it is not intended to indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and therefore the terms describing the positional relationship in the drawings are only for illustrative purposes and are not to be construed as limitations of the present patent, and those skilled in the art can understand the specific meanings of the terms according to specific situations.
Referring to fig. 2-6, the preferred embodiment of the present invention is shown.
The utility model provides a lower hoisting point truss structure of climbing frame, pole setting 1 in the hoisting point truss under climbing the frame, the one side of pole setting 1 is provided with a plurality of hoisting point truss horizontal poles 3 under climbing the frame in the hoisting point truss under climbing the frame, the one end of climbing frame lower hoisting point truss horizontal pole 3 is connected with the outer pole setting 2 of hoisting point truss under climbing the frame, climb and install hoisting point 10 down on the outer pole setting 2 of hoisting point truss under the frame, this hoisting point truss 11 simple structure down, safe light, the assembly use degree of difficulty is lower, simple manufacturing process, wide application, circulated use.
In this embodiment, the one end upper portion of climbing frame lower hoisting point truss horizontal pole 3 all is provided with the little rectangular steel sheet of climbing frame lower hoisting point truss 9, climbs frame lower hoisting point truss little rectangular steel sheet 9 and climbs frame lower hoisting point truss in pole setting 1 fixed connection, all is provided with on the little rectangular steel sheet of climbing frame lower hoisting point truss and runs through the mouth, run through the mouth all with set up in the frame lower hoisting point truss in pole setting 1 in the frame lower hoisting point truss in pole setting 8 through-holes parallel and level.
In this embodiment, a steel plate 12 for a truss of a lower lifting point of the climbing frame is fixed in the middle between the inner vertical rod 1 of the truss of the lower lifting point of the climbing frame and the outer vertical rod 2 of the truss of the lower lifting point of the climbing frame, and the steel plate 12 for the truss of the lower lifting point of the climbing frame is fixed on the truss cross rod 3 of the truss of the lower lifting point of the climbing frame through bolts.
In this embodiment, a plurality of diagonal web members 4 of the lower lifting point truss of the climbing frame are obliquely arranged between the outer vertical rod 2 of the lower lifting point truss of the climbing frame and the inner vertical rod 1 of the lower lifting point truss of the climbing frame, so that the stability of the lower lifting point truss 11 is improved.
In this embodiment, all be provided with the bolt in the pole setting through-hole 8 in the hoisting point truss under the climbing frame, the bolt pass in the hoisting point truss under the climbing frame pole setting 1 through-hole and with guide rail pole setting 6 fixed connection, one side of guide rail pole setting 6 is provided with guide rail 7, swing joint has horizontal truss 5 in the guide rail 7, the bolt in the pole setting through-hole in the hoisting point truss under the climbing frame passes guide rail pole setting 6, guide rail 7 in proper order, and in proper order with guide rail pole setting 6, guide rail 7 screw thread fixed connection, connection stability is strong.
In this embodiment, a connecting bolt penetrates through the middle part of the lower hoisting point truss cross rod 3 of the climbing frame, and the connecting bolt is fixedly connected with the horizontal truss 5.
The technical scheme can overcome the defects that in the prior art, due to stress concentration, the frame body is deformed, the weight of part of lower lifting point trusses is larger, the processing period is long, the transportation cost is high, the installation difficulty in the later stage is increased, the construction cost is improved, and the construction efficiency is low, so that the safe use of the attached lifting scaffold can be guaranteed, and meanwhile, a large amount of labor can be effectively saved and the construction efficiency is improved.
When the technical scheme is used, a lower lifting point 10 and a lower lifting point truss 11 are connected together through a bolt, an inner vertical rod 1 of a climbing frame lower lifting point truss and an outer vertical rod 2 of the climbing frame lower lifting point truss are arranged in parallel and are all vertically placed, one side end surface of the inner vertical rod 1 of the climbing frame lower lifting point truss is clung to a guide rail vertical rod 6, one side end surface of the inner vertical rod 1 of the climbing frame lower lifting point truss, which is close to the outer vertical rod 2 of the climbing frame lower lifting point truss, is provided with four identical inner vertical rod through holes 8 of the climbing frame lower lifting point truss, one side of the inner vertical rod through hole 8 of the climbing frame lower lifting point truss is provided with a small rectangular steel plate 9 of the climbing frame lower lifting point truss, the four small rectangular steel plates 9 of the climbing frame lower lifting point truss are, the inner vertical rod 1 of the climbing frame lower lifting point truss and the outer vertical rod 2 of the climbing frame lower lifting point truss are connected through three same and parallel arranged cross rods 3 of the climbing frame lower lifting point truss and three parallel arranged oblique web members 4 of the climbing frame lower lifting point truss.
The lower hoisting point 10 is connected with a lower hoisting point truss 11 through four bolts, wherein two bolts are connected with a climbing frame lower hoisting point truss steel plate 2, two bolts are connected with a climbing frame lower hoisting point truss outer vertical rod 2, a guide rail vertical rod 6 and a guide rail 7 are assembled together through 4 bolts in a climbing frame lower hoisting point truss inner vertical rod through hole 8, four through holes in an upper climbing frame lower hoisting point truss cross rod 3 and a lower climbing frame lower hoisting point truss cross rod 3 are connected with a horizontal truss 5 through four bolts vertically, the dismounting is convenient, the safety and the reliability are realized, the repeated use can be realized for a plurality of times, the lifting and the maintenance are more convenient, meanwhile, when the traction force provided by the electric chain block is overlarge, the displacement of the block chain is realized through the relative rotation between the climbing frame lower hoisting point truss structure and the electric block, thereby the traction force is buffered, and the frame body is prevented from deforming, overcomes many defects in the prior lower hanging point truss.
