CN210316439U - Movable operating platform for installing high-altitude pipeline equipment - Google Patents

Movable operating platform for installing high-altitude pipeline equipment Download PDF

Info

Publication number
CN210316439U
CN210316439U CN201920941793.5U CN201920941793U CN210316439U CN 210316439 U CN210316439 U CN 210316439U CN 201920941793 U CN201920941793 U CN 201920941793U CN 210316439 U CN210316439 U CN 210316439U
Authority
CN
China
Prior art keywords
operation platform
platform
high altitude
work platform
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920941793.5U
Other languages
Chinese (zh)
Inventor
王伟民
游崇灏
陈树华
吴水林
郑铿锐
游崇杰
杨宏鸿
詹泽荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Lianfu Construction Engineering Co ltd
Shantou Building Engineering General Corp
Original Assignee
Guangdong Lianfu Construction Engineering Co ltd
Shantou Building Engineering General Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Lianfu Construction Engineering Co ltd, Shantou Building Engineering General Corp filed Critical Guangdong Lianfu Construction Engineering Co ltd
Priority to CN201920941793.5U priority Critical patent/CN210316439U/en
Application granted granted Critical
Publication of CN210316439U publication Critical patent/CN210316439U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a remove operation platform for high altitude pipe-line equipment installation, including gyro wheel, assembly frame spare, work platform and steel cat ladder, assembly frame spare comprises pole setting and horizontal pole interconnect, the bottom of pole setting is equipped with the gyro wheel that the operation platform of being convenient for removed, work platform fixes the top surface of establishing in the pole setting work platform be equipped with safety protective guard all around, the running-board has been laid to work platform, running-board one corner is equipped with the opening, installs the steel cat ladder of work platform about the constructor of being convenient for at the opening part. The utility model discloses it is convenient to set up and demolish the process, can dismantle convenient next project after the construction is accomplished and use, the utility model discloses the material consumption of installation and use is less, and construction cycle is short, greatly reduced construction cost.

Description

Movable operating platform for installing high-altitude pipeline equipment
Technical Field
The utility model relates to an aerial working field, more specifically are a remove operation platform for high altitude pipe-line equipment installation.
Background
At present, a plurality of factory building main beams are steel frame herringbone beams, the top elevation reaches 10-20m and is unequal, the installation height of the blowout prevention spraying pipe diameter in a warehouse is high, the length is long, the material load is large, and the construction is very inconvenient.
SUMMERY OF THE UTILITY MODEL
The patent of the utility model provides a remove operation platform for high altitude pipeline equipment fixing for solve the problem of high altitude pipeline equipment fixing difficulty.
In order to achieve the purpose, the utility model provides a remove operation platform for high altitude pipe-line equipment installation, including gyro wheel, assembly frame spare, work platform and steel cat ladder, its characterized in that: the assembling frame piece is composed of a vertical rod and a transverse rod which are connected with each other, rollers convenient for an operating platform to move are arranged at the bottom end of the vertical rod, the working platform is fixedly arranged on the top surface of the vertical rod, safety protective guards are arranged on the periphery of the working platform, pedal plates are laid on the working platform, an opening is formed in one end of each pedal plate, and a steel ladder convenient for a constructor to go up and down the working platform is installed at the opening.
As the utility model discloses a preferred technical scheme, assemble frame spare and assemble by the three-layer support body and constitute, through muffjoint between the support body to through the bolt fastening, the gyro wheel is established in first layer support body bottom surface, work platform establishes at third layer support body top surface.
As an optimized technical scheme of the utility model, all be equipped with the down tube that increases support body rigidity between pole setting and the horizontal pole on each layer of support body.
As an optimal technical proposal of the utility model, the assembly frame piece is provided with an outlet for constructors to enter the steel crawling ladder on one side of the position of the steel crawling ladder.
As an optimized technical solution of the present invention, the safety protection fence is composed of a plurality of vertical rods and a cross rod connected to each other.
As an optimized technical scheme of the utility model, safety protection fence's bottom is equipped with the bounding wall that is used for construction tool to drop.
As an optimal technical scheme of the utility model, the gyro wheel is the universal wheel, the gyro wheel is installed on the top support of pole setting bottom one side.
As an optimal technical scheme of the utility model, in S3, when the whole of third layer support body and second floor frame body butt joint, third layer support body and second floor frame body coupling docks with the first layer support body, constructor uses the sleeve to add the bolt and is connected fixedly between the support body at simple and easy operation platform.
Compared with the prior art, the utility model discloses possess following beneficial effect:
the mobile operation platform is formed by assembling all parts by using bolts, the erection and dismantling processes are convenient, and the field space and time are not occupied in the processing stage. The space that the removal operation platform took is less, can not influence the construction of other device equipment in warehouse, and the low side of removing operation platform is equipped with the gyro wheel, the operation platform's of being convenient for removal. After the construction is completed, the operation platform is moved to be detached, so that the operation platform can be conveniently used in the next project.
The utility model discloses equipment material consumes fewly, reduces constructor's input, and construction cycle is shorter, greatly reduced construction cost, the utility model is suitable for an installation of all kinds of pipe-line equipment in high altitude.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a schematic view of the first layer frame body of the present invention;
fig. 4 is a schematic view of the connection between the vertical rods of the present invention;
in the figure: 1. the safety protection device comprises rollers, 2 parts of assembly frame members, 3 parts of vertical rods, 4 parts of cross rods, 5 parts of inclined rods, 6 parts of a working platform, 7 parts of pedals, 8 parts of safety protection fences, 9 parts of enclosing plates, 10 parts of steel ladder stands and 11 parts of sleeves.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the following description is made in detail with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The utility model discloses a structural schematic is shown as figure 1 ~ 4, a remove operation platform for high altitude piping installation, including gyro wheel 1, top support, by pole setting 3 and horizontal pole 4 component assemble frame spare 2, install at the work platform 6 of assembling 2 top surfaces of frame spare and be used for constructor to go up and down work platform 6's steel stair.
In this embodiment assemble frame spare 2 and assemble by the three-layer support body and constitute, be first layer support body, second floor support body and third layer support body respectively, be equipped with sleeve 11 between the support body and connect to pass through the bolt fastening. Each layer of rack pieces is 3.5m high, and the height of the rack body is set according to the height of the warehouse.
The support body comprises pole setting 3 and horizontal pole 4 interconnect, horizontal pole 4 is with interconnect between the pole setting 3, and horizontal pole 4 is perpendicular with pole setting 3, it is fixed to wear bolted connection through the connecting piece between pole setting 3 and the horizontal pole 4. Threaded holes matched with the vertical rods 3 and the cross rods 4 are formed in the connecting pieces, and bolts are threaded in the threaded holes to fixedly connect the vertical rods 3 with the cross rods 4. Still be equipped with the down tube 5 that increases support body rigidity between pole setting 3 and the horizontal pole 4, down tube 5 sets up at pole setting 3 and 4 diagonal angles of horizontal pole, form triangle-shaped between pole setting 3, horizontal pole 4 and the down tube 5, the tip of down tube 5 is fixed on the connecting piece.
The upper and lower both ends of sleeve 11 suit with the inner chamber of support body pole setting 3, the lower pot head of sleeve 11 is at the top surface of lower floor support body pole setting 3, the upper end cover of sleeve 11 uses sleeve 11 to dock upper and lower two-layer support body in the bottom surface of upper support body pole setting 3, be equipped with the screw hole that suits with pole setting 3 on the sleeve 11, it is fixed with two-layer support body to wear the bolt in screw hole position.
The bottom surface of first layer support body pole setting 3 all is equipped with the screw rod support frame, the screw rod support frame is used for ensureing the stability when operation platform constructs, guarantees construction safety one side of 3 bottoms in pole setting is equipped with the top and holds in the palm, the bottom that the top held in the palm is equipped with the gyro wheel 1 of the operation platform removal of being convenient for, the top holds in the palm and accomplishes one side of back welded fastening in pole setting 3 bottom at the whole installations of removal operation platform.
The top surface of the third layer of support body is fixedly provided with a working platform 6, the working platform 6 is formed by welding a plurality of cross rods 4 in a staggered mode, pedals 7 are paved on the cross rods 4, the pedals 7 are wood plates or steel plates, an opening is formed in any one corner of each pedal 7, a steel crawling ladder 10 is arranged at the position of the opening and connected to the ground for enabling a constructor to get on and off the working platform 6, a cover plate is arranged at the position of the opening of each pedal 7 and used for preventing the constructor from stepping empty during construction work, meanwhile, preventing operation tools from falling off, and guaranteeing construction safety.
The periphery of the working platform 6 is provided with a safety protective guard 8 formed by connecting vertical rods 3 and cross rods 4, the height of the safety protective guard 8 is 1.2-1.5 m, and the bottom of the safety protective guard 8 is provided with a coaming 9 for preventing tools on the working platform 6 from falling.
The assembly frame piece 2 is provided with an outlet for constructors to enter the steel ladder stand 10 at the position where the steel ladder stand 10 is installed.
An installation method of a mobile operation platform for high-altitude pipeline equipment installation comprises the following steps:
s1, electric hoist installation: the electric hoist is arranged on the herringbone crossbeam of the warehouse, then the control circuits of the electric hoist are all connected, and the electric hoist is debugged and accepted for hoisting the assembly frame piece 2.
In this embodiment the electric block is installed on warehouse chevron shape girder, is convenient for install the pipeline hoist and mount of department in the middle of the warehouse, the hoist and mount platform of being convenient for simultaneously.
S2, assembling frame pieces; assembling three layers of frame members on the ground by using a vertical rod 3, a cross rod 4 and an inclined rod 5, assembling the working platform 6, the safety protective guard 8 and a third layer of frame body, and placing the assembled three layers of frame bodies at different positions under the herringbone girder of the warehouse;
s3, hoisting the platform: when the platform is installed, the platform is installed in sections from top to bottom through the electric hoist. Control electric block moves the top of third layer support body, uses electric block to hoist third layer support body to second floor support body top simple operation platform is set up to the periphery of second floor support body for constructor will at simple operation platform third layer support body and the butt joint of second floor support body, connect through sleeve 11 between the support body to pass through the bolt fastening.
After the third-layer frame body and the second-layer frame body are in butt joint, the whole body in butt joint of the third-layer frame body and the second-layer frame body is hoisted above the first-layer frame body through an electric hoist, and the simple operation platform on the periphery of the second-layer frame body is moved to the periphery of the first-layer frame body after the second-layer frame body which is well assembled is hoisted, so that the whole body in butt joint of the third-layer frame body and the second-layer frame body is in butt joint with the first-layer frame body, and finally, the whole moving operation platform is formed.
Preferably, the assembly frame member 2 can be assembled by using two layers of frame bodies and three layers of frame bodies according to the height of the warehouse pipeline, or assembled by using more layers of frame bodies under the safe condition, and the height of each layer of frame body can be set to be the height of the upright rod 3 according to the height of the warehouse pipeline.
Preferably, the vertical rods 3, the cross rods 4, the inclined rods 5, the connecting pieces, the working platform 6, the steel ladder stand 10 and the sleeves 11 which form the operating platform are designed and processed in a factory, are drilled and welded, and are transported to a construction site for assembly.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only for illustrating the principles of the present invention, and that there can be various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides a remove operation platform for high altitude pipe-line equipment installation, includes gyro wheel (1), assembles frame spare (2), work platform (6) and steel cat ladder (10), its characterized in that: assemble frame spare (2) and constitute by pole setting (3) and horizontal pole (4) interconnect, the bottom of pole setting (3) is equipped with gyro wheel (1) that the operation platform of being convenient for removed, work platform (6) are fixed to be established at the top surface of pole setting (3) be equipped with safety protective guard (8) around work platform (6), work platform (6) upper berth is equipped with running-board (7), running-board (7) one corner is equipped with the opening, installs the steel cat ladder (10) of the upper and lower work platform of the constructor of being convenient for at the opening part.
2. The mobile operation platform for high altitude pipe installation according to claim 1, wherein: assemble frame spare (2) and assemble by the three-layer support body and constitute, connect through sleeve (11) between the support body to through the bolt fastening, establish at first layer support body gyro wheel (1), establish at the third layer support body work platform (6).
3. The mobile operation platform for high altitude pipe installation according to claim 2, wherein: and an inclined rod (5) for increasing the rigidity of the frame body is arranged between the vertical rod (3) and the cross rod (4) on each layer of frame body.
4. The mobile operation platform for high altitude pipe installation according to claim 3, wherein: the upright rods (3), the cross rods (4) and the inclined rods (5) are fixedly connected through connecting pieces and threaded rods.
5. The mobile operation platform for high altitude pipe installation according to claim 1, wherein: the assembly frame piece (2) is provided with an outlet for constructors to enter the steel ladder (10) at the position where the steel ladder (10) is installed.
6. The mobile operation platform for high altitude pipe installation according to claim 1, wherein: the safety protective guard (8) is formed by connecting a plurality of vertical rods (3) and a cross rod (4).
7. The mobile operation platform for high altitude pipe installation according to claim 6, wherein: and a coaming (9) used for falling of construction tools is arranged at the bottom end of the safety protective guard (8).
8. The mobile operation platform for high altitude pipe installation according to claim 1, wherein: the roller (1) is a universal wheel, and the roller (1) is arranged on a top support on one side of the bottom of the upright rod (3).
CN201920941793.5U 2019-06-21 2019-06-21 Movable operating platform for installing high-altitude pipeline equipment Expired - Fee Related CN210316439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920941793.5U CN210316439U (en) 2019-06-21 2019-06-21 Movable operating platform for installing high-altitude pipeline equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920941793.5U CN210316439U (en) 2019-06-21 2019-06-21 Movable operating platform for installing high-altitude pipeline equipment

