CN209907886U - An adjustable prefabricated stair construction platform - Google Patents

An adjustable prefabricated stair construction platform Download PDF

Info

Publication number
CN209907886U
CN209907886U CN201920161760.9U CN201920161760U CN209907886U CN 209907886 U CN209907886 U CN 209907886U CN 201920161760 U CN201920161760 U CN 201920161760U CN 209907886 U CN209907886 U CN 209907886U
Authority
CN
China
Prior art keywords
frame
platform
screw
screw sleeve
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920161760.9U
Other languages
Chinese (zh)
Inventor
赵思远
吴咏陶
钟志锋
黄志超
刘淦锋
谢健曦
杨萌
余文浩
陈永强
欧阳伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Construction Co Ltd
Original Assignee
Guangzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Construction Co Ltd filed Critical Guangzhou Construction Co Ltd
Priority to CN201920161760.9U priority Critical patent/CN209907886U/en
Application granted granted Critical
Publication of CN209907886U publication Critical patent/CN209907886U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了一种可调节的装配式楼梯施工平台,包括平台框架,平台框架一端可设于楼层板上,另一端设有至少两个支撑架;支撑架包括设于平台框架下方的上支架、套设于上支架的下支架以及升降调节装置,下支架可支撑在休息平台板上,升降调节装置用于调节上支架与下支架的相对距离;平台框架上还设有用于抵接剪力墙的对撑装置。相比于传统的搭设钢管操作平台,本实用新型提供的可调节的装配式楼梯施工平台场地适应性更强,可吊装至作业场地,平台框架一端设于楼层板上,支撑架一端设于休息平台板上,对撑装置抵紧两侧的剪力墙,施工平台便于拆装,可循环利用率高,缩短施工周期和缩小施工难度,经济效益好。

The utility model discloses an adjustable assembled stair construction platform, comprising a platform frame, one end of the platform frame can be arranged on a floor slab, and the other end is provided with at least two support frames; the support frames comprise an upper frame arranged below the platform frame A bracket, a lower bracket sleeved on the upper bracket, and a lifting adjustment device, the lower bracket can be supported on the rest platform plate, and the lifting adjustment device is used to adjust the relative distance between the upper bracket and the lower bracket; the platform frame is also provided with abutting shears The support device of the force wall. Compared with the traditional operation platform for erecting steel pipes, the adjustable assembled stair construction platform provided by the utility model has stronger site adaptability, and can be hoisted to the work site. On the platform plate, the supporting device is pressed against the shear walls on both sides, the construction platform is easy to disassemble and assemble, the recycling rate is high, the construction period is shortened and the construction difficulty is reduced, and the economic benefit is good.

Description

一种可调节的装配式楼梯施工平台An adjustable prefabricated stair construction platform

技术领域technical field

本实用新型涉及建筑施工设备技术领域,尤其涉及一种可调节的装配式楼梯施工平台。The utility model relates to the technical field of building construction equipment, in particular to an adjustable assembled stair construction platform.

背景技术Background technique

城市发展规划趋于规模化、专业化,装配式建筑日益增多,装配式建筑中的楼梯施工在建设期中受到场地影响较大。特别对于存在楼梯核心筒需要支模,结构复杂的项目,施工过程时常会因楼梯部分中空,无实体操作面,层高太高,工人无法施工,影响施工进度。Urban development planning tends to be large-scale and specialized, and the number of prefabricated buildings is increasing. The stair construction in prefabricated buildings is greatly affected by the site during the construction period. Especially for projects with complex structures that require formwork for the core tube of the stairs, the construction process is often affected by the fact that the stairs are partially hollow, there is no solid operating surface, and the floor height is too high.

为了方便楼梯吊装施工,方便工人对楼梯间周边墙板的吊装定位,楼梯间墙体需要支模时方便工人安拆墙体模板,通常会在楼梯间用钢管搭设临时操作架。作为临时施工平台,方便工人施工。这种方法有以下不足之处:In order to facilitate the hoisting and construction of the stairs, facilitate the lifting and positioning of the wall panels around the stairwell, and facilitate the workers to install and remove the wall formwork when the stairwell wall needs formwork, a temporary operating frame is usually set up with steel pipes in the stairwell. As a temporary construction platform, it is convenient for workers to construct. This approach has the following disadvantages:

对于临时钢管施工平台,虽然能提供施工平台,且起到一定的防护效果,但是搭设难度大,工期长,且在装配式施工过程中,又要拆除已经搭设好的施工平台,造成施工繁琐,延误工期。For the temporary steel pipe construction platform, although it can provide a construction platform and play a certain protective effect, it is difficult to set up, the construction period is long, and in the prefabricated construction process, the already erected construction platform needs to be dismantled, resulting in cumbersome construction. Delay in construction.

实用新型内容Utility model content

为了克服上述现有技术所述的至少一种缺陷,本实用新型提供一种可调节的装配式楼梯施工平台。In order to overcome at least one of the above-mentioned defects in the prior art, the present invention provides an adjustable assembled stair construction platform.

本实用新型为解决其问题所采用的技术方案是:The technical scheme adopted by the present utility model for solving its problems is:

一种可调节的装配式楼梯施工平台,所述平台框架一端可设于楼层板上,另一端设有至少两个支撑架;所述支撑架包括设于所述平台框架下方的上支架、套设于所述上支架的下支架以及升降调节装置,所述下支架可支撑在休息平台板上,所述升降调节装置用于调节所述上支架与下支架的相对距离;所述平台框架上还设有用于抵接剪力墙的对撑装置。An adjustable assembled stair construction platform, one end of the platform frame can be set on the floor slab, and the other end is provided with at least two support frames; The lower bracket and the lifting adjustment device are arranged on the upper bracket, the lower bracket can be supported on the rest platform plate, and the lifting adjustment device is used to adjust the relative distance between the upper bracket and the lower bracket; There is also a supporting device for abutting against the shear wall.

相比于传统的搭设钢管操作平台,本实用新型提供的可调节的装配式楼梯施工平台场地适应性更强,可吊装至作业场地,平台框架一端设于楼层板上,支撑架一端设于休息平台板上,对撑装置抵紧两侧的剪力墙,该施工平台便于拆装,可循环利用率高,缩短施工周期和缩小施工难度,经济效益好。Compared with the traditional operation platform for erecting steel pipes, the adjustable assembled stair construction platform provided by the utility model has stronger site adaptability, and can be hoisted to the work site. On the platform plate, the supporting devices are pressed against the shear walls on both sides. The construction platform is easy to disassemble and assemble, has high recycling rate, shortens the construction period and reduces the construction difficulty, and has good economic benefits.

进一步地,所述升降调节装置包括竖直螺杆、设于所述上支架上的上螺杆套筒以及设于所述下支架上的下螺杆套筒;所述竖直螺杆为双向螺杆,且与所述上螺杆套筒和下螺杆套筒螺纹配合。Further, the lifting adjustment device includes a vertical screw, an upper screw sleeve arranged on the upper support, and a lower screw sleeve arranged on the lower support; the vertical screw is a bidirectional screw, and is connected with the upper support. The upper screw sleeve and the lower screw sleeve are threadedly matched.

由此,通过升降调节装置的设置,工人可以通过旋转竖直螺杆来调节支撑架的高度,以适应不同高度差的作业场地。Therefore, through the setting of the lifting adjustment device, the worker can adjust the height of the support frame by rotating the vertical screw, so as to adapt to the work site with different height differences.

进一步地,所述竖直螺杆上还设置有垂直其长度方向的第一通孔。Further, the vertical screw rod is also provided with a first through hole perpendicular to its length direction.

由此,工人可以向第一通孔中插入调节杆来旋转竖直螺杆,利用杠杆原理更加省力方便。Therefore, the worker can insert the adjusting rod into the first through hole to rotate the vertical screw, which is more labor-saving and convenient by using the lever principle.

进一步地,所述对撑装置包括水平布置的对撑顶杆以及设于所述平台框架上的顶杆座,所述对撑顶杆与顶杆座螺纹配合,所述对撑顶杆的一端设有用于抵接所述剪力墙的托板。Further, the opposing support device includes a horizontally arranged opposing support ejector rod and an ejector rod seat provided on the platform frame, the opposing support ejector rod is threadedly matched with the ejector rod seat, and one end of the opposing support ejector rod is threaded. There are pallets for abutting the shear walls.

由此,工人可以通过旋转对撑顶杆,使托板抵接剪力墙,加强施工平台的整体刚度,防止施工平台失稳。In this way, the workers can make the supporting plate abut against the shear wall by rotating the counter-supporting mandrel, so as to strengthen the overall rigidity of the construction platform and prevent the construction platform from becoming unstable.

进一步地,所述上支架与所述平台框架拆卸连接。Further, the upper bracket is detachably connected to the platform frame.

进一步地,所述平台框架包括两条平行布置的主梁以及拆卸连接两条所述主梁的多条次梁。Further, the platform frame includes two main beams arranged in parallel and a plurality of secondary beams that are detachably connected to the two main beams.

进一步地,相邻的所述次梁之间设有可拆卸的加强檩条。Further, detachable reinforcing purlins are arranged between the adjacent secondary beams.

由此,各部件之间可拆装,以便收纳以及更换各部件,亦可以更好的适应各种场地;同时加强檩条可避免次梁受力变形过大。As a result, the parts can be disassembled and assembled, so as to store and replace the parts, and can also better adapt to various venues; at the same time, the reinforcement of the purlin can avoid excessive deformation of the secondary beam.

进一步地,所述平台框架上还设有连接装置,所述连接装置将所述平台框架沿所述主梁长度方向分为第一框架以及第二框架。Further, a connecting device is further provided on the platform frame, and the connecting device divides the platform frame into a first frame and a second frame along the length direction of the main beam.

进一步地,所述连接装置包括水平螺杆、设于所述第一框架上的第一螺杆套筒以及设于所述第二框架上的第二螺杆套筒;所述水平螺杆为双向螺杆,且与所述第一螺杆套筒和第二螺杆套筒螺纹配合。Further, the connecting device includes a horizontal screw, a first screw sleeve arranged on the first frame, and a second screw sleeve arranged on the second frame; the horizontal screw is a bidirectional screw, and It is threaded with the first screw sleeve and the second screw sleeve.

由此,通过连接装置的设置,更换不同长度规格的施工平台时,工人可以通过旋转水平螺杆来锁紧第一框架和第二框架。Therefore, through the setting of the connecting device, when replacing construction platforms with different length specifications, the worker can lock the first frame and the second frame by rotating the horizontal screw.

进一步地,所述水平螺杆上还设置有垂直其长度方向的第二通孔。Further, the horizontal screw is also provided with a second through hole perpendicular to its length direction.

由此,工人可以向第二通孔中插入调节杆来旋转水平螺杆,利用杠杆原理更加省力方便。Therefore, the worker can insert the adjusting rod into the second through hole to rotate the horizontal screw, which is more labor-saving and convenient by using the lever principle.

综上所述,本实用新型提供的可调节的装配式楼梯施工平台具有如下技术效果:To sum up, the adjustable assembled stair construction platform provided by the present utility model has the following technical effects:

1)通过各部件的可拆卸设计,采用装配形式组合安装形成一个完整的施工平台,实现了施工平台的专业化、标准化,而且便于收纳、运输和现场安装,还有利于使用过程中的维修,省工、省力、省时,可循环利用,缩短施工周期和缩小施工难度;1) Through the detachable design of each component, a complete construction platform is formed by combined installation in the form of assembly, which realizes the specialization and standardization of the construction platform, and is convenient for storage, transportation and on-site installation, and is also conducive to maintenance during use. It is labor-saving, labor-saving, time-saving, and can be recycled, shortening the construction period and reducing the difficulty of construction;

2)通过升降调节装置、连接装置的设置,工人可以根据现场情况通过旋转竖直螺杆以及水平螺杆灵活调节、组合施工平台,对场地条件要求低,在复杂的施工过程中有良好的作用;2) Through the setting of the lifting adjustment device and the connecting device, the workers can flexibly adjust and combine the construction platform by rotating the vertical screw and the horizontal screw according to the site conditions, which has low requirements on the site conditions and plays a good role in the complex construction process;

3)通过对撑装置的设置,工人可以旋转对撑顶杆,使得托板抵接剪力墙,加强施工平台的整体刚度,防止施工平台失稳。3) Through the setting of the support device, the worker can rotate the support rod to make the support plate abut against the shear wall, strengthen the overall rigidity of the construction platform, and prevent the construction platform from becoming unstable.

附图说明Description of drawings

图1为本实用新型实施例的结构示意图;Fig. 1 is the structural representation of the utility model embodiment;

图2为本实用新型实施例的安装示意图;Fig. 2 is the installation schematic diagram of the embodiment of the utility model;

图3为图1的俯视图;Fig. 3 is the top view of Fig. 1;

图4为图3中的次梁与加强檩条的连接示意图;Fig. 4 is the connection schematic diagram of the secondary beam and the reinforcement purlin in Fig. 3;

图5为图1的A部放大示意图。FIG. 5 is an enlarged schematic diagram of part A of FIG. 1 .

其中,附图标记含义如下:Among them, the meanings of the reference signs are as follows:

1、平台框架;11、主梁;111、第一加强肋板;12、次梁;121、第一连接板;122、第二加强肋板;13、加强檩条;131、第二连接板;14、连接装置;141、水平螺杆;142、第一螺杆套筒;143、第二螺杆套筒;1411、第二通孔;1A、第一框架;1B、第二框架;2、支撑架;21、上支架;211、支撑板;22、下支架;23、升降调节装置;231、竖直螺杆;232、上螺杆套筒;233、下螺杆套筒;2311、第一通孔;3、对撑装置;31、对撑顶杆;32、顶杆座;33、托板;4、楼层板;5、休息平台板。1. Platform frame; 11. Main beam; 111. First reinforcing rib plate; 12. Secondary beam; 121. First connecting plate; 122. Second reinforcing rib plate; 13. Strengthening purlin; 14, connecting device; 141, horizontal screw; 142, first screw sleeve; 143, second screw sleeve; 1411, second through hole; 1A, first frame; 1B, second frame; 2, support frame; 21, upper bracket; 211, support plate; 22, lower bracket; 23, lifting adjustment device; 231, vertical screw; 232, upper screw sleeve; 233, lower screw sleeve; 2311, first through hole; 3, Supporting device; 31. Supporting mandrel; 32. Mandrel seat; 33. Support plate; 4. Floor plate; 5. Rest platform plate.

具体实施方式Detailed ways

为了更好地理解和实施,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。For better understanding and implementation, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.

除非另有定义,本文所使用的所有的技术和科学术语与属于本实用新型的技术领域的技术人员通常理解的含义相同。本文中在本实用新型的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在限制本实用新型。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the technical field to which the present invention belongs. The terms used in the description of the present invention herein are only for the purpose of describing specific embodiments, and are not intended to limit the present invention.

参阅图1至图5,本实用新型公开了一种可调节的装配式楼梯施工平台,该施工平台可应用至楼梯间的施工作业中,对于复杂的结构楼梯以及需要临时挡水的基坑阶段的施工过程有良好的作用。Referring to FIGS. 1 to 5 , the present utility model discloses an adjustable assembly-type stair construction platform, which can be applied to the construction of stairwells. For complex structure stairs and foundation pit stages that require temporary water retention The construction process has a good effect.

该施工平台包括平台框架1,平台框架1一端可设于楼层板4上,另一端设有两个支撑架2;支撑架2包括设于平台框架1下方的上支架21、套设于上支架21的下支架22以及升降调节装置23,升降调节装置23用于调节支撑架2的高度,由此实现对平台框架的高度位置调节;平台框架1上还设有用于抵接剪力墙的对撑装置3。The construction platform includes a platform frame 1, one end of the platform frame 1 can be set on the floor slab 4, and the other end is provided with two support frames 2; The lower bracket 22 of 21 and the lifting adjustment device 23, the lifting adjustment device 23 is used to adjust the height of the support frame 2, thereby realizing the height position adjustment of the platform frame; Support device 3.

具体地,平台框架1呈矩形状,其可搁置在楼层板4上以形成面接触,并通过楼层板4上预留的钢筋41形成约束,诚然,平台框架1的上方还可铺设垫板,以方便工人在其上面作业;为了方便施工现场取材制作维修,上支架21采用50mm*4mm的方钢管制作而成,下支架22采用70mm*5mm的方钢管制作而成,由此下支架22得以套设在上支架21的外部,以便上支架21相对下支架22上下滑动;下支架22的下方焊接有底座221,底座221可通过螺栓与休息平台板5固定连接。Specifically, the platform frame 1 is in the shape of a rectangle, which can be placed on the floor plate 4 to form surface contact, and is restrained by the steel bars 41 reserved on the floor plate 4. It is true that a backing plate can also be laid on the platform frame 1, In order to facilitate the workers to work on it; in order to facilitate the production and maintenance of materials on the construction site, the upper bracket 21 is made of 50mm*4mm square steel pipe, and the lower bracket 22 is made of 70mm*5mm square steel pipe, so that the lower bracket 22 can be It is sleeved on the outside of the upper bracket 21 so that the upper bracket 21 slides up and down relative to the lower bracket 22 ; a base 221 is welded below the lower bracket 22 , and the base 221 can be fixedly connected to the rest platform 5 by bolts.

参阅图1,升降调节装置23包括竖直螺杆231、上螺杆套筒232以及下螺杆套筒233。其中,上螺杆套筒232和下螺杆套筒233分别焊接或螺栓固定在上支架21以及下支架22上;竖直螺杆231为双向螺杆,上螺杆套筒232和下螺杆套筒233上分别设有与竖直螺杆231配合的内螺纹,竖直螺杆231的两端分别穿过上螺杆套筒232和下螺杆套筒233,由此将上支架21以及下支架22连接在一起;竖直螺杆231中部还设置有垂直其长度方向的第一通孔2311。作业时,工人可以向第一通孔2311中插入调节杆来旋转竖直螺杆231,用以调节上支架21与下支架22的距离,进而调节支撑架2的高度,以适应不同高度差的作业场地。Referring to FIG. 1 , the lift adjusting device 23 includes a vertical screw 231 , an upper screw sleeve 232 and a lower screw sleeve 233 . The upper screw sleeve 232 and the lower screw sleeve 233 are respectively welded or bolted to the upper bracket 21 and the lower bracket 22; the vertical screw 231 is a bidirectional screw, and the upper screw sleeve 232 and the lower screw sleeve 233 are respectively provided with There is an inner thread matched with the vertical screw 231, and the two ends of the vertical screw 231 respectively pass through the upper screw sleeve 232 and the lower screw sleeve 233, thereby connecting the upper bracket 21 and the lower bracket 22 together; the vertical screw The middle part of 231 is also provided with a first through hole 2311 perpendicular to its length direction. During the operation, the worker can insert the adjusting rod into the first through hole 2311 to rotate the vertical screw 231 to adjust the distance between the upper bracket 21 and the lower bracket 22, and then adjust the height of the support frame 2 to adapt to the operation of different height differences. site.

参阅图1和图3,平台框架1的两侧对称设置有8个对撑装置3,对撑装置3包括水平布置的对撑顶杆31以及焊接或螺栓固定在平台框架1上的顶杆座32,对撑顶杆31靠近所述剪力墙的一端焊接有托板33;顶杆座32上设有内螺纹,对撑顶杆31上设有与顶杆座32内螺纹配合的外螺纹,由此,工人可以通过旋转对撑顶杆31,调整托板33与顶杆座32的距离,并使得托板33抵接在所述剪力墙上,从而对称撑紧所述剪力墙以便固定住所述施工平台。Referring to FIGS. 1 and 3 , there are 8 counter-supporting devices 3 symmetrically arranged on both sides of the platform frame 1, and the counter-supporting devices 3 include horizontally arranged counter-supporting mandrels 31 and a mandrel seat welded or bolted on the platform frame 1 32. A support plate 33 is welded to the end of the support mandrel 31 close to the shear wall; the mandrel seat 32 is provided with an internal thread, and the support mandrel 31 is provided with an external thread matched with the internal thread of the mandrel seat 32 Therefore, the worker can adjust the distance between the support plate 33 and the push rod base 32 by rotating the support rod 31, and make the support plate 33 abut on the shear wall, thereby symmetrically supporting the shear wall in order to fix the construction platform.

为了便于所述施工平台的拆装和布置,在本实施例中,上支架21上方焊接有支撑板211,平台框架1与支撑板211通过螺栓固定连接,从而实现上支架21与平台框架1的可拆卸连接。诚然,上支架21与支撑板211的连接方式还可以为胶水粘合或者螺栓连接等,平台框架1与支撑板211的连接方式还可以为焊接或者胶水粘合等;其中,支撑板211与上支架21以及平台框架1连接方式的组合,只要能实现上支架21与平台框架1可拆卸的功能即可。In order to facilitate the disassembly and arrangement of the construction platform, in this embodiment, a support plate 211 is welded above the upper bracket 21, and the platform frame 1 and the support plate 211 are fixedly connected by bolts, so as to realize the connection between the upper bracket 21 and the platform frame 1. Detachable connection. It is true that the connection method between the upper bracket 21 and the support plate 211 can also be glue bonding or bolt connection, etc., and the connection method between the platform frame 1 and the support plate 211 can also be welding or glue bonding. The combination of the connection manner of the bracket 21 and the platform frame 1 is sufficient as long as the upper bracket 21 and the platform frame 1 can be detached.

在本实施例中,平台框架1包括两条平行布置的主梁11以及可拆卸连接两条主梁11的6条次梁12,相邻的两条次梁12之间还设有可拆卸的加强檩条13。In this embodiment, the platform frame 1 includes two main beams 11 arranged in parallel and six secondary beams 12 that are detachably connected to the two main beams 11 , and detachable detachable beams 12 are also provided between the two adjacent secondary beams 12 . Reinforced purlins 13.

参阅图3、图4和图5,具体地,亦为了方便施工现场取材制作维修,主梁11和次梁12均采用18号槽钢制成,加强檩条13采用12号槽钢制成,其中,主梁11与次梁12垂直布置,次梁12与加强檩条13垂直布置。支撑板211与主梁11通过螺栓固定连接;次梁12的两端均设有一第一连接板121,主梁11上焊接有与第一连接板121对应的第一加强肋板111,第一连接板112通过螺栓将次梁12与第一加强肋板111连接在一起;加强檩条13两端均设有一第二连接板131,次梁12中部侧面上焊接有与第二连接板131对应的第二加强肋板122,第二连接板131通过螺栓将加强檩条13与第二加强肋板122连接在一起。诚然,位于平台框架1中部的4条次梁12将对应在其两侧均焊接有一第二加强肋板122。Referring to Fig. 3, Fig. 4 and Fig. 5, specifically, also in order to facilitate the construction and maintenance of the construction site, the main beam 11 and the secondary beam 12 are made of No. 18 channel steel, and the reinforcing purlin 13 is made of No. 12 channel steel, wherein , the main beam 11 and the secondary beam 12 are arranged vertically, and the secondary beam 12 and the reinforcing purlin 13 are arranged vertically. The support plate 211 and the main beam 11 are fixedly connected by bolts; both ends of the secondary beam 12 are provided with a first connecting plate 121, and the first reinforcing rib 111 corresponding to the first connecting plate 121 is welded on the main beam 11. The connecting plate 112 connects the secondary beam 12 and the first reinforcing rib plate 111 together by bolts; a second connecting plate 131 is provided on both ends of the reinforcing purlin 13, and the middle side of the secondary beam 12 is welded with a corresponding second connecting plate 131. The second reinforcing rib 122 and the second connecting plate 131 connect the reinforcing purlin 13 and the second reinforcing rib 122 together by bolts. Indeed, the four secondary beams 12 located in the middle of the platform frame 1 will have a second reinforcing rib 122 welded on both sides thereof.

在本实施例中,平台框架1的宽度方向两侧还对称设有连接装置14,连接装置14将平台框架1沿主梁11长度方向分为第一框架1A以及第二框架1B。具体地,两条主梁11在连接装置14对应的位置断开,再拆除中间的加强檩条13,以形成第一框架1A和第二框架1B。In this embodiment, connecting devices 14 are symmetrically arranged on both sides of the platform frame 1 in the width direction. The connecting devices 14 divide the platform frame 1 into a first frame 1A and a second frame 1B along the length direction of the main beam 11 . Specifically, the two main beams 11 are disconnected at the positions corresponding to the connecting devices 14, and then the reinforcing purlins 13 in the middle are removed to form the first frame 1A and the second frame 1B.

参阅图3,连接装置14包括水平螺杆141、第一螺杆套筒142以及第二螺杆套筒143。其中,第一螺杆套筒142和第二螺杆套筒143分别焊接或螺栓固定在第一框架1A以及第二框架1B上;水平螺杆141为双向螺杆,第一螺杆套筒142和第二螺杆套筒143上分别设有与水平螺杆141配合的内螺纹,水平螺杆141的两端分别穿过第一螺杆套筒142和第二螺杆套筒143,由此将第一框架1A以及第二框架1B连接在一起;水平螺杆141中部还设置有垂直其长度方向的第二通孔1411。作业时,工人可以向第二通孔1411中插入调节杆来旋转水平螺杆141,用以固定第一框架1A与第二框架1B,从而形成一个整体的平台框架1。Referring to FIG. 3 , the connecting device 14 includes a horizontal screw 141 , a first screw sleeve 142 and a second screw sleeve 143 . The first screw sleeve 142 and the second screw sleeve 143 are welded or bolted to the first frame 1A and the second frame 1B respectively; the horizontal screw 141 is a bidirectional screw, the first screw sleeve 142 and the second screw sleeve The barrel 143 is respectively provided with an inner thread which is matched with the horizontal screw 141, and the two ends of the horizontal screw 141 respectively pass through the first screw sleeve 142 and the second screw sleeve 143, thereby connecting the first frame 1A and the second frame 1B. Connected together; the middle of the horizontal screw 141 is also provided with a second through hole 1411 perpendicular to its length direction. During operation, a worker can insert an adjusting rod into the second through hole 1411 to rotate the horizontal screw 141 to fix the first frame 1A and the second frame 1B, thereby forming an integral platform frame 1 .

故而当需要大尺寸调整施工平台的长度时,可以通过更换第二框架1B,以另一个第二框架1B和现有的第一框架1A安装组合形成一个新的施工平台,不必备多套整体的施工平台,降低工程成本。Therefore, when the length of the construction platform needs to be adjusted in a large size, the second frame 1B can be replaced, and another second frame 1B and the existing first frame 1A can be installed and combined to form a new construction platform, and multiple sets of integral parts are not necessary. The construction platform can reduce the engineering cost.

综上所述,本实用新型提供的可调节的装配式楼梯施工平台,采用装配形式组合安装而成,实现了施工平台的专业化、标准化,而且便于收纳、运输和现场安装,还有利于使用过程中的维修,省工、省力、省时,可循环利用,缩短施工周期和缩小施工难度;亦可以根据现场情况灵活调节、组合施工平台,以适应不同规格和条件的施工场地;通过与楼层板、休息平台板以及剪力墙的连接或抵接约束,形成整体支撑体系,施工平台更加稳固。To sum up, the adjustable assembled stair construction platform provided by the utility model is assembled and installed in an assembly form, which realizes the specialization and standardization of the construction platform, and is convenient for storage, transportation and on-site installation, and is also conducive to use. Maintenance in the process saves labor, effort and time, and can be recycled, shortening the construction period and reducing the difficulty of construction; it can also flexibly adjust and combine construction platforms according to site conditions to adapt to construction sites of different specifications and conditions; The connection or abutment constraints of the slab, the rest platform slab and the shear wall form an overall support system, and the construction platform is more stable.

本实用新型方案所公开的技术手段不仅限于上述实施方式所公开的技术手段,还包括由以上技术特征任意组合所组成的技术方案。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也视为本实用新型的保护范围。The technical means disclosed by the solution of the present invention are not limited to the technical means disclosed in the above-mentioned embodiments, but also include technical solutions composed of any combination of the above-mentioned technical features. It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, several improvements and modifications can be made, and these improvements and modifications are also regarded as the protection scope of the present invention.

Claims (10)

1.一种可调节的装配式楼梯施工平台,包括平台框架,其特征在于:所述平台框架一端可设于楼层板上,另一端设有至少两个支撑架;所述支撑架包括设于所述平台框架下方的上支架、套设于所述上支架的下支架以及升降调节装置,所述下支架可支撑在休息平台板上,所述升降调节装置用于调节所述上支架与下支架的相对距离;所述平台框架上还设有用于抵接剪力墙的对撑装置。1. An adjustable assembled stair construction platform, comprising a platform frame, characterized in that: one end of the platform frame can be set on the floor plate, and the other end is provided with at least two support frames; The upper bracket under the platform frame, the lower bracket sleeved on the upper bracket, and the lifting adjustment device, the lower bracket can be supported on the rest platform plate, and the lifting adjustment device is used to adjust the upper bracket and the lower bracket. The relative distance of the brackets; the platform frame is also provided with a supporting device for abutting against the shear wall. 2.根据权利要求1所述的可调节的装配式楼梯施工平台,其特征在于:所述升降调节装置包括竖直螺杆、设于所述上支架上的上螺杆套筒以及设于所述下支架上的下螺杆套筒;所述竖直螺杆为双向螺杆,且与所述上螺杆套筒和下螺杆套筒螺纹配合。2. The adjustable prefabricated stair construction platform according to claim 1, wherein the lifting adjustment device comprises a vertical screw, an upper screw sleeve arranged on the upper bracket, and an upper screw sleeve arranged on the lower The lower screw sleeve on the bracket; the vertical screw is a bidirectional screw, and is threadedly matched with the upper screw sleeve and the lower screw sleeve. 3.根据权利要求2所述的可调节的装配式楼梯施工平台,其特征在于:所述竖直螺杆上还设置有垂直其长度方向的第一通孔。3 . The adjustable assembled stair construction platform according to claim 2 , wherein the vertical screw rod is further provided with a first through hole perpendicular to its length direction. 4 . 4.根据权利要求1所述的可调节的装配式楼梯施工平台,其特征在于:所述对撑装置包括水平布置的对撑顶杆以及设于所述平台框架上的顶杆座,所述对撑顶杆与顶杆座螺纹配合,所述对撑顶杆的一端设有用于抵接所述剪力墙的托板。4 . The adjustable prefabricated stair construction platform according to claim 1 , wherein the supporting device comprises a horizontally arranged counter-supporting top rod and a top rod seat arranged on the platform frame, and the The counter-supporting top rod is threadedly matched with the top-rod seat, and one end of the counter-supporting top rod is provided with a support plate for abutting against the shear wall. 5.根据权利要求1所述的可调节的装配式楼梯施工平台,其特征在于:所述上支架与所述平台框架拆卸连接。5 . The adjustable prefabricated stair construction platform according to claim 1 , wherein the upper bracket is detachably connected to the platform frame. 6 . 6.根据权利要求1所述的可调节的装配式楼梯施工平台,其特征在于:所述平台框架包括两条平行布置的主梁以及拆卸连接两条所述主梁的多条次梁。6 . The adjustable prefabricated stair construction platform according to claim 1 , wherein the platform frame comprises two main beams arranged in parallel and a plurality of secondary beams that are disassembled and connected to the two main beams. 7 . 7.根据权利要求6所述的可调节的装配式楼梯施工平台,其特征在于:相邻的所述次梁之间设有可拆卸的加强檩条。7 . The adjustable prefabricated stair construction platform according to claim 6 , wherein a detachable reinforcing purlin is arranged between the adjacent secondary beams. 8 . 8.根据权利要求6所述的可调节的装配式楼梯施工平台,其特征在于:所述平台框架上还设有连接装置,所述连接装置将所述平台框架沿所述主梁长度方向分为第一框架以及第二框架。8. The adjustable prefabricated stair construction platform according to claim 6, characterized in that: the platform frame is further provided with a connecting device, and the connecting device divides the platform frame along the length direction of the main beam. for the first frame and the second frame. 9.根据权利要求8所述的可调节的装配式楼梯施工平台,其特征在于:所述连接装置包括水平螺杆、设于所述第一框架上的第一螺杆套筒以及设于所述第二框架上的第二螺杆套筒;所述水平螺杆为双向螺杆,且与所述第一螺杆套筒和第二螺杆套筒螺纹配合。9 . The adjustable prefabricated stair construction platform according to claim 8 , wherein the connecting device comprises a horizontal screw, a first screw sleeve arranged on the first frame, and a first screw sleeve arranged on the first frame. 10 . The second screw sleeve on the two frames; the horizontal screw is a bidirectional screw and is threadedly matched with the first screw sleeve and the second screw sleeve. 10.根据权利要求9所述的可调节的装配式楼梯施工平台,其特征在于:所述水平螺杆上还设置有垂直其长度方向的第二通孔。10 . The adjustable prefabricated stair construction platform according to claim 9 , wherein the horizontal screw is further provided with a second through hole perpendicular to its length direction. 11 .
CN201920161760.9U 2019-01-29 2019-01-29 An adjustable prefabricated stair construction platform Expired - Fee Related CN209907886U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920161760.9U CN209907886U (en) 2019-01-29 2019-01-29 An adjustable prefabricated stair construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920161760.9U CN209907886U (en) 2019-01-29 2019-01-29 An adjustable prefabricated stair construction platform

Publications (1)

Publication Number Publication Date
CN209907886U true CN209907886U (en) 2020-01-07

Family

ID=69029693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920161760.9U Expired - Fee Related CN209907886U (en) 2019-01-29 2019-01-29 An adjustable prefabricated stair construction platform

Country Status (1)

Country Link
CN (1) CN209907886U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360150A (en) * 2020-10-30 2021-02-12 中国一冶集团有限公司 Socket pipe combined detachable triangular support frame for construction and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112360150A (en) * 2020-10-30 2021-02-12 中国一冶集团有限公司 Socket pipe combined detachable triangular support frame for construction and construction method

Similar Documents

Publication Publication Date Title
CN110644664A (en) Fabricated building construction method and laminated slab construction supporting system
CN106930192B (en) Assembled variable cross-section contracture sliding mode system and its construction method
CN111395754B (en) Method for implementing formwork supporting system
CN105952140B (en) Tool-type steel framework Wood-plastic formwork system and its construction technology for cast-in-place concrete
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN103485574A (en) Method for constructing reinforced concrete structure of tower top of prilling tower
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN218668474U (en) Basket type overhanging bearing frame
CN110017141B (en) A rapid formwork system for ultra-deep shaft concrete ring frame beam and its construction method
CN116411694A (en) Adjustable modular disc buckle type supporting system and supporting method thereof
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
CN212866793U (en) A prefabricated construction elevator parking platform
CN116591468B (en) A temporary support device for a concrete cantilever structure and its construction method
CN215289775U (en) Early-dismantling formwork system for cast-in-place culvert
CN216194083U (en) Box girder template convenient to dismantle transportation
CN215630118U (en) Movable aluminum mould board piping lane pours shaping structure in succession
CN213204913U (en) Modular prefabricated staircase operation platform
CN105003074A (en) Commercial building construction system and construction method thereof
CN210798994U (en) Concrete structure wall body unilateral template structure
CN105178588A (en) commercial building construction system and construction method thereof
CN115045505A (en) Device for pouring concrete platform on steel structure frame and construction method
CN207314793U (en) Operating platform between a kind of regularization precast stair
CN219864091U (en) Aluminum template supporting device for wall deformation joint and supporting type wall deformation joint
CN114790818B (en) Diagonal bracing transition method for accelerating erection of overhanging scaffold
CN223135449U (en) Assembled ribbed floor formwork

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200107