CN109296213A - A kind of Mobile crane using skyscraper brush window machine track curtain wall construction - Google Patents
A kind of Mobile crane using skyscraper brush window machine track curtain wall construction Download PDFInfo
- Publication number
- CN109296213A CN109296213A CN201811245223.9A CN201811245223A CN109296213A CN 109296213 A CN109296213 A CN 109296213A CN 201811245223 A CN201811245223 A CN 201811245223A CN 109296213 A CN109296213 A CN 109296213A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- job platform
- girder
- crossbeam
- cantilever beams
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/162—Handles to carry construction blocks
Abstract
The invention discloses a kind of Mobile cranes using skyscraper brush window machine track curtain wall construction, including template, second girder and the first girder, the top of template is fixedly connected with track foundation by chemical bolt, and the top of track foundation is fixedly connected with orbit movable trolley by I-steel, the top of template and be located at track foundation rear end be fixedly connected with the first girder, job platform is fixedly connected on the left of first girder, railing is fixedly connected on the outside of job platform inner surface, the top of template and be located at track foundation on the right side of be fixedly connected with chock plate, and the top of chock plate is contacted with the bottom of the second girder, crossbeam is fixedly connected between the left side of second girder and the first girder.Mobile crane of the invention its install convenient, securely, therefore the installation effectiveness of curtain wall can be effectively improved, the cost that curtain wall installation can be effectively reduced meets the interests of enterprise itself to expand the market competitiveness of unit in charge of construction.
Description
Technical field
It is specially a kind of using skyscraper brush window machine track curtain wall construction the present invention relates to curtain wall construction technical field
Mobile crane.
Background technique
Curtain wall is the exterior wall enclosure of building, and not load-bearing is hung up as curtain, therefore also known as " curtain wall ", it is modern
Large-scale and skyscraper commonly has the lightweight wall of decorative effect, is made of panel and support system, can be opposite
Main structure has certain displacement ability or itself has certain deformability, do not undertake the building external shield knot that main structure is acted on
Structure or decorative structure (one kind that exterior wall frame formula support system is also Curtain Wall), curtain wall is the entirety of an independent completion
Structural system, curtain wall are generally used for the outside of main structure, are generally all coated on main structure surface, curtain wall is with respect to main body
Structure planar has certain fine motion ability, (airtight with wind resistance compressive strain, rain leakage (watertightness), air penetration
Property), plane internal deformation (shock resistance), thermal technology's (heat insulating ability), sound insulation, lightning protection, fire prevention, environmental protection, sound absorption, beauty, decoration and energy conservation
The advantages of, curtain wall be unable to do without the use of loop wheel machine during the installation process, but its mounting means of existing loop wheel machine is more complicated, to drop
The low installation effectiveness and cost of curtain wall, is unfavorable for the interests of enterprise itself, for this purpose, it is proposed that a kind of utilize skyscraper brush
The Mobile crane of window machine track curtain wall construction.
Summary of the invention
The purpose of the present invention is to provide a kind of Mobile crane using skyscraper brush window machine track curtain wall construction, with
Solve the problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of utilize skyscraper brush window machine track curtain wall
The top of the Mobile crane of construction, including template, the second girder and the first girder, the template connects by the way that chemical bolt is fixed
It is connected to track foundation, and the top of track foundation is fixedly connected with orbit movable trolley, the top of the template by I-steel
Portion and be located at track foundation rear end be fixedly connected with the first girder, job platform is fixedly connected on the left of the first girder, make
It is fixedly connected with railing on the outside of industry platform inner surface, the top of the template and being located on the right side of track foundation is fixedly connected with
Chock plate, and the top of chock plate is contacted with the bottom of the second girder, it is solid between the left side and the first girder of second girder
Surely it is connected with crossbeam, and the bottom of crossbeam is fixedly connected with horizontal cross brace, the top of the crossbeam is fixed by chemical bolt
It is connected with hoist engine, and is fixedly connected to brace between crossbeam and the second girder and the first girder, second girder and
It is fixedly connected with Cantilever Beams at the top of one girder, crossbeam is fixedly connected at the top of Cantilever Beams, and be located at the cross at the top of Cantilever Beams
Beam is fixedly connected by brace with the first girder, and the bottom of the Cantilever Beams is fixedly connected with fixed pulley, and fixed pulley passes through
Wirerope is connect with hoist engine, and the end of wirerope has hung type unitized curtain wall.
Preferably, the bottom of the Cantilever Beams and job platform passes through the fixed company in left side of hound and the first girder
It connects.
Preferably, the front and rear sides of the job platform pass through cable wind rope and connect with I-steel, and cable wind rope is close to work
One end of word steel is socketed with rope clamp, and the bottom of rope clamp is fixedly connected with rope fastening holder.
Preferably, operating method includes the installation of orbit movable loop wheel machine and the dismounting of orbit movable loop wheel machine.
Preferably, orbit movable loop wheel machine installation the following steps are included:
A, attachment rail mobile trolley: chemical bolt installation I-steel is first passed through at the top of track foundation, then in I-steel
Top passes through chemical bolt attachment rail mobile trolley;
B, it sets up job platform: setting up scaffold at the top of template, to form job platform, need to use cross bar between scaffold
Drawknot, while needing to fasten safety rope in the construction personnel of job platform surface work;
C, steel frame column and cross bar are installed: building multi-layer scaffold and job platform, to install steel frame column and cross bar, while
The construction personnel of job platform surface work needs to fasten safety rope;
D, install Cantilever Beams: construction personnel installs Cantilever Beams, while applying in the work of job platform surface at the top of job platform
Worker person needs to fasten safety rope;
E, install brace: operator station the surface of job platform by be located at Cantilever Beams at the top of crossbeam and the first girder it
Between be fixedly connected with brace, while needing to fasten safety rope in the construction personnel of job platform surface work;
F, hoist engine, fixed pulley, wirerope and horizontal cross brace are installed: being fixedly connected on the top of crossbeam by chemical bolt
The bottom of hoist engine, crossbeam is fixedly connected with horizontal cross brace, is fixedly connected with fixed pulley in the bottom of Cantilever Beams, while will determine
Pulley is connect by wirerope with hoist engine;
G, side is removed operation horizontal edge of table and installed the operating platform: construction personnel successively removes scaffold from top to bottom, thus realization pair
The dismounting work of job platform, and during removing job platform, staff passes through the tools installation operation such as chemical screw
Platform, while needing to fasten safety rope in the construction personnel of job platform surface work;
H, operation test, comes into operation.
Preferably, orbit movable loop wheel machine method for dismounting the following steps are included:
A, operation horizontal edge of table disassembling section platform is set up on side: scaffold is set up at the top of template, to form job platform, and
During setting up job platform, staff works by tool ejectors operating platforms such as spanners, while on job platform surface
Construction personnel need to fasten safety rope;
B, hoist engine, fixed pulley, wirerope and horizontal cross brace are removed: hoist engine being removed from the top of crossbeam, level is cut
Knife support is removed from the bottom of crossbeam, fixed pulley is removed from the bottom of Cantilever Beams, while by wirerope from fixed pulley and hoist engine
Between remove;
C, it removes brace: brace being removed between the crossbeam and the first girder being located at the top of Cantilever Beams, while in operation
The construction personnel of platform surface work needs to fasten safety rope;
D, remove Cantilever Beams: construction personnel removes Cantilever Beams from the top of job platform, while working on job platform surface
Construction personnel need to fasten safety rope;
E, job platform, scaffold and crossbeam are removed simultaneously;
F, steel frame column is removed;
G, it removes mobile trolley: orbit movable trolley is removed from the top of I-steel;
H, it removes remaining job platform: I-steel is removed from the top of track foundation, and by track foundation from the top of template
It removes.
Compared with prior art, beneficial effects of the present invention are as follows:
Mobile crane of the invention its install convenient, securely, therefore the installation effectiveness of curtain wall can be effectively improved, curtain can be effectively reduced
The cost of wall installation meets the interests of enterprise itself to expand the market competitiveness of unit in charge of construction.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural schematic diagram of step A in orbit movable loop wheel machine of the present invention installation;
Fig. 3 is the structural schematic diagram of step B in orbit movable loop wheel machine of the present invention installation;
Fig. 4 is the structural schematic diagram of step C in orbit movable loop wheel machine of the present invention installation;
Fig. 5 is the structural schematic diagram of step D in orbit movable loop wheel machine of the present invention installation;
Fig. 6 is the structural schematic diagram of step E in orbit movable loop wheel machine of the present invention installation;
Fig. 7 is the structural schematic diagram of step F in orbit movable loop wheel machine of the present invention installation;
Fig. 8 is the structural schematic diagram of step G in orbit movable loop wheel machine of the present invention installation;
Fig. 9 is the structural schematic diagram of step H in orbit movable loop wheel machine of the present invention installation;
Figure 10 is the structural schematic diagram of step A during orbit movable loop wheel machine of the present invention is removed;
Figure 11 is the structural schematic diagram of step B during orbit movable loop wheel machine of the present invention is removed;
Figure 12 is the structural schematic diagram of step C during orbit movable loop wheel machine of the present invention is removed;
Figure 13 is the structural schematic diagram of step D during orbit movable loop wheel machine of the present invention is removed;
Figure 14 is the structural schematic diagram of step E during orbit movable loop wheel machine of the present invention is removed;
Figure 15 is the structural schematic diagram of step F during orbit movable loop wheel machine of the present invention is removed;
Figure 16 is the structural schematic diagram of step G during orbit movable loop wheel machine of the present invention is removed;
Figure 17 is the structural schematic diagram of step H during orbit movable loop wheel machine of the present invention is removed.
In figure: 1 template, 2 chock plates, 3 second girders, 4 horizontal cross braces, 5 braces, 6 crossbeams, 7 braces, 8 Cantilever Beams,
9 fixed pulleys, 10 wirerope, 11 hounds, 12 type unitized curtain walls, 13 job platforms, 14 hoist engines, 15 I-steel, 16 track bases
Plinth, 17 first girders, 18 railings, 19 orbit movable trolleies.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1-17, a kind of Mobile crane using skyscraper brush window machine track curtain wall construction, including template
1, the top of the second girder 3 and the first girder 17, template 1 is fixedly connected with track foundation 16, and track base by chemical bolt
The top of plinth 16 is fixedly connected with orbit movable trolley 19 by I-steel 15, the top of template 1 and is located at track foundation 16
Rear end be fixedly connected with the first girder 17, the left side of the first girder 17 is fixedly connected with job platform 13, job platform 13
Front and rear sides pass through cable wind rope and connect with I-steel 15, and cable wind rope is socketed with rope clamp, rope clamp close to one end of I-steel 15
Bottom be fixedly connected with rope fastening holder, be fixedly connected with railing 18 on the outside of 13 inner surface of job platform, the top of template 1 and
It is fixedly connected with chock plate 2 positioned at the right side of track foundation 16, and the top of chock plate 2 is contacted with the bottom of the second girder 3, the
Crossbeam 6 is fixedly connected between the left side of two girders 3 and the first girder 17, and the bottom of crossbeam 6 is fixedly connected with horizontal cross
Support 4, the top of crossbeam 6 is fixedly connected with hoist engine 14, and crossbeam 6 and the second girder 3 and the first girder 17 by chemical bolt
Between be fixedly connected to brace 5, the top of the second girder 3 and the first girder 17 is fixedly connected with Cantilever Beams 8,8 He of Cantilever Beams
The bottom of job platform 13 passes through hound 11 and is fixedly connected with the left side of the first girder 17, and the top of Cantilever Beams 8 is fixed to be connected
It is connected to crossbeam 6, and the crossbeam 6 for being located at 8 top of Cantilever Beams is fixedly connected by brace 7 with the first girder 17, the bottom of Cantilever Beams 8
Portion is fixedly connected with fixed pulley 9, and fixed pulley 9 is connect by wirerope 10 with hoist engine 14, and the end of wirerope 10 has been hung
Type unitized curtain wall 12, install convenient, securely therefore can effectively improve the installation effectiveness of curtain wall, curtain wall installation can be effectively reduced
Cost meets the interests of enterprise itself to expand the market competitiveness of unit in charge of construction.
Its operating method includes the installation of orbit movable loop wheel machine and the dismounting of orbit movable loop wheel machine.
The installation of orbit movable loop wheel machine the following steps are included:
A, attachment rail mobile trolley 19: chemical bolt installation I-steel 15 is first passed through at the top of track foundation 16, then in work
The top of word steel 15 passes through chemical bolt attachment rail mobile trolley 19;
B, it sets up job platform 13: setting up scaffold at the top of template 1, to form job platform 13, needed between scaffold
It needs to fasten safety rope with cross bar drawknot, while in the construction personnel of 13 surface of job platform work;
C, steel frame column and cross bar are installed: building multi-layer scaffold and job platform 13, to install steel frame column and cross bar, simultaneously
On 13 surface of job platform, the construction personnel of work needs to fasten safety rope;
D, install Cantilever Beams 8: construction personnel installs Cantilever Beams 8 at the top of job platform 13, while in 13 surface work of job platform
The construction personnel of work needs to fasten safety rope;
E, install brace 7: operator station will be located at the crossbeam 6 and first at 8 top of Cantilever Beams on the surface of job platform 13
It is fixedly connected with brace 7 between girder 17, while needing to fasten safety rope in the construction personnel of 13 surface of job platform work;
F, hoist engine 14, fixed pulley 9, wirerope 10 and horizontal cross brace 4 are installed: solid by chemical bolt on the top of crossbeam 6
Surely it is connected with hoist engine 14, the bottom of crossbeam 6 is fixedly connected with horizontal cross brace 4, and it is fixed to be fixedly connected in the bottom of Cantilever Beams 8
Pulley 9, while fixed pulley 9 being connect by wirerope 10 with hoist engine 14;
G, install the operating platform when removing job platform 13: construction personnel successively removes scaffold from top to bottom, to realize
Dismounting work to job platform 13, and during removing job platform 13, staff passes through the tools peace such as chemical screw
Operating platform is filled, while needing to fasten safety rope in the construction personnel of 13 surface of job platform work;
H, operation test, comes into operation.
The method for dismounting of orbit movable loop wheel machine the following steps are included:
A, the disassembling section platform when setting up job platform 13: scaffold is set up at the top of template 1, to form job platform
13, and during setting up job platform 13, staff passes through the tool ejectors operating platforms such as spanner, while in job platform
The construction personnel of 13 surfaces work needs to fasten safety rope;
B, hoist engine 14, fixed pulley 9, wirerope 10 and horizontal cross brace 4 are removed: hoist engine 14 is removed from the top of crossbeam 6,
By horizontal cross brace 4 from the bottom of crossbeam 6 remove, by fixed pulley 9 from the bottom of Cantilever Beams 8 remove, while by wirerope 10 from
It is removed between fixed pulley 9 and hoist engine 14;
C, it removes brace 7: brace 7 being removed between the crossbeam 6 and the first girder 17 for being located at 8 top of Cantilever Beams, simultaneously
On 13 surface of job platform, the construction personnel of work needs to fasten safety rope;
D, remove Cantilever Beams 8: construction personnel removes Cantilever Beams 8 from the top of job platform 13, while in 13 table of job platform
The construction personnel of face work needs to fasten safety rope;
E, job platform 13, scaffold and crossbeam 6 are removed simultaneously;
F, steel frame column is removed;
G, it removes mobile trolley 19: orbit movable trolley 19 is removed from the top of I-steel 15;
H, it removes remaining job platform 13: I-steel 15 is removed from the top of track foundation 16, and by track foundation 16 from mould
It removes at the top of plate 1.
In use, its install convenient, securely, therefore can effectively improve the installation effectiveness of curtain wall, curtain wall installation can be effectively reduced
Cost meet the interests of enterprise itself to expand the market competitiveness of unit in charge of construction.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of Mobile crane using skyscraper brush window machine track curtain wall construction, including template (1), the second girder (3)
With the first girder (17), it is characterised in that: the top of the template (1) is fixedly connected with track foundation by chemical bolt
(16), and the top of track foundation (16) passes through I-steel (15) and is fixedly connected with orbit movable trolley (19), the template
(1) the top and rear end for being located at track foundation (16) is fixedly connected with the first girder (17), the left side of the first girder (17) is solid
Surely it is connected with job platform (13), is fixedly connected with railing (18) on the outside of job platform (13) inner surface, the template (1)
Top and being located on the right side of track foundation (16) is fixedly connected with chock plate (2), and the top of chock plate (2) and the second girder
(3) bottom contact, is fixedly connected with crossbeam (6), and crossbeam between the left side and the first girder (17) of second girder (3)
(6) bottom is fixedly connected with horizontal cross brace (4), and the top of the crossbeam (6) is fixedly connected with elevator by chemical bolt
Machine (14), and brace (5) are fixedly connected between crossbeam (6) and the second girder (3) and the first girder (17), described second is main
It is fixedly connected with Cantilever Beams (8) at the top of beam (3) and the first girder (17), Cantilever Beams are fixedly connected with crossbeam at the top of (8)
(6), and the crossbeam (6) at the top of Cantilever Beams (8) is fixedly connected by brace (7) with the first girder (17), the overhanging
The bottom of beam (8) is fixedly connected with fixed pulley (9), and fixed pulley (9) is connect by wirerope (10) with hoist engine (14), steel wire
The end of rope (10) has hung type unitized curtain wall (12).
2. a kind of Mobile crane using skyscraper brush window machine track curtain wall construction according to claim 1, special
Sign is: the bottom of the Cantilever Beams (8) and job platform (13) passes through the left side of hound (11) Yu the first girder (17)
It is fixedly connected.
3. a kind of Mobile crane using skyscraper brush window machine track curtain wall construction according to claim 1, special
Sign is: the front and rear sides of the job platform (13) pass through cable wind rope and connect with I-steel (15), and cable wind rope is close to work
One end of word steel (15) is socketed with rope clamp, and the bottom of rope clamp is fixedly connected with rope fastening holder.
4. a kind of movable type using skyscraper brush window machine track curtain wall construction according to any one of claims 1 to 3
Loop wheel machine, it is characterised in that: its operating method includes the installation of orbit movable loop wheel machine and the dismounting of orbit movable loop wheel machine.
5. a kind of Mobile crane using skyscraper brush window machine track curtain wall construction according to claim 4, special
Sign is: the installation of orbit movable loop wheel machine the following steps are included:
A, attachment rail mobile trolley (19): first passing through chemical bolt installation I-steel (15) at the top of track foundation (16),
Pass through chemical bolt attachment rail mobile trolley (19) at the top of I-steel (15) again;
B, job platform (13) are set up: setting up scaffold at the top of template (1), to be formed job platform (13), scaffold it
Between need with cross bar drawknot, while needing to fasten safety rope in the construction personnel of job platform (13) surface work;
C, steel frame column and cross bar are installed: building multi-layer scaffold and job platform (13), to install steel frame column and cross bar, together
When job platform (13) surface work construction personnel need to fasten safety rope;
D, install Cantilever Beams (8): construction personnel installs Cantilever Beams (8) at the top of job platform (13), while in job platform
(13) construction personnel of surface work needs to fasten safety rope;
E, install brace (7): operator station will be located at the crossbeam at the top of Cantilever Beams (8) on the surface of job platform (13)
(6) it is fixedly connected between the first girder (17) brace (7), while being needed in the construction personnel of job platform (13) surface work
Fasten safety rope;
F, hoist engine (14), fixed pulley (9), wirerope (10) and horizontal cross brace (4) are installed: being passed through on the top of crossbeam (6)
Chemical bolt is fixedly connected with hoist engine (14), and the bottom of crossbeam (6) is fixedly connected with horizontal cross brace (4), in Cantilever Beams (8)
Bottom be fixedly connected with fixed pulley (9), while fixed pulley (9) being connect by wirerope (10) with hoist engine (14);
G, install the operating platform when removing job platform (13): construction personnel successively removes scaffold from top to bottom, thus real
Now to the dismounting work of job platform (13), and during removing job platform (13), staff passes through chemical screw etc.
Tool installs the operating platform, while needing to fasten safety rope in the construction personnel of job platform (13) surface work;
H, operation test, comes into operation.
6. a kind of Mobile crane using skyscraper brush window machine track curtain wall construction according to claim 4, special
Sign is: the method for dismounting of orbit movable loop wheel machine the following steps are included:
A, the disassembling section platform when setting up job platform (13): scaffold is set up at the top of template (1), to form operation horizontal
Platform (13), and during setting up job platform (13), staff is being made by tool ejectors operating platforms such as spanners
The construction personnel of industry platform (13) surface work needs to fasten safety rope;
B, hoist engine (14), fixed pulley (9), wirerope (10) and horizontal cross brace (4) are removed: by hoist engine (14) from crossbeam
(6) top is removed, and horizontal cross brace (4) is removed from the bottom of crossbeam (6), by fixed pulley (9) from the bottom of Cantilever Beams (8)
It removes, while wirerope (10) being removed between fixed pulley (9) and hoist engine (14);
C, brace (7) are removed: by brace (7) between the crossbeam (6) and the first girder (17) being located at the top of Cantilever Beams (8)
It removes, while needing to fasten safety rope in the construction personnel of job platform (13) surface work;
D, remove Cantilever Beams (8): construction personnel removes Cantilever Beams (8) from the top of job platform (13), while in operation horizontal
The construction personnel of platform (13) surface work needs to fasten safety rope;
E, job platform (13), scaffold and crossbeam (6) are removed simultaneously;
F, steel frame column is removed;
