CN103334580A - Section steel tripod for cantilevered scaffold and scaffold system - Google Patents

Section steel tripod for cantilevered scaffold and scaffold system Download PDF

Info

Publication number
CN103334580A
CN103334580A CN 201310314291 CN201310314291A CN103334580A CN 103334580 A CN103334580 A CN 103334580A CN 201310314291 CN201310314291 CN 201310314291 CN 201310314291 A CN201310314291 A CN 201310314291A CN 103334580 A CN103334580 A CN 103334580A
Authority
CN
China
Prior art keywords
tripod
shaped steel
steel
little
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201310314291
Other languages
Chinese (zh)
Other versions
CN103334580B (en
Inventor
李雁鸣
陈辉
郭鑫
年洪喜
王红宾
李志远
杨玉苹
刘迎红
赵继刚
张维娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Original Assignee
BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd filed Critical BEIJING CONSTRUCTION ENGINEERING GROUP BOHAI CONSTRUCTION Co Ltd
Priority to CN201310314291.7A priority Critical patent/CN103334580B/en
Publication of CN103334580A publication Critical patent/CN103334580A/en
Application granted granted Critical
Publication of CN103334580B publication Critical patent/CN103334580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a section steel tripod for a cantilevered scaffold. The section steel tripod comprises a beam, a vertical strut and an inclined strut, wherein the beam, the vertical strut and the inclined strut form a triangular structure; a small vertical strut is arranged between the beam and the inclined strut; a small cross strut is arranged between the vertical strut and the inclined strut; strong-strength bolt preformed holes are formed in the vertical strut; the vertical strut is connected with a structural column or a wall body through the preformed holes by anchor parts to realize the mounting of the section steel tripod; 14# I-steel is adopted for the beam and the vertical strut; 10# I-steel is adopted for the small vertical strut and the small cross strut; the beam is provided with stiffening rib plates; and limiting reinforcement heads are arranged below the beam. For a local core tube part (such as an elevator room position and a staggered floor of steel cantilever beams) without a floor slab, steel beams of an ordinary cantilevered scaffold cannot be normally arranged, and is fixedly arranged on a main body structure through the section steel tripod, and stress on the cantilevered scaffold is transmitted to a structural wall body through anchoring bolts by the tripod, so that the tripod is clear in stress and simple in stress transmission, and can be recycled, the construction safety and operability are ensured, a requirement on a construction period is met, and the efficiency is improved.

Description

Shaped steel tripod and connection system for guide rail in a kind of overhanging scaffold
Technical field
The present invention relates to the scaffold field, particularly a kind of overhanging type steel pin hand frame system.
Background technology
The overhanging scaffold engineering is dangerous bigger the work items in the building operations, the design of overhanging scaffold is unreasonable or use incorrect, bring serious threat can for constructor's life, bring very big difficulty to engineering construction, cause ill effect to society.Especially the construction of building body corner cantilever steel girder is very crucial, and traditional builder's jack is laid radially at the girder steel of body corner, building, and this mode is unfavorable for structural safety owing to too concentrated, has very big potential safety hazard.
Summary of the invention
The objective of the invention is: a kind of bight shaped steel tripod that scaffold installs is provided, has solved security hidden trouble, and stressed clear and definite, power transmission is simple, and can have enough to meet the need use.
The technical solution used in the present invention is: the tripod of the shaped steel in a kind of overhanging scaffold is provided, comprise crossbeam, perpendicular support and diagonal brace, the perpendicular support of crossbeam and diagonal brace constitute the triangle structure, between crossbeam and the diagonal brace, be provided with little perpendicular support, be provided with little stull between perpendicular support and the diagonal brace, leave the high-strength bolt preformed hole in the perpendicular support, anchor will erect support by preformed hole and be connected with structural column or body of wall, realize the installation of shaped steel tripod, its middle cross beam, perpendicular support is the 14# i iron, and little perpendicular support and little stull are the 10# i iron, the crossbeam setting floor of putting more energy into arranges spacing steel bar end under the crossbeam;
In the position of shear wall or structural column non-floor and in the position of structure corner, perpendicular support is perpendicular support continuously, and little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, little perpendicular support and little stull close with link position diagonal brace, all be positioned at the middle part of diagonal brace;
Have in structural shear wall or structural column outside and to encorbelment beam or to decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into diagonal brace bottom linkage section, with little stull linkage section and with crossbeam linkage section three parts, wherein be positioned on the crossbeam with the crossbeam linkage section, the perpendicular support of three parts is provided with the high-strength bolt preformed hole, be convenient to being connected of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, the link position of little perpendicular support and little stull and diagonal brace is close, all is positioned at the middle part of diagonal brace;
And, local unloading wire rope is set, wire rope is connected with post or body of wall by the spacing steel bar end of crossbeam;
Simultaneously, the invention provides a kind of shaped steel overhanging type steel pin hand frame system, it comprises the shaped steel tripod in the above-mentioned overhanging scaffold, and comprise the builder's jack support body, cooperate the scaffold support body by a plurality of cantilever steel girders and shaped steel tripod, synergy between each member forms unified stressed system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, and vertical rod is evenly arranged, leger is arranged on the vertical rod inboard, goes up anti-certain distance from the vertical rod bottom adjacent leger and vertical rod are fixedly connected with cruciform fastening for falsework; Remove outside the host node, leger at two vertical host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is along vertical rod left and right sides symmetric arrangement, be fixed on the leger with fastener, the host node place must establish a little cross bar, wall-connecting piece is anyhow to order arrangement, even layout, vertical with the structure facade with support body, an end that is connected with support body allows declivity slightly, must not upwarp, near host node, wall-connecting piece is taked the thick pillar form to wall-connecting piece as far as possible, meet the post position and must arrange together, cantilever steel girder or shaped steel tripod position arrange the unloading wire rope;
Further, escalator core tube position, staggered floor place adopt the shaped steel tripod; The non-floor position, cantilever steel girder falls within on the beam, and length extends to on the floor plate the U-shaped earth anchor in setting at least 2 roads, end; Staircase position, cantilever steel girder are passed the inboard body of wall of structure and are arranged, during inboard no body of wall, the terminal inboard coupling beam 200mm at least that surpasses of shaped steel, U-shaped earth anchor bury and coupling beam in the middle part of;
Further, the shaped steel tripod is adopted in structure corner frame column position, adjacent cantilever steel girder anchored end is welded into " well " font integral body with it, use the 14# channel-section steel to fall within the shaped steel tripod, and weld with the shaped steel tripod, the support body vertical rod falls within on the channel-section steel, and the channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope that channel-section steel is unloaded;
Wherein, the set-up mode of unloading wire rope is, the per pass beam of encorbelmenting establishes together 6 * 19(a), the unloading of Φ 17.5 wire rope; For the position of using the shaped steel tripod, the shaped steel tripod is added one 6 * 19(a), Φ 17.5 unloading wire rope, angle is 45 °~60 ° between unloading wire rope and the tripod, and the structure rotation angle position uses 6 * 19(a) Φ, 17.5 wire rope pocket vertical rod nodes that support body is unloaded, and the wire rope pocket is hung on the support body host node, each host node setting of horizontal plane together, every wire rope is joined 8 of saddle clips, and 6 are used for firmly, and 2 to be used for that safety is set curved.
The invention has the beneficial effects as follows: for local core tube position, as escalator position, cantilever steel girder staggered floor place non-floor, can't the common scaffold girder steel of normal mounting type, needing to establish earth anchor on the lower-layer concrete floor fixes shaped steel with wire rope, it itself is exactly elastic body, waste material, and unfavorable to stablizing.Use the shaped steel tripod to be fixed on the agent structure, scaffold is stressed to be passed on the structure wall by anchor bolt by tripod, and stressed clear and definite, power transmission is simple, and can have enough to meet the need use, has realized working security, operability, satisfies construction period, has raised the efficiency.
Description of drawings
The present invention is further described below in conjunction with accompanying drawing and case study on implementation.
Fig. 1 is that the present invention is in the position of shear wall or structural column non-floor and at the position of structure corner shaped steel tripod schematic diagram
Fig. 2 encorbelments beam or decorates eaves but the position shaped steel tripod schematic diagram of non-floor for the present invention has in structural shear wall or structural column outside;
Fig. 3 installs the posterior nodal point schematic diagram for the present invention;
Fig. 4 is the present invention and post installation back schematic diagram;
Fig. 5 installs the back schematic diagram for the present invention with the wall of encorbelmenting is arranged;
Fig. 6 buckles the reinforcement design diagram safely for wire rope of the present invention
Description of reference numerals: 1, crossbeam; 2, perpendicular support; 3, diagonal brace; 4, little perpendicular support; 5, little stull; 6, high-strength bolt preformed hole; 7, the floor of putting more energy into; 8, spacing steel bar end.
The specific embodiment
Shown in Fig. 1-2: the shaped steel tripod in a kind of overhanging scaffold, comprise crossbeam 1, perpendicular support 2 and diagonal brace 3, crossbeam, perpendicular support and diagonal brace constitute the triangle structure, between crossbeam and the diagonal brace, be provided with little perpendicular support 4, be provided with little stull 5 between perpendicular support and the diagonal brace, leave high-strength bolt preformed hole 6 in the perpendicular support, anchor will erect support by preformed hole and be connected with structural column or body of wall, realize the installation of shaped steel tripod, its middle cross beam, perpendicular support is the 14# i iron, and little perpendicular support and little stull are the 10# i iron, the crossbeam setting floor 7 of putting more energy into arranges spacing steel bar end 8 under the crossbeam;
Have in structural shear wall or structural column outside and to encorbelment beam or to decorate eaves but the position of non-floor, perpendicular support is perpendicular support continuously, and little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, the link position of little perpendicular support and little stull and diagonal brace is close, all is positioned at the middle part of diagonal brace;
Have in structural shear wall or structural column outside and to encorbelment beam or to decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into diagonal brace bottom linkage section, with little stull linkage section and with crossbeam linkage section three parts, wherein be positioned on the crossbeam with the crossbeam linkage section, the perpendicular support of three parts is provided with the high-strength bolt preformed hole, be convenient to being connected of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, the link position of little perpendicular support and little stull and diagonal brace is close, all is positioned at the middle part of diagonal brace; And, local unloading wire rope is set, wire rope is connected with post or body of wall by spacing steel bar end;
Also provide a kind of shaped steel overhanging type steel pin hand frame system referring to Fig. 3-5 the present invention, it comprises the shaped steel tripod in the above-mentioned overhanging scaffold, and comprise the builder's jack support body, cooperate the scaffold support body by a plurality of cantilever steel girders and shaped steel tripod, synergy between each member forms unified stressed system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, vertical rod arranges that evenly leger is arranged on the vertical rod inboard, goes up anti-certain distance from the vertical rod bottom adjacent leger and vertical rod are fixedly connected with cruciform fastening for falsework; Remove outside the host node, leger at two vertical host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is along vertical rod left and right sides symmetric arrangement, be fixed on the leger with fastener, the host node place must establish a little cross bar, wall-connecting piece is anyhow to order arrangement, even layout, vertical with the structure facade with support body, an end that is connected with support body allows declivity slightly, must not upwarp, near host node, wall-connecting piece is taked the thick pillar form to wall-connecting piece as far as possible, meet the post position and must arrange together, cantilever steel girder or shaped steel tripod position arrange the unloading wire rope;
Further, escalator core tube position, staggered floor place adopt the shaped steel tripod; The non-floor position, cantilever steel girder falls within on the beam, and length extends to on the floor plate the U-shaped earth anchor in setting at least 2 roads, end; Staircase position, cantilever steel girder are passed the inboard body of wall of structure and are arranged, during inboard no body of wall, the terminal inboard coupling beam 200mm at least that surpasses of shaped steel, U-shaped earth anchor bury and coupling beam in the middle part of;
Further, the shaped steel tripod is adopted in structure corner frame column position, adjacent cantilever steel girder anchored end is welded into " well " font integral body with it, use the 14# channel-section steel to fall within the shaped steel tripod, and weld with the shaped steel tripod, the support body vertical rod falls within on the channel-section steel, and the channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope that channel-section steel is unloaded;
Wherein, the set-up mode of unloading wire rope is, the per pass beam of encorbelmenting establishes together 6 * 19(a), the unloading of Φ 17.5 wire rope; For the position of using the shaped steel tripod, the shaped steel tripod is added one 6 * 19(a), Φ 17.5 unloading wire rope, angle is 45 °~60 ° between unloading wire rope and the tripod, and the structure rotation angle position uses 6 * 19(a) Φ, 17.5 wire rope pocket vertical rod nodes that support body is unloaded, and the wire rope pocket is hung on the support body host node, each host node setting of horizontal plane together, every wire rope is joined 8 of saddle clips, and 6 are used for firmly, and 2 to be used for that safety is set curved.
The construction technology process of shaped steel tripod support body is:
1 cast-in fixing bolt → 2 shaped steel tripods is installed → 3 channel-section steels and → 4 bar → 8 first step legers → little cross bar of 9 first steps → 10 second step legers → little cross bar of 11 second steps → 12 of laterally sweeping the floor, bar → 6 vertical rods → 7 of vertically sweeping the floor are installed are repeated 10,11 steps to design height → 13 wall-connecting pieces → 14 bridgings → 15 scaffold floors, flak jacket hurdle, foot guard plate → 16 safety nets.
The construction technology of shaped steel overhanging type steel pin hand frame system is:
1), built-in fitting construction: the girder steel anchor ring is buried underground in advance with the top board reinforcement construction, uses HPB235 Ф 18 reinforcement fabrications, and the terminal return certain distance of girder steel anchored end arranges the first road girder steel anchor ring, at girder steel wing plate welding vertical rod antiskid bar;
2), cantilever steel girder is installed: cantilever steel girder integral body is used i iron, evenly arranges by constant spacing, and the cloth position can't be spared in chance frame column, wall, ater-casting, and the frame column that staggers, wall are arranged cantilever steel girder apart from post, wall limit 100mm; Cantilever steel girder is met the shear wall structure position, keeps somewhere height * wide in the relevant position in advance and be the preformed hole of 220mm * 120mm before body of wall is built;
3), the shaped steel tripod is installed: the shaped steel tripod uses 14# i iron and 10# i iron to be welded, and uses anchor and high-strength chemical bolt and body of wall to connect;
4), vertical rod installs: vertical rod up and down on a vertical line, when the butt joint spreading is adopted in vertical rod, vertical rod clasp is answered interlaced arrangement, in the joint of two adjacent vertical rods is not arranged on synchronously;
5), leger is installed: go up anti-200mm from the vertical rod bottom and begin adjacent leger and vertical rod are joined with cruciform fastening for falsework, the joint location of upper and lower cross bar is staggeredly arranged in different vertical rod advances;
6), little cross bar is installed: remove outside the host node, leger at two vertical host nodes adds little cross bar together, little cross bar to the length of choosing between 40mm~50mm, arrange near vertical rod, the host node place must arrange a little cross bar, with being fixed in the vertical rod with right-angle coupler with the little cross bar that sockets, the center to center distance of two right-angle couplers in host node place should be greater than 150mm;
7), wall-connecting piece is installed: vertical interval was two steps, level interval is three to stride, wall-connecting piece is anyhow to order arrangement, even layout, vertical with the structure facade with support body, an end that is connected with support body allows declivity slightly, must not upwarp, wall-connecting piece is not more than 300mm apart from the distance of host node, and wall connecting rod stretches out the length of fastener should be greater than 100mm;
8), wire rope unloading:
The per pass beam of encorbelmenting establishes together 6 * 19(a), the unloading of Φ 17.5 wire rope; For the position of using the shaped steel tripod, the shaped steel tripod is added one 6 * 19(a), Φ 17.5 unloading wire rope, angle is 45 °~60 ° between unloading wire rope and the tripod, and the structure rotation angle position uses 6 * 19(a) Φ, 17.5 wire rope pocket vertical rod nodes that support body is unloaded, and the wire rope pocket is hung on the support body host node, each host node setting of horizontal plane together, every wire rope is joined 8 of saddle clips, and 6 are used for firmly, and 2 to be used for that safety is set curved;
9), support body is checked and accepted
When structure reinforcing bars colligation examination, template installation and concreting are finished, all burying underground of built-in fittings such as anchor ring carried out an acceptance inspection, wherein during the examination of girder steel location, answer the close inspection girder steel encorbelment and whether anchorage length meets standard and designing requirement, whether the position that checks hole to be provided is accurate, whether the welding that checks girder steel suspension ring and vertical rod antiskid bar firm, and the reply support body is is once checked and accepted after whenever having set up one wall-connecting piece, examination by after can continue to set up.
Wherein most wall-connecting pieces are taked the thick pillar form, meet the post position and arrange together, adopt following measures to guarantee the construction of wall-connecting piece according to the design that two steps three of wall-connecting piece stride:
(1) bury short steel pipes underground in beam, depth of burying 200mm exposes 100mm, uses Ф 48.3 * 3.6 steel pipes, cruciform fastening for falsework that support body and structure are rigidly connected, and wall-connecting piece uses two fasteners;
(2) meet the shear wall position and use Ф 25 reinforcing bars and short steel pipes or the welding of little cross bar, utilize shear wall through-wall bolt hole, Ф 25 reinforcing bars are passed in the air from through-wall bolt, the screw rod both sides add 100 * 100 * 8 iron plate pads, and both sides use double nut to tighten.
Points for attention for the installation of shaped steel tripod:
The shaped steel tripod uses 14# i iron and 10# i iron to be welded, and uses anchor to be connected with body of wall with high-strength chemical bolt.Must agree through design before tripod is installed, by design structural bearing capacity be veritified.Because during the support body construction, first floor structural frames trestle has been constructed and has been finished, therefore, before installing, anchor needs the accurate unwrapping wire of anchorage point, the reinforcing bar encrypted area that staggers so that bolt is planted in punching, and should be carried out each joint center of anchoring spiral shell to the distance of host node recently in advance and is not more than 1/3 of advance.
Points for attention for the wall-connecting piece installation:
Meet the shear wall position and use Ф 25 reinforcing bars and short steel pipes or the welding of little cross bar, utilize shear wall through-wall bolt hole, Ф 25 reinforcing bars are passed in the air from through-wall bolt, the screw rod both sides add 100 * 100 * 8 iron plate pads, and both sides use double nut to tighten; To order arrangement, even layout, vertical with the structure facade with support body, an end that is connected with support body is declivity slightly, must not upwarp anyhow for wall-connecting piece; Wall-connecting piece is as far as possible near host node (distance apart from host node is not more than 300mm).Wall connecting rod stretches out the length of fastener should be greater than 100mm.
Points for attention for the wire rope unloading:
Use the position of shaped steel tripod, the shaped steel tripod is added one 6 * 19(a), the unloading of Φ 17.5 wire rope, angle is 45 °~60 ° between unloading wire rope and the tripod.Girder steel wing tip welding Φ 32 antiskid bars; On 8 layers on structure, border, 29.4m place arranges wire rope the scaffold support body is unloaded, and the wire rope level interval is that 3m(draws a layout every one).The unloading wire rope is selected 6 * 19 Ф, 12.5 wire rope for use, adopt to embrace the connected mode of beam, utilizes the structure coupling beam to wear the beam bolt hole or reserves the Chuan Liang hole in unloading relevant position, wire rope place.
As shown in Figure 6: structure is delivered the position and is strengthened design, uses 6 * 19(a) Φ, 17.5 wire rope pocket vertical rod nodes that support body is unloaded, and the wire rope pocket is hung on the support body host node, and each host node setting of horizontal plane together.Every wire rope is joined 8 of saddle clips, and 6 are used for firmly, and 2 are used for arranging " safety is curved ".

Claims (8)

1. the shaped steel tripod in the overhanging scaffold, it is characterized in that: comprise crossbeam (1), perpendicular support (2) and diagonal brace (3), crossbeam, perpendicular support and diagonal brace constitute the triangle structure, between crossbeam and the diagonal brace, be provided with little perpendicular support (4), be provided with little stull (5) between perpendicular support and the diagonal brace, in the perpendicular support high-strength bolt preformed hole (6) is set, anchor will erect support by preformed hole and be connected with structural column or body of wall, realize the installation of shaped steel tripod, its middle cross beam, perpendicular support is the 14# i iron, and little perpendicular support and little stull are the 10# i iron, the crossbeam setting floor (7) of putting more energy into arranges spacing steel bar end (8) under the crossbeam.
2. the shaped steel tripod in a kind of overhanging scaffold according to claim 1, it is characterized in that: in the position of shear wall or structural column non-floor and in the position of structure corner, perpendicular support is elongated shaped steel, little perpendicular support is parallel to the direction of perpendicular support, little stull and diagonal brace perpendicular, little perpendicular support and little stull close with link position diagonal brace, all be positioned at the middle part of diagonal brace.
3. the shaped steel tripod in a kind of overhanging scaffold according to claim 1, it is characterized in that: have in structural shear wall or structural column outside and encorbelment beam or decorate eaves but the position of non-floor, perpendicular support is for being interrupted perpendicular support, be divided into and diagonal brace bottom linkage section, with little stull linkage section, with with crossbeam linkage section three parts, wherein be positioned on the crossbeam with the crossbeam linkage section, the perpendicular support of three parts is provided with the high-strength bolt preformed hole, be convenient to being connected of each several part and post or body of wall, little perpendicular support is parallel to the direction of perpendicular support, little stull is perpendicular to cylinder or metope, little perpendicular support and little stull close with link position diagonal brace, all be positioned at the middle part of diagonal brace.
4. according to the shaped steel tripod in claim 2 or the 3 described a kind of overhanging scaffolds, it is characterized in that: local unloading wire rope is set, and wire rope is connected with post or body of wall by the spacing steel bar end of crossbeam.
5. shaped steel overhanging type steel pin hand frame system, it comprises the shaped steel tripod in the described overhanging scaffold of one of claim 1-4, it is characterized in that: comprise the builder's jack support body, cooperate the builder's jack support body by a plurality of cantilever steel girders and shaped steel tripod, synergy between each member forms unified stressed system, support body comprises vertical rod, leger, little cross bar, wall-connecting piece and unloading wire rope, cantilever steel girder or shaped steel tripod are evenly arranged, vertical rod is set thereon, vertical rod arranges that evenly leger is arranged on the vertical rod inboard, goes up anti-certain distance from the vertical rod bottom adjacent leger and vertical rod are fixedly connected with cruciform fastening for falsework; Remove outside the host node, leger at two vertical host nodes adds little cross bar together, arrange near vertical rod, the little cross bar of levels is along vertical rod left and right sides symmetric arrangement, be fixed on the leger with fastener, the host node place must establish a little cross bar, wall-connecting piece is anyhow to order arrangement, even layout, vertical with the structure facade with support body, an end that is connected with support body allows declivity slightly, must not upwarp, near host node, wall-connecting piece is taked the thick pillar form to wall-connecting piece as far as possible, meet the post position and must arrange together, cantilever steel girder or shaped steel tripod position arrange the unloading wire rope.
6. a kind of shaped steel overhanging type steel pin hand frame system according to claim 5 is characterized in that: escalator core tube position, staggered floor place, structure corner, have the beam of encorbelmenting position to adopt the shaped steel tripod; Beam, non-floor position are arranged, and cantilever steel girder falls within on the beam, and length extends to on the floor plate the U-shaped earth anchor in setting at least 2 roads, end; Staircase position, cantilever steel girder are passed the inboard body of wall of structure and are arranged, during inboard no body of wall, the terminal inboard coupling beam 200mm at least that surpasses of shaped steel, U-shaped earth anchor bury and coupling beam in the middle part of.
7. according to claim 5 or 6 described a kind of shaped steel overhanging type steel pin hand frame systems, it is characterized in that: the shaped steel tripod is adopted in structure corner frame column position, adjacent cantilever steel girder anchored end is welded into " well " font integral body with it, use the 14# channel-section steel to fall within the shaped steel tripod, and weld with the shaped steel tripod, the support body vertical rod falls within on the channel-section steel, and the channel-section steel crossover sites is welded into well word frame, uses Φ 17.5 wire rope that channel-section steel is unloaded.
8. a kind of shaped steel overhanging type steel pin hand frame system according to claim 7 is characterized in that: the set-up mode of unloading wire rope is, the per pass beam of encorbelmenting establishes together 6 * 19(a), the unloading of Φ 17.5 wire rope; For the position of using the shaped steel tripod, the shaped steel tripod is added one 6 * 19(a), Φ 17.5 unloading wire rope, angle is 45 °~60 ° between unloading wire rope and the tripod, and the structure rotation angle position uses 6 * 19(a) Φ, 17.5 wire rope pocket vertical rod nodes that support body is unloaded, and the wire rope pocket is hung on the support body host node, each host node setting of horizontal plane together, every wire rope is joined 8 of saddle clips, and 6 are used for firmly, and 2 to be used for that safety is set curved.
CN201310314291.7A 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail Active CN103334580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310314291.7A CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310314291.7A CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Publications (2)

Publication Number Publication Date
CN103334580A true CN103334580A (en) 2013-10-02
CN103334580B CN103334580B (en) 2016-03-30

Family

ID=49242781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310314291.7A Active CN103334580B (en) 2013-07-25 2013-07-25 Section steel tripod in a kind of overhanging scaffold and connection system for guide rail

Country Status (1)

Country Link
CN (1) CN103334580B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821767A (en) * 2016-03-23 2016-08-03 中交第二航务工程局有限公司 Method for prefabricating box girder adjustable reinforcement cage binding jig frame through stub matching method
CN110952765A (en) * 2019-11-20 2020-04-03 中建四局第六建设有限公司 Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform
CN112962945A (en) * 2021-02-04 2021-06-15 中建一局集团建设发展有限公司 Corner bracket structure and construction method
CN114790818A (en) * 2022-06-07 2022-07-26 中冶建工集团有限公司 Diagonal bracing transition method for accelerating erection of overhanging scaffold
CN114790818B (en) * 2022-06-07 2024-04-23 中冶建工集团有限公司 Diagonal bracing transition method for accelerating erection of overhanging scaffold

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4325528A (en) * 1980-03-13 1982-04-20 Martin Jack T Bracket mounting
CN2832995Y (en) * 2005-08-24 2006-11-01 上海市第七建筑有限公司 Suspension scaffold supporting device of light hanging type brandreth
CN2883556Y (en) * 2006-04-05 2007-03-28 刘国恩 Rigid shuttering outer hanging frame able to regulater hanging point
CN101736893B (en) * 2009-12-16 2011-06-22 通广建工集团有限公司 Overhanging type scaffold supporting system
CN203347213U (en) * 2013-07-25 2013-12-18 北京建工博海建设有限公司 Structural steel tripod in overhanging type scaffold and scaffold system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105821767A (en) * 2016-03-23 2016-08-03 中交第二航务工程局有限公司 Method for prefabricating box girder adjustable reinforcement cage binding jig frame through stub matching method
CN105821767B (en) * 2016-03-23 2017-12-05 中交第二航务工程局有限公司 The method of the adjustable steel reinforcement cage colligation moulding bed of Box Beam Precast by Short Line Matching Method
CN110952765A (en) * 2019-11-20 2020-04-03 中建四局第六建设有限公司 Formwork supporting platform for shear wall high-altitude concrete cantilever structure and assembling method of formwork supporting platform
CN112962945A (en) * 2021-02-04 2021-06-15 中建一局集团建设发展有限公司 Corner bracket structure and construction method
CN114790818A (en) * 2022-06-07 2022-07-26 中冶建工集团有限公司 Diagonal bracing transition method for accelerating erection of overhanging scaffold
CN114790818B (en) * 2022-06-07 2024-04-23 中冶建工集团有限公司 Diagonal bracing transition method for accelerating erection of overhanging scaffold

Also Published As

Publication number Publication date
CN103334580B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN203347213U (en) Structural steel tripod in overhanging type scaffold and scaffold system
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN103334580B (en) Section steel tripod in a kind of overhanging scaffold and connection system for guide rail
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN202214968U (en) Overhanging scaffold erection structure
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
CN102733599A (en) Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN102953344B (en) Climbing cone type triangular cantilever bracket
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN207177310U (en) A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure
CN205024833U (en) Reinforcing bar concrete combination prefabricated component
CN203640257U (en) Support of overhanging type scaffold
CN207633795U (en) A kind of foundation pit suspension lane device
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN105909280A (en) Installing structure for super-large section tunnel arch wall lining rebar positioning and reinforcing
CN213597442U (en) Elevator shaft template operation platform that encorbelments
CN110424733A (en) A kind of high-altitude long-span overhung exempts from floor-type support structure and its construction method
CN106907022B (en) A kind of high-altitude cable-stayed type fashioned iron operating platform form bracing system construction technology
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN209066837U (en) A kind of combined type construction supporting platform
CN208857960U (en) A kind of Large-Span Continuous domes and its top plate supporting system
CN203361596U (en) Auxiliary support of integrated lifting operation platform
CN203430006U (en) Quick disassembly and assembly cantilever bracket for building outer wall construction
CN217711628U (en) Channel steel cantilever support template supporting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant