CN102259794A - Method for installing overall combined type crane beam - Google Patents

Method for installing overall combined type crane beam Download PDF

Info

Publication number
CN102259794A
CN102259794A CN2011102051023A CN201110205102A CN102259794A CN 102259794 A CN102259794 A CN 102259794A CN 2011102051023 A CN2011102051023 A CN 2011102051023A CN 201110205102 A CN201110205102 A CN 201110205102A CN 102259794 A CN102259794 A CN 102259794A
Authority
CN
China
Prior art keywords
crane girder
integral combined
steel column
combined crane
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102051023A
Other languages
Chinese (zh)
Other versions
CN102259794B (en
Inventor
杨基亮
王敏仕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGJIANG PLANNING AND DESIGN INSTITUTE FOR SHIPPING
Original Assignee
CHANGJIANG PLANNING AND DESIGN INSTITUTE FOR SHIPPING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGJIANG PLANNING AND DESIGN INSTITUTE FOR SHIPPING filed Critical CHANGJIANG PLANNING AND DESIGN INSTITUTE FOR SHIPPING
Priority to CN 201110205102 priority Critical patent/CN102259794B/en
Publication of CN102259794A publication Critical patent/CN102259794A/en
Application granted granted Critical
Publication of CN102259794B publication Critical patent/CN102259794B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for installing an overall combined type crane beam. The method comprises the steps of: after installing a steel column, assembling various types of manufactured components into the overall combined type crane beam; and then lifting integrally. The overall combined type crane beam comprises two mutually parallel crane beams and a brake component arranged on the top of the crane beams. A vertical support and/or a lower flange horizontal support are arranged between the two crane beams. A connection plate is arranged on end plates of the two crane beams. Suspension rings are arranged on the upper flanges of the two crane beams. According to the method disclosed by the invention, the construction safety, the operability and the economical efficiency are sufficiently considered; and the special engineering experiences prove that the method has the advantages of good implementation effect, low investment, high working efficiency, quality and safety assurance, strong applicability and extremely popularized significance.

Description

The installation method of integral combined crane girder
Technical field
The present invention relates to the installation method of crane girder, refer to a kind of installation method of integral combined crane girder particularly.
Background technology
In ANALYSIS FOR STEEL CRANE GIRDERS and ancillary system are widely used in that crane the is arranged modern industry factory building of (crane in bridge type).
The conventional mounting method is: single Pin crane girder (being generally the I-shaped cross-section), brake truss or walk members such as guidance tape and be prefabricated in the factory respectively, then each member is transported to the scene.After the steel column installation, single Pin crane girder of each axis is lifted respectively, directly winch to steel column bracket place, then through overcorrection, with after post is connected and fixed, begin to lift each braking truss again, walk member such as guidance tape, in the high-altitude each braked truss at last, walk guidance tape and cooresponding every Pin crane girder welds respectively or bolt together is fixed.
Because the braking truss is generally angle steel and makes, walks guidance tape and be generally sheet steel and form with angle steel, the member integral rigidity is all less, and flexibility is big, and transportation easily produces local deformation, and it is comparatively difficult that installation is hung at the scene.Not only installation procedure is many for the conventional mounting method, the time is long, the lifting work capacity is big, and aloft work efficient is low, welding quality control difficulty between the member, security risk are higher.
Summary of the invention
Purpose of the present invention will overcome the existing in prior technology deficiency exactly, and a kind of installation method of integral combined crane girder is provided.
For achieving the above object, the installation method of the integral combined crane girder that the present invention is designed after the steel column installation, carries out integral hoisting after each component assembly of making become integral combined crane girder; Described integral combined crane girder comprises the braking element that crane girder that two Pin are arranged in parallel and crane girder top are provided with, be provided with vertical support and/or lower flange horizontal support between the described two Pin crane girders, the end plate of described two Pin crane girders is provided with connecting panel, and the top flange of described two Pin crane girders is provided with suspension ring.
Described installation method specifically may further comprise the steps:
When a. lifting by crane, earlier integral combined crane girder is hung ground 0.2~0.4m, move the center that integral combined crane girder makes its centrally aligned installation site then;
B. slowly integral combined crane girder is winched to steel column over top 0.2~0.4m;
C. the space of integral combined crane beam end portion is penetrated the upper prop of steel column, and move down integral combined crane girder slowly, until the bracket place of steel column;
D. adjust integral combined crane girder and make its bracket line of centers of aiming at steel column, in place and slow off the hook;
E. loose hook, lifting is finished, treat integral combined crane girder proofread and correct errorless after, finish adjacently stride between the integral combined crane girder, being connected and fixed of integral combined crane girder and bracket, integral combined crane girder and steel column upper prop.
Further, described braking element is for braking truss or walking guidance tape.
Further, the width L in space, described braking element end is 1/2 of a steel column upper prop width.
Beneficial effect of the present invention is: the present invention has changed the orthodox method that single member hangs installation one by one, with each member all at produce in factory and be assembled into integral combined member, be transported to the on-the-spot disposable erection work of hanging of finishing the crane girder system then, operation is simplified, the lifting work capacity reduces, improved installation effectiveness, by statistics, work efficiency is 5.2 times of conventional mounting method, has shortened construction period greatly.The present invention has reduced the work capacity of on-the-spot high-altitude welding lifting, and the artificial quantities at scene is shifted to by the millwork equalization, and on-the-spot aloft work is transferred to the factory floor operation, helps improving the industrialization fabricating quality and the installation effectiveness of crane girder system; The minimizing of amount of high-altitude operation is of value to workman's personal safety again, has improved the safety of producing, and has embodied the production theory of " people-oriented "; Integral combined crane girder has also increased the member integral rigidity, can reduce the local deformation that member produces in transportation, avoids braking truss, walks the problem that the transportation of member such as guidance tape is scattered, yielding, difficulty is installed, and has improved construction quality.The installation method of integral combined crane girder can be widely used in the general industry factory building colonnade, and each strides the installation of hanging of crane girder system, can be after steel column be installed, roofing element carries out the installation of hanging of integral combined crane girder before installing, and satisfies the mounting condition of crane runway.
Description of drawings
Fig. 1 is the perspective view of integral combined crane girder.
Fig. 2 be integral combined crane girder the end construction scheme drawing.
Fig. 3 a is the installation process scheme drawing of the first step of integral combined crane girder.
Fig. 3 b is the installation process scheme drawing in second step of integral combined crane girder.
Fig. 3 c is the installation process scheme drawing in the 3rd step of integral combined crane girder.
Fig. 3 d is the installation process scheme drawing in the 4th step of integral combined crane girder.
Fig. 3 e is the installation process scheme drawing in the 5th step of integral combined crane girder.
The specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
Integral combined crane girder 1 shown in Fig. 1,2 comprises the braking element 1.2 that crane girder 1.1 that two Pin are arranged in parallel and crane girder 1.1 tops are provided with.Braking element 1.2 is the braking truss.The top flange that the end plate that is provided with vertical support 1.3 and lower flange horizontal support 1.4, two Pin crane girders 1.1 between the two Pin crane girders 1.1 is provided with connecting panel 1.5, two Pin crane girders 1.1 is provided with suspension ring 1.6.The width L in space, braking element 1.2 end is 1/2 of steel column 2 upper prop width, that is, the end of braking element 1.2 and crane girder 1.1 distance L of end in the same way are 1/2 of steel column 2 width.
The installation method of integral combined crane girder of the present invention specifically may further comprise the steps:
When a. lifting by crane, earlier integral combined crane girder 1 is hung ground 0.3m, move the center that integral combined crane girder 1 makes its centrally aligned installation site then, shown in Fig. 3 a;
B. slowly integral combined crane girder is winched to steel column 2 over top 0.3m, shown in Fig. 3 b;
C. the space with integral combined crane girder 1 end penetrates the upper prop of steel column 2, and moves down integral combined crane girder 1 slowly, until bracket 2.1 places of steel column 2, shown in Fig. 3 c;
D. adjust integral combined crane girder 1 and make it aim at bracket 2.1 line of centerss of steel column 2, in place and slow off the hook is shown in Fig. 3 d;
E. loose hook, lifting is finished, treat integral combined crane girder 1 proofread and correct errorless after, finish adjacently stride between the integral combined crane girder 1, integral combined crane girder 1 is connected and fixed with steel column 2 upper props with bracket 2.1, integral combined crane girder 1, shown in Fig. 3 e.
Embodiment
Certain engineering is positioned at a shipbuilding yard, be the body section manufacturing shop, factory building is arranged from West to East, 1~20 beam column of steel structure of indoor section and roofing (post is apart from 12m) hang installation and finish in advance, the track of 75 tons of cranes of factory building and corresponding beam column form the open-air segmentation transhipment place that 21m strides from 20 21m to 21 axis that extend eastward.21m between 20 and 21 strides integral combined crane girder and adopts installation method of the present invention to install.
Two the single Pin crane girders and the ancillary system of middle mast axis are assembled into integral combined crane girder in factory, specifically form, as depicted in figs. 1 and 2 by two Pin crane girders 1.1, braking element 1.2, lower flange horizontal support 1.4, connecting panel 1.5 and bolt.Two Pin crane girders 1.1 be arranged in parallel, braking element 1.2 is by being fixedly welded on the top of two Pin crane girders 1.1, lower flange horizontal support 1.4 is by being fixedly welded on the bottom of two Pin crane girders 1.1, and adjacent integral combined crane girder then is in the same place with bolted connection by connecting panel 1.5 when installing and fixing.
21m strides integral combined crane girder and has five groups, and wherein maximum weight is 32T, and the crane girder span is 21m, and two ends are supported on respectively on the bracket 2.1 of 20,21 axis lattice type steel columns 2, and the below is a factory road.
After integral combined crane girder was transported to the erecting stage, the braking element 1.2 of the integral combined crane girder of middle colonnade was divided into walking guidance tape and two kinds of situations of braking truss, can be positioned over the tram respectively according to the designing requirement of each combined member; Analyze as calculated, adopt 150 tons of automobile cranes to lift.Before integral combined crane girder lifting, finished the installation of hanging of 21 axis steel columns 2, comprise work such as steel column 2 corrections, the welding of suspension column stiffener; Whether two Pin crane girders, 1.1 spacings of checking integral combined crane girder once more meet design requirement, and whether its error can satisfy code requirement; Simultaneously, carry out suspension ring 1.6 according to design paper and make, be welded in the appropriate location of crane girder 1.1 top flanges; At last, carry out marching into the arena and lifting dead work (comprising that steel rope, jig are connected with suspension ring) of 150 tons of automobile cranes.
After every work preparation is errorless, begin lifting.By crane man unified command with give signal: earlier integral combined crane girder 1 is hung ground 0.3m during lifting, move integral combined crane girder 1 then, make the center of its centrally aligned installation site; Slowly rise hook, integral combined crane girder 1 winched to 21 axis steel columns, 2 over top 0.3m, in this process with integral combined crane girder 1 integral body a little near 21 axis directions; Utilize the space, end of the braking element 1.2 of integral combined crane girder 1, make crane girder one end pass the upper prop of 21 steel columns 2, move down bracket 2.1 places then slowly until steel column 2; Adjust integral combined crane girder 1 with hoisting crane and make it aim at steel column 2 connecting panels and bracket 2.1 track centerline of first mark of handling affairs, and stride the crane girder line of centers with the indoor 12m of factory building and align, when beginning slow off the hook after in place; Hoisting crane pine hook, lifting is finished, treat integral combined crane girder 1 proofread and correct errorless after, finish finally being connected and fixed of integral combined crane girder 1.
By this case history as can be seen, each strides the installation of hanging of crane girder system to have adopted installation method of the present invention can finish in the mounting industrial factory building colonnade smoothly, improved on-site installation efficient, work efficiency is 5.2 times of conventional mounting method, reduce aloft work, guarantee construction safety, improved construction quality.Practice test feasibility, safety and the economy of integral combined crane girder installation method, applicability is strong, implementation result is good.

Claims (4)

1. the installation method of an integral combined crane girder is characterized in that: after steel column (2) installation, carry out integral hoisting after each component assembly of making become integral combined crane girder (1); Described integral combined crane girder (1) comprises the braking element (1.2) that crane girder (1.1) that two Pin are arranged in parallel and crane girder (1.1) top are provided with, be provided with vertical support (1.3) and/or lower flange horizontal support (1.4) between the described two Pin crane girders (1.1), the end plate of described two Pin crane girders (1.1) is provided with connecting panel (1.5), and the top flange of described two Pin crane girders (1.1) is provided with suspension ring (1.6).
2. the installation method of integral combined crane girder according to claim 1, it is characterized in that: described method specifically may further comprise the steps:
When a. lifting by crane, earlier integral combined crane girder (1) is hung ground 0.2~0.4m, move the center that integral combined crane girder (1) makes its centrally aligned installation site then;
B. slowly integral combined crane girder is winched to steel column (2) over top 0.2~0.4m;
C. the space with integral combined crane girder (1) end penetrates the upper prop of steel column (2), and moves down integral combined crane girder (1) slowly, locates until the bracket (2.1) of steel column (2);
D. adjust integral combined crane girder (1) and make its bracket (2.1) line of centers of aiming at steel column (2), in place and slow off the hook;
E. loose hook, lifting is finished, treat integral combined crane girder (1) proofread and correct errorless after, finish adjacently stride between the integral combined crane girder (1), integral combined crane girder (1) is connected and fixed with steel column (2) upper prop with bracket (2.1), integral combined crane girder (1).
3. the installation method of integral combined crane girder according to claim 1 is characterized in that: described braking element (1.2) is for the braking truss or walk guidance tape.
4. the installation method of integral combined crane girder according to claim 1, it is characterized in that: the width L in described braking element (1.2) space, end is 1/2 of steel column (a 2) upper prop width.
CN 201110205102 2011-07-21 2011-07-21 Method for installing overall combined type crane beam Expired - Fee Related CN102259794B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110205102 CN102259794B (en) 2011-07-21 2011-07-21 Method for installing overall combined type crane beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110205102 CN102259794B (en) 2011-07-21 2011-07-21 Method for installing overall combined type crane beam

