CN106499188B - The hydraulic material distributing machine of floor inner climbing type is climbed support system - Google Patents

The hydraulic material distributing machine of floor inner climbing type is climbed support system Download PDF

Info

Publication number
CN106499188B
CN106499188B CN201611208337.7A CN201611208337A CN106499188B CN 106499188 B CN106499188 B CN 106499188B CN 201611208337 A CN201611208337 A CN 201611208337A CN 106499188 B CN106499188 B CN 106499188B
Authority
CN
China
Prior art keywords
floor
material distributing
distributing machine
frame
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611208337.7A
Other languages
Chinese (zh)
Other versions
CN106499188A (en
Inventor
张俊国
孙锐
徐国清
安会丽
谢斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201611208337.7A priority Critical patent/CN106499188B/en
Publication of CN106499188A publication Critical patent/CN106499188A/en
Application granted granted Critical
Publication of CN106499188B publication Critical patent/CN106499188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

It climbs support system the invention discloses the hydraulic material distributing machine of floor inner climbing type, including the support device of climbing being installed on every layer of concrete building plate, the support device of climbing includes the floor attachment frame being installed on concrete building plate and is installed on the jacking support device that the floor adheres on frame.The support system apparatus of climbing of the hydraulic material distributing machine of floor inner climbing type provided by the present invention, structure is simple, it is convenient to assemble and disassemble, highly-safe, operating efficiency can be significantly improved.It solves domestic production producer and is typically employed on concrete building plate floor is arranged to adhere to frame and carry out material distributing machine self weight, work and climb carrying and need to be arranged below the frame layer that climbs the mode that returns back to top of multilayer steel pipe, the steel pipe that needs for solving floor inner climbing type material distributing machine returns back to top the old method of multilayer floor slab, achieve the purpose that save material, save artificial, environmentally protective and safe construction, improves the interior practicability for climbing material distributing machine.

