CN204848024U - Girder steel hoist device for construction - Google Patents
Girder steel hoist device for construction Download PDFInfo
- Publication number
- CN204848024U CN204848024U CN201520530260.XU CN201520530260U CN204848024U CN 204848024 U CN204848024 U CN 204848024U CN 201520530260 U CN201520530260 U CN 201520530260U CN 204848024 U CN204848024 U CN 204848024U
- Authority
- CN
- China
- Prior art keywords
- column
- stand
- electric block
- connecting rod
- pressure pin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a girder steel hoist device for construction, including stand, coexistence post pull rod, die -pin, connecting rod and electric block, the upper portion on one side of the stand is equipped with two pull rod connecting plates, and the upper end of two pull rods is rotated with a pull rod connecting plate respectively and is connected, lower extreme at stand and coexistence post pull rod is equipped with a fixed backing plate respectively, the opposite side of die -pin levels in stand, the upper and lower both ends of connecting rod link to each other through the one end that the stand was kept away from to connecting rod connecting plate and the upper portion and the die -pin of stand respectively, electric block installs the downside of keeping away from stand one end in the die -pin through rings. The utility model discloses the efficiency of the perpendicular transport of girder steel can be effectively improved, intensity of labour is reduced to simple to operate, swift, the cost low.
Description
Technical field
The utility model relates to a kind of hanging device, particularly relates to a kind of building operation steel beam lifting device.
Background technology
In building operation especially housing construction process, need to use girder steel in a large number, usual main house body building and installation girder steel mostly adopts the instrument such as tower crane, crane to lift; But the hoisting point position of indoor location girder steel, the such equipment of crane just cannot in placely be installed; And at present, be not also specifically designed to the specialized equipment of indoor steel beam lifting, thus cause the lifting of girder steel to become a difficult problem, time-consuming, effort, labour intensity is large, and handling efficiency is low or it is too high to implement technical fee.
Utility model content
For prior art above shortcomings, the purpose of this utility model is how to solve girder steel in indoor construction process and vertically carries trouble, labour intensity is large, and the problem that construction costs is high, a kind of building operation steel beam lifting device is provided, effectively can improve the efficiency that girder steel is vertically carried, reduce labour intensity, and easy for installation, quick, cost is low.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is such: a kind of building operation steel beam lifting device, it is characterized in that: comprise column, two column pull bars, pressure pin, connecting rod and electric block, two pull bar connecting panels are provided with on the top of column side, described pull bar connecting panel is positioned at perpendicular, and between two pull bar connecting panels, forming the angle of 30-90 °, the upper end of two pull bars is rotationally connected with a pull bar connecting panel respectively; Be respectively equipped with a fixing backing plate in the lower end of column and two column pull bars, wherein, two column pull bars and fixing backing plate are rotationally connected;
Described pressure pin level is located at the opposite side of column, and its one end is connected with the bottom of column; The upper/lower terminal of described connecting rod is connected with pressure pin one end away from column with the top of column respectively by connecting rod connecting panel; Described electric block is installed on the downside of pressure pin away from column one end by suspension ring.
Further, described electric block is self-locking type electric block, and the lifting rope of electric block is provided with girder steel suspender.
Further, described pressure pin and connecting rod are all rotationally connected with column.
Compared with prior art, the utility model tool has the following advantages:
1, structure is simple, only this device need be installed on beam that namely floor structure beam slab install near girder steel, can carry out lifting, the carrying of girder steel, time saving and energy saving, easy to use, can complete indoor girder steel and vertically carry, and effectively can improve handling efficiency; Reduce labour intensity, and effectively save hoisting cost.
2, column and all form triangular structure between column pull bar and flooring, between column pull bar and flooring, thus make the stability of whole device better, thus ensure the stable, reliable of hoisting process.
Accompanying drawing explanation
Structural representation when Fig. 1 is the utility model use.
In figure: 1-column, 2-column pull bar, 3-pressure pin, 4-connecting rod, 5-electric block, 6-fixing backing plate, 7-girder steel suspender.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment: see Fig. 1, a kind of building operation steel beam lifting device, comprise column 1, two column pull bar 2, pressure pin 3, connecting rod 4 and electric block 5, two pull bar connecting panels are provided with on the top of column 1 side, described pull bar connecting panel is positioned at perpendicular, and between two pull bar connecting panels, forming the angle of 30-90 °, the upper end of two pull bars is rotationally connected with a pull bar connecting panel respectively.Be respectively equipped with a fixing backing plate 6 in the lower end of column 1 and two column pull bars 2, wherein, two column pull bars 2 are rotationally connected with fixing backing plate 6; During concrete enforcement, described fixing backing plate 6 has several connecting screw hole, during use, to be installed on beam that namely floor structure beam slab install near girder steel by tie bolt, the lifting of girder steel can be carried out, easy to use, and the girder steel that can complete indoor is vertically carried.After fixing backing plate 6 is fixedly connected with flooring, column 1 and all form triangular structure between column pull bar 2 and flooring, between column pull bar 2 and flooring, thus make the stability of whole device better, thus ensure the stable, reliable of hoisting process.
Described pressure pin 3 level is located at the opposite side of column 1, and its one end is connected with the bottom of column 1; The upper/lower terminal of described connecting rod 4 is connected with pressure pin 3 one end away from column 1 with the top of column 1 respectively by connecting rod 4 connecting panel.Like this, pressure pin 3, connecting rod 4 and column 1 also form a leg-of-mutton structure, thus improve the stability in hoisting process further.During concrete enforcement, described pressure pin 3 and connecting rod 4 are all rotationally connected with column 1, after as required pressure pin 3 and connecting rod 4 being turned to correct position, only by pretension stay cord, the position of pressure pin 3 need be fixed, thus avoid pressure pin 3 in hoisting process to rotate in the horizontal plane.
Described electric block 5 is installed on the downside of pressure pin 3 away from column 1 one end by suspension ring; Described electric block 5 is self-locking type electric block 5, and the lifting rope of electric block 5 is provided with girder steel suspender 7, so that fixed by girder steel fast, makes lifting more quick.
Finally it should be noted that, above embodiment is only in order to illustrate the technical solution of the utility model but not restriction technologies scheme, those of ordinary skill in the art is to be understood that, those are modified to the technical solution of the utility model or equivalent replacement, and do not depart from aim and the scope of the technical program, all should be encompassed in the middle of right of the present utility model.
Claims (3)
1. a building operation steel beam lifting device, it is characterized in that: comprise column, two column pull bars, pressure pin, connecting rod and electric block, two pull bar connecting panels are provided with on the top of column side, described pull bar connecting panel is positioned at perpendicular, and between two pull bar connecting panels, forming the angle of 30-90 °, the upper end of two pull bars is rotationally connected with a pull bar connecting panel respectively; Be respectively equipped with a fixing backing plate in the lower end of column and two column pull bars, wherein, two column pull bars and fixing backing plate are rotationally connected;
Described pressure pin level is located at the opposite side of column, and its one end is connected with the bottom of column; The upper/lower terminal of described connecting rod is connected with pressure pin one end away from column with the top of column respectively by connecting rod connecting panel; Described electric block is installed on the downside of pressure pin away from column one end by suspension ring.
2. building operation steel beam lifting device according to claim 1, is characterized in that: described electric block is self-locking type electric block, and the lifting rope of electric block is provided with girder steel suspender.
3. building operation steel beam lifting device according to claim 1, is characterized in that: described pressure pin and connecting rod are all rotationally connected with column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520530260.XU CN204848024U (en) | 2015-07-21 | 2015-07-21 | Girder steel hoist device for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520530260.XU CN204848024U (en) | 2015-07-21 | 2015-07-21 | Girder steel hoist device for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204848024U true CN204848024U (en) | 2015-12-09 |
Family
ID=54738597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520530260.XU Expired - Fee Related CN204848024U (en) | 2015-07-21 | 2015-07-21 | Girder steel hoist device for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204848024U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108249318A (en) * | 2017-12-21 | 2018-07-06 | 上海二十冶建设有限公司 | A kind of new steel structure hoisting engineering steel gin pole installation method |
-
2015
- 2015-07-21 CN CN201520530260.XU patent/CN204848024U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108249318A (en) * | 2017-12-21 | 2018-07-06 | 上海二十冶建设有限公司 | A kind of new steel structure hoisting engineering steel gin pole installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203269354U (en) | Transport sling for prefabricated slab | |
CN203474231U (en) | Steel bar tower safety hoisting device | |
CN203998604U (en) | The be threaded vertical reinforcement erecting equipment of form of employing | |
CN204848024U (en) | Girder steel hoist device for construction | |
CN202324662U (en) | Installation device for foam cement composites | |
CN201598093U (en) | Hoisting fixture for large-sized sectional box-type beam | |
CN101723240B (en) | Special fixture for hoisting rectangular section steel column and hoisting method by using same | |
CN202707066U (en) | Manual hole digging pile wall-protecting integral template | |
CN203624808U (en) | Detachable steel structure hanger | |
CN103470057B (en) | A kind of high-altitude component hoisting construction method | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN105366559A (en) | Small hoisting machine fixed on channel steel framework | |
CN207030735U (en) | Prefabricated balcony lifts servicing unit | |
CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
CN103058083B (en) | Bolt sphere truss gig | |
CN204224149U (en) | Steel structure secondary member hoisting device | |
CN208948679U (en) | Assembled hanger | |
CN204198306U (en) | A kind of device for purlin lifting in building operation | |
CN203867062U (en) | Trapezoid steel roof truss with hollowed-out chord members | |
CN202465035U (en) | Brick lifting device | |
CN208814490U (en) | A kind of novel drainage ditch cover plate hanging apparatus | |
CN201485204U (en) | Gas tank hanging device | |
CN202185973U (en) | Device for assisting dismounting and installing T beam formwork | |
CN202322137U (en) | Telescopic hanger | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151209 Termination date: 20210721 |