CN201695668U - Assembly type walkdown platform - Google Patents
Assembly type walkdown platform Download PDFInfo
- Publication number
- CN201695668U CN201695668U CN2010202118005U CN201020211800U CN201695668U CN 201695668 U CN201695668 U CN 201695668U CN 2010202118005 U CN2010202118005 U CN 2010202118005U CN 201020211800 U CN201020211800 U CN 201020211800U CN 201695668 U CN201695668 U CN 201695668U
- Authority
- CN
- China
- Prior art keywords
- platform
- beams
- utility
- fixed handrails
- encorbelmenting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The utility model relate to an assembly type walkdown platform, which is suitable for the installation project of multilayer and high-rise steel structures in civil engineering, and comprises a platform frame formed by three cantilever beams, clamps, bolts, fixed handrails and a movable handrail, wherein the platform frame is spliced by the three cantilever beams in an F shape, and the cantilever ends of the three cantilever beams are respectively connected with two structural beams which are distributed in a T shape through the clamps and the bolts; the two fixed handrails are also arranged on the platform frame, and the movable handrail connects the two fixed handrails; and round steel inserting pins which are arranged on the movable handrail are matched with pin bushes on the fixed handrails. The utility model has the beneficial effects of better solving the problem that a vertical operation channel of construction workers is quickly arranged, ensuring the life safety of the construction workers and the installation quality of the vertical operating channel, increasing work efficiency, reducing labor intensity, had convenient assembly because of lightweight members, high usage rate, circulated use, easy assembly and disassembly, and convenient movement, and is especially suitable for multilayer and high-rise steel-structure factory buildings.
Description
Technical field
The utility model relates to a kind of assembling that is applicable to worker China Democratic National Construction Association multilayer, the high-rise steel structure installing engineering platform of walking unhurriedly.
Background technology
In multilayer, the high-rise steel structure installing engineering, along with the continuous rising of depth of building since the constructor that factor such as design and construction progress can not guarantee the multi-story interlayer fully up and down the required vertical channel of operation put in place synchronously.Solution to this problem is to adopt soft catladder substantially between industry, according to code requirement, the catladder height can not surpass 8m, many for this reason system temporary steel platforms that on steel column, girder steel, weld, still bigger influence can be arranged to the impression quality of structure though the steel platform of weldering system is treated, the constructor can not be fully guaranteed safely up and down, the field Welding inefficiency, labour intensity is big.
Summary of the invention
The purpose of this utility model provides a kind of assembling platform of walking unhurriedly, and satisfies the work high above the ground code requirement, increases work high above the ground personnel's safety factor, stops high bob accident, increases work efficiency, reduces labour intensity.
For achieving the above object, the utility model is achieved through the following technical solutions:
A kind of assembling platform of walking unhurriedly, comprise platform framework, jig, bolt, non-floating rail, movable railing that three beams of encorbelmenting are formed, described platform framework is spliced by " F " shape by three beams of encorbelmenting, the end of encorbelmenting of three beams of encorbelmenting is connected with two structural beams of "T"-shaped distribution with bolt by jig respectively, also be provided with two non-floating rails on the platform framework, movable railing couples together two non-floating rails.
Described movable railing is provided with the round steel latch and matches with guide on the non-floating rail.
Compared with prior art, the beneficial effects of the utility model are: the vertical operation path that has solved the constructor well is provided with problem fast, guarantee constructor's the life security and the installation quality of vertical operation path, increase work efficiency, reduce construction cost, reduce labour intensity, the light ease of assembly of component quality; The utilization rate height can have enough to meet the need use; Install and remove easy conveniently moving; Be particularly useful for many high-rise steel structure factory building.
Description of drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the utility model embodiment schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present utility model is described further:
See Fig. 1, Fig. 2, a kind of assembling platform of walking unhurriedly, comprise the platform framework 1 that three beams of encorbelmenting are formed, jig 2, bolt 3, non-floating rail 1 and non-floating rail 25, movable railing 11, described platform framework 1 is by the beam 1 of encorbelmenting, the beam 27 of encorbelmenting, the beam 38 of encorbelmenting forms by the welding of " F " shape, also be provided with landing slab 15 on the platform framework 1, landing slab 15 can be by plank, steel plate, iron net etc. is made, the end of encorbelmenting of three beams of encorbelmenting passes through the structural beams 1 of jig 2 and bolt 3 and "T"-shaped distribution respectively, structural beams 2 10 is connected, platform framework 1 is provided with non-floating rail 1 and the non-floating rail of being made by the equal leg angle of ∠ 30 * 425, movable railing 11 couples together non-floating rail 1 and non-floating rail 25, and movable railing 11 is made by the equal leg angle of ∠ 30 * 4.Also being provided with the round steel latch 12 of φ 10 on the described movable railing 11 matches with guide 13 on the non-floating rail.Guide 13 is made by the M12 nut in an embodiment.
As Fig. 3, the utility model matches with two removable catladders 14 and constitutes passage vertically, is applicable in the engineering construction of many high-rise steel structure factory building.Its installation process is earlier packaged type catladder 14 to be fixed on the mounted structural beams, carries out the installation of this platform of walking unhurriedly then.The utility model is to be formed by a plurality of unit constructions, and lighter weight does not need crane during installation, during installation if according to by main to inferior order.
Facts have proved that the utility model can extensively promote the use of, improve the operating personnel high-altitude operating environment of operation path up and down greatly, the generation of well having stopped high bob accident reduces construction cost, and the structure installation quality also increases significantly.
Claims (2)
1. assembling platform of walking unhurriedly, it is characterized in that, comprise platform framework, jig, bolt, non-floating rail, movable railing that three beams of encorbelmenting are formed, described platform framework is spliced by " F " shape by three beams of encorbelmenting, the end of encorbelmenting of three beams of encorbelmenting is connected with two structural beams of "T"-shaped distribution with bolt by jig respectively, also be provided with two non-floating rails on the platform framework, movable railing couples together two non-floating rails.
2. a kind of assembling according to claim 1 platform of walking unhurriedly is characterized in that, described movable railing is provided with the round steel latch and matches with guide on the non-floating rail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202118005U CN201695668U (en) | 2010-06-02 | 2010-06-02 | Assembly type walkdown platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202118005U CN201695668U (en) | 2010-06-02 | 2010-06-02 | Assembly type walkdown platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201695668U true CN201695668U (en) | 2011-01-05 |
Family
ID=43396907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202118005U Expired - Lifetime CN201695668U (en) | 2010-06-02 | 2010-06-02 | Assembly type walkdown platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201695668U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103206076A (en) * | 2012-01-12 | 2013-07-17 | 佛山市南海保达建筑机械设备有限公司 | Movable building loading and unloading platform and moving method |
CN106320369A (en) * | 2016-08-26 | 2017-01-11 | 中国化学工程第六建设有限公司 | Opposite-clamping type detachable movable platform for assembling stand column of pipe rack structure |
CN109025241A (en) * | 2018-06-14 | 2018-12-18 | 上海建工集团股份有限公司 | Assembled aisle panel assembly and its construction method |
CN111173249A (en) * | 2020-01-10 | 2020-05-19 | 上海二十冶建设有限公司 | Overhanging support system attached to rectangular beam and column |
CN115478674A (en) * | 2022-09-23 | 2022-12-16 | 中冶宝钢技术服务有限公司 | Cantilever platform for high-altitude welding operation of column head |
-
2010
- 2010-06-02 CN CN2010202118005U patent/CN201695668U/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103206076A (en) * | 2012-01-12 | 2013-07-17 | 佛山市南海保达建筑机械设备有限公司 | Movable building loading and unloading platform and moving method |
CN103206076B (en) * | 2012-01-12 | 2015-12-02 | 佛山市南海保达建筑机械设备有限公司 | A kind of packaged type building loading/unloading platform and moving method |
CN106320369A (en) * | 2016-08-26 | 2017-01-11 | 中国化学工程第六建设有限公司 | Opposite-clamping type detachable movable platform for assembling stand column of pipe rack structure |
CN106320369B (en) * | 2016-08-26 | 2019-06-18 | 中国化学工程第六建设有限公司 | Pipe rack column group is to the detachable movable platform of wafer type |
CN109025241A (en) * | 2018-06-14 | 2018-12-18 | 上海建工集团股份有限公司 | Assembled aisle panel assembly and its construction method |
CN109025241B (en) * | 2018-06-14 | 2021-10-26 | 上海建工集团股份有限公司 | Assembled walkway plate device and construction method thereof |
CN111173249A (en) * | 2020-01-10 | 2020-05-19 | 上海二十冶建设有限公司 | Overhanging support system attached to rectangular beam and column |
CN115478674A (en) * | 2022-09-23 | 2022-12-16 | 中冶宝钢技术服务有限公司 | Cantilever platform for high-altitude welding operation of column head |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201695668U (en) | Assembly type walkdown platform | |
CN202706503U (en) | Electric lifting discharging platform for main building construction | |
KR20190140266A (en) | The steel formwork for tunnels with workwalk for workers | |
CN111997342B (en) | Cantilever framework supporting structure protruding out of building and construction method thereof | |
CN102337782B (en) | Lift system for constructing truss platform on top of tall and large space | |
CN101372865A (en) | Stay suspender multispan beam structure highly hollow-out formwork system and construction method | |
CN202227701U (en) | Spliced type horizontal channel device | |
CN102080451B (en) | Construction method of industrial factory building grid | |
CN103912128A (en) | Construction method of high-altitude one-piece steel truss | |
CN102912981A (en) | Gate type high-rise building connected structure construction device | |
CN104790644B (en) | Extending and contracting sliding support frame for roof decorative bottom boards | |
CN203359727U (en) | Construction elevator wall-attaching support | |
CN205444739U (en) | Fixed railing structure of detachable | |
CN201729631U (en) | Truss type platform lifting device for constructing on top portions of tall and big spaces | |
CN204001887U (en) | Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN110724783B (en) | Dismantling and installing method of waste heat boiler in converter environment-friendly reconstruction | |
CN204326490U (en) | A kind of construction of lift well operating platform | |
CN103206077B (en) | Structure for steel structure roof inner slab installation foot hand cradle | |
CN208363559U (en) | A kind of hoistway operation platform level adjusting structure | |
CN102259794A (en) | Method for installing overall combined type crane beam | |
CN206844680U (en) | Steel vestibule installation on ground load transfer device | |
CN104806001A (en) | Safety operation platform for sliding and lifting of elevator shaft guide rail and construction method | |
CN219240308U (en) | Installation operation device for T-beam diaphragm plate and wet joint construction | |
CN218091956U (en) | Movable steel pipe positioning pile for building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20110105 |