Description

The hydraulic material distributing machine of floor inner climbing type is climbed support system
Technical field
The present invention relates to engineering mechanical device technical fields, and in particular to a kind of hydraulic material distributing machine of floor inner climbing type is climbed branch Support system.
Background technique
With the development that modern ultrahigh layer is built, when pump concrete, using the new of jack up fluid pressure type material distributing machine cloth Technique has become the inexorable trend in construction, is vigorously implemented and is promoted;It climbs in the matched floor fixation of original production producer The mode of frame is needed steel pipe to return back to top multilayer, increases labor intensity, waste of manpower, material resources, together because of the Lack of support of its floor When, it causes construction inconvenience, influence the duration.
How to guarantee the work of material distributing machine and safety of climbing, plane positioning, the structure type, cloth of live material distributing machine will be combined Material machine performance parameter etc. climb position concrete structure analyzed safely, checked, measure and improvement, will be construction skill A key subject in art.
For engineering practice, using the hydraulic material distributing machine of floor inner climbing type, climbed in floor fixation need to meet equipment self-weight, Intensity force request when super-pressure pumping, but designing the most of thickness designs of floor is 100mm thick, is positioned according to material distributing machine, The checking computations such as slab thickness, floor span, floor lateral pressure, bearing capacity of floor slab, floor Punching Shear, if matched using original production producer The mode of the fixed frame that climbs of the floor of set, the bearing capacity of floor is inadequate, needs steel pipe to return back to top 7 layers or more, such pump line will It is accessed inside and outside the frame body that returns back to top, causes very big trouble to material distributing machine spreading pump line, it is inconvenient, increase labor intensity, meanwhile, In the case where pump line blocking, pump line is removed or is changed Guan Yin and returns back to top the obstacle of frame body, in the case where handling not in time, mixes in pipeline Solidifying soil cannot be dredged in time, will cause construction delays, influence the duration.
So how solving the support system of climbing of the hydraulic material distributing machine of inner climbing type for the above analysis, needing to carry out special project The research of solution.
Summary of the invention
It climbs support system it is an object of the invention to provide the hydraulic material distributing machine of floor inner climbing type, solves above-mentioned prior art problem In one or more;The support system of climbing solves original climbing device used by the hydraulic material distributing machine of floor inner climbing type In the case where flooring carries insufficient situation, the work load mode combined using floor attachment frame with adjustable telescopic supporting beam, Work load, which uses to climb, supports load bearing beam vertical load, attachment frame load level load to be transmitted in the case where being combined stress Common stress on beam and floor.
Its support system apparatus of climbing rides upon work carrying and carrying of climbing on floor beams of concrete as material distributing machine, By former floor climb frame flooring stress be changed to bracing members beam carry concrete structure load bearing beam material distributing machine vertical load, it is attached by floor The horizontal loading of frame (or the floor of genuine configuration climbs frame) carrying material distributing machine, accomplished effective combination of load and structure.
The hydraulic material distributing machine of floor inner climbing type according to the present invention is climbed support system, including being installed on every layer of concrete building plate It climbs support device, the support device of climbing includes the floor attachment frame being installed on concrete building plate and to be installed on the floor attached The jacking support device on frame.
The hydraulic material distributing machine of floor inner climbing type provided by the present invention is climbed support system, and structure is simple, convenient to assemble and disassemble, safety Property it is high, by the cooperation of climb support device and jacking cylinder device, the hydraulic material distributing machine of jack up can be made layer-by-layer in skyscraper It climbs, is climbed using material distributing machine supporting beam is climbed in floor and adjustable telescopic by Force system, accomplished the effective of load and structure In conjunction with, easy to operate, highly-safe in engineering construction, combination stressed support system of climbing meets structure design bearing requirements, In an implementation, both reduced the material that multilayer floor slab needs steel pipe to return back to top, in turn ensure material distributing machine using safe, and be conducive to construction It is easy to operate, operating efficiency is significantly improved, labor intensity is reduced, has saved cost, generated remarkable in economical benefits.
In some embodiments, the floor attachment frame includes two sections of angle iron frames, connects the connection of two angle iron frames Bolt, two sections of angle iron frames form a frame structure, and welding is provided with connecting plate on the frame quadrangle of two sections of angle iron frames composition, The connecting plate is equipped with the connection bolt fixed with floor, be fixedly installed on the angle iron frame inside casing wall voussoir frame and with The iron voussoir of material distributing machine tower body wedging.Floor adheres to frame small in size, light-weight, installation, removes conveniently, main to carry material distributing machine water Flat load.
In some embodiments, the jacking support device includes two girders disposed in parallel, two tops disposed in parallel Crossbeam, extension type beam and the support being fixedly arranged on the telescopic beam are risen, the jacking cross beam both ends are connected by screw bolts solid Due on the girder, the girder both ends are fitted with extension type beam, and the extension type beam other end is fixedly connected There is the support, the support is fixed by bolts on concrete beam.Structure is simple, easy for installation, and extension type beam can make cloth Material machine weight uniform force, improves security performance, main to carry that material distributing machine is vertical and work load.
In some embodiments, the girder both ends are evenly distributed with several pin holes, on one of them described pin hole It is fitted with the pin shaft for fixing extension type beam.Extension type beam can effectively be fixed so that jacking support device be capable of fixing in On spandrel girder.
In some embodiments, jacking cylinder bracket, the jacking cylinder branch are equipped on two jacking cross beams Frame is connected to the jacking cylinder device by axle sleeve.It is convenient to dismantle or install at any time jacking cylinder device, when needing to make cloth Machine climb operation when, only need to start make jacking cylinder device operate.
In some embodiments, the jacking cross beam is equipped with axis hole, and the axis hole is fitted with the big axis of jacking.It is convenient solid Material distributing machine tower body is determined in support device of climbing, and keeps its structure more stable.
Detailed description of the invention
Fig. 1 is that the hydraulic material distributing machine of floor inner climbing type of one embodiment of the present invention is climbed the structural representation of support system Figure;
Fig. 2 be one embodiment of the present invention the hydraulic material distributing machine of floor inner climbing type climb support system floor attachment The structural schematic diagram of frame and concrete building plate;
Fig. 3 be one embodiment of the present invention the hydraulic material distributing machine of floor inner climbing type climb support system floor attachment The structural schematic diagram of frame;
Fig. 4 be one embodiment of the present invention the hydraulic material distributing machine of floor inner climbing type climb support system jacking support The structural schematic diagram of device;
Fig. 5 is that the hydraulic material distributing machine of floor inner climbing type of one embodiment of the present invention is climbed the jacking cylinder of support system The structural schematic diagram of device;
Fig. 6 is that the hydraulic material distributing machine of floor inner climbing type of one embodiment of the present invention is climbed support system and material distributing machine tower The structural schematic diagram that body combines;
Fig. 7 is that the hydraulic material distributing machine of floor inner climbing type of one embodiment of the present invention is climbed support system and material distributing machine tower The structural schematic diagram of body combination jacking process.
Specific embodiment
With reference to the accompanying drawings of the specification, the present invention is described in more detail.