The details of the present invention are well known to those skilled in the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (9)
1. The utility model provides a lower hoisting point truss structure of climbing frame which characterized in that: the climbing device comprises a climbing frame lower lifting point truss inner vertical rod, wherein a plurality of climbing frame lower lifting point truss cross rods are arranged on one side of the climbing frame lower lifting point truss inner vertical rod, one end of each climbing frame lower lifting point truss cross rod is connected with a climbing frame lower lifting point truss outer vertical rod, and a lower lifting point is installed on the climbing frame lower lifting point truss outer vertical rod.
2. The lower suspension point truss structure of a climbing frame according to claim 1, wherein: the small rectangular steel plate of the climbing frame lower hoisting point truss is fixedly connected with the inner vertical rod of the climbing frame lower hoisting point truss.
3. The lower suspension point truss structure of a climbing frame according to claim 2, wherein: all be provided with on the little rectangle steel sheet of the hoisting point truss under the frame of climbing and run through the mouth, run through the mouth all with set up in the frame of climbing on the pole setting in the hoisting point truss under the frame of climbing pole in the pole setting in the hoisting point truss under the frame pole in pole setting the pole parallel and level in pole setting hole.
4. The lower suspension point truss structure of a climbing frame according to claim 3, wherein: the middle part between the inner vertical rod of the climbing frame lower lifting point truss and the outer vertical rod of the climbing frame lower lifting point truss is fixed with a climbing frame lower lifting point truss steel plate, and the climbing frame lower lifting point truss steel plate is fixed on a climbing frame lower lifting point truss cross rod through bolts.
5. The lower suspension point truss structure of a climbing frame according to claim 4, wherein: a plurality of inclined web members of the lower climbing frame hoisting point truss are obliquely arranged between the outer vertical rod of the lower climbing frame hoisting point truss and the inner vertical rod of the lower climbing frame hoisting point truss.
6. The lower suspension point truss structure of a climbing frame according to claim 5, wherein: all be provided with the bolt in the pole setting through-hole in the hoisting point truss under the climbing frame, the bolt passes pole setting through-hole in the hoisting point truss under the climbing frame and with guide rail pole setting fixed connection.
7. The lower suspension point truss structure of a climbing frame according to claim 6, wherein: one side of the guide rail upright stanchion is provided with a guide rail, and a horizontal truss is movably connected in the guide rail.
8. The lower suspension point truss structure of a climbing frame according to claim 7, wherein: and bolts in the through holes of the vertical rods in the lower lifting point truss of the climbing frame sequentially penetrate through the guide rail vertical rods and the guide rail and are fixedly connected with the guide rail vertical rods and the guide rail in a threaded manner.
9. The lower suspension point truss structure of a climbing frame according to claim 8, wherein: and a connecting bolt penetrates through the middle part of the truss cross rod of the lower lifting point of the climbing frame and is fixedly connected with the horizontal truss.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021646292.3U CN212295594U (en) | 2020-08-10 | 2020-08-10 | Lower hoisting point truss structure of climbing frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202021646292.3U CN212295594U (en) | 2020-08-10 | 2020-08-10 | Lower hoisting point truss structure of climbing frame |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN212295594U true CN212295594U (en) | 2021-01-05 |
Family
ID=73937446
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202021646292.3U Expired - Fee Related CN212295594U (en) | 2020-08-10 | 2020-08-10 | Lower hoisting point truss structure of climbing frame |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN212295594U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111794490A (en) * | 2020-08-10 | 2020-10-20 | 深圳市江丰工程技术有限公司 | A hanging point truss structure of a climbing frame |
-
2020
- 2020-08-10 CN CN202021646292.3U patent/CN212295594U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111794490A (en) * | 2020-08-10 | 2020-10-20 | 深圳市江丰工程技术有限公司 | A hanging point truss structure of a climbing frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN214935296U (en) | Lifting device convenient to big inclination steel column does not have support equipment | |
| CN212295594U (en) | Lower hoisting point truss structure of climbing frame | |
| CN113958131B (en) | Suspended ceiling structure of steel structure truss string system roof and construction method thereof | |
| CN210064895U (en) | Installation hoist of prefabricated unit in space | |
| CN213569002U (en) | Construction elevator attaches wall mounting structure | |
| CN211813077U (en) | Prefabricated component hoist of assembly type structure | |
| CN222714917U (en) | Lifting appliance for lifting and installing H-shaped steel upright post | |
| CN212388962U (en) | Attached type lifting scaffold wall-attached support for bay window | |
| CN205616391U (en) | Construction elevator guide rail frame | |
| CN202767493U (en) | Lifting scaffold of high-rise balcony | |
| CN214899827U (en) | High-altitude outdoor cable terminal work platform | |
| CN218323967U (en) | Steel construction roof truss goes up and down and stop device | |
| CN114084814B (en) | Lifting system suitable for small space | |
| CN110040632A (en) | A kind of segmental hoisting construction method of large span section steel beam | |
| CN212740446U (en) | I-steel hoist device | |
| CN109914223B (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system and operation method thereof | |
| CN217975328U (en) | Climbing frame upper and lower hoisting point truss assembly capable of being provided with auxiliary vertical rod | |
| CN210002233U (en) | Hoisting system suitable for suspension bridge steel structure bridge deck system | |
| CN220723293U (en) | A three-point hoist device for arc girder steel | |
| CN111794490A (en) | A hanging point truss structure of a climbing frame | |
| CN218149673U (en) | Truss type lower hanging rack device for climbing frame | |
| CN207312978U (en) | A kind of Super High boom-type tower crane hand-held C-type beam and climb band device | |
| CN222593210U (en) | Steel construction section bar lifting device | |
| CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus | |
| CN216239666U (en) | Eccentric hoist system of inserted lift scaffold |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210105 |