G, mobile trolley (19) are removed: orbit movable trolley (19) is removed from the top of I-steel (15);
H, it removes remaining job platform (13): I-steel (15) is removed from the top of track foundation (16), and by track foundation
(16) it is removed from the top of template (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811245223.9A CN109296213A (en) | 2018-10-24 | 2018-10-24 | A kind of Mobile crane using skyscraper brush window machine track curtain wall construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811245223.9A CN109296213A (en) | 2018-10-24 | 2018-10-24 | A kind of Mobile crane using skyscraper brush window machine track curtain wall construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109296213A true CN109296213A (en) | 2019-02-01 |
Family
ID=65158711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811245223.9A Pending CN109296213A (en) | 2018-10-24 | 2018-10-24 | A kind of Mobile crane using skyscraper brush window machine track curtain wall construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109296213A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000274069A (en) * | 1999-03-26 | 2000-10-03 | Osamu Okuda | Lift for scaffold component member |
CN202245811U (en) * | 2011-09-16 | 2012-05-30 | 姜清海幕墙系统工程武汉有限公司 | Combined curtain wall hoisting equipment |
CN204782016U (en) * | 2015-07-03 | 2015-11-18 | 北京建工集团有限责任公司 | Hoist and mount of curtain wall glass plate and conveyor |
CN204899238U (en) * | 2015-06-29 | 2015-12-23 | 中冶天工集团有限公司 | Unitized curtain wall plate hoist device |
CN204983613U (en) * | 2015-08-05 | 2016-01-20 | 中建一局集团第二建筑有限公司 | Hoist and mount system of cell board curtain installation |
CN207727956U (en) * | 2017-12-20 | 2018-08-14 | 青岛东捷建设工程有限公司 | A kind of horizontally movable novel hanging basket |
-
2018
- 2018-10-24 CN CN201811245223.9A patent/CN109296213A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000274069A (en) * | 1999-03-26 | 2000-10-03 | Osamu Okuda | Lift for scaffold component member |
CN202245811U (en) * | 2011-09-16 | 2012-05-30 | 姜清海幕墙系统工程武汉有限公司 | Combined curtain wall hoisting equipment |
CN204899238U (en) * | 2015-06-29 | 2015-12-23 | 中冶天工集团有限公司 | Unitized curtain wall plate hoist device |
CN204782016U (en) * | 2015-07-03 | 2015-11-18 | 北京建工集团有限责任公司 | Hoist and mount of curtain wall glass plate and conveyor |
CN204983613U (en) * | 2015-08-05 | 2016-01-20 | 中建一局集团第二建筑有限公司 | Hoist and mount system of cell board curtain installation |
CN207727956U (en) * | 2017-12-20 | 2018-08-14 | 青岛东捷建设工程有限公司 | A kind of horizontally movable novel hanging basket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501837U (en) | Steel case roof beam becomes bridge welding simple platform | |
CN203684632U (en) | Telescopic type welding operation platform | |
CN112112418B (en) | Construction method of high-rise building aluminum formwork climbing frame combined system | |
CN102080451B (en) | Construction method of industrial factory building grid | |
CN202509754U (en) | High-altitude steel structure node construction working platform | |
CN201695668U (en) | Assembly type walkdown platform | |
CN206034876U (en) | From hard protective platform of formula level that climbs in construction | |
CN109296213A (en) | A kind of Mobile crane using skyscraper brush window machine track curtain wall construction | |
CN217635571U (en) | Cross beam connecting member for industrial boiler | |
CN204059904U (en) | A kind of hoistway operation platform being applied to multi-platform operation | |
CN109162466A (en) | Room level units formula curtain wall installing structure and method | |
CN202642056U (en) | Simple guardrail frame used during process of building ship | |
CN108487621A (en) | Assembled movement shield cage and its construction method | |
CN212154622U (en) | Outer wall plate mounting ladder stand for steel structure factory building | |
CN201212250Y (en) | Mobile wheel track installation platform for large-sized network frame engineering | |
CN104060832A (en) | Method and device for improving safety of unloading platform | |
CN104806001B (en) | The sliding safe operation platform of elevator guide rail and construction method | |
CN210316439U (en) | Movable operating platform for installing high-altitude pipeline equipment | |
CN204402001U (en) | For the mobile operating platform system that structure for steel structure roof inner slab is installed | |
CN204454472U (en) | Platform is moved down for what install without scaffold elevator | |
CN102673752A (en) | Simple guardrail frame for ship construction process | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN209369290U (en) | A kind of external wall of high-rise building operation platform | |
JP3462576B2 (en) | Method and apparatus for narrow space construction of exterior finishing panel | |
CN201592955U (en) | Equipment overhauling crown block for assembling wire frame in large and medium-size industrial factory buildings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20220311 |