CN206487149U - Floor inner climbing type hydraulic pressure material distributing machine is climbed support system - Google Patents

Floor inner climbing type hydraulic pressure material distributing machine is climbed support system Download PDF

Info

Publication number
CN206487149U
CN206487149U CN201621426155.2U CN201621426155U CN206487149U CN 206487149 U CN206487149 U CN 206487149U CN 201621426155 U CN201621426155 U CN 201621426155U CN 206487149 U CN206487149 U CN 206487149U
Authority
CN
China
Prior art keywords
material distributing
floor
distributing machine
jacking
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201621426155.2U
Other languages
Chinese (zh)
Inventor
张俊国
孙锐
徐国清
安会丽
谢斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201621426155.2U priority Critical patent/CN206487149U/en
Application granted granted Critical
Publication of CN206487149U publication Critical patent/CN206487149U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Climbed support system the utility model discloses floor inner climbing type hydraulic pressure material distributing machine, including the support meanss of climbing being installed on every layer of concrete building plate, the support meanss of climbing include the floor attachment frame being installed on concrete building plate and the jacking support meanss being installed on the floor attachment frame.The support system apparatus of climbing of floor inner climbing type hydraulic pressure material distributing machine provided by the utility model, it is simple in construction, convenient to assemble and disassemble, safe, operating efficiency can be significantly improved.Solve domestic production producer and be typically employed in and set floor to adhere to frame on concrete building plate to carry out material distributing machine deadweight, work and climb carrying and need the pattern that sets multilayer steel pipe to return back to top below the frame layer that climbs, the steel pipe that needs for solving floor inner climbing type material distributing machine returns back to top the old method of multilayer floor slab, reach section material, save the purpose of artificial, environmental protection and safe construction, improve the interior practicality for climbing material distributing machine.

Description

Floor inner climbing type hydraulic pressure material distributing machine is climbed support system
Technical field
The utility model is related to engineering mechanical device technical field, and in particular to a kind of floor inner climbing type hydraulic pressure material distributing machine is climbed Ascending branch support system.
Background technology
With the development of modern ultrahigh layer building, during pump concrete, using the new of jack up fluid pressure type material distributing machine cloth Technique is vigorously implemented and promoted into the inexorable trend in construction;Fix and climb in the supporting floor of original production producer The mode of frame, because its floor Lack of support, it is necessary to which steel pipe returns back to top multilayer, increase labor intensity, waste of manpower, material resources, together When, cause construction inconvenience, influence duration.
How to ensure the work of material distributing machine and safety of climbing, the plane positioning, structure type, cloth of live material distributing machine will be combined Material machine performance parameter etc. climb position concrete structure analyzed, checked safely, measure and improvement, will be skill of constructing A key subject in art.
For engineering practice, using floor inner climbing type hydraulic pressure material distributing machine, climbed in floor fixation need to meet equipment self-weight, Intensity force request during super-pressure pumping, but the design most of thickness of floor are designed as 100mm thickness, are positioned according to material distributing machine, Slab thickness, floor span, floor lateral pressure, bearing capacity of floor slab, floor Punching Shear etc. are checked, if matched somebody with somebody using original production producer The floor of set fixes the mode for the frame that climbs, and the bearing capacity of its floor is not enough, it is necessary to which steel pipe returns back to top more than 7 layers, and such pump line will Accessed inside and outside the support body that returns back to top, very big trouble is caused to material distributing machine spreading pump line, operation inconvenience increases labor intensity, meanwhile, In the case where pump line is blocked, pump line is removed or changed Guan Yin and returns back to top the obstacle of support body, in the case of handling not in time, is mixed in pipeline Solidifying soil can not be dredged in time, can cause construction delays, influence the duration.
So being analyzed for more than, the support system of climbing of inner climbing type hydraulic pressure material distributing machine how is solved, it is necessary to carry out special project The research of solution.
Utility model content
The purpose of this utility model provides floor inner climbing type hydraulic pressure material distributing machine and climbed support system, solves above-mentioned prior art One or more in problem;The support system of climbing, solves the original that floor inner climbing type hydraulic pressure material distributing machine used and climbs Device adheres to the work load side that frame is combined with adjustable telescopic support beam in the case where flooring carrying is not enough using floor Formula, in the case that its work load is using the support load bearing beam vertical load that climbs, the attachment combined stress of frame load level load It is delivered to beam and common stress on floor.
Its support system apparatus of climbing rides upon the work carrying and carrying of climbing as material distributing machine on floor beams of concrete, By former floor climb frame flooring stress be changed to bracing members beam carry concrete structure load bearing beam material distributing machine vertical load, it is attached by floor The horizontal loading of frame (or the floor of genuine configuration climbs frame) carrying material distributing machine, has accomplished effective combination of load and structure.
Climbed support system according to floor inner climbing type hydraulic pressure material distributing machine of the present utility model, including be installed in every layer of concrete building plate On support meanss of climbing, the floor attachment that the support meanss of climbing include being installed on concrete building plate frame and is installed on the building Jacking support meanss on plate attachment frame.
Floor inner climbing type hydraulic pressure material distributing machine provided by the utility model is climbed support system, simple in construction, convenient to assemble and disassemble, It is safe, by the cooperation of climb support meanss and jacking cylinder device, jack up hydraulic pressure material distributing machine can be made in skyscraper Successively climb, climbed using material distributing machine support beam is climbed in floor and adjustable telescopic by Force system, accomplished load and structure Effectively combine, easy to operate, safe in engineering construction, combination stressed support system of climbing meets structure design carrying It is required that, in force, the material that multilayer floor slab needs steel pipe to return back to top both was reduced, in turn ensure that material distributing machine uses safety, and sharp It is convenient in constructing operation, operating efficiency is significantly improved, labor intensity is reduced, has saved cost, produced economic benefit Significantly.
In some embodiments, the floor attachment frame includes two sections of angle iron frames, connects the connection of two angle iron frames Bolt, two sections of angle iron frames constitute welding on a frame structure, the framework corner of two sections of angle iron frame compositions and are provided with connecting plate, The connecting plate is provided with the connecting bolt fixed with floor, be fixedly installed on the angle iron frame inside casing wall voussoir frame and with The iron voussoir of material distributing machine tower body wedging.Floor attachment frame small volume, lightweight, installation, dismounting are convenient, main carrying material distributing machine water Flat load.
In some embodiments, the jacking support meanss include two girders be arrangeding in parallel, two tops be arrangeding in parallel Crossbeam, extension type beam and the bearing being fixedly arranged on the telescopic beam are risen, the jacking cross beam two ends are connected by screw bolts solid Due on the girder, the girder both ends are fitted with extension type beam, and the extension type beam other end is fixedly connected There is the bearing, the bearing is secured by bolts on concrete beam.Simple in construction, easy for installation, extension type beam can cause cloth Material machine weight uniform force, improves security performance, and main carrying material distributing machine is vertical and work load.
In some embodiments, the girder both ends are evenly distributed with some pin-and-holes, on one of them described pin-and-hole It is fitted with the bearing pin for fixing extension type beam.Extension type beam can effectively be fixed so that jacking support meanss can be fixed on On spandrel girder.
In some embodiments, jacking cylinder support, the jacking cylinder branch are equipped with two jacking cross beams Frame is connected to the jacking cylinder device by axle sleeve.It is convenient to dismantle or install at any time jacking cylinder device, when needing to make cloth Machine carry out climb operation when, only need to start make jacking cylinder device operate.
In some embodiments, the jacking cross beam is provided with axis hole, and the axis hole is fitted with the big axle of jacking.It is convenient solid Material distributing machine tower body is determined in support meanss of climbing, and makes its structure more stable.
Brief description of the drawings
Fig. 1 climbs the structure of support system for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model Schematic diagram;
Fig. 2 climbs the floor of support system for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model Adhere to the structural representation of frame and concrete building plate;
Fig. 3 climbs the floor of support system for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model Adhere to the structural representation of frame;
Fig. 4 climbs the jacking of support system for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model The structural representation of support meanss;
Fig. 5 climbs the jacking of support system for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model The structural representation of cylinder apparatus;
Fig. 6 climbs support system and cloth for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model The structural representation that machine tower body is combined;
Fig. 7 climbs support system and cloth for a kind of floor inner climbing type hydraulic pressure material distributing machine of embodiment of the present utility model The structural representation of machine tower body combination jacking process.
Embodiment
With reference to Figure of description, the utility model is described in more detail.
As shown in Fig. 1 and Fig. 6, floor inner climbing type hydraulic pressure material distributing machine is climbed support system, including is installed in every layer of concrete Support meanss 10 of climbing on floor, it is plugged in the material distributing machine tower body for support meanss 10 of climbing and for making material distributing machine tower body climb Jacking cylinder device 20, wherein, material distributing machine tower body and jacking cylinder device 20 are prior art, the one end of jacking cylinder device 20 It is installed on and climbs in support meanss 10, the other end is fixedly connected on material distributing machine tower body by the big axle 31 of jacking, with jacking oil The motion of cylinder assembly 20 can cause material distributing machine successively up to be lifted.
Support meanss of climbing 10 include be bolted be installed on concrete building plate floor attachment frame 11 and again by Bolt is fixedly installed in the jacking support meanss 12 on concrete building plate spandrel girder, and wherein jacking support meanss 12 include extension type beam 123, the bearing 124 of jacking support meanss 12 can be fixed on concrete beam spandrel girder according to actual conditions, can so increase by Power;Jacking support meanss 12 are installed on the vertical direction that floor adheres to frame 11, and mainly carrying material distributing machine is whole for support meanss of climbing 10 Body vertical load.
As shown in Fig. 2~Fig. 3, floor attachment frame 11 includes two sections of angle iron frames 111, connection two pieces angle iron frame 111 Connecting bolt 112, two sections of angle iron frames 111 constitute to weld on a frame structures, the framework corner that angle iron frame 111 is constituted and set Put or bolt is fixed with connecting plate 1111, connecting plate 1111 is provided with angle on the connecting bolt 113 fixed with floor, attachment frame 11 The voussoir frame 1112 of setting and the iron voussoir 114 with tower body wedging are welded on steel frame 111.
Above-mentioned middle material distributing machine tower body adheres to the voussoir frame 1112 set on frame 11 and the wedging of iron voussoir 114, building by floor Plate attachment frame 11 mainly carries the horizontal loading of material distributing machine.
As shown in Figure 4, jacking support meanss 12 include the jacking horizontal stroke that two girders 121, two be arrangeding in parallel be arranged in parallel Beam 122, extension type beam 123 and bearing 124, the two ends of jacking cross beam 122 are bolted to connection on girder 121, girder 121 both ends are fitted with extension type beam 123, and the other end of extension type beam 123 is fixedly connected by welding and has bearing 124, Bearing 124 is secured by bolts on concrete spandrel girder, by the adjustable range of extension type beam 123, can be easily by bearing 124 It is fixed on concrete spandrel girder, simple in construction, easy for installation, extension type beam can cause material distributing machine weight uniform force, improve peace Full performance;The both ends of girder 121, which are evenly distributed with some pin-and-holes, one of pin-and-hole, to be fitted with for fixing extension type beam 123 bearing pin 125, can effectively fix extension type beam so that jacking support meanss can be fixed on spandrel girder.Two girders 121 And two constitute a frame structure between jacking cross beam 122, girder 121, which is fixed with passing through welding manner on jacking cross beam 122, pacifies Equipped with some roller devices 127, in the present embodiment, each girder 121 on each jacking cross beam 122 with being respectively provided with two rollers Device 127, roller devices 127 are installed at the inside casing of frame structure, and roller devices 127 include a concave type dead plate and located at recessed Roller in type fixed plate, its role is to when material distributing machine tower body climb operation, can be reduced by roller devices 127 It is rubbed so that the process of climbing is easier.
Jacking cylinder support 126, jacking cylinder are provided with by welding manner on two centre positions of jacking cross beam 122 Support 126 is connected with jacking cylinder device 20 by axle sleeve, convenient to dismantle or install at any time jacking cylinder device 20, when needs make Material distributing machine tower body climb operation when, need to only start operates jacking cylinder device 20, the side of jacking cross beam 122 middle part Position, which is run through, is provided with axis hole, and axis hole is fitted with the big axle 31 of jacking, and the big axle 31 of jacking is used to fix material distributing machine tower body and support of climbing Device, makes its structure more stable.
As shown in Figure 5, jacking cylinder device 20 includes oil cylinder 21 and is plugged in the piston rod 22 of the one end of oil cylinder 21, oil cylinder 21 other ends are connected on jacking cylinder support 126 by axle sleeve, and the other end of piston rod 22 is fixedly connected by the big axle 31 of jacking Material distributing machine tower body, when need to make material distributing machine tower body climb operation when, then remove the big axle 31 of jacking in the axis hole of crossbeam 122 i.e. Can.
As shown in Fig. 6, Fig. 7, in actual motion, in three sets of support system apparatus of climbing of storey setting of climbing of planning 10;At least two sets floor attachment frames 11 are first installed in floor up and down in floor first, then two sets of support systems 10 of climbing are installed On same upright position, then material distributing machine complete machine is installed, material distributing machine tower body is connected using the big axle 31 of jacking and jacking support is Bulk cargo puts 12 in one;Before climb next time, the floor attachment frame 11 and jacking support system apparatus 12 of most last layer are installed On same upright position.
Then install jacking hydraulic cylinder 20 and the big axle 31 of jacking with the jacking support system apparatus 10 at middle part, and from automatically controlled Case guides to operating case in the floor face of jacking cylinder device 20.
Material distributing machine is integrally climbed operation principle:
Preparation before climbing:Arm support is folded to the line of two jacking cylinder device 20 direction in 90 ° simultaneously at the top of material distributing machine Raise 85 ° of arm upright, it is ensured that material distributing machine arm support assembly equalising torque, inspection jack-up system flooring before and after climbing in support meanss 10 Barrier above, the pump line pipe collar for removing material distributing machine tower body bottom.
Up stroke is operated:Start the Oil pump electrical machinery of jacking cylinder device 20, piston rod 22 stretches out, withstood on material distributing machine tower body The big axle 31 of jacking, loosens the big axle 31 of lower jacking that oil cylinder 21 is on stress to underframe, extracts the lower big axle 31 of jacking out, Jacking piston rod 22 is further continued for, jacking cylinder device 20 is covered a stroke.
Down stroke is operated:Oil cylinder and piston rod appropriate location are adjusted, the crossbeam 122 in the bottom of jacking cylinder device 20 is inserted The lower big axle 31 of jacking, makes material distributing machine tower body be completely supported in jacking support meanss 12, and oil cylinder 21 and piston rod 22 are received completely Return, cloth extracts the big axle 31 of upper jacking, is inserted into next hole of climbing.
Up stroke and down stroke step are repeated, until the jacking of cloth motor spindle is adhered to below the floor of frame 11 about to away from floor Untill 0.5~1m or so required height, it is to avoid inserted beyond jacking layer, and on crossbeam 122 in jacking support meanss 12 The big axle 31 of jacking, through material distributing machine tower body to opposite crossbeam 122, it is determined that after reliable pin joint, jack-up hydraulic ram declines, and makes top Big axle 31 is risen by the integrated carrying material distributing machine load of support system apparatus 10 that climbs, and each floor attachment frame 11 of wedging and tower body it Between iron voussoir 114, reach that form bracing frame 11 and adjustable telescopic support system apparatus 10 of climbing reach work in combination load Mode, it is to avoid material distributing machine tower body is integrally tumbled.
Floor inner climbing type hydraulic pressure material distributing machine provided by the utility model is climbed support system, simple in construction, convenient to assemble and disassemble, It is safe, it is domestic to be climbed the combined work load side of support system apparatus using floor attachment frame and adjustable telescopic first Formula, has accomplished effective combination of load and structure, and the technological achievement reaches advanced international level.In engineering construction, both reduced Multilayer floor slab needs the material that steel pipe returns back to top, in turn ensure that material distributing machine using safety, it is convenient to be beneficial to constructing operation again, significantly carries High operating efficiency, reduces labor intensity, has saved cost, improve the practicality of inner climbing type material distributing machine, produced warp Ji remarkable benefit, reaches environmental protection and safe construction purpose.
Described above is only preferred embodiment of the present utility model, it is noted that to those skilled in the art, On the premise of the utility model creation design is not departed from, some similar modification and improvement can also be made, these should also be regarded Within protection domain of the present utility model.

Claims (6)

  1. The support system 1. floor inner climbing type hydraulic pressure material distributing machine is climbed, it is characterised in that:Including being installed in climbing on every layer of concrete building plate Ascending branch support arrangement (10), the support meanss of climbing (10) include the floor attachment frame (11) being installed on concrete building plate and are installed on Jacking support meanss (12) on the floor attachment frame (11).
  2. The support system 2. floor inner climbing type hydraulic pressure material distributing machine according to claim 1 is climbed, it is characterised in that:The floor Adhering to frame (11) includes two sections of angle iron frames (111), the connecting bolt (112) of two angle iron frames of connection (111), two sections of angle frames Frame (111) constitutes welding on a frame structure, the framework corner of two sections of angle iron frame (111) compositions and is provided with connecting plate (1111), the connecting plate (1111) is provided with the connecting bolt (113) fixed with floor, angle iron frame (111) inside casing Voussoir frame (1112) and the iron voussoir (114) with material distributing machine tower body wedging are fixedly installed on wall.
  3. The support system 3. floor inner climbing type hydraulic pressure material distributing machine according to claim 2 is climbed, it is characterised in that:The jacking Support meanss (12) include two girders be arrangeding in parallel (121), two jacking cross beams be arrangeding in parallel (122), extension type beam (123) and the bearing (124) that is fixedly arranged on the extension type beam (123), jacking cross beam (122) two ends are connected using bolt Connect and be fixed on the girder (121), girder (121) both ends are fitted with extension type beam (123), described scalable Formula beam (123) other end is fixedly connected with the bearing (124), and the bearing (124) is secured by bolts on concrete beam.
  4. The support system 4. floor inner climbing type hydraulic pressure material distributing machine according to claim 3 is climbed, it is characterised in that:The girder (121) both ends are evenly distributed with some pin-and-holes, are fitted with one of them described pin-and-hole for fixing extension type beam (123) Bearing pin (125).
  5. The support system 5. floor inner climbing type hydraulic pressure material distributing machine according to claim 4 is climbed, it is characterised in that:Described in two Jacking cylinder support (126) is equipped with jacking cross beam (122), the jacking cylinder support (126) is connected to top by axle sleeve On oil-lifting jar device (20).
  6. The support system 6. floor inner climbing type hydraulic pressure material distributing machine according to claim 5 is climbed, it is characterised in that:The jacking Crossbeam (122) is provided with axis hole, and the axis hole is fitted with the big axle of jacking (31).
CN201621426155.2U 2016-12-23 2016-12-23 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system Withdrawn - After Issue CN206487149U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621426155.2U CN206487149U (en) 2016-12-23 2016-12-23 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621426155.2U CN206487149U (en) 2016-12-23 2016-12-23 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Publications (1)

Publication Number Publication Date
CN206487149U true CN206487149U (en) 2017-09-12

Family

ID=59770102

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621426155.2U Withdrawn - After Issue CN206487149U (en) 2016-12-23 2016-12-23 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Country Status (1)

Country Link
CN (1) CN206487149U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499188A (en) * 2016-12-23 2017-03-15 中建二局第二建筑工程有限公司 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499188A (en) * 2016-12-23 2017-03-15 中建二局第二建筑工程有限公司 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system
CN106499188B (en) * 2016-12-23 2019-01-11 中建二局第二建筑工程有限公司 The hydraulic material distributing machine of floor inner climbing type is climbed support system

Similar Documents

Publication Publication Date Title
CN101886466B (en) Construction method for support structure of coal tower template for tamping type coke oven
CN106337555A (en) Method for constructing triangular steel support for cantilever structure of outer wall of building
CN104141383A (en) Bailey beam suspension formwork supporting system and construction method thereof
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN207314624U (en) A kind of network frame house cap accumulation slippage mounting structure
CN104005569A (en) Construction method for supporting beam and removing columns
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
CN106499188B (en) The hydraulic material distributing machine of floor inner climbing type is climbed support system
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN206487149U (en) Floor inner climbing type hydraulic pressure material distributing machine is climbed support system
CN106351245A (en) Tower crane foundation base and construction method thereof
CN212866793U (en) Assembled construction elevator stops layer platform
CN211340840U (en) Tower crane foundation of internal climbing tower crane
CN215885954U (en) Construction elevator foundation supporting structure
CN203640257U (en) Support of overhanging type scaffold
CN203499259U (en) Tool type cantilevered unloading platform
CN112813988B (en) Concrete foundation pit supporting and monitoring construction technology based on axial force servo system
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN209907886U (en) Adjustable assembled stair construction platform
CN113250486A (en) Construction process for replacing lateral support of building structure
CN106088398A (en) A kind of combined wall board
CN207194414U (en) A kind of foundation-free steel platform for temporary support
CN206844680U (en) Steel vestibule installation on ground load transfer device
CN211447712U (en) I-shaped steel beam overhanging scaffold for open caisson
CN110805256A (en) Construction process of flower basket pull rod tool type overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20170912

Effective date of abandoning: 20190111

AV01 Patent right actively abandoned