As shown in Fig. 1 and Fig. 6, the hydraulic material distributing machine of floor inner climbing type is climbed support system, including is installed in every layer of concrete Support device 10 of climbing on floor is plugged in the material distributing machine tower body for support device 10 of climbing and for making material distributing machine tower body climb Jacking cylinder device 20, wherein material distributing machine tower body and jacking cylinder device 20 are the prior art, 20 one end of jacking cylinder device It is installed on and climbs in support device 10, the other end is fixedly connected on material distributing machine tower body by jacking big axis 31, with jacking oil The movement of cylinder assembly 20 can make material distributing machine successively up be promoted.
Support device of climbing 10 includes being bolted the floor attachment frame 11 being installed on concrete building plate and equally passing through Bolt is fixedly installed in the jacking support device 12 on concrete building plate spandrel girder, wherein jacking support device 12 includes extension type beam 123, can according to the actual situation by jack support device 12 support 124 be fixed on concrete beam spandrel girder, can so increase by Power;Jacking support device 12 is installed on the vertical direction of floor attachment frame 11, and mainly carrying material distributing machine is whole for support device of climbing 10 Body vertical load.
As shown in Fig. 2~Fig. 3, it includes two sections of angle iron frames 111 that floor, which adheres to frame 11, connects two pieces angle iron frame 111 Connection bolt 112, two sections of angle iron frames 111 form a frame structures, weld and set on the frame quadrangle that angle iron frame 111 forms It sets or bolt is fixed with connecting plate 1111, connecting plate 1111 is equipped with the connection bolt 113 fixed with floor, adheres to angle on frame 11 The voussoir frame 1112 of setting and the iron voussoir 114 with tower body wedging are welded on steel frame 111.
Material distributing machine tower body adheres to the voussoir frame 1112 being arranged on frame 11 and 114 wedging of iron voussoir, building by floor among the above Plate adheres to the horizontal loading that frame 11 mainly carries material distributing machine.
As shown in Figure 4, jacking support device 12 includes that the jacking disposed in parallel of two girders 121, two disposed in parallel is horizontal Beam 122, extension type beam 123 and support 124,122 both ends of jacking cross beam are bolted to connection on girder 121, girder 121 both ends are fitted with extension type beam 123, and 123 other end of extension type beam is fixedly connected by welding and has support 124, Support 124 is fixed by bolts on concrete spandrel girder, can be easily by support 124 by 123 adjustable range of extension type beam It is fixed on concrete spandrel girder, structure is simple, and easy for installation, extension type beam can make material distributing machine weight uniform force, improves peace Full performance;121 both ends of girder are evenly distributed with several pin holes, are fitted on one of pin hole for fixing extension type beam 123 pin shaft 125 can effectively fix extension type beam, so that jacking support device is capable of fixing on spandrel girder.Two girders 121 And two form a frame structure between jacking cross beam 122, passes through the fixed peace of welding manner on girder 121 and jacking cross beam 122 Equipped with several roller devices 127, in the present embodiment, each girder 121 with respectively there are two idler wheels for installation on each jacking cross beam 122 Device 127, roller devices 127 are installed at the inside casing of frame structure, and roller devices 127 include a concave type dead plate and are set to recessed Idler wheel in type fixed plate, its role is to can be reduced by roller devices 127 when material distributing machine tower body climb operation It rubs, so that the process of climbing is easier.
Jacking cylinder bracket 126, jacking cylinder are equipped with by welding manner on two 122 middle positions of jacking cross beam Bracket 126 is connected with jacking cylinder device 20 by axle sleeve, convenient to dismantle or install at any time jacking cylinder device 20, when needs make Material distributing machine tower body climb operation when, need to only start operates jacking cylinder device 20, in the middle part of 122 side of jacking cross beam Position, which is run through, is equipped with axis hole, and axis hole is fitted with the big axis 31 of jacking, jacks big axis 31 for fixing material distributing machine tower body and support of climbing Device keeps its structure more stable.
As shown in Figure 5, jacking cylinder device 20 includes oil cylinder 21 and the piston rod 22 for being plugged in 21 one end of oil cylinder, oil cylinder 21 other ends are connected on jacking cylinder bracket 126 by axle sleeve, and 22 other end of piston rod is fixedly connected by jacking big axis 31 Material distributing machine tower body, when need to make material distributing machine tower body climb operation when, then remove the big axis 31 of jacking in 122 axis hole of crossbeam i.e. It can.
As shown in Fig. 6, Fig. 7, in actual operation, in three sets of storey setting support devices 10 of climbing of climbing of planning; At least two sets of floor attachment frames 11 are first installed in upper and lower floor in floor first, then two sets of support devices 10 of climbing are installed same On one upright position, then material distributing machine complete machine is installed, connects material distributing machine tower body and jacking support device 12 using big axis 31 is jacked In one;Before climb next time, most upper one layer of the floor attachment frame 11 of installation and jacking support device 12 are in same vertical position It sets.
Then install jacking cylinder device 20 and the big axis of jacking 31 in the jacking support device 12 at middle part, and from electric cabinet Operating case is guided to the floor face of jacking cylinder device 20.
Material distributing machine is integrally climbed working principle:
Preparation before climbing: cantilever crane is folded to two jacking cylinder devices, 20 line direction in 90 ° simultaneously at the top of material distributing machine Raise 85 ° of arm upright, guarantee material distributing machine cantilever crane assembly equalising torques, inspection jack-up system flooring before and after climbing in support device 10 The pump line pipe collar of above barrier, dismounting material distributing machine tower body bottom.
Up stroke operation: starting 20 Oil pump electrical machinery of jacking cylinder device, piston rod 22 are stretched out, are withstood on material distributing machine tower body Big axis 31 is jacked, the big axis 31 of the lower jacking for being in oil cylinder 21 in stress to lower frame loosens, extract the big axis 31 of lower jacking out, It is further continued for jacking piston rod 22, jacking cylinder device 20 is made to cover a stroke.
Down stroke operation: adjusting oil cylinder and piston rod appropriate location, and the crossbeam 122 in 20 lower part of jacking cylinder device is inserted into The lower big axis 31 of jacking, is completely supported at material distributing machine tower body in jacking support device 12, and oil cylinder 21 and piston rod 22 are received completely It returns, cloth is extracted and jacks big axis 31, and next hole of climbing is inserted into.
Up stroke and down stroke step are repeated, until jacking cloth motor spindle to below away from floor attachment 11 floor of frame about Until the desired height of 0.5~1m or so, avoid beyond jacking layer, and be inserted on the crossbeam 122 in jacking support device 12 Big axis 31 is jacked, is passed through on material distributing machine tower body to opposite crossbeam 122, after determining reliable pin joint, jack-up hydraulic ram decline makes to push up Big axis 31 is risen by the 10 integrated carrying material distributing machine load of support device that climbs, and between each floor attachment frame 11 of wedging and tower body Iron voussoir 114, reaches floor attachment frame 11 and adjustable telescopic support device 10 of climbing reaches work in combination load mode, avoids Material distributing machine tower body is integrally tumbled.
The hydraulic material distributing machine of floor inner climbing type provided by the present invention is climbed support system, and structure is simple, convenient to assemble and disassemble, safety Property it is high, it is domestic to be climbed the work load mode that support system apparatus is combined using floor attachment frame and adjustable telescopic for the first time, Effective combination of load and structure is accomplished, which reaches advanced international level.In engineering construction, both reduced more Floor plate needs the material that steel pipe returns back to top, in turn ensure material distributing machine using safe, and it is convenient to be conducive to constructing operation, significantly improves Operating efficiency reduces labor intensity, has saved cost, improves the practicability of inner climbing type material distributing machine, generated economic effect It is beneficial significant, reach environmentally protective and safe construction purpose.
The above is only preferred embodiment of the invention, it is noted that those skilled in the art, not Under the premise of being detached from the invention design, some similar deformation and improvement can be made, these also should be regarded as the present invention Protection scope within.

Claims (5)

  1. The support system 1. the hydraulic material distributing machine of floor inner climbing type is climbed, it is characterised in that: including being installed in climbing on every layer of concrete building plate Ascending branch support arrangement (10), the support device of climbing (10) include floor attachment frame (11) being installed on concrete building plate and are installed on Jacking support device (12) on floor attachment frame (11);
    The jacking support device (12) include two girders (121) disposed in parallel, two jacking cross beams (122) disposed in parallel, Extension type beam (123) and the support (124) being fixedly arranged on the extension type beam (123), jacking cross beam (122) both ends It being fixed with bolts on the girder (121), girder (121) both ends are fitted with extension type beam (123), Extension type beam (123) other end is fixedly connected with the support (124), and the support (124) is fixed by bolts in On concrete beam.
  2. The support system 2. the hydraulic material distributing machine of floor inner climbing type according to claim 1 is climbed, it is characterised in that: the floor Adhering to frame (11) includes two sections of angle iron frames (111), connects the connection bolt (112) of two angle iron frames (111), two sections of angle frames Frame (111) forms a frame structure, and welding is provided with connecting plate on the frame quadrangle of two sections of angle iron frames (111) composition (1111), the connecting plate (1111) is equipped with the connection bolt (113) fixed with floor, angle iron frame (111) inside casing Voussoir frame (1112) and the iron voussoir (114) with material distributing machine tower body wedging are fixedly installed on wall.
  3. The support system 3. the hydraulic material distributing machine of floor inner climbing type according to claim 2 is climbed, it is characterised in that: the girder (121) both ends are evenly distributed with several pin holes, are fitted on one of them described pin hole for fixing extension type beam (123) Pin shaft (125).
  4. The support system 4. the hydraulic material distributing machine of floor inner climbing type according to claim 3 is climbed, it is characterised in that: described in two It is equipped on jacking cross beam (122) jacking cylinder bracket (126), the jacking cylinder bracket (126) is connected to top by axle sleeve On oil-lifting jar device (20).
  5. The support system 5. the hydraulic material distributing machine of floor inner climbing type according to claim 4 is climbed, it is characterised in that: the jacking Crossbeam (122) is equipped with axis hole, and the axis hole is fitted with the big axis (31) of jacking.
CN201611208337.7A 2016-12-23 2016-12-23 The hydraulic material distributing machine of floor inner climbing type is climbed support system Active CN106499188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611208337.7A CN106499188B (en) 2016-12-23 2016-12-23 The hydraulic material distributing machine of floor inner climbing type is climbed support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611208337.7A CN106499188B (en) 2016-12-23 2016-12-23 The hydraulic material distributing machine of floor inner climbing type is climbed support system

Publications (2)

Publication Number Publication Date
CN106499188A CN106499188A (en) 2017-03-15
CN106499188B true CN106499188B (en) 2019-01-11

Family

ID=58333808

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611208337.7A Active CN106499188B (en) 2016-12-23 2016-12-23 The hydraulic material distributing machine of floor inner climbing type is climbed support system

Country Status (1)

Country Link
CN (1) CN106499188B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114704096A (en) * 2022-03-18 2022-07-05 中建八局发展建设有限公司 Climbing formula quick detach concrete spreader in pit shaft
CN115045507B (en) * 2022-08-12 2022-11-15 江苏锐鹰机械有限公司 Well support circulation formula concrete spreader that climbs

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020039653A (en) * 2002-04-30 2002-05-27 주식회사 하이라이즈 Auto climbing for concrete placing boom
CN203879012U (en) * 2014-05-20 2014-10-15 三一汽车制造有限公司 Climbing support and concrete placing boom
CN204282833U (en) * 2014-11-27 2015-04-22 三一汽车制造有限公司 A kind of boom and climbing system thereof
CN206487149U (en) * 2016-12-23 2017-09-12 中建二局第二建筑工程有限公司 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020039653A (en) * 2002-04-30 2002-05-27 주식회사 하이라이즈 Auto climbing for concrete placing boom
CN203879012U (en) * 2014-05-20 2014-10-15 三一汽车制造有限公司 Climbing support and concrete placing boom
CN204282833U (en) * 2014-11-27 2015-04-22 三一汽车制造有限公司 A kind of boom and climbing system thereof
CN206487149U (en) * 2016-12-23 2017-09-12 中建二局第二建筑工程有限公司 Floor inner climbing type hydraulic pressure material distributing machine is climbed support system

Also Published As

Publication number Publication date
CN106499188A (en) 2017-03-15

Similar Documents

Publication Publication Date Title
CN207314624U (en) A kind of network frame house cap accumulation slippage mounting structure
CN104929148B (en) The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
CN210164286U (en) Support arrangement for high altitude large-span steel structure truss installation usefulness
CN107663916A (en) A kind of network frame house cap accumulation slippage mounting structure and construction method
CN104005569A (en) Construction method for supporting beam and removing columns
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN106499188B (en) The hydraulic material distributing machine of floor inner climbing type is climbed support system
CN101929338A (en) Hydraulic fan-shaped support system for controlling steel frame deformation in tunnel construction
CN104234447A (en) Tool-type suspension staircase for deep foundation pit
CN204983173U (en) Steel construction beam -column connection node
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN206487149U (en) Floor inner climbing type hydraulic pressure material distributing machine is climbed support system
CN212866793U (en) Assembled construction elevator stops layer platform
CN209723400U (en) Using a kind of prefabricated integral frame bean column node that sleeve quickly connects
CN204163104U (en) External elevator steel beam foundation constructs
CN203640257U (en) Support of overhanging type scaffold
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN112813988B (en) Concrete foundation pit supporting and monitoring construction technology based on axial force servo system
CN201825672U (en) Lifting device for generator stator
CN211200447U (en) Compressor foundation bolt and mounting structure thereof
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN103486335A (en) Method for fixing super high-rise construction concrete pumping pipe
CN109653359B (en) Large-clearance self-resetting steel frame center support system with flange plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant