CN218091956U - Movable steel pipe positioning pile for building - Google Patents
Movable steel pipe positioning pile for building Download PDFInfo
- Publication number
- CN218091956U CN218091956U CN202221606274.1U CN202221606274U CN218091956U CN 218091956 U CN218091956 U CN 218091956U CN 202221606274 U CN202221606274 U CN 202221606274U CN 218091956 U CN218091956 U CN 218091956U
- Authority
- CN
- China
- Prior art keywords
- seat
- bearing plate
- steel pipe
- building
- loading board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A movable steel pipe positioning pile for a building comprises a bearing plate, wherein a positioning seat is mounted on the top surface of the bearing plate and used for fixing a vertical rod, a V-shaped limiting seat is arranged on one side section of the bearing plate, a left limiting area is formed between the V-shaped limiting seat and the bottom surface of the bearing plate, a Z-shaped limiting seat is fixedly mounted at the bottom of the other side section of the bearing plate, a right limiting area is formed between the Z-shaped limiting seat and the bearing plate, a sliding seat is formed between the left limiting area and the bearing plate, between the right limiting area and the bearing plate, and the sliding seat is used for sliding on I-shaped steel in the building; the movable positioning piles can be processed in a centralized manner in a factory, so that the forming quality and the processing quality are ensured, the operation is simple and convenient, the time and the labor are saved, and the turnover rate is high; when the positioning pile is used, the movable steel pipe positioning pile is fastened at the selected position of the I-steel, and then the vertical rods of the overhanging outer scaffold or the vertical rods of the protective railings at two sides of the overhanging discharging platform are positioned, so that the positioning pile is fixed at the existing position, no obstacle obstructs the movement of constructors, and the safety is improved.
Description
Technical Field
The utility model relates to a portable steel pipe spud pile for building, concretely relates to conveniently encorbelment outer scaffold frame pole setting or encorbelment the platform both sides of unloading and prevent that railing sets up, does not injure the I-steel, dismantles the accessible steel pipe spud pile of steel pipe.
Background
At present, the buildings with the building height of more than 24m mostly adopt an overhanging outer scaffold erected as a building outer enclosure system, an overhanging platform is simultaneously equipped for stacking and hoisting floor turnover materials, and a protective railing is erected between the overhanging platform and a main structure for safety. The common mode of positioning and fixing the overhanging outer scaffold or the protective railing is to weld a reinforcing steel bar head at the position of a vertical rod determined in advance by adopting a standard method on an overhanging steel beam (I-steel), and seat the overhanging outer scaffold or the protective railing vertical rod at the short reinforcing steel bar head after the I-steel is fixed. However, in actual site construction, the left and right steel bar heads are determined to be on the same horizontal line by adjusting the steel beam (i-steel) forwards and backwards, and even the position of the welded steel bar heads is inaccurate, so that personal safety hazards exist in site adjustment, and meanwhile, the site welding quality is not guaranteed, and light pollution and power utilization hazards are easy to generate. The method has the advantages that the steel bar heads which are not avoided by connecting the steel beams (I-beams) are rearranged every time for repairing or adjusting, if the steel bar heads are repeatedly cut off and rewelded, the steel beams (I-beams) are influenced, the stress of the steel beams (I-beams) is further influenced, and the I-beams cannot be circulated easily due to repeated construction for a long time. If the operation of hoist and mount is carried out to belted steel muscle head, make the girder steel pile put things in good order easily and have hoist and mount potential safety hazard or cause the reinforcing bar head to warp unable the use, if single hoist and mount then reduce tower crane hoist and mount work efficiency, extravagant construction period.
Disclosure of Invention
For solving the problem that prior art exists, the utility model provides a under the harmless girder steel (I-steel) self quality prerequisite, conveniently in the outer scaffold frame pole setting of encorbelmenting or the platform protection railing pole setting rigidity of encorbelmenting, conveniently dismantle and reduce on-the-spot power consumption and construction potential safety hazard, can concentrate the mobilizable steel pipe spud of processing in the workshop.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a portable steel pipe spud pile for building, includes the loading board, install the positioning seat on the loading board top surface, the positioning seat is used for fixed pole setting, loading board one side section is provided with the spacing seat of V type, form the spacing district in a left side between spacing seat of V type and the loading board bottom surface, loading board opposite side section bottom fixed mounting has the spacing seat of Z type, form the spacing district in a right side between spacing seat of Z type and the loading board, form the slide between spacing district in a left side, the spacing district in a right side and the loading board, the slide is used for sliding on the I-shaped steel in the building.
Preferably, the positioning seat is a sleeve, the sleeve is welded and fixed on the top surface of the bearing plate, and at least two bolt fastening holes are longitudinally formed in the side wall of the sleeve.
Preferably, the other side section of the bearing plate is provided with a bolt fixing hole, and the Z-shaped limiting seat is fixedly installed on the bottom surface of the bearing plate through a bolt.
Preferably, the bearing plate is a steel plate, and the V-shaped limiting seat is formed by bending one side of the bearing plate.
Preferably, the Z-shaped limiting seat is formed by bending a steel plate, the included angle of one bending part is 45 degrees, and the included angle of the other bending part is 40 degrees.
Compared with the prior art, the technical scheme has the beneficial effects that:
1. the mode that the overhanging outer scaffold upright post or the protective railing upright posts on two sides of the overhanging discharging platform and the section steel are connected through the movable steel pipe positioning pile is adopted, so that the movable positioning pile can be processed in a centralized manner in a factory, the forming quality and the processing quality are ensured, the field operation is simple and convenient, the time and the labor are saved, the turnover rate is high, and the reduction of field electric welding is characterized by construction according with the green construction characteristics of construction engineering;
2. when the positioning pile is used, the movable steel pipe positioning pile is fastened at the selected position of the I-steel, the overhanging outer scaffold vertical rod or the protection railing vertical rods on the two sides of the overhanging discharging platform are positioned, and finally the positioning pile is fixed at the existing position, so that no obstacle obstructs the movement of constructors when workers on site hoist, install the I-steel, install the overhanging outer scaffold vertical rod or the protection railing vertical rods on the two sides of the overhanging discharging platform, and the safety is improved.
Drawings
For further explanation of the present invention, the drawings and embodiments are listed below.
Fig. 1 is a side view schematic diagram of the present invention.
Fig. 2 is a schematic view of the top view structure of the present invention.
Fig. 3 is a schematic view of the local cross-section structure of the present invention.
Fig. 4 is a schematic view of the local structure of the present invention.
Detailed Description
As shown in fig. 1-4, a portable steel pipe spud pile for building, includes 1 loading board, install 2 positioning seats on 1 loading board top surface, 2 positioning seats are used for fixed pole setting, 1 loading board one side section is provided with the spacing seat of 3V type, form 4 left spacing districts between 3V type spacing seat and 1 loading board bottom surface, 1 loading board opposite side section bottom fixed mounting has the spacing seat of 5Z type, form 6 right spacing districts between 5Z type spacing seat and 1 loading board, form the slide between 4 left spacing districts, 6 right spacing districts and 1 loading board, the slide is used for sliding on 7 i shaped steel in the building.
Preferably, the positioning seat 2 is a sleeve, the sleeve is welded and fixed on the top surface of the bearing plate 1, and at least two 8 bolt fastening holes are longitudinally formed in the side wall of the sleeve.
Preferably, the other side section of the bearing plate 1 is provided with 10 bolt fixing holes, and the 5Z-shaped limiting seat is fixedly installed on the bottom surface of the bearing plate 1 through 9 bolts.
Preferably, the bearing plate 1 is a steel plate, and the 3V-shaped limiting seat is formed by bending one side of the bearing plate 1.
Preferably, the 5Z-shaped limiting seat is formed by bending a steel plate, the included angle of one bending part is 45 degrees, and the included angle of the other bending part is 40 degrees.
Obviously, the above embodiment is only one example of the present invention, and any simple improvement in the structure or principle provided by the present invention is within the protection scope of the present invention.
Claims (5)
1. The utility model provides a portable steel pipe spud pile for building, its characterized in that includes the loading board, install the positioning seat on the loading board top surface, the positioning seat is used for fixed pole setting, loading board one side section is provided with the spacing seat of V type, form left spacing district between spacing seat of V type and the loading board bottom surface, loading board opposite side section bottom fixed mounting has the spacing seat of Z type, form the spacing district in right side between spacing seat of Z type and the loading board, form the slide between spacing district in a left side, the spacing district in right side and the loading board, the slide is used for sliding on the I-steel in the building.
2. The movable steel pipe spud for building according to claim 1, wherein the positioning seat is a sleeve, the sleeve is welded and fixed on the top surface of the loading plate, and at least two bolt fastening holes are longitudinally arranged on the side wall of the sleeve.
3. The movable steel pipe positioning pile for building as claimed in claim 1, wherein a bolt fixing hole is provided at the other side section of the bearing plate, and the Z-shaped position-limiting seat is fixedly installed at the bottom surface of the bearing plate by a bolt.
4. The movable steel pipe positioning pile for buildings as claimed in claim 1, wherein the bearing plate is a steel plate, and the V-shaped position limiting seat is formed by bending one side of the bearing plate.
5. The movable steel pipe positioning pile for building as claimed in claim 1, wherein the Z-shaped limiting seat is formed by bending a steel plate, wherein an included angle of one bending part is 45 degrees, and an included angle of the other bending part is 40 degrees.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221606274.1U CN218091956U (en) | 2022-06-26 | 2022-06-26 | Movable steel pipe positioning pile for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221606274.1U CN218091956U (en) | 2022-06-26 | 2022-06-26 | Movable steel pipe positioning pile for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218091956U true CN218091956U (en) | 2022-12-20 |
Family
ID=84476472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221606274.1U Active CN218091956U (en) | 2022-06-26 | 2022-06-26 | Movable steel pipe positioning pile for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218091956U (en) |
-
2022
- 2022-06-26 CN CN202221606274.1U patent/CN218091956U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112726409A (en) | Hoisting device for bridge water surface pile tie beam and construction method thereof | |
CN113585075A (en) | Cast-in-place bridge deck formwork for steel-concrete composite beam | |
CN201695668U (en) | Assembly type walkdown platform | |
CN218091956U (en) | Movable steel pipe positioning pile for building | |
CN117005664A (en) | Electric translation type hanging basket | |
CN114319159B (en) | Ascending ramp dismantling system and construction method | |
CN114411699A (en) | Auxiliary device for steel pipe pile construction and construction method | |
CN210827835U (en) | Beam column rigid connection structure | |
CN102913007A (en) | Steel reinforcement processing shed and construction method therefor | |
CN210369025U (en) | Floor-free tower crane foundation construction structure with steel structure | |
CN209228053U (en) | Large cantilever combined type anchor curable type steel operation platform | |
CN209907886U (en) | Adjustable assembled stair construction platform | |
CN206844680U (en) | Steel gallery ground assembly load transfer device | |
CN220395134U (en) | High-rise building high-altitude cantilever supporting structure | |
CN220319075U (en) | Guy rope hanging basket assembling platform | |
CN212001628U (en) | H-shaped steel connecting device | |
CN219653713U (en) | Heavy pile foundation steel reinforcement cage positioner | |
CN215803310U (en) | Assembled design platform system of unloading | |
CN218643330U (en) | Steel-pipe pile is inserted and is beaten construction platform | |
CN214329793U (en) | Steel platform for repairing travelling crane | |
CN220246645U (en) | Temporary trestle structure on water | |
CN219732340U (en) | Steel construction connected node reinforcing apparatus | |
CN220431975U (en) | Super-high adhesion structure of construction elevator | |
CN218116111U (en) | Cylindrical pier top construction work platform | |
CN220364860U (en) | Quick-mounting plate type bridge panel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |