CN103486335A - Method for fixing super high-rise construction concrete pumping pipe - Google Patents
Method for fixing super high-rise construction concrete pumping pipe Download PDFInfo
- Publication number
- CN103486335A CN103486335A CN201310462293.0A CN201310462293A CN103486335A CN 103486335 A CN103486335 A CN 103486335A CN 201310462293 A CN201310462293 A CN 201310462293A CN 103486335 A CN103486335 A CN 103486335A
- Authority
- CN
- China
- Prior art keywords
- pump
- defeated pipe
- retaining ring
- ring
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
- F16L3/10—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
- F16L3/1091—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being fixed to each other with fastening members on each side
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a device and method for fixing a super high-rise construction concrete pumping pipe. The fixing device comprises embedded parts embedded into a concrete structure, a fixing support and a hoop type fixing ring. The fixing support is connected to the concrete structure through the embedded parts, the hoop type fixing ring comprises two semicircular rings, one semicircular ring is a fixed ring fixedly connected to the fixing support, the other semicircular ring is a movable ring, the fixed ring and the movable ring are connected with each other through a split bolt, and the pumping pipe is fixed into a circular ring between the movable ring and the fixed ring. According to the device and method for fixing the super high-rise construction concrete pumping pipe, through the adoption of conventionalized components, the reasonable arrangement of supporting forms of nodes and the adoption of standard and qualitative manners, the fixing device is customized for the pumping pipe, the fixing device can be used repeatedly, therefore, steel pipe rent expense is avoided, and in the long run, the purpose of fixing the concrete pumping pipe is safely, scientifically and reasonably achieved with energy saved.
Description
Technical field
The invention belongs to technical field of civil engineering, relate to a kind of pump line fixation method, particularly the fixation method of the defeated pipe of a kind of concrete pump for the skyscraper concrete pouring construction.
Background technique
Concrete Pumping Technology is increasingly extensive in the application of Construction of Civil Engineering at present.Concrete pump generally adopts hydraulic driving twin-cylinder reciprocating piston form, by two oil cylinder alternating actions, promotes the working piston force feed concrete in concrete cylinder, realizes concrete continuous conveying, but also can produce great vibrations simultaneously.The conventional construction method is carried out anchor ear by around pump line, steel pipe being set, thereby reduce the vibrations of pump line, but rent for a long time steel pipe and will produce larger expense, simultaneously steel pipe anchor ear fastener used and nut are in concrete pumping process repeatedly, the unavoidable generation become flexible, enlarge the probability of booster, increased potential safety hazard.
Summary of the invention
Technical problem to be solved by this invention is the deficiency for existing concrete pump line means of fixation, a kind of finalization, the standardized fixation method for the defeated pipe of Super High construction concrete pump are provided, thereby reduce the fixing waste to material of conventional pump line, by the finalization facility, strengthen all transfer efficients of material, played purpose energy-conservation, consumption reduction.
The technological scheme of technical solution problem of the present invention is as follows:
A kind of fixing device for the defeated pipe of Super High construction concrete pump, it is characterized in that, comprise the embedded part, fixed support, the locking hood type retaining ring that are embedded in concrete structure, described fixed support is connected on concrete structure by embedded part, described locking hood type retaining ring comprises two semicircular ring, one of them semicircular ring is the retaining ring be fixedly connected on fixed support, another semicircular ring is loose collar, between retaining ring and loose collar, by split bolt, interconnect, the defeated pipe of described pump is fixed in the annulus between loose collar and retaining ring.
The present invention has announced the fixation method of the above-mentioned fixing device for the defeated pipe of Super High construction concrete pump simultaneously, it is characterized in that, it comprises that the Vertical direction of the defeated pipe of pump and substantially horizontal finalization fix:
(1) for the defeated pipe of the pump of Vertical direction, at first need on floor, be punched, so that the defeated pipe passing through floors of pump; Then pre-buried embedded part on concrete panel, and fixed support and embedded part are welded and fixed, the defeated pipe of pump is positioned in retaining ring, utilize split bolt that the defeated pipe of pump is fixed in loose collar and retaining ring;
(2) for the defeated pipe of the pump of substantially horizontal, pre-buried embedded part in concrete floor slab, then be welded and fixed fixed support and embedded part, and the defeated pipe of pump is positioned in retaining ring, utilizes split bolt that the defeated pipe of pump is fixed in loose collar and retaining ring.
From above disclosed technological scheme, fixing device of the present invention is by adopting the finalization member, supporting form by rational arrangement node, by qualitativeization of standardization form, for pump line " has been made " fixing device to measure, but huge profit has been avoided the lease expenses of steel pipe with repeatedly, from long-range angle, the fixation problem of safety, science, reasonable, energy-conservation solution concrete pump pipe.All embedded parts and steel member all can be installed and convenient disassembly in processing factory's typing processing, after engineering finishes, can go to again Other Engineering week and use, and have improved the turnover rate of material.Simultaneously, adopt its intensity of the defeated pipe of finalization member mounted pump of moulding high, good stability, greatly reduce the vibrations of pump line in the concreting process, thereby reduced the booster probability of pump line in the casting and compacting of concrete construction, and reduced big bang to completing structural damage.
The accompanying drawing explanation
Fig. 1 installment state figure for the defeated pipe of Vertical direction pump that is the present invention for the fixing device of the defeated pipe of Super High construction concrete pump;
Fig. 2 installment state figure for the defeated pipe of Vertical direction pump that is the present invention for the fixing device of the defeated pipe of Super High construction concrete pump;
Fig. 3 embedded part front view;
Fig. 4 is the embedded part side view;
The structural representation that Fig. 5 is the locking hood type retaining ring.
Reference character is as follows:
1, concrete wall 2, embedded part 3, fixed support
4, retaining ring 5, loose collar 6, concrete floor slab
7, split bolt 8, steel plate 9, anchor pin
10, the defeated pipe of pump
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
As 1, 2, shown in 5, the present invention is for the fixing device of the defeated pipe of Super High construction concrete pump, , comprise the embedded part 2 be embedded in concrete structure, fixed support 3, the locking hood type retaining ring, described fixed support 3 is connected on concrete structure by embedded part 2, described locking hood type retaining ring comprises two semicircular ring, one of them semicircular ring is the retaining ring 4 be fixedly connected on fixed support, another semicircular ring is loose collar 5, between retaining ring 4 and loose collar 5, by split bolt 7, interconnect, the defeated pipe 10 of described pump is fixed in the annulus between loose collar 5 and retaining ring 4.
Further, as shown in Figure 1, 2, described fixed support 3 is A-frame, and it is welded to each other connection by three channel-section steels, and bottom channel-section steel and embedded part 2 are welded to connect.
Further, as shown in Figure 3,4, described embedded part comprises steel plate 8 and anchor pin 9, and described steel plate 8 adopts the perforation plug welding to be connected with anchor pin 9, and described anchor pin 9 has four.Described embedded part has two.
The fixation method of the fixing device for the defeated pipe of Super High construction concrete pump of the present invention comprises that the Vertical direction of the defeated pipe of pump and substantially horizontal finalization fix:
(1) for the defeated pipe of the pump of Vertical direction as shown in Figure 1, at first need on concrete floor slab 6, be punched, so that defeated pipe 10 passing through floors of pump; Then pre-buried embedded part 2 on concrete panel 1, and fixed support 3 and embedded part 1 are welded and fixed, be positioned over the defeated pipe 10 of pump in retaining ring 4, utilizes split bolt 10 that the defeated pipe of pump is fixed in loose collar 5 and retaining ring 4;
(2) for the defeated pipe of the pump of substantially horizontal as shown in Figure 2, at the interior pre-buried embedded part 2 of concrete floor slab 6, then fixed support 3 and embedded part 2 are welded and fixed, the defeated pipe 10 of pump is positioned in retaining ring 4, utilize split bolt 10 that the defeated pipe of pump is fixed in loose collar 5 and retaining ring 4.
The defeated pipe 10 of said pump produces and is connected reliably with A-frame by anchor ear form annulus.Due to annulus employing retaining ring 4 and the detachable annulus alive 5 of the defeated pipe 10 of mounted pump, semicircle of each self-forming, the easy accessibility of the defeated pipe 10 of pump from now on of being more convenient for.
The foregoing is only better embodiment of the present invention, not be used for limiting the scope of the invention, every equal conversion of doing according to the claims in the present invention, all within protection scope of the present invention.
Claims (5)
1. the fixing device for the defeated pipe of Super High construction concrete pump, it is characterized in that, comprise the embedded part, fixed support, the locking hood type retaining ring that are embedded in concrete structure, described fixed support is connected on concrete structure by embedded part, described locking hood type retaining ring comprises two semicircular ring, one of them semicircular ring is the retaining ring be fixedly connected on fixed support, another semicircular ring is loose collar, between retaining ring and loose collar, by split bolt, interconnect, the defeated pipe of described pump is fixed in the annulus between loose collar and retaining ring.
2. the fixing device for the defeated pipe of Super High construction concrete pump according to claim 1, it is characterized in that: described fixed support is A-frame, and it is welded to each other connection by three channel-section steels, and bottom channel-section steel and embedded part are welded to connect.
3. the fixing device for the defeated pipe of Super High construction concrete pump according to claim 1, it is characterized in that: described embedded part comprises steel plate and anchor pin, and described steel plate adopts the plug welding of boring a hole to be connected with the anchor pin, and described anchor pin has four.
4. the fixing device for the defeated pipe of Super High construction concrete pump according to claim 3, it is characterized in that: described embedded part has two.
5. the fixation method of the fixing device for the defeated pipe of Super High construction concrete pump as described as claim 1~4 any one, is characterized in that, it comprises that the Vertical direction of the defeated pipe of pump and substantially horizontal finalization fix:
(1) for the defeated pipe of the pump of Vertical direction, at first need on floor, be punched, so that the defeated pipe passing through floors of pump; Then pre-buried embedded part on concrete panel, and fixed support and embedded part are welded and fixed, the defeated pipe of pump is positioned in retaining ring, utilize split bolt that the defeated pipe of pump is fixed in loose collar and retaining ring;
(2) for the defeated pipe of the pump of substantially horizontal, pre-buried embedded part in concrete floor slab, then be welded and fixed fixed support and embedded part, and the defeated pipe of pump is positioned in retaining ring, utilizes split bolt that the defeated pipe of pump is fixed in loose collar and retaining ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310462293.0A CN103486335A (en) | 2013-09-30 | 2013-09-30 | Method for fixing super high-rise construction concrete pumping pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310462293.0A CN103486335A (en) | 2013-09-30 | 2013-09-30 | Method for fixing super high-rise construction concrete pumping pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103486335A true CN103486335A (en) | 2014-01-01 |
Family
ID=49826805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310462293.0A Pending CN103486335A (en) | 2013-09-30 | 2013-09-30 | Method for fixing super high-rise construction concrete pumping pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103486335A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925421A (en) * | 2014-04-29 | 2014-07-16 | 中国核工业第二二建设有限公司 | Support special for pump pipes |
CN105736834A (en) * | 2016-04-01 | 2016-07-06 | 安庆市鸿裕工业产品设计有限公司 | Adjustable fixing support assembly |
CN106368434A (en) * | 2016-09-27 | 2017-02-01 | 上海建工建集团有限公司 | Supporting device for pumping tube of concrete pumping equipment and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3142726U (en) * | 2008-03-18 | 2008-06-26 | 株式会社シバシン商会 | Bracket KS type for scaffolding for mounting concrete feed pipes. |
CN201241997Y (en) * | 2008-08-08 | 2009-05-20 | 青岛通广建工集团有限公司 | Concrete delivery pump tube fixing chucking tools |
CN201486842U (en) * | 2009-07-15 | 2010-05-26 | 中建三局第一建设工程有限责任公司 | Concrete transfer pump tube vertical fixture |
CN202248908U (en) * | 2011-10-19 | 2012-05-30 | 贵州建工集团第三建筑工程有限责任公司 | Vertical clamped connecting device of concrete conveying pump pipe |
CN202812476U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Clamping seat used for fixing concrete pump pipe |
CN203082367U (en) * | 2012-12-18 | 2013-07-24 | 中建三局第一建设工程有限责任公司 | Vertical fixing device for concrete pump pipe |
-
2013
- 2013-09-30 CN CN201310462293.0A patent/CN103486335A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3142726U (en) * | 2008-03-18 | 2008-06-26 | 株式会社シバシン商会 | Bracket KS type for scaffolding for mounting concrete feed pipes. |
CN201241997Y (en) * | 2008-08-08 | 2009-05-20 | 青岛通广建工集团有限公司 | Concrete delivery pump tube fixing chucking tools |
CN201486842U (en) * | 2009-07-15 | 2010-05-26 | 中建三局第一建设工程有限责任公司 | Concrete transfer pump tube vertical fixture |
CN202248908U (en) * | 2011-10-19 | 2012-05-30 | 贵州建工集团第三建筑工程有限责任公司 | Vertical clamped connecting device of concrete conveying pump pipe |
CN202812476U (en) * | 2012-07-31 | 2013-03-20 | 中天建设集团有限公司天津分公司 | Clamping seat used for fixing concrete pump pipe |
CN203082367U (en) * | 2012-12-18 | 2013-07-24 | 中建三局第一建设工程有限责任公司 | Vertical fixing device for concrete pump pipe |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103925421A (en) * | 2014-04-29 | 2014-07-16 | 中国核工业第二二建设有限公司 | Support special for pump pipes |
CN105736834A (en) * | 2016-04-01 | 2016-07-06 | 安庆市鸿裕工业产品设计有限公司 | Adjustable fixing support assembly |
CN106368434A (en) * | 2016-09-27 | 2017-02-01 | 上海建工建集团有限公司 | Supporting device for pumping tube of concrete pumping equipment and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104109999B (en) | The construction method of bridge tower thwart beam | |
CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
CN203808484U (en) | Integrated cantilevered and attached external scaffolding | |
CN103711298A (en) | Method for constructing anchoring system of structural steel overhanging scaffold | |
CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
CN203499229U (en) | Operating platform for construction of elevator shaft | |
CN103206075B (en) | Suspension platform for construction of steel reinforced concrete cantilever structure | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN103486335A (en) | Method for fixing super high-rise construction concrete pumping pipe | |
CN105926925A (en) | Joist steel cantilever beam of suspended scaffold and construction method thereof | |
CN204418654U (en) | For the aluminum alloy pattern plate between body of wall | |
CN205153515U (en) | Overhanging bearing frame makes up positioner | |
CN104947804B (en) | A kind of steel bracket and the construction method that beam-column node structure is built using it | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN103334580A (en) | Section steel tripod for cantilevered scaffold and scaffold system | |
CN203756190U (en) | Trolley device for herringbone forked tunnel | |
CN106499188B (en) | The hydraulic material distributing machine of floor inner climbing type is climbed support system | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN204139577U (en) | Embedment means formula wall-connecting piece after a kind of | |
CN204435421U (en) | A kind of assembling manhole | |
CN204343647U (en) | A kind of the shaped steel suspension scaffolding bracing frame | |
CN203684694U (en) | Connection device for installing distributor into elevator shaft | |
CN203113826U (en) | Double-machine hoisting steel truss temporary supporting device | |
CN203010022U (en) | Floor crossing type steel fixing support of concrete pump |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140101 |