Publications (1)

Publication Number Publication Date
CN210316439U true CN210316439U (en) 2020-04-14

Family

ID=70145618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920941793.5U Expired - Fee Related CN210316439U (en) 2019-06-21 2019-06-21 Movable operating platform for installing high-altitude pipeline equipment

Country Status (1)

Country Link
CN (1) CN210316439U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242034A (en) * 2019-06-21 2019-09-17 汕头市建筑工程总公司 A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110242034A (en) * 2019-06-21 2019-09-17 汕头市建筑工程总公司 A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment

Similar Documents

Publication Publication Date Title
CN201843074U (en) Parallel moving bin for overhauling ramp bridge of overpass
CN102102344B (en) Method for quickly assembling assembled corrugated culvert
CN211775640U (en) Modular staircase regularization steel protection passageway
CN210316439U (en) Movable operating platform for installing high-altitude pipeline equipment
US20240262657A1 (en) Construction System
CN109653484B (en) Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering
CN216476193U (en) Portable steel member installation operation platform of modularization
CN108894534B (en) Sintering desulfurization plant modular dismantling method
CN203846750U (en) Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder
CN110242034A (en) A kind of Mobile operating platform and its installation method for the installation of high-altitude pipe-line equipment
CN201292511Y (en) Vertical lifting table for repairing overpass high pier stud
CN214652865U (en) Concatenation formula installs old building elevator steel construction derrick additional
CN211597642U (en) Scaffold for building convenient to installation
CN210084690U (en) Hoistway with elevator
CN113668831A (en) Movable overhanging scaffold
CN113719662A (en) Sectional integral lifting installation construction method for large-scale dense pipeline system
CN206487149U (en) Floor inner climbing type hydraulic pressure material distributing machine is climbed support system
CN205296801U (en) A operation platform that is used for curved surface building exterior window to install
CN220847086U (en) Movable aerial work trolley for steel box girder construction
CN220645081U (en) Truss inner member construction platform
CN218116111U (en) Cylindrical pier top construction work platform
CN210508301U (en) Detachable travelling crane type mobile construction platform
CN215631490U (en) Elevator shaft operating platform
CN201962930U (en) Translational scaffold
CN210659342U (en) Detachable stair face limit guard rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200414

Termination date: 20210621

CF01 Termination of patent right due to non-payment of annual fee