Publications (2)

Publication Number Publication Date
CN102259794A true CN102259794A (en) 2011-11-30
CN102259794B CN102259794B (en) 2013-03-27

Family

ID=45006672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110205102 Expired - Fee Related CN102259794B (en) 2011-07-21 2011-07-21 Method for installing overall combined type crane beam

Country Status (1)

Country Link
CN (1) CN102259794B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102759350A (en) * 2012-07-23 2012-10-31 武汉一冶钢结构有限责任公司 High-altitude measuring method for construction of crane beams
CN106439209A (en) * 2016-08-31 2017-02-22 中国能源建设集团天津电力建设有限公司 Novel mounting scheme for high-pressure union air valve
CN107140533A (en) * 2017-05-25 2017-09-08 河南成兴建设工程有限公司 A kind of hanging method of concrete T type crane girder
CN115108460A (en) * 2022-07-13 2022-09-27 中国十七冶集团有限公司 Factory building crane beam system installation method and factory building crane beam system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1807218A (en) * 2006-01-26 2006-07-26 贵阳铝镁设计研究院 Single-layer multiple-span bent column crane beam positioning method
CN101348212A (en) * 2008-08-23 2009-01-21 中冶天工建设有限公司 Giant crane beam mounting method
CN101759098A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Crane beam frame construction method
CN201660368U (en) * 2010-03-31 2010-12-01 长沙有色冶金设计研究院 Suspension device for underground monorail crane girder
CN102086000A (en) * 2009-12-08 2011-06-08 中冶成工上海五冶建设有限公司 Onsite splicing and mounting method for extra-large and overweight box crane girders

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1807218A (en) * 2006-01-26 2006-07-26 贵阳铝镁设计研究院 Single-layer multiple-span bent column crane beam positioning method
CN101348212A (en) * 2008-08-23 2009-01-21 中冶天工建设有限公司 Giant crane beam mounting method
CN101759098A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Crane beam frame construction method
CN102086000A (en) * 2009-12-08 2011-06-08 中冶成工上海五冶建设有限公司 Onsite splicing and mounting method for extra-large and overweight box crane girders
CN201660368U (en) * 2010-03-31 2010-12-01 长沙有色冶金设计研究院 Suspension device for underground monorail crane girder

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102759350A (en) * 2012-07-23 2012-10-31 武汉一冶钢结构有限责任公司 High-altitude measuring method for construction of crane beams
CN106439209A (en) * 2016-08-31 2017-02-22 中国能源建设集团天津电力建设有限公司 Novel mounting scheme for high-pressure union air valve
CN107140533A (en) * 2017-05-25 2017-09-08 河南成兴建设工程有限公司 A kind of hanging method of concrete T type crane girder
CN115108460A (en) * 2022-07-13 2022-09-27 中国十七冶集团有限公司 Factory building crane beam system installation method and factory building crane beam system

Also Published As

Publication number Publication date
CN102259794B (en) 2013-03-27

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN105569358A (en) Construction method of special-shaped curved surface roof with large span and multiple curvatures
CN102259794B (en) Method for installing overall combined type crane beam
CN107514145A (en) A kind of removable steel roofing liner installation construction device and method
CN102912991A (en) Track hosting device and track hoisting method of large curtain wall unit plate
CN105442866A (en) Protective dismantle and assembly method for large-scale towering steel structures
CN108518071B (en) Installation method of double-layer large-span steel structure corridor
CN106544959B (en) The construction method of king-tower lifting segment and bridge main tower saddle containing saddle
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN104018680B (en) Lifting method of large-span solid-web type arc beam
CN110980500A (en) A kind of balanced force auxiliary hoisting beam and roof structure integral hoisting method
CN107419907B (en) A kind of steel-making tower steel structure platform is staggered installation of welding method
CN103993739B (en) The construction method of granulation tower spraying layer stiff beam
CN103061514A (en) Long-span steel structure corridor construction method
CN107013044A (en) The modularization installation method of lighting roof and the lowering or hoisting gear for installing lighting roof
CN209369277U (en) Mounting platform is used in daylighting top steel construction
CN107285200A (en) A kind of high large-span truss integral translation construction method for hanging
CN218714838U (en) Self-lifting heavy-load construction platform
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN215331380U (en) Rail type suspension platform
CN117145043A (en) Assembled type corridor, corridor end connection structure and construction method
CN113404199B (en) Installation method of umbrella-shaped roof structure
CN205840289U (en) A kind of suspension type vertical operating platform
CN109057146A (en) A kind of method for rapidly mounting of assembled steel frame secondary beam
CN211947883U (en) Integrally-assembled large-span steel truss overbridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130327

Termination date: 20140721

EXPY Termination of patent